CN112502420B - A protection platform for construction - Google Patents

A protection platform for construction Download PDF

Info

Publication number
CN112502420B
CN112502420B CN202011422667.2A CN202011422667A CN112502420B CN 112502420 B CN112502420 B CN 112502420B CN 202011422667 A CN202011422667 A CN 202011422667A CN 112502420 B CN112502420 B CN 112502420B
Authority
CN
China
Prior art keywords
wall
platform
keel
building
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011422667.2A
Other languages
Chinese (zh)
Other versions
CN112502420A (en
Inventor
孙淑华
丁清源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Huayuan Construction Engineering Design Co ltd
Original Assignee
Shenzhen Huayuan Construction Engineering Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Huayuan Construction Engineering Design Co ltd filed Critical Shenzhen Huayuan Construction Engineering Design Co ltd
Priority to CN202011422667.2A priority Critical patent/CN112502420B/en
Publication of CN112502420A publication Critical patent/CN112502420A/en
Application granted granted Critical
Publication of CN112502420B publication Critical patent/CN112502420B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions

Abstract

The invention discloses a protective platform for building construction, which relates to the field of building construction and comprises a cross frame mechanism, wherein the top end of the cross frame mechanism is provided with a platform mechanism, a building frame is arranged above the cross frame mechanism and positioned on one side of the platform mechanism, one end of the cross frame mechanism is positioned in the building frame, and a supporting mechanism is arranged in the building frame and positioned above the cross frame mechanism. According to the invention, through the arranged transverse frame mechanism, the positioning plate is firstly adjusted according to the extending length of the transverse frame mechanism, the fixed block is pulled out from the fixed groove through the handle arranged at the top end of the fixed block, the fixed block drives the inserted rod to be pulled out from the sliding plate and stretches the first spring, the fixed block is rotated to keep the same direction as the clamping groove, the fixed block can slide in the clamping groove, the fixing of the positioning plate is released at the moment, and then the fixed block is moved according to requirements, so that the use efficiency is improved, and the problem of different convenient adjustment specifications is effectively solved.

Description

A protection platform for construction
Technical Field
The invention relates to the field of building construction, in particular to a protection platform for building construction.
Background
Along with the constantly expansion of urbanization construction, the city is constantly assembling most population in the region, it is expensive to lead to the land price in the city, the house is intensive, in order to full play land unit area utilization, high-rise building is constantly replacing past multi-storey building, when high-rise building is under construction, generally need carry out the inspection maintenance to the outside of building, generally can build the scaffold frame outside the building and fix, but high-rise building is higher, the scaffold frame can not build too high, consequently need to build protection platform and fix the scaffold frame.
Present protection platform is when fixing, can adopt the support frame to fix usually, current carriage is when using, generally all adopt the fixing clip to fix the support frame, the fixing clip need drill on the wall body when the installation, the installation effectiveness is low, and can cause the damage to the building, but the platform all is a monoblock steel sheet constitution usually when the platform is fixed on the support frame, it is very inconvenient when assembling the platform, and all be fixed at general platform length, but current building is for the design style, the appearance has great difference change, consequently, need build the platform of different specifications, current platform can not adapt to the installation of different specifications.
Disclosure of Invention
The invention aims to: in order to solve the problems that when the supporting frame is fixed, holes need to be formed in a building, the platform is inconvenient to assemble and different and convenient adjusting specifications need to be adjusted, a protection platform for building construction is provided.
In order to achieve the purpose, the invention provides the following technical scheme: a protective platform for building construction comprises a cross frame mechanism, wherein a platform mechanism is arranged at the top end of the cross frame mechanism, a building frame is arranged above the cross frame mechanism and positioned on one side of the platform mechanism, one end of the cross frame mechanism is positioned in the building frame, and a supporting mechanism is arranged in the building frame and positioned above the cross frame mechanism;
the multi-group is seted up to the crossbearer mechanism, and the draw-in groove has all been seted up to the inner wall of every group crossbearer mechanism, the multiunit fixed slot has been seted up to the inner wall of draw-in groove, the inner wall of draw-in groove is located the below of fixed slot and has seted up the spout, the inside of crossbearer mechanism. A shallow groove is formed in one side of the clamping groove, a positioning plate is arranged at the bottom end of the clamping groove, a sliding plate is arranged at the top end of the positioning plate, a fixing block is arranged above the sliding plate, an inserting rod is arranged at the bottom end of the fixing block, the inserting rod penetrates through the sliding plate and extends into the positioning plate, a plurality of groups of limiting grooves are formed in the outer wall of the cross frame mechanism, limiting plates are sleeved on the outer sides of the limiting grooves, and one sides of the limiting plates are attached to the outer wall of the building frame;
the platform mechanism comprises a keel positioned above the cross frame mechanism, a plurality of groups of mounting plates are arranged on the inner wall of the keel, a plurality of groups of main clamping plates are arranged inside the keel, a plurality of groups of main clamping plates are connected to two sides of the keel, a cutting strip is arranged at the bottom end of the keel above the clamping groove and is clamped and connected with the clamping groove through the cutting strip, a plurality of groups of top posts are arranged on one side of the cutting strip above the shallow groove, each group of top posts extend to the inside of the keel and are connected with inclined plates, a locking rod is arranged on one side of the inner wall of the cross frame mechanism above the inclined plates and penetrates through the inner wall of the keel and extends to the outer side of the keel, and a plurality of groups of locking holes matched with the locking rods are formed in the outer wall of the main clamping plate;
the supporting mechanism comprises a pressure plate attached to the outer wall of the cross frame mechanism, a lower ejector rod is arranged above the pressure plate, a plurality of groups of supporting legs are arranged on the outer wall of the lower ejector rod, an upper ejector rod is arranged above the supporting mechanism, the top end of the upper ejector rod is connected with a sucker, an injection opening is formed in the outer wall of the supporting mechanism, the outer wall of the supporting mechanism far away from the injection opening is provided with a pressure relief opening, and one-way valves are arranged inside the edge ring and the pressure relief opening.
Preferably, the attaching plate is arranged on one side of the positioning plate and attached to the outer wall of the building, and the sliding plate is connected with the clamping groove in a sliding mode through the sliding groove.
Preferably, the bottom end of the inserted bar is connected with a first spring, and the inserted bar is movably connected with the positioning plate through the first spring.
Preferably, the shape of the fixing block is matched with the shape of the inner wall of the fixing groove, the width of the fixing block is matched with the width of the clamping groove, and the outer wall of the top end of the fixing block is provided with a handle.
Preferably, the outer wall of fore-set is located the inside of fossil fragments and sets up the limit ring, the fore-set passes through the limit ring and is connected with the fossil fragments block.
Preferably, the end of the lock rod is provided with an arc surface, one side of the lock rod is provided with a second spring, and the outer wall of the lock rod is connected with the keel in a sliding manner.
Preferably, the outer walls of the main clamping plate and the side clamping plates are provided with mounting grooves, and the main clamping plate and the side clamping plates are connected with the mounting plate in a clamping mode through the mounting grooves.
Preferably, the outer wall of the building frame is provided with a hook, the outer side of the hook is connected with a rope, the top end of the platform mechanism is provided with a plurality of groups of lifting hooks, and the platform mechanism is connected with the rope through the lifting hooks.
Compared with the prior art, the invention has the beneficial effects that:
1. according to the invention, through the arranged transverse frame mechanism and the supporting mechanism, before the transverse frame mechanism is installed through the positioning plate and the platform mechanism is installed, the limiting plate is inserted into the corresponding limiting groove, the limiting plate is attached to the building frame, then the pressure plate is placed above the transverse frame mechanism and positioned on the inner side of the building, the lower ejector rod is inserted into the open groove above the pressure plate, the lower ejector rod is fixed through the supporting legs, then sufficient hydraulic oil is injected into the supporting mechanism through the injection port, the hydraulic oil pushes the upper ejector rod to move upwards until the upper ejector rod pushes the sucker to be in contact with the top end of the inner wall of the building, so that the sucker can be tightly adsorbed on the inner wall of the building, and at the moment, the hydraulic oil injection is stopped, so that the supporting mechanism fixes the transverse frame mechanism, a wedge does not need to be punched on the building for installation, the damage to the building is reduced, and the problem that holes need to be formed on the building when the supporting frame is fixed is effectively solved;
2. through the arranged transverse frame mechanism and the platform mechanisms, the platform mechanisms are firstly placed on the transverse frame mechanisms, the inserting strips are aligned with the clamping grooves, the inserting strips are inserted into the clamping grooves, a plurality of groups of top columns are attached to the inner walls of the shallow grooves, the top columns push the inclined plates to move upwards under the pushing of the shallow grooves, the inclined plates push the locking rods to move towards the outer sides of the keels while moving upwards until the locking rods are inserted into locking holes formed in the outer walls of the main clamping plates, so that the main clamping plates are locked, after the plurality of groups of platform mechanisms are installed, each group of side clamping plates are also connected with the installation plate in a clamping mode through installation grooves formed in the outer walls, each group of platform mechanisms are attached to each other through the side clamping plates, so that the side clamping plates are limited, the side clamping plates are prevented from being deviated from the keels, and the problem of inconvenient platform assembly is effectively solved;
3. through the crossbearer mechanism that sets up, at first adjust the locating plate according to the length that crossbearer mechanism extends, handle through seting up on the fixed block top pulls out the fixed block from the fixed slot, the fixed block drives the inserted bar and takes out from the slide and stretch to first spring, rotate the fixed block, make the fixed block keep the same direction with the draw-in groove, make the fixed block can slide in the draw-in groove, remove the fixed to the locating plate this moment, then move the fixed block according to the demand, after installing the fixed block in suitable position, take the fixed block out from the draw-in groove again, and rotate the fixed block and make fixed block align with the second group fixed slot, under the pulling of first spring, make fixed block and the block of second group fixed slot, thereby accomplish the position control to the locating plate, afterwards extend the one end of crossbearer mechanism to the outside of building frame, and fix a position crossbearer mechanism through the locating plate, laminate with the building outside through the laminating board of locating plate one side, accomplish the distance is fixed, then select the platform mechanism of suitable specification according to extension length, thereby can conveniently adjust the specification of crossbearer mechanism, the availability factor has been improved, the problem of different convenient regulation specifications has effectively been solved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the cross-frame mechanism mounting structure of the present invention;
FIG. 3 is a schematic view of the support mechanism mounting structure of the present invention;
FIG. 4 is a schematic cross-sectional view of the cross-frame mechanism of the present invention;
FIG. 5 is a schematic view of a positioning plate according to the present invention;
FIG. 6 is a schematic view of the structure of the insert rod of the present invention;
FIG. 7 is a schematic diagram of a limiting plate according to the present invention;
FIG. 8 is a schematic view of the lower mandril mounting structure of the present invention;
FIG. 9 is a cross-sectional view of the supporting mechanism of the present invention;
FIG. 10 is a schematic view of the mounting structure of the slip of the present invention;
FIG. 11 is a schematic view of the construction of the top post of the present invention;
FIG. 12 is a schematic view of the locking bar construction of the present invention;
FIG. 13 is a schematic view of the main card and side card mounting structure of the present invention.
In the figure: 1. a cross frame mechanism; 101. a card slot; 102. positioning a plate; 103. a limiting plate; 104. a limiting groove; 105. shallow slot; 106. laminating the plates; 107. a slide plate; 108. a fixed block; 109. a fixing groove; 110. a chute; 111. inserting a rod; 112. a first spring; 2. a platform mechanism; 201. a keel; 202. a main clamping plate; 203. a side clamping plate; 204. cutting; 205. a top pillar; 206. an edge ring; 207. a sloping plate; 208. a second spring; 209. a lock lever; 210. mounting a plate; 211. mounting grooves; 212. a lock hole; 3. a support mechanism; 301. an ejector rod is arranged; 302. a suction cup; 303. a lower ejector rod; 304. pressing a plate; 305. supporting legs; 306. an injection port; 307. a pressure relief port; 4. hooking; 5. a rope; 6. a building frame.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without making any creative effort based on the embodiments in the present invention, belong to the protection scope of the present invention.
Referring to fig. 1-13, a protective platform for building construction includes a cross frame mechanism 1, a platform mechanism 2 is disposed at the top end of the cross frame mechanism 1, a building frame 6 is disposed above the cross frame mechanism 1 and on one side of the platform mechanism 2, one end of the cross frame mechanism 1 is disposed inside the building frame 6, and a support mechanism 3 is disposed inside the building frame 6 and above the cross frame mechanism 1;
the cross mechanism 1 has multiple sets, and the inner wall of each set of cross mechanism 1 has a slot 101, the inner wall of the slot 101 has multiple sets of fixing slots 109, the inner wall of the slot 101 is located below the fixing slots 109 and has a sliding slot 110, and the cross mechanism 1 is inside. A shallow groove 105 is formed in one side of the clamping groove 101, a positioning plate 102 is arranged at the bottom end of the clamping groove 101, a sliding plate 108 is arranged at the top end of the positioning plate 102, a fixing block 108 is arranged above the sliding plate 108, an inserting rod 111 is arranged at the bottom end of the fixing block 108, the inserting rod 111 penetrates through the sliding plate 108 and extends into the positioning plate 102, a plurality of groups of limiting grooves 104 are formed in the outer wall of the cross frame mechanism 1, a limiting plate 103 is sleeved on the outer side of each limiting groove 104, and one side of each limiting plate 103 is attached to the outer wall of the building frame 6;
the platform mechanism 2 comprises a keel 201 positioned above the cross frame mechanism 1, a plurality of groups of mounting plates 210 are arranged on the inner wall of the keel 201, a plurality of groups of main clamping plates 202 are arranged inside the keel 201, a plurality of groups of main clamping plates 202 are connected to two sides of the keel 201, an inserting strip 204 is arranged at the bottom end of the keel 201 and positioned above the clamping groove 101, the keel 201 is connected with the clamping groove 101 in a clamping manner through the inserting strip 204, a plurality of groups of top columns 205 are arranged on one side of the inserting strip 204 and positioned above the shallow groove 105, each group of top columns 205 extends to the inside of the keel 201 and is connected with an inclined plate 207, a locking rod 209 is arranged on one side of the inner wall of the cross frame mechanism 1 and positioned above the inclined plate 207, the locking rod 209 penetrates through the inner wall of the keel 201 and extends to the outer side of the keel 201, and a plurality of locking holes 212 matched with the locking rod 209 are arranged on the outer wall of the main clamping plate 202;
the supporting mechanism 3 comprises a pressing plate 304 attached to the outer wall of the cross frame mechanism 1, a lower ejector rod 303 is arranged above the pressing plate 304, a plurality of groups of supporting legs 305 are arranged on the outer wall of the lower ejector rod 303, an upper ejector rod 301 is arranged above the supporting mechanism 3, a sucking disc 302 is connected to the top end of the upper ejector rod 301, an injection opening 306 is arranged on the outer wall of the supporting mechanism 3, a pressure relief opening 307 is arranged on the outer wall of the supporting mechanism 3 far away from the injection opening 306, and a one-way valve is arranged inside the side ring 206 and the pressure relief opening 307.
Please refer to fig. 4 and fig. 5, a fitting plate 106 is disposed on one side of the positioning plate 102, the fitting plate 106 fits with the outer wall of the building, and the sliding plate 107 is slidably connected to the slot 101 through the sliding slot 110, and can be engaged with the outer wall of the building through the fitting plate 106, so as to control the extending distance of the traverse mechanism 1.
Please refer to fig. 6, the bottom end of the insertion rod 111 is connected to a first spring 112, the insertion rod 111 is movably connected to the positioning plate 102 through the first spring 112, and the first spring 112 can pull the insertion rod 111 to be always connected to the positioning plate 102 to prevent the fixing block 108 from falling off.
Referring to fig. 2, 4 and 6, the fixing block 108 has a shape matching the shape of the inner wall of the fixing groove 109, the fixing block 108 has a width matching the width of the engaging groove 101, and the fixing block 108 has a handle on the outer wall of the top end thereof for engaging with the fixing groove 109, thereby fixing the positioning plate 102.
Please refer to fig. 11, an edge ring 206 is disposed on an outer wall of the top pillar 205 inside the keel 201, the top pillar 205 is connected to the keel 201 by the edge ring 206, and the edge ring 206 can ensure that the top pillar 205 is not separated from the keel 201.
Please refer to fig. 12, an end of the lock bar 209 is provided with an arc surface, one side of the lock bar 209 is provided with a second spring 208, and an outer wall of the lock bar 209 is slidably connected with the keel 201, so that the sloping plate 207 can push the lock bar 209 to be engaged with the lock hole 212 through the arc surface.
Please refer to fig. 13, the outer walls of the main card 202 and the side card 203 are both provided with mounting slots 211, and the main card 202 and the side card 203 are both connected to the mounting plate 210 through the mounting slots 211.
Please refer to fig. 1, the outer wall of the building frame 6 is provided with a hook 4, the outer side of the hook 4 is connected with a rope 5, the top end of the platform mechanism 2 is provided with a plurality of groups of hooks, the platform mechanism 2 is connected with the rope 5 through the hooks, the rope 5 can reduce the extrusion of the platform mechanism 2 to the cross frame mechanism 1, and the use safety is improved.
The working principle is as follows: firstly, the positioning plate 102 is adjusted according to the extending length of the transverse frame mechanism 1, the fixing block 108 is pulled out from the fixing groove 109 through a handle arranged at the top end of the fixing block 108, the fixing block 108 drives the insertion rod 111 to be pulled out from the sliding plate 107 and stretches the first spring 112, the fixing block 108 is rotated to enable the fixing block 108 to keep the same direction with the clamping groove 101, the fixing block 108 can slide in the clamping groove 101, the positioning plate 102 is released from being fixed, then the fixing block 108 is moved according to requirements, after the fixing block 108 is installed at a proper position, the fixing block 108 is pulled out from the clamping groove 101 again, the fixing block 108 is rotated to enable the fixing block 108 to be aligned with the second group of fixing grooves 109, under the pulling of the first spring 112, the fixing block 108 is clamped with the second group of fixing grooves 109, the position of the positioning plate 102 is adjusted, then one end of the transverse frame mechanism 1 is extended to the outer side of the building frame 6, the transverse frame mechanism 1 is positioned through the positioning plate 102, the jointing plate 106 on one side of the positioning plate 102 is jointed with the outer side of the building, the distance is fixed, and then the platform mechanism 2 with the proper specification can be conveniently adjusted according to the extending length, and the platform mechanism 1, and the platform can be suitable for improving the use efficiency of the whole transverse frame mechanism and the application occasion;
after the transverse frame mechanism 1 is installed through the positioning plate 102 and before the platform mechanism 2 is installed, the limiting plate 103 is inserted into the corresponding limiting groove 104, the limiting plate 103 is attached to the building frame 6, then the pressure plate 304 is placed above the transverse frame mechanism 1 and located on the inner side of a building, the lower ejector rod 303 is inserted into the groove above the pressure plate 304, the lower ejector rod 303 is fixed through the supporting leg 305, sufficient hydraulic oil is injected into the supporting mechanism 3 through the injection port 306, the hydraulic oil pushes the upper ejector rod 301 to move upwards until the upper ejector rod 301 pushes the suction cup 302 to be in contact with the top end of the inner wall of the building, the suction cup 302 can be tightly adsorbed on the inner wall of the building, the injection of the hydraulic oil is stopped at the moment, the supporting mechanism 3 is enabled to fix the transverse frame mechanism 1, a wedge does not need to be installed on the building, and damage to the building is reduced;
before installing platform mechanism 2 in crossbearer mechanism 1, at first, connect multiunit main cardboard 202 and multiunit side cardboard 203 through the multiunit mounting panel 210 block that mounting groove 211 and fossil fragments 201 outside were seted up, move to crossbearer mechanism 1 top through external loop wheel machine to platform mechanism 2 afterwards, place platform mechanism 2 on crossbearer mechanism 1, align cutting 204 with draw-in groove 101, and insert cutting 204 in draw-in groove 101, make multiunit fore-set 205 and the inner wall laminating of shallow mouthful groove 105, and make fore-set 205 promote swash plate 207 rebound under the promotion of shallow mouthful groove 105, swash plate 207 promote locking lever 209 to move to fossil fragments 201 outside while moving upwards, until locking lever 209 inserts in the lockhole 212 that main cardboard 202 outer wall was seted up, thereby lock main cardboard 202, after multiunit platform mechanism 2 hoists, platform mechanism 2 laminates each other, thereby make side cardboard 203 fix in fossil fragments 201, thereby cardboard 203 carries out spacing, prevent that side cardboard 203 from taking place the skew from fossil fragments from in fossil fragments 201, later pass through rope 5 and connect fossil fragments 4, each group platform mechanism's extrusion mechanism can improve the safety of hoisting mechanism to platform 1.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (7)

1. The utility model provides a protection platform for construction, includes crossbearer mechanism (1), its characterized in that: the top end of the transverse frame mechanism (1) is provided with a platform mechanism (2), a building frame (6) is arranged above the transverse frame mechanism (1) and positioned on one side of the platform mechanism (2), one end of the transverse frame mechanism (1) is positioned inside the building frame (6), and a support mechanism (3) is arranged inside the building frame (6) and positioned above the transverse frame mechanism (1); the building frame structure is characterized in that multiple groups of transverse frame mechanisms (1) are arranged, clamping grooves (101) are formed in the inner walls of each group of transverse frame mechanisms (1), multiple groups of fixing grooves (109) are formed in the inner walls of the clamping grooves (101), sliding grooves (110) are formed in the inner walls of the clamping grooves (101) and located below the fixing grooves (109), shallow grooves (105) are formed in one sides, located in the clamping grooves (101), of the transverse frame mechanisms (1), positioning plates (102) are arranged at the bottom ends of the clamping grooves (101), sliding plates (107) are formed at the top ends of the positioning plates (102), fixing blocks (108) are arranged above the sliding plates (107), inserting rods (111) are formed at the bottom ends of the fixing blocks (108), the inserting rods (111) penetrate through the sliding plates (107) and extend into the positioning plates (102), multiple groups of limiting grooves (104) are formed in the outer walls of the transverse frame mechanisms (1), limiting plates (103) are sleeved on the outer sides of the limiting grooves (104), and one sides of the limiting plates (103) are attached to the outer walls of a building frame (6);
the platform mechanism (2) comprises a keel (201) positioned above a cross frame mechanism (1), a plurality of groups of mounting plates (210) are arranged on the inner wall of the keel (201), a plurality of groups of main clamping plates (202) are arranged inside the keel (201), a plurality of groups of main clamping plates (202) are connected to two sides of the keel (201), an inserting strip (204) is arranged above a clamping groove (101) at the bottom end of the keel (201), the keel (201) is connected with the clamping groove (101) in a clamping manner through the inserting strip (204), a plurality of groups of top pillars (205) are arranged above a shallow groove (105) at one side of the inserting strip (204), each group of top pillars (205) extends to the keel (201) and is connected with an inclined plate (207), a locking rod (209) is arranged at one side of the inner wall of the cross frame mechanism (1) above the inclined plate (207), the locking rod (209) penetrates through the inner wall of the keel (201) and extends to the outer side of the keel (201), a plurality of locking holes (212) matched with the locking rod (209) are arranged on the outer wall of the main clamping plates (202);
the supporting mechanism (3) comprises a pressing plate (304) attached to the outer wall of the transverse frame mechanism (1), a lower ejector rod (303) is arranged above the pressing plate (304), a plurality of groups of supporting legs (305) are arranged on the outer wall of the lower ejector rod (303), an upper ejector rod (301) is arranged above the supporting mechanism (3), a sucking disc (302) is connected to the top end of the upper ejector rod (301), an injection port (306) is formed in the outer wall of the supporting mechanism (3), a pressure relief port (307) is formed in the outer wall, far away from the injection port (306), of the supporting mechanism (3), an edge ring (206) is formed in the outer wall of the top column (205) and located inside the keel (201), and the top column (205) is connected with the keel (201) in a clamping mode through the edge ring (206); and a one-way valve is arranged in the pressure relief opening (307).
2. A protective platform for use in building construction according to claim 1, wherein: binding plate (106) have been seted up to one side of locating plate (102), binding plate (106) and building outer wall laminate mutually, slide (107) are through spout (110) and draw-in groove (101) sliding connection.
3. A protective platform for use in building construction according to claim 1, wherein: the bottom end of the inserted bar (111) is connected with a first spring (112), and the inserted bar (111) is movably connected with the positioning plate (102) through the first spring (112).
4. A protective platform for use in building construction according to claim 1, wherein: the shape of the fixing block (108) is matched with the shape of the inner wall of the fixing groove (109), the width of the fixing block (108) is matched with the width of the clamping groove (101), and a handle is arranged on the outer wall of the top end of the fixing block (108).
5. A protective platform for use in building construction according to claim 1, characterised in that: the end of the lock rod (209) is provided with an arc surface, one side of the lock rod (209) is provided with a second spring (208), and the outer wall of the lock rod (209) is in sliding connection with the keel (201).
6. A protective platform for use in building construction according to claim 1, characterised in that: the outer walls of the main clamping plate (202) and the side clamping plate (203) are provided with mounting grooves (211), and the main clamping plate (202) and the side clamping plate (203) are clamped and connected with the mounting plate (210) through the mounting grooves (211).
7. A protective platform for use in building construction according to claim 1, wherein: couple (4) have been seted up to the outer wall of building frame (6), and the outside of couple (4) is connected with rope (5), the multiunit lifting hook has been seted up on the top of platform mechanism (2), platform mechanism (2) are connected with rope (5) through the lifting hook.
CN202011422667.2A 2020-12-08 2020-12-08 A protection platform for construction Active CN112502420B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011422667.2A CN112502420B (en) 2020-12-08 2020-12-08 A protection platform for construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011422667.2A CN112502420B (en) 2020-12-08 2020-12-08 A protection platform for construction

Publications (2)

Publication Number Publication Date
CN112502420A CN112502420A (en) 2021-03-16
CN112502420B true CN112502420B (en) 2022-11-08

Family

ID=74971272

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011422667.2A Active CN112502420B (en) 2020-12-08 2020-12-08 A protection platform for construction

Country Status (1)

Country Link
CN (1) CN112502420B (en)

Family Cites Families (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2170127A1 (en) * 1993-08-30 1995-03-09 John Clement Preston Construction platform
CN202658867U (en) * 2012-05-30 2013-01-09 佛山市南海保达建筑机械设备有限公司 Overhanging construction platform
CN106522495B (en) * 2016-12-15 2017-10-20 俞昱 A kind of novel compositions wallboard
CN208137457U (en) * 2018-02-12 2018-11-23 日照大象房屋建设有限公司 Discharging platform is used in a kind of construction of assembled architecture
CN208168388U (en) * 2018-04-10 2018-11-30 中建一局集团第五建筑有限公司 A kind of pin-connected panel discharging platform and its connection structure
CN210598185U (en) * 2019-07-17 2020-05-22 广西建工集团第二安装建设有限公司 Shaped steel platform of unloading of encorbelmenting of fast-assembling quick detach
CN211647234U (en) * 2019-12-18 2020-10-09 中国建筑第五工程局有限公司 Overhanging type scaffold
CN211646807U (en) * 2019-12-26 2020-10-09 苏州海升达建设有限公司 Light gauge steel sound insulation construction
CN111441582B (en) * 2020-06-16 2020-09-18 安徽政通建筑工程有限公司 Template for building convenient to swift installation
CN111980389A (en) * 2020-08-12 2020-11-24 中建八局第一建设有限公司 Face limit operation platform

Also Published As

Publication number Publication date
CN112502420A (en) 2021-03-16

Similar Documents

Publication Publication Date Title
CN112502420B (en) A protection platform for construction
CN212387617U (en) Tower crane base convenient for bidirectional combination reinforcement
CN218581076U (en) Mounting structure of adjustable ground frame of assembled
CN201070240Y (en) Expansion guide rails
CN212427700U (en) Assembled curtain wall decorative column structure
CN211817006U (en) Three-dimensional deformed steel structure
CN210197264U (en) Auxiliary steel structure carrying support for gas boiler
CN210288855U (en) A various steel furred ceiling for toilet
CN109661924B (en) Vertical greening structure
CN209340229U (en) Inner casing dismounts the hydraulic cylinder mobile fixture on stage apparatus
CN215157562U (en) Floating top cover
CN205840067U (en) The connector that type unitized curtain wall is connected with agent structure
CN211775335U (en) Fast-assembling building decorative panel
CN112267710B (en) Prevent braced frame for assembly building of sinking
CN115596951B (en) LED screen support convenient to disassemble and assemble and installation method
CN216235603U (en) Assembled PC prefabricated component superimposed sheet pile hoist and mount transportation frame
CN217871947U (en) Wood column and column foundation reinforcing structure for repairing wooden ancient architecture
CN218952405U (en) Support beam structure convenient to install
CN213144402U (en) Base structure for hydraulic lifting device of workover rig
CN213980343U (en) Safety locking device for lifting flood-proof door
CN215795064U (en) A three-dimensional component piling bin for building PC prefab
CN220847046U (en) Beret convenient to dismantle
CN219238157U (en) Automatic walking stacker
CN220117806U (en) Building construction faces limit protection from protection screen system that climbs
CN217557384U (en) Assembly type structure superimposed sheet is optimized structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20221014

Address after: 518000 b3001e, Tianli Central Business Plaza, Hyde 3rd road, Nanshan District, Shenzhen, Guangdong

Applicant after: Shenzhen Huayuan Construction Engineering Design Co.,Ltd.

Address before: 537400 the Guangxi Zhuang Autonomous Region Yulin Beiliu Xingshan Industrial Park

Applicant before: Sun Shuhua

GR01 Patent grant
GR01 Patent grant