Power distribution network salvagees and uses toolbox
Technical Field
The invention relates to the technical field of power tool boxes, in particular to a tool box for rush repair of a power distribution network.
Background
The power distribution network is salvageed and is used with the toolbox when the power distribution network is salvageed, can place various instruments in the toolbox, needs timely salvage after the electric power network breaks down to prevent to influence national production and life because of the short of electricity, therefore need the very good to time assurance when the power rush-repair.
Traditional toolbox for salvage, the instrument is placed in both sides case lid inboard, and it is inconvenient to take, and various instruments are mixed and disorderly, and it is inconvenient to look over, causes the extension of maintenance duration, and electric power distribution network salvagees and need ascend a height the operation, and the toolbox is placed inconveniently, so provides a electric power distribution network salvagees and uses toolbox to solve the above-mentioned problem that provides.
Disclosure of Invention
The invention aims to provide a tool box for rush repair of a power distribution network, which is convenient to take tools and move and hang on a climbing ladder and the like, and solves the problems that tools in the existing tool box are inconvenient to take and move and hang on the climbing ladder.
The invention is realized by the following technical scheme:
a tool box for first-aid repair of an electric power distribution network comprises a box body, wherein an intermediate plate is fixedly connected to the inner bottom wall of the box body, a main tool plate is movably connected to the left side of the intermediate plate, an auxiliary tool plate is fixedly connected to the right side of the main tool plate, a placing plate is fixedly connected to one side of the main tool plate, which is opposite to the auxiliary tool plate, a binding belt is fixedly connected to one side of the main tool plate, which is opposite to the auxiliary tool plate, a net bag is fixedly connected to the left side of the main tool plate, two net baskets are fixedly connected to the right side of the auxiliary tool plate, a plurality of inserting grooves are formed in the left side of the intermediate plate, a communicating groove is formed in the top of the main tool plate, a spring groove is formed in the right side of the main tool plate, a clamping spring is fixedly connected to the inner side of the spring groove, a clamping, the right side of box articulates there is the couple, the right side fixedly connected with magnetism of box inhales the seat, the top of box articulates there is the apron.
Preferably, the cross section of the main tool plate is L-shaped, the auxiliary tool plate is positioned on the right side of the middle plate, and the top of the main tool plate is fixedly connected with a handle.
Preferably, the two binding bands are respectively positioned above the two placing plates, and the communication groove is communicated with the spring groove.
Preferably, the fixture block is inserted into the bottommost slot, and the five slots are arranged at equal intervals on the left side of the middle plate.
Further, the number of the slots is 5.
Preferably, the top end of the pull rod penetrates through the communication groove and extends to the top of the main tool plate, and the hook is tightly attached to the hook.
Preferably, the bottom of the box body is fixedly connected with four universal wheels, and the left side of the auxiliary tool plate is fixedly connected with an anti-slip pad.
Has the advantages that:
this distribution network salvagees and uses toolbox, place the instrument through the left side at the main tool board and the right side of vice tool board, it is tied up by the bandage again to shelve the instrument on the board, the position is clear, be convenient for take, can put the instrument that does not need frequent use through string bag and basket, through the pulling pull rod, make fixture block compression joint spring withdraw from the slot, can upwards pull up main tool board and vice tool board, loosen the pull rod again, make the slot joint of fixture block and different positions, thereby take out different height with main tool board and vice tool board, directly expose the instrument, it is convenient to take, the box removal of can being convenient for through the universal wheel of bottom half, can be convenient for hang the box on the ladder of ascending a height through the couple, this toolbox, the instrument is taken conveniently, and be convenient for remove and hang on the ladder of ascending a height.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged view of part A of FIG. 1 according to the present invention.
In the figure: the tool comprises a box body 1, an intermediate plate 2, a main tool plate 3, an auxiliary tool plate 4, a placing plate 5, a bandage 6, a net bag 7, a net basket 8, a slot 9, a communicating groove 10, a spring groove 11, a clamping spring 12, a clamping block 13, a pull rod 14, a hook 15, a magnetic suction seat 16 and a cover plate 17.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-2, a tool box for first-aid repair of power distribution network comprises a box body 1, four universal wheels are fixedly connected to the bottom of the box body 1, an intermediate plate 2 is fixedly connected to the inner bottom wall of the box body 1, a main tool plate 3 is movably connected to the left side of the intermediate plate 2, the cross section of the main tool plate 3 is in an L shape, a handle is fixedly connected to the top of the main tool plate 3, an auxiliary tool plate 4 is fixedly connected to the right side of the main tool plate 3, the auxiliary tool plate 4 is located on the right side of the intermediate plate 2, an anti-slip mat is fixedly connected to the left side of the auxiliary tool plate 4, a placement plate 5 is fixedly connected to the opposite side of the main tool plate 3 and the auxiliary tool plate 4, a binding band 6 is fixedly connected to the opposite side of the main tool plate 3 and the auxiliary tool plate 4, the two binding bands 6 are respectively located above the two placement plates 5, a net bag 7 is fixedly connected to the left side of the, five slots 9 are arranged on the left side of the middle plate 2, a communicating slot 10 is arranged on the top of the main tool plate 3, a spring slot 11 is arranged on the right side of the main tool plate 3, the communicating slot 10 is communicated with the spring slot 11, a clamping spring 12 is fixedly connected on the inner side of the spring slot 11, a clamping block 13 is fixedly connected on the right end of the clamping spring 12, the clamping block 13 is inserted with the slot 9 at the bottommost part, the five slots 9 are arranged on the left side of the middle plate 2 at equal intervals, a pull rod 14 is fixedly connected on the top of the clamping block 13, the top end of the pull rod 14 penetrates through the communicating slot 10 and extends to the top of the main tool plate 3, a hook 15 is hinged on the right side of the box body 1, a magnetic suction seat 16 is fixedly connected on the right side of the box body 1, the hook 15 is clung to the magnetic suction seat 16, a cover plate 17 is hinged on the top of the box body 1, tools are, the position is clear, be convenient for take, can put the instrument that does not need the frequent use through string bag 7 and basket 8, through pulling pull rod 14, make fixture block 13 compression joint spring 12 withdraw from slot 9, can be with main instrument board 3 and vice instrument board 4 upwards pull-up, loosen pull rod 14 again, make fixture block 13 and the slot 9 joint of different positions, thereby take out different heights with main instrument board 3 and vice instrument board 4, directly expose the instrument, the convenience of taking, box 1 through the universal wheel of box 1 bottom can be convenient for remove, can be convenient for hang box 1 on the ladder of ascending a height through couple 15.
When using, place the instrument through the left side at main instrument board 3 and the right side of vice instrument board 4, it is tied up by bandage 6 again to shelve the instrument on the board 5, the position is clear, be convenient for take, can put the instrument that does not need frequent use through string bag 7 and basket 8, through pulling pull rod 14, make fixture block 13 compression joint spring 12 withdraw from slot 9, can upwards pull up main instrument board 3 and vice instrument board 4, loosen pull rod 14 again, make fixture block 13 and the slot 9 joint of different positions, thereby take out different heights with main instrument board 3 and vice instrument board 4, directly expose the instrument, it is convenient to take, box 1 can be convenient for to remove through the universal wheel of box 1 bottom, can be convenient for hang box 1 on the ladder of ascending a height through couple 15.
To sum up, the tool box for the first-aid repair of the power distribution network is characterized in that tools are placed on the left side of a main tool plate 3 and the right side of an auxiliary tool plate 4, the tools placed on a placing plate 5 are bound by a binding belt 6, the positions are clear, the tool box is convenient to take, tools which do not need to be frequently used can be placed through a net bag 7 and a net basket 8, a clamping block 13 compresses a clamping spring 12 to withdraw from a slot 9 by pulling a pull rod 14, the main tool plate 3 and the auxiliary tool plate 4 can be pulled upwards, the pull rod 14 is loosened, the clamping block 13 is clamped with the slots 9 at different positions, the main tool plate 3 and the auxiliary tool plate 4 are taken out at different heights, the tools are directly exposed and convenient to take, the box body 1 can be conveniently moved through universal wheels at the bottom of the box body 1, the box body 1 can be conveniently hung on a climbing ladder through a hook 15, the tool box is convenient to take, and is convenient to move and hang on the climbing ladder, the problem of inside instrument of current toolbox take inconvenience, and be not convenient for remove and hang on the ladder of ascending a height is solved.
It is to be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.