CN112508338A - New energy station grid-connected performance comprehensive evaluation system and evaluation method thereof - Google Patents

New energy station grid-connected performance comprehensive evaluation system and evaluation method thereof Download PDF

Info

Publication number
CN112508338A
CN112508338A CN202011245888.7A CN202011245888A CN112508338A CN 112508338 A CN112508338 A CN 112508338A CN 202011245888 A CN202011245888 A CN 202011245888A CN 112508338 A CN112508338 A CN 112508338A
Authority
CN
China
Prior art keywords
new energy
power grid
grid
module
energy station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011245888.7A
Other languages
Chinese (zh)
Other versions
CN112508338B (en
Inventor
杨立滨
张海宁
李春来
李正曦
刘庭响
李志青
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Qinghai Electric Power Co Clean Energy Development Research Institute
State Grid Qinghai Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Qianghai Electric Power Co Ltd
Original Assignee
State Grid Qinghai Electric Power Co Clean Energy Development Research Institute
State Grid Qinghai Electric Power Co Ltd
Economic and Technological Research Institute of State Grid Qianghai Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Qinghai Electric Power Co Clean Energy Development Research Institute, State Grid Qinghai Electric Power Co Ltd, Economic and Technological Research Institute of State Grid Qianghai Electric Power Co Ltd filed Critical State Grid Qinghai Electric Power Co Clean Energy Development Research Institute
Priority to CN202011245888.7A priority Critical patent/CN112508338B/en
Publication of CN112508338A publication Critical patent/CN112508338A/en
Application granted granted Critical
Publication of CN112508338B publication Critical patent/CN112508338B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0639Performance analysis of employees; Performance analysis of enterprise or organisation operations
    • G06Q10/06393Score-carding, benchmarking or key performance indicator [KPI] analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/80Management or planning
    • Y02P90/82Energy audits or management systems therefor

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Development Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention provides a new energy station grid-connected performance comprehensive evaluation system, belonging to the technical field of power grids, the system comprises a power grid operation data interface for transmitting power grid operation data to a complex power grid working condition simulation module, a new energy station model parameter identification and verification module for performing model verification by using test data, a power grid complex working condition simulation module for developing complex power grid simulation, a power grid regional operation risk judgment module for judging operation risks, a new energy station grouping module for dividing new energy station groups, a support vector machine module for dynamically modeling new energy station grid-connected performance indexes, an index correction module for correcting new energy station grid-connected performance evaluation indexes, a new energy station comprehensive evaluation module for evaluating grid-connected new energy stations, and a new energy station evaluation result display and output module for displaying and outputting evaluation results. In addition, the invention also provides a method for operating the system.

Description

New energy station grid-connected performance comprehensive evaluation system and evaluation method thereof
Technical Field
The invention belongs to the technical field of power grids, and particularly relates to a new energy station grid-connected performance comprehensive evaluation system and an evaluation method thereof.
Background
The access of large-scale new energy power generation brings challenges to the operation of a power grid, and the test and evaluation of the grid-connected performance of a new energy station before grid connection are important means for guaranteeing the safe and stable operation of the power grid. Due to the limitation of capacity and technology, only tests and field tests can be carried out on the inverter or the power generation unit at the present stage, and the grid connection performance of the new energy power station needs to be solved by means of simulation.
On the other hand, the basis of the evaluation of the grid-connected performance of the new energy station comes from various publicly-published standards, such as GB/T19963 technical Specification for accessing the wind power station into the power system and GB/T19964 technical Specification for accessing the photovoltaic power station into the power system.
However, the establishment of relevant indexes of the new energy power generation grid-connected standard needs to have higher universality and certain timeliness, has no pertinence, and cannot accurately express the actual requirements of different regional power grids on new energy stations. For a power grid dispatching department, the same evaluation index is adopted for all new energy stations in the whole regional power grid, so that the evaluation result does not have reference value, and sometimes even misleading can be carried out on dispatching personnel.
Meanwhile, the development speeds of new energy resources in different areas are different, and the power grid net rack strength degrees of different areas can also be different greatly, so that the requirements for grid connection performance evaluation of new energy station stations at different geographical positions and different time stages are different.
In order to scientifically and comprehensively evaluate the new energy of the new energy station grid-connected new energy, a reasonable index system needs to be established to evaluate the new energy station in different areas.
Disclosure of Invention
The purpose of the invention is as follows: in order to overcome the defects of the prior art, the invention provides a new energy station grid-connected performance comprehensive evaluation system; another object of the present invention is to provide an evaluation method thereof.
The technical scheme is as follows: in order to achieve the purpose, the invention adopts the following technical scheme:
a new energy station grid-connected performance comprehensive evaluation system comprises:
power grid operation data interface: transmitting the power grid operation data to a power grid complex condition simulation module;
the new energy station model parameter identification and verification module comprises: the method comprises the steps of using test data of key equipment of the new energy station as input, identifying parameters of a new energy station model, automatically checking the accuracy of the established new energy station model, and outputting information of the established new energy station model to a power grid complex condition simulation module;
the power grid complex condition simulation module: according to the output of the power grid operation data interface and the new energy station model parameter identification and verification module, simulation is carried out on the complex working condition of the power grid by selecting the set power grid fault, and the result is output to the power grid regional operation risk judgment module;
the power grid regional operation risk judgment module: according to the received power grid complex condition simulation result and the national standard, judging the regional safety risk of the power grid, and outputting the result to a new energy station grouping module;
the new energy station grouping module: according to the received result of the regional operation risk judgment of the power grid, the power grid is automatically divided into regions, new energy stations in the regions are numbered, the operation and test data of the new energy stations are automatically imported into a database, the grouping result is output to a support vector machine module, and meanwhile, data and information interaction support is provided for a grid-connected index performance comprehensive evaluation module;
a support vector machine module: according to the received new energy station grouping module output result, automatically classifying and sequencing new energy station grid-connected quantization indexes in the national standard; according to the received output result of the power grid regional operation risk judgment module, weighting the new energy station grid-connected performance indexes of each region;
an index correction module: carrying out manual correction or self-adaptive correction on the received output result of the support vector machine module, and outputting the result to a grid-connected performance index comprehensive evaluation module;
the grid-connected performance index comprehensive evaluation module comprises: comprehensively evaluating the grid-connected performance of the new energy station according to the received operation and test data of the new energy station and corresponding evaluation indexes, and outputting an evaluation result to an evaluation result output and display module;
an evaluation result output and display module: and displaying the evaluation result of the new energy station, and supporting the user to self-define export of the evaluation result.
Further, the new energy station model parameter identification and verification module establishes a new energy station model framework according to an NB/T31066 wind turbine generator electrical simulation model modeling guide rule and a GB/T32826 photovoltaic power generation system modeling guide rule, identifies model parameters based on test data input, and automatically corrects the accuracy of the model.
Furthermore, the power grid complex condition simulation module constructs a simulation system by reading the information of a power grid net rack, a new energy station, a traditional power supply and a load model from the output data information of the power grid operation data interface and the new energy station model parameter identification and verification module according to user self definition or automatically; and performing electromechanical transient simulation on the running condition of the power grid by selecting the set power grid fault by user definition or automatically.
Furthermore, the regional operation risk of the power grid is judged by setting criteria according to the requirements of stable indexes of voltage, frequency and power angle of the power system in the national standard GB38755 power system safety and stability guide rule, and by scanning the output result of the complex working condition simulation module of the power grid, the regional operation risk of the power grid is identified.
Furthermore, the new energy station grouping module identifies key sections of the power grid according to the received result of the regional operation risk judgment of the power grid, divides different power grid regions in a section cutting mode, and numbers and stores test data of new energy stations in the regions according to the region division result of the power grid.
Further, the support vector machine module outputs a power grid operation state sample (M) according to the new energy station grouping module and the power grid regional operation risk judgment modulei,Ni) Establishing normalized linear classification surfaces
ωTM+b=0 (I)
Wherein M isiThe power grid is in the ith power grid running state and generally comprises key power supply output, key node voltage, key line tide, power grid frequency/voltage/power angle stability information; n is a radical ofiThe sign of whether the section is a key section or not in the power grid running state is shown, omega is a characteristic distance, and b is a sequencing variable; according to classification interval
Figure BDA0002770011990000031
To a maximum, the following optimization problem is established:
Figure BDA0002770011990000032
further, the index correction module supports two modes, one is a user-defined mode, and the other is an index adaptive correction mode.
Furthermore, the index correction module is used for solving the formula (II) in a self-adaptive correction mode, during the solving process, the constraint term is relaxed, and meanwhile, a punishment term is added, wherein the formula (II) is corrected to be
Figure BDA0002770011990000033
In the formula, xi is a relaxation factor,
Figure BDA0002770011990000034
is a penalty item; in order to ensure the solving effect of the formula (III) under the nonlinear data, a kernel function is introduced in the solving process.
Further, the grid-connected performance index comprehensive evaluation module: and solving the model established by the support vector machine module corrected by the index correction module, comprehensively evaluating the grid-connected performance of the new energy station and outputting the result to an evaluation result output and display module.
Furthermore, the evaluation method of the new energy field station grid-connected performance comprehensive evaluation system takes the issued new energy station grid-connected quantitative index as a basis, adopts the actual operation data and simulation result of the new energy station and the power grid, calculates the operation risk of the regional power grid, and comprehensively evaluates the new energy station grid-connected performance by establishing a support vector machine model;
further, the evaluation method of the new energy station grid-connected performance comprehensive evaluation system comprises the following steps:
step 1: establishing an electromechanical transient simulation model of the new energy station according to the test data of the key equipment of the new energy station;
step 2: according to the power grid operation data and the established new energy station model, establishing a regional power grid electromechanical transient simulation model containing large-scale new energy power generation;
and step 3: simulating the complex operation condition of the power grid by setting a typical fault, judging the operation risk of the power grid according to the national standard, and determining the key section of the regional power grid;
and 4, step 4: dividing power grid regions according to the key sections of the regional power grid, and grouping the new energy station and storing test data according to the division of the regions;
and 5: establishing a new energy station comprehensive evaluation index support vector machine model suitable for the complex power grid working condition according to the division of the power grid region and the operation risk condition of the power grid in each region;
step 6: correcting the support vector machine model through a user-defined or self-adaptive correction mode; a default adaptive correction mode;
and 7: and the operation and test data of the grouped new energy stations are used as input, and the comprehensive evaluation and sequencing of the grid-connected performance of the new energy stations are realized by solving the support vector machine model, and are output and displayed.
Compared with the prior art, the invention has the beneficial effects that:
1) the universality of related quantitative indexes in the release standard can be considered, and the operation risk of the regional power grid can be considered;
2) the simulation and the measured data are combined to construct the complex power grid working condition which needs to be adapted to the grid-connected operation of the new energy station, so that the bottleneck that only test evaluation can be carried out on a generator set or a unit at the present stage due to the limitation of capacity and technology is overcome;
3) on the basis of the operation data of the new energy station and the regional power grid, the timeliness of the grid-connected performance evaluation index of the new energy station can be guaranteed through rolling simulation analysis, the operation of a power system containing new energy power generation is scientifically guided, and the safe and stable operation of the regional power grid is guaranteed;
4) the sequencing and the correction of the new energy station grid-connected performance evaluation indexes are completed by establishing a support vector machine model, and the method has the characteristics of speed block calculation, high classification accuracy and strong generalization capability, and is simple in program design and easy to implement;
5) the basis of establishing the new energy power station grid-connected performance evaluation index is the public national standard and the judgment result of the regional operation risk of the power grid, so that the actual requirement of safe and stable operation of the power grid can be met, the actual appeal of the operation of the power station can be fully considered, and the coordinated operation of the source network can be effectively supported.
Drawings
Fig. 1 is a schematic diagram of a comprehensive evaluation system for grid-connected performance of a new energy station.
Detailed Description
The technical scheme of the comprehensive evaluation system and the comprehensive evaluation method for the grid-connected performance of the new energy station will be clearly and completely described below with reference to the embodiment and the accompanying drawings. Fig. 1 shows a schematic diagram of a comprehensive evaluation scheme of grid-connected performance of a new energy station.
A new energy station grid-connected performance comprehensive evaluation system comprises a power grid operation data interface, a new energy station model parameter identification and verification module, a power grid complex condition simulation module, a power grid regional operation risk judgment module, a new energy station grouping module, a support vector machine module, an index correction module, a new energy station comprehensive evaluation module and an evaluation result display and output module; the method specifically comprises the following steps:
power grid operation data interface: transmitting the power grid operation data to a power grid complex condition simulation module;
the new energy station model parameter identification and verification module comprises: the method comprises the steps that test data of key equipment of the new energy station are used as input, model parameters of the new energy station are identified, and a result is output to a power grid complex working condition simulation module;
the power grid complex condition simulation module: automatically simulating the complex working condition of the power grid by selecting the set power grid fault, and outputting the result to a power grid regional operation risk judgment module;
the power grid regional operation risk judgment module: according to the national standard, the regional security risk of the power grid is judged, and the result is output to a new energy station grouping module;
the new energy station grouping module: according to the received result of the regional operation risk judgment of the power grid, dividing the power grid into regions, numbering the new energy stations in each divided region, automatically importing the operation and test data of the new energy stations into a database, outputting the grouping result to a support vector machine module, and providing data and information interaction support for a grid-connected index performance comprehensive evaluation module;
a support vector machine module: automatically classifying and sequencing new energy station grid-connected quantitative indexes in the national standard, and weighting new energy station grid-connected performance indexes of each region according to the received output result of the power grid regional operation risk judgment module;
an index correction module: providing two modes of user self-definition and index self-adaptive correction, correcting the received output result of the support vector machine module, and outputting the result to the grid-connected performance index comprehensive evaluation module;
the grid-connected performance index comprehensive evaluation module comprises: comprehensively evaluating the grid-connected performance of the new energy station according to the received operation and test data of the new energy station and corresponding evaluation indexes, and outputting an evaluation result to an evaluation result output and display module;
an evaluation result output and display module: and displaying the evaluation result of the new energy station, and supporting the user to self-define export of the evaluation result.
A user establishes an accurate new energy station equivalent model according to new energy station key equipment test data and a published new energy power generation modeling standard NB/T31066 'wind turbine generator set electrical simulation model modeling guide rule' and GB/T32826 'photovoltaic power generation system modeling guide rule'; and establishing a regional power grid electromechanical transient simulation model according to the power grid operation data, wherein the parameters of the simulation model can be identified and corrected on line through the power grid operation data. The power grid model is established according to relevant requirements, such as DL755 electric power system safety and stability guide rules and GB/T26399 electric power system safety and stability control technology guide rules.
The method is characterized in that faults are set at key nodes of a power grid, multi-working-condition operation conditions of the regional power grid are simulated, and the basis of fault setting and risk judgment is GB38755 electric power system safety and stability guide rule, DL755 electric power system safety and stability guide rule, GB/T26399 electric power system safety and stability control technology guide rule, GB/T31464 electric power grid operation criterion, GB/T19963 technical specification for accessing a wind power plant into an electric power system and GB/T19964 technical specification for accessing a photovoltaic power station into the electric power system. The method comprises the steps of determining a key section of the power grid through judging regional operation risks of the power grid, and then performing regional division on the power grid according to the key section.
According to the division of the power grid region, numbering the operation and test data of the new energy station in the divided region, and writing the new energy station into a database in a classified manner; meanwhile, according to GB38755 electric power system safety and stability guide rules, DL755 electric power system safety and stability guide rules, GB/T26399 electric power system safety and stability control technical guide rules and GB/T31464 electric network operation criteria, grid connection performance indexes in national standard GB/T19963 technical specification of wind power plant access electric power system and GB/T19964 technical specification of photovoltaic power plant access electric power system are weighted, and a normalized linear classification surface is established according to electric network operation state samples (Mi, Ni) output by a new energy field station grouping module and an electric network regional operation risk judgment module
ωTM+b=0 (I)
Wherein M isiThe power grid is in the ith power grid running state and generally comprises key power supply output, key node voltage, key line tide, power grid frequency/voltage/power angle stability information; n is a radical ofiThe sign of whether the section is a key section or not in the power grid running state is shown, omega is a characteristic distance, and b is a sequencing variable;
according to classification interval
Figure BDA0002770011990000071
To a maximum, the following optimization problem is established:
Figure BDA0002770011990000072
the comprehensive evaluation of the grid-connected performance of the new energy station is to solve the formula (II), wherein in the solving process, a constraint item needs to be loosened, and a punishment item needs to be added. For this reason, the formula (II) can be modified to
Figure BDA0002770011990000073
Where xi is the relaxation factor, yiFor a matrix of correction coefficients, X, for the vibration amplitude of the support vector machine parametersiIs the amplitude of the variable to the support vector machine variable;
Figure BDA0002770011990000074
is a penalty term, wherein C is a penalty coefficient, and i is the number of new energy stations (1, 2, 3, … …, n).
In order to ensure the solving effect of the formula (III) under the nonlinear data, a kernel function can be considered in the solving process. Before solving, the user can select a custom or system self-adaptive mode to correct the index according to the requirement.
The new energy station grid-connected performance comprehensive evaluation system can also sequence the new energy stations according to the evaluation result and aiming at the requirements of power grid operation and power grid dispatching departments. After the formula (III) is solved, the variable omega is the corresponding sequencing basis.
Finally, it should be noted that: the described embodiments are only some embodiments of the present application and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present application.

Claims (10)

1. The utility model provides a new forms of energy field station performance integrated evaluation system that is incorporated into power networks which characterized in that, this system includes:
power grid operation data interface: transmitting the power grid operation data to a power grid complex condition simulation module;
the new energy station model parameter identification and verification module comprises: the method comprises the steps of using test data of key equipment of the new energy station as input, identifying parameters of a new energy station model, automatically checking the accuracy of the established new energy station model, and outputting information of the established new energy station model to a power grid complex condition simulation module;
the power grid complex condition simulation module: according to the output of the power grid operation data interface and the new energy station model parameter identification and verification module, simulation is carried out on the complex working condition of the power grid by selecting the set power grid fault, and the result is output to the power grid regional operation risk judgment module;
the power grid regional operation risk judgment module: according to the received power grid complex condition simulation result and the national standard, judging the regional safety risk of the power grid, and outputting the result to a new energy station grouping module;
the new energy station grouping module: according to the received result of the regional operation risk judgment of the power grid, the power grid is automatically divided into regions, new energy stations in the regions are numbered, the operation and test data of the new energy stations are automatically imported into a database, the grouping result is output to a support vector machine module, and meanwhile, data and information interaction support is provided for a grid-connected index performance comprehensive evaluation module;
a support vector machine module: according to the received new energy station grouping module output result, automatically classifying and sequencing new energy station grid-connected quantization indexes in the national standard; according to the received output result of the power grid regional operation risk judgment module, weighting the new energy station grid-connected performance indexes of each region;
an index correction module: carrying out manual correction or self-adaptive correction on the received output result of the support vector machine module, and outputting the result to a grid-connected performance index comprehensive evaluation module;
the grid-connected performance index comprehensive evaluation module comprises: comprehensively evaluating the grid-connected performance of the new energy station according to the received operation and test data of the new energy station and corresponding evaluation indexes, and outputting an evaluation result to an evaluation result output and display module;
an evaluation result output and display module: and displaying the evaluation result of the new energy station, and supporting the user to self-define export of the evaluation result.
2. The comprehensive evaluation system for the grid-connected performance of the new energy station as claimed in claim 1, wherein the new energy station model parameter identification and verification module identifies model parameters based on test data input by establishing a new energy station model framework, and automatically corrects the accuracy of the model.
3. The system for comprehensively evaluating the grid-connected performance of the new energy station according to claim 1, wherein the power grid complex condition simulation module constructs a simulation system by reading information of a power grid network frame, the new energy station, a traditional power supply and a load model from output data information of a power grid operation data interface and a new energy station model parameter identification and verification module according to user definition or automatically; and performing electromechanical transient simulation on the running condition of the power grid by selecting the set power grid fault by user definition or automatically.
4. The system for comprehensively evaluating the grid-connected performance of the new energy station according to claim 1, characterized in that the regional operation risk of the power grid is judged by setting criteria according to the voltage, frequency and power angle stability index requirements of the power system and identifying the regional operation risk of the power grid by scanning the output result of the complex working condition simulation module of the power grid; the new energy station grouping module identifies key sections of the power grid according to the received result of the regional operation risk judgment of the power grid, divides different power grid regions in a section cutting mode, and numbers and stores test data of new energy stations in the regions according to the region division result of the power grid.
5. The system according to claim 1, wherein the support vector machine module is configured to perform comprehensive evaluation on the grid-connection performance of the new energy station according to the grid operation state samples, M, output by the new energy station grouping module and the grid regional operation risk determination modulei,NiEstablishing normalized linear classification surface
ωTM+b=0 (I)
Wherein M isiThe power grid is in the ith power grid running state and generally comprises key power supply output, key node voltage, key line tide, power grid frequency/voltage/power angle stability information; n is a radical ofiThe sign of whether the section is a key section or not in the power grid running state is shown, omega is a characteristic distance, and b is a sequencing variable; according to classification interval
Figure FDA0002770011980000021
Maximum, is established asThe following optimization problem:
Figure FDA0002770011980000022
6. the comprehensive evaluation system for the grid-connected performance of the new energy field station as claimed in claim 1, wherein the index correction module supports two modes, one is a user-defined mode, and the other is an index adaptive correction mode.
7. The system according to claim 1, wherein the index correction module is adapted to solve the formula (II) in a correction mode, and during the solution, the constraint term is relaxed and a penalty term is added, and after the formula (II) is corrected, the formula (II) is
Figure FDA0002770011980000031
In the formula, xi is a relaxation factor,
Figure FDA0002770011980000032
is a penalty item; in order to ensure the solving effect of the formula (III) under the nonlinear data, a kernel function is introduced in the solving process.
8. The system according to claim 1, characterized in that the grid-connection performance index comprehensive evaluation module: and solving the model established by the support vector machine module corrected by the index correction module, comprehensively evaluating the grid-connected performance of the new energy station and outputting the result to an evaluation result output and display module.
9. The evaluation method of the new energy field station grid-connected performance comprehensive evaluation system as claimed in any one of claims 1 to 8, characterized in that the new energy field station grid-connected performance is comprehensively evaluated by establishing a support vector machine model by taking issued new energy power station grid-connected quantitative indexes, adopting new energy power station and grid actual operation data and simulation results, taking regional grid operation risks into consideration.
10. The evaluation method of the new energy station grid-connected performance comprehensive evaluation system according to claim 9, characterized by comprising the following steps:
step 1: establishing an electromechanical transient simulation model of the new energy station according to the test data of the key equipment of the new energy station;
step 2: according to the power grid operation data and the established new energy station model, establishing a regional power grid electromechanical transient simulation model containing large-scale new energy power generation;
and step 3: simulating the complex operation condition of the power grid by setting a typical fault, judging the operation risk of the power grid according to the national standard, and determining the key section of the regional power grid;
and 4, step 4: dividing power grid regions according to the key sections of the regional power grid, and grouping the new energy station and storing test data according to the division of the regions;
and 5: establishing a new energy station comprehensive evaluation index support vector machine model suitable for the complex power grid working condition according to the division of the power grid region and the operation risk condition of the power grid in each region;
step 6: correcting the support vector machine model through a user-defined or self-adaptive correction mode; a default adaptive correction mode;
and 7: and the operation and test data of the grouped new energy stations are used as input, and the comprehensive evaluation and sequencing of the grid-connected performance of the new energy stations are realized by solving the support vector machine model, and are output and displayed.
CN202011245888.7A 2020-11-10 2020-11-10 New energy station grid-connected performance comprehensive evaluation system and evaluation method thereof Active CN112508338B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011245888.7A CN112508338B (en) 2020-11-10 2020-11-10 New energy station grid-connected performance comprehensive evaluation system and evaluation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011245888.7A CN112508338B (en) 2020-11-10 2020-11-10 New energy station grid-connected performance comprehensive evaluation system and evaluation method thereof

Publications (2)

Publication Number Publication Date
CN112508338A true CN112508338A (en) 2021-03-16
CN112508338B CN112508338B (en) 2024-05-28

Family

ID=74956160

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011245888.7A Active CN112508338B (en) 2020-11-10 2020-11-10 New energy station grid-connected performance comprehensive evaluation system and evaluation method thereof

Country Status (1)

Country Link
CN (1) CN112508338B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113241792A (en) * 2021-05-21 2021-08-10 中国电力科学研究院有限公司 Method and device for planning grid-connected machine type of power electronic power supply
CN113269435A (en) * 2021-05-21 2021-08-17 国网山东省电力公司电力科学研究院 New energy station running state coupling monitoring and evaluating system
CN113449968A (en) * 2021-06-09 2021-09-28 重庆锦禹云能源科技有限公司 New energy power grid frequency risk assessment method and device based on deep learning
CN116054167A (en) * 2023-03-06 2023-05-02 国网山东省电力公司聊城供电公司 Power grid comprehensive dispatching management system and method based on power distribution network flexible controller

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120197605A1 (en) * 2011-01-30 2012-08-02 Sinovel Wind Group Co., Ltd. Comprehensive assessment system and assessment method for vibration and load of wind generating set
CN102938093A (en) * 2012-10-18 2013-02-20 安徽工程大学 Wind power forecasting method
CN106355336A (en) * 2016-08-31 2017-01-25 许昌许继软件技术有限公司 Power generation efficiency evaluation method of photovoltaic power station
CN109242200A (en) * 2018-09-29 2019-01-18 华北电力大学 A kind of wind power interval prediction method of Bayesian network forecasting model
CN110705769A (en) * 2019-09-26 2020-01-17 国家电网公司华北分部 New energy power generation power prediction optimization method and device
CN110705771A (en) * 2019-09-26 2020-01-17 国家电网公司华北分部 Method and device for predicting and optimizing power generation power of new energy of regional power grid

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120197605A1 (en) * 2011-01-30 2012-08-02 Sinovel Wind Group Co., Ltd. Comprehensive assessment system and assessment method for vibration and load of wind generating set
CN102938093A (en) * 2012-10-18 2013-02-20 安徽工程大学 Wind power forecasting method
CN106355336A (en) * 2016-08-31 2017-01-25 许昌许继软件技术有限公司 Power generation efficiency evaluation method of photovoltaic power station
CN109242200A (en) * 2018-09-29 2019-01-18 华北电力大学 A kind of wind power interval prediction method of Bayesian network forecasting model
CN110705769A (en) * 2019-09-26 2020-01-17 国家电网公司华北分部 New energy power generation power prediction optimization method and device
CN110705771A (en) * 2019-09-26 2020-01-17 国家电网公司华北分部 Method and device for predicting and optimizing power generation power of new energy of regional power grid

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘纯 等: "基于智能电网调度控制系统基础平台的新能源优化调度", 《电力系统自动化》, vol. 39, no. 1, pages 1 - 5 *
王明松等: "自动化新能源场站运行评价专家系统可行性研究", 《内燃机与配件》, pages 1 - 2 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113241792A (en) * 2021-05-21 2021-08-10 中国电力科学研究院有限公司 Method and device for planning grid-connected machine type of power electronic power supply
CN113269435A (en) * 2021-05-21 2021-08-17 国网山东省电力公司电力科学研究院 New energy station running state coupling monitoring and evaluating system
CN113449968A (en) * 2021-06-09 2021-09-28 重庆锦禹云能源科技有限公司 New energy power grid frequency risk assessment method and device based on deep learning
CN113449968B (en) * 2021-06-09 2023-08-29 重庆锦禹云能源科技有限公司 New energy power grid frequency risk assessment method and device based on deep learning
CN116054167A (en) * 2023-03-06 2023-05-02 国网山东省电力公司聊城供电公司 Power grid comprehensive dispatching management system and method based on power distribution network flexible controller

Also Published As

Publication number Publication date
CN112508338B (en) 2024-05-28

Similar Documents

Publication Publication Date Title
CN112508338B (en) New energy station grid-connected performance comprehensive evaluation system and evaluation method thereof
CN109978242A (en) The photovoltaic power generation cluster power forecasting method and device of scale are risen based on statistics
CN104077494A (en) Simulation evaluation method for access of distributed power source to power distribution network
CN109742788B (en) New energy power station grid-connected performance evaluation index correction method
AU2013201595A1 (en) Method and apparatus for harmonic state estimation in power system
CN110907754B (en) Fault line severity evaluation method based on PSD-BPA
CN105893757A (en) Voltage sag severity comprehensive evaluation method
CN105956722A (en) Short-term wind power prediction method and apparatus
CN108336739A (en) A kind of Probabilistic Load Flow on-line calculation method based on RBF neural
CN107202971A (en) Unconventional low voltage electric network electric energy measuring equipment operation characteristic simulation testing device
CN106814265A (en) A kind of photovoltaic DC-to-AC converter generating efficiency test system
CN105930900A (en) Method and system for predicting hybrid wind power generation
CN106526347A (en) Digital-analog hybrid simulation-based photovoltaic inverter low voltage ride through evaluation method
CN112288293A (en) Comprehensive evaluation method for electric energy quality of large charging station
CN104574221B (en) A kind of photovoltaic plant running status discrimination method based on loss electricity characteristic parameter
CN112485514A (en) Method for evaluating uncertainty of power consumption of electric balance
CN112231628A (en) Method and system for determining compensation performance of active power quality control equipment
CN105024645A (en) Matrix evolution-based photovoltaic array fault location method
CN105956755A (en) Method and system for establishing quantitative relationship of general power line loss rate influencing factors
CN109799454A (en) Generator stator insulation residual breakdown strength prediction technique based on particle group optimizing
CN114662809A (en) Method and system for evaluating electric energy quality of power supply in comprehensive energy park
CN106602595A (en) Method for evaluating AC-side impedance balance index of grid-connected photovoltaic inverter
CN113779892B (en) Method for predicting wind speed and wind direction
CN106055730B (en) Power system carbon flow simulation analysis method suitable for large-scale power grid
CN111027816B (en) Photovoltaic power generation efficiency calculation method based on data envelope analysis

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant