CN112491043B - 一种新能源富集电网电源规划方法及系统 - Google Patents
一种新能源富集电网电源规划方法及系统 Download PDFInfo
- Publication number
- CN112491043B CN112491043B CN202011319486.7A CN202011319486A CN112491043B CN 112491043 B CN112491043 B CN 112491043B CN 202011319486 A CN202011319486 A CN 202011319486A CN 112491043 B CN112491043 B CN 112491043B
- Authority
- CN
- China
- Prior art keywords
- power
- power supply
- planning
- voltage
- load
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 53
- 230000008569 process Effects 0.000 claims abstract description 18
- 238000006467 substitution reaction Methods 0.000 claims abstract description 18
- 238000005457 optimization Methods 0.000 claims abstract description 12
- 238000005265 energy consumption Methods 0.000 claims abstract description 8
- 238000004458 analytical method Methods 0.000 claims abstract description 7
- 238000004146 energy storage Methods 0.000 claims description 20
- 230000005611 electricity Effects 0.000 claims description 15
- 238000004519 manufacturing process Methods 0.000 claims description 15
- 238000004088 simulation Methods 0.000 claims description 12
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 12
- 230000005540 biological transmission Effects 0.000 claims description 11
- 238000010248 power generation Methods 0.000 claims description 10
- 238000010276 construction Methods 0.000 claims description 6
- 238000011156 evaluation Methods 0.000 claims description 4
- 238000011084 recovery Methods 0.000 claims description 4
- 238000010438 heat treatment Methods 0.000 claims description 3
- 150000001875 compounds Chemical class 0.000 claims 1
- 230000006870 function Effects 0.000 description 19
- 238000004590 computer program Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 238000003860 storage Methods 0.000 description 5
- 230000008859 change Effects 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000005338 heat storage Methods 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 230000001052 transient effect Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/18—Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06313—Resource planning in a project environment
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/04—Circuit arrangements for ac mains or ac distribution networks for connecting networks of the same frequency but supplied from different sources
- H02J3/06—Controlling transfer of power between connected networks; Controlling sharing of load between connected networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/12—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load
- H02J3/14—Circuit arrangements for ac mains or ac distribution networks for adjusting voltage in ac networks by changing a characteristic of the network load by switching loads on to, or off from, network, e.g. progressively balanced loading
- H02J3/144—Demand-response operation of the power transmission or distribution network
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/466—Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/04—Constraint-based CAD
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2113/00—Details relating to the application field
- G06F2113/04—Power grid distribution networks
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/10—Power transmission or distribution systems management focussing at grid-level, e.g. load flow analysis, node profile computation, meshed network optimisation, active network management or spinning reserve management
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2203/00—Indexing scheme relating to details of circuit arrangements for AC mains or AC distribution networks
- H02J2203/20—Simulating, e g planning, reliability check, modelling or computer assisted design [CAD]
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/22—The renewable source being solar energy
- H02J2300/24—The renewable source being solar energy of photovoltaic origin
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/20—The dispersed energy generation being of renewable origin
- H02J2300/28—The renewable source being wind energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J2300/00—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation
- H02J2300/40—Systems for supplying or distributing electric power characterised by decentralized, dispersed, or local generation wherein a plurality of decentralised, dispersed or local energy generation technologies are operated simultaneously
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/80—Management or planning
- Y02P90/82—Energy audits or management systems therefor
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Strategic Management (AREA)
- Power Engineering (AREA)
- Entrepreneurship & Innovation (AREA)
- Geometry (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Marketing (AREA)
- Evolutionary Computation (AREA)
- General Engineering & Computer Science (AREA)
- Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Computer Hardware Design (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Public Health (AREA)
- Biodiversity & Conservation Biology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Educational Administration (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Computer Networks & Wireless Communication (AREA)
- Computational Mathematics (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Pure & Applied Mathematics (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Abstract
本发明涉及一种能源富集电网电源规划方法及系统,其包括:第一阶段规划处理和第二阶段规划处理;第一阶段规划处理基于规划网架结构,将线路或断面潮流最大作为优化目标,满足电压、频率运行约束条件,对网络元件进行N‑1,N‑2稳定校核,形成满足电力系统安全稳定要求的电源规划方案;第二阶段规划处理是在第一阶段电源规划成立的基础上,通过建立各类电源等效替代关系,对电源布局规划中不同类型电源的配置位置及配置数量进行优化,然后针对所选电源布局规划方案,以运行成本最小为目标函数,以资源约束、负荷需求及机组出力特性、运行成本特征为边界约束,进行电力电量平衡机新能源消纳水平分析,形成最优的布局方案。
Description
技术领域
本发明涉及一种新能源规划技术领域,特别是关于一种提升电力系统安全运行水平的新能源富集电网电源规划方法及系统。
背景技术
近年来,新能源的开发和利用取得了跨越式发展,大力推动清洁替代和环境替代,风电、光伏等新能源持续大规模高速发展在一定程度上缓解了能源危机和环境污染问题。但是清洁能源规模剧增带来的是传统发电的规模下降,其中火电等具有较强系统支撑能力的电源类型越来越少,系统安全稳定运行风险逐日升高。因此,亟需一种在规划之初就兼顾保障电网安全稳定水平和新能源电力消纳的电源规划方法,实现系统安全与系能源消纳水平的同步提高。
发明内容
针对上述问题,本发明的目的是提供一种新能源富集电网电源规划方法及系统,其能有效提升电力系统安全运行水平。
为实现上述目的,本发明采取以下技术方案:一种新能源富集电网电源规划方法,其包括:第一阶段规划处理和第二阶段规划处理;所述第一阶段规划处理是基于电力系统安全稳定运行为前提的电源规划方法:基于规划网架结构,将线路或断面潮流最大作为优化目标,满足电压、频率运行约束条件,对网络元件进行N-1,N-2稳定校核,形成满足电力系统安全稳定要求的电源规划方案;所述第二阶段规划处理是在第一阶段电源规划成立的基础上,通过建立各类电源等效替代关系,对电源布局规划中不同类型电源的配置位置及配置数量进行优化,然后针对所选电源布局规划方案,以运行成本最小为目标函数,以资源约束、负荷需求及机组出力特性、运行成本特征为边界约束,进行电力电量平衡机新能源消纳水平分析,形成最优的布局方案。
进一步,所述第一阶段规划处理的电源规划方法包括以下步骤:
10.1)基于预先选定的运行方式,设置新能源开机出力水平和负荷水平;
10.2)提升线路或断面潮流;
10.3)设定约束条件,对全网N-1、N-2进行故障扫描;
10.4)判断,是否出现电压或频率越限情况;若出现,则对电压薄弱点进行分电压等级排序,进入步骤10.5),并优先对高电压等级电网中的电压薄弱节点新增规划电源,分析能源禀赋、建设运行成本,以低成本为最优;
若未出现,则将线路或断面潮流提升5%,直至区外受电达到最大限值,线路或断面潮流无法上涨,输出电源规划方案;
10.5)薄弱点电源规划,根据扫描存在的问题类别,若是单纯的电压越限的问题,则优先规划动态无功设备;若是仅出现频率越限,或电压与频率同时越限的问题,则在薄弱点优先规划具有转动惯量的水电、光热、火电以及核电电源;
10.6)结合资源量、电源实际接入系统情况、机组自身调节特性进行横向对比,以故障后稳态电压恢复水平和系统频率偏差作为校核标准,建立各电源替代关系,形成包含规划电源的新电网系统,返回步骤10.3);
10.7)根据电源替代关系,以清洁能源优先、低造价成本优先,在满足系统稳定要求的情况下选取结果最优的电源规划方案。
进一步,所述步骤10.2)中,根据目标年电网情况,基于预设的运行方式安排并按照设定原则优化区域内线路和断面的输电能力。
进一步,所述运行方式安排中,光伏发电出力Pw按照历史装最高出力水平的80%设置,风电发电出力Ppv按照历史最高出力水平的50%设置,水力发电出力Phydro按照枯期水利资源情况设置开机水平,火力、热力发电出力Pthermal按照冬季供热负荷需求保证最小开机水平;负荷选取为系统内最大负荷,跨区外送直流按照规划年最大输送功率选取;运行方式设置如下:
式中,Ppvmax是光伏历史最高出力;Pwmax是风电历史最高出力;Rhyrdo是本地区枯期水利资源,fhydro是根据水利资源计算水电机组出力水平的函数;PL是负荷功率,fthermal是根据负荷功率折算供热需求功率的函数。
进一步,以断面输电能力最大为目标函数进行优化,目标函数为:
式中,Plinei表示第i个线路或断面的传输功率。
进一步,所述步骤10.3)中,约束条件为:
式中,Ui表示节点电压,Ui0表示故障前该节点的稳态电压;f0表示故障前的系统稳态频率,f表示表示故障后系统稳态频。
进一步,所述第二阶段规划处理的基于电力电量平衡的电源规划评估方法包括以下步骤:
20.1)加入通过第一阶段规划处理得出的规划新增电源;
20.2)输入规划年份各新能源电源装机规模,从历年其中随机选取一年的各新能源8760小时出力标幺值曲线,分别对应相乘得到规划年份新能源出力曲线;
20.3)输入规划年份系统负荷规模,选取最近一年的负荷8760小时标幺值曲线,相乘得到规划年份负荷曲线;
20.4)设置各电源机组、线路、断面的外特性参数以及各类机组分时段运行成本;
20.5)进行逐日生产模拟。
20.6)根据逐日生产运行模拟结果,结合规划地区弃电水平要求,校验新能源弃电水平,若新能源弃电率低于5%或预先设定值,则不作进一步调整,输出储能规划方案;若新能源弃电率高于5%或预先设定值,则规划新增储能电源,其储能功率和容量按照对应方法进行选取,返回步骤20.5)。
进一步,所述步骤20.3)中,根据最近一年的8760小时负荷标幺值曲线近似作为目标年份负荷曲线,乘以目标年份负荷总量,得出规划目标年份的8760小时实际负荷曲线。
进一步,所述步骤20.5)中,设置边界条件,以运行成本最低为优化目标进行逐日生产运行模拟;
所述边界条件包括电源发电功率约束、线路和断面交换功率约束,以及区域内部电力和电量平衡约束;
其中,Pkm表示电源k在第时段发电功率,Ckm表示电源k在第m小时的综合运行成本;
式中,Pk表示电源k的功率,Pint表示区外受入功率,PL为负荷功率;tk,tint,tL分别为电源k、区外受入和负荷的等效运行时间。
一种新能源富集电网电源规划系统,其包括:第一阶段规划处理模块和第二阶段规划处理模块;
所述第一阶段规划处理模块基于规划网架结构,将线路或断面潮流最大作为优化目标,满足电压、频率运行约束条件,对网络元件进行N-1,N-2稳定校核,形成满足电力系统安全稳定要求的电源规划方案;
所述第二阶段规划处理模块是在第一阶段电源规划成立的基础上,通过建立各类电源等效替代关系,对电源布局规划中不同类型电源的配置位置及配置数量进行优化,然后针对所选电源布局规划方案,以运行成本最小为目标函数,以资源约束、负荷需求及机组出力特性、运行成本特征为边界约束,进行电力电量平衡机新能源消纳水平分析,形成最优的布局方案。
本发明由于采取以上技术方案,其具有以下优点:1、本发明采用制约故障遍历的方式,针对电压稳定的无功电源补强和针对功角稳定的高转动惯量的电源优化,以系统安全稳定为约束,生成最优电源组合。2、本发明能提高系统安全稳定运行水平和降低新能源弃电水平的储能电站规划方法,有效降低了新能源弃电量,提高了网内新能源外送能力。
附图说明
图1是本发明的第一阶段规划处理流程示意图。
图2是本发明的第二阶段规划处理流程示意图。
具体实施方式
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例的附图,对本发明实施例的技术方案进行清楚、完整地描述。显然,所描述的实施例是本发明的一部分实施例,而不是全部的实施例。基于所描述的本发明的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本发明保护的范围。
在本发明的第一实施方式中,提供一种新能源富集电网电源规划方法,其包括第一阶段规划处理和第二阶段规划处理。第一阶段规划处理是基于电力系统安全稳定运行为前提的电源规划方法:基于规划网架结构,将线路或断面潮流最大作为优化目标,满足电压、频率等运行约束条件,对关键网络元件进行N-1,N-2稳定校核,形成满足电力系统安全稳定要求的电源规划方案。第二阶段规划处理是在第一阶段电源规划成立的基础上,以提高新能源消纳能力的储能电源规划:通过建立各类电源等效替代关系,对电源布局规划中不同类型电源的配置位置及配置数量进行优化,然后针对所选电源布局规划方案,以运行成本最小为目标函数,以资源约束、负荷需求及机组出力特性、运行成本等特征为边界约束,进行电力电量平衡机新能源消纳水平分析,形成最优的布局方案。
如图1所示,第一阶段规划处理的电源规划方法包括以下步骤:
10.1)基于预先选定的运行方式,设置新能源开机出力水平和负荷水平;
将规划电网目标年份的风电、光伏等新能源计划装机布置在对应地区电网,将预测负荷作为边界条件计入对应地区电网,完成规划线路或改接线路等网架结构变化设置;
10.2)提升线路或断面潮流;
根据目标年电网情况,基于预设的运行方式安排并按照设定原则优化区域内线路和断面的输电能力;
其中,运行方式安排中,光伏发电出力Pw按照历史装最高出力水平的80%设置,风电发电出力Ppv按照历史最高出力水平的50%设置,水力发电出力Phydro按照枯期水利资源情况设置开机水平,火力、热力发电出力Pthermal按照冬季供热负荷需求保证最小开机水平。负荷选取为系统内最大负荷;跨区外送直流按照规划年最大输送功率选取。运行方式设置如下:
式中,Ppvmax是光伏历史最高出力;Pwmax是风电历史最高出力;Rhyrdo是本地区枯期水利资源,fhydro是根据水利资源计算水电机组出力水平的函数;PL是负荷功率,fthermal是根据负荷功率折算供热需求功率的函数。
以断面输电能力最大为目标函数进行优化,目标函数为:
式中,Plinei表示第i个线路或断面的传输功率。
10.3)设定约束条件,对全网N-1、N-2进行故障扫描;
考虑系统电压、频率约束,以故障后节点电压恢复至故障前0.9pu以上,稳态系统频率偏差不超过0.1Hz为约束条件。通过机电暂态仿真,对全网线路、变压器等元件进行N-1、N-2故障校核。约束条件为:
式中,Ui表示节点电压,Ui0表示故障前该节点的稳态电压;f0表示故障前的系统稳态频率,f表示故障后系统稳态频率。
10.4)判断,是否出现电压或频率越限情况;
若出现,则对电压薄弱点进行分电压等级排序,进入步骤10.5),并优先对高电压等级电网中的电压薄弱节点新增规划电源,分析能源禀赋、建设运行成本,以低成本为最优。
若未出现,则将线路或断面潮流提升5%,直至区外受电达到最大限值,线路或断面潮流无法上涨,输出电源规划方案。
10.5)薄弱点电源规划,根据扫描存在的问题类别,若是单纯的电压越限的问题,则优先规划新增调相机或SVG等动态无功设备;若是仅出现频率越限,或电压与频率同时越限的问题,则在薄弱点优先规划具有转动惯量的水电、光热、火电以及核电等电源。
10.6)结合资源量、电源实际接入系统情况、机组自身调节特性进行横向对比,以故障后稳态电压恢复水平和系统频率偏差作为校核标准,建立各电源替代关系,形成包含规划电源的新电网系统,返回步骤10.3)。
10.7)根据电源替代关系,以清洁能源优先、低造价成本优先,在满足系统稳定要求的情况下选取结果最优的电源规划方案。
上述各步骤中,电源规划先后顺序以水电、光热等清洁能源优先,火电、燃气等传统能源其次。其中水电、光热等电源受周边地理位置和周边资源禀赋制约,在电源规划中作为决定性因素,若条件不满足,则一票否决,不再根据成本造价进行进一步比选。
上述各步骤中,规划电源的接入系统方式需按照通常情况进行设计,如火电、水电可接入220kV或更高电压等级,而光热等电源一般考虑其装机容量较小,接入330kV或以下电网。不同电源类型、接入点及接入电压等级对节点电压和系统频率的提升效果不同,可以据此建立电源替代关系,并结合实际资源禀赋、建设成本合理规划新增电源组合。
本发明的第一阶段规划处理方法是结合机电仿真,将不同类型电源的实际接入系统方式纳入考虑,尤其是对于节点电压和系统频率约束。一般的电源规划没有将电压、频率约束作为电源规划的先决约束条件,而仅是作为系统校核的一个步骤。
如图2所示,第二阶段规划处理的基于电力电量平衡的电源规划评估方法包括以下步骤:
20.1)加入通过第一阶段规划处理得出的规划新增电源;
20.2)输入规划年份各新能源电源装机规模,从历年其中随机选取一年的各新能源8760小时出力标幺值曲线,分别对应相乘得到规划年份新能源出力曲线;
具体为:对于每日的出力曲线,从历年其中随机选取一年的出力曲线作为目标年份该日的出力曲线,依次应用至年内365日。根据该随机选取拟合的8760小时出力标幺值曲线,分别乘以各自类型电源的装机规模,拟合得出规划目标年份的新能源8760小时实际出力曲线。
20.3)输入规划年份系统负荷规模,选取最近一年的负荷8760小时标幺值曲线,相乘得到规划年份负荷曲线;
具体为:根据最近一年的8760小时负荷标幺值曲线近似作为目标年份负荷曲线,乘以目标年份负荷总量,得出规划目标年份的8760小时实际负荷曲线。
根据最近一年区外断面功率交换的8760小时标幺值曲线,乘以本区内目标年与最近一年的负荷总量比值,得出目标年份区外断面功率交换的8760小时实际出力曲线。
20.4)设置各电源机组、线路、断面的外特性参数以及各类机组分时段运行成本等;其中,外特性参数包括最大、最小功率限值等;
将新增规划电源外特性参数纳入考虑,若机组为风电或光伏,则参照同地区其他出力曲线设置,若为火电、水电,则按照机组外特性曲线进行设置,同时设置新增规划电源的运行成本参数。
20.5)进行逐日生产模拟。
具体为:设置边界条件,以运行成本最低为优化目标进行逐日生产运行模拟。边界条件包括电源发电功率约束、线路和断面交换功率约束,以及区域内部电力和电量平衡约束。
其中,Pkm表示电源k在第时段发电功率,Ckm表示电源k在第m小时的综合运行成本。
式中,Pk表示电源k的功率,Pint表示区外受入功率(受入为+),PL为负荷功率;tk,tint,tL分别为电源k、区外受入和负荷的等效运行时间。
在约束条件中,系统层面上任意时刻的发电加上区外断面受入功率之和需大于等于用电负荷功率、全年所有时段的发电和区外受入电量之和需大于负荷电量。此外,各发电机和线路功率需在允许的范围内。
20.6)根据逐日生产运行模拟结果,结合规划地区弃电水平要求,校验新能源弃电水平,若新能源弃电率低于5%或预先设定值,则不作进一步调整,输出储能规划方案;若新能源弃电率高于5%或预先设定值,则规划新增储能电源,其储能功率和容量按照对应方法进行选取,返回步骤20.5);
具体为:在得到逐日生产运行模拟结果之后,其各类电源的全年利用小时数均会发生变化,清洁能源弃电水平可能会一定程度上升高。若如新增规划电源为火电、水电、核电等机组,由于其开机状态下的最小出力要求,导致在电量平衡方面需要压缩新能源的上网电量,导致清洁能源弃电水平上升。若新增规划电源为光热、抽水蓄能等机组,由于其具备一定的储热、蓄水的储能功能,在其储能容量允许的情况下进行储能,则会降低清洁能源的弃电水平下降;若其储能容量已储满时系统内已然电力富裕,则会在原本清洁能能源弃电的基础上,进一步增加该规划新增电源的弃电电力,导致系统弃电水平上升。
在得到新增规划电源后的电力电量平衡结果,以新能源弃电率不高于5%作为评价标准,也可结合不同地区实际情况进行设置弃电率。若平衡结果显示弃电率高于要求标准,则在系统内规划新增储能电源,储能电站的额定功率按照日均弃电电力选取(无弃电情况下弃电电力取0),储能的额定容量按照日均弃电电量选取。规划新增储能按照其建设运行成本最低为目标进行配置。配置后重新进行电力电联平衡分析,若仍不满足要求,则储能功率和容量增加10%,重复校核,直至满足要求。
在本发明的第二实施方式中,提供一种新能源富集电网电源规划系统,其包括:第一阶段规划处理模块和第二阶段规划处理模块;
第一阶段规划处理模块基于规划网架结构,将线路或断面潮流最大作为优化目标,满足电压、频率运行约束条件,对网络元件进行N-1,N-2稳定校核,形成满足电力系统安全稳定要求的电源规划方案;
第二阶段规划处理模块是在第一阶段电源规划成立的基础上,通过建立各类电源等效替代关系,对电源布局规划中不同类型电源的配置位置及配置数量进行优化,然后针对所选电源布局规划方案,以运行成本最小为目标函数,以资源约束、负荷需求及机组出力特性、运行成本特征为边界约束,进行电力电量平衡机新能源消纳水平分析,形成最优的布局方案。
本领域内的技术人员应明白,本申请的实施例可提供为方法、系统、或计算机程序产品。因此,本申请可采用完全硬件实施例、完全软件实施例、或结合软件和硬件方面的实施例的形式。而且,本申请可采用在一个或多个其中包含有计算机可用程序代码的计算机可用存储介质(包括但不限于磁盘存储器、CD-ROM、光学存储器等)上实施的计算机程序产品的形式。
本申请是参照根据本申请实施例的方法、设备(系统)、和计算机程序产品的流程图和/或方框图来描述的。应理解可由计算机程序指令实现流程图和/或方框图中的每一流程和/或方框、以及流程图和/或方框图中的流程和/或方框的结合。可提供这些计算机程序指令到通用计算机、专用计算机、嵌入式处理机或其他可编程数据处理设备的处理器以产生一个机器,使得通过计算机或其他可编程数据处理设备的处理器执行的指令产生用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的装置。
这些计算机程序指令也可存储在能引导计算机或其他可编程数据处理设备以特定方式工作的计算机可读存储器中,使得存储在该计算机可读存储器中的指令产生包括指令装置的制造品,该指令装置实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能。
这些计算机程序指令也可装载到计算机或其他可编程数据处理设备上,使得在计算机或其他可编程设备上执行一系列操作步骤以产生计算机实现的处理,从而在计算机或其他可编程设备上执行的指令提供用于实现在流程图一个流程或多个流程和/或方框图一个方框或多个方框中指定的功能的步骤。
Claims (9)
1.一种新能源富集电网电源规划方法,其特征在于,包括:第一阶段规划处理和第二阶段规划处理;所述第一阶段规划处理是基于电力系统安全稳定运行为前提的电源规划方法:基于规划网架结构,将线路或断面潮流最大作为优化目标,满足电压、频率运行约束条件,对网络元件进行N-1,N-2稳定校核,形成满足电力系统安全稳定要求的电源规划方案;所述第二阶段规划处理是在第一阶段电源规划成立的基础上,通过建立各类电源等效替代关系,对电源布局规划中不同类型电源的配置位置及配置数量进行优化,然后针对所选电源布局规划方案,以运行成本最小为目标函数,以资源约束、负荷需求及机组出力特性、运行成本特征为边界约束,进行电力电量平衡机新能源消纳水平分析,形成最优的布局方案;
所述第一阶段规划处理的电源规划方法包括以下步骤:
10.1)基于预先选定的运行方式,设置新能源开机出力水平和负荷水平;
10.2)提升线路或断面潮流;
10.3)设定约束条件,对全网N-1、N-2进行故障扫描;
10.4)判断,是否出现电压或频率越限情况;若出现,则对电压薄弱点进行分电压等级排序,进入步骤10.5),并优先对高电压等级电网中的电压薄弱节点新增规划电源,分析能源禀赋、建设运行成本,以低成本为最优;
若未出现,则将线路或断面潮流提升5%,直至区外受电达到最大限值,线路或断面潮流无法上涨,输出电源规划方案;
10.5)薄弱点电源规划,根据扫描存在的问题类别,若是单纯的电压越限的问题,则优先规划动态无功设备;若是仅出现频率越限,或电压与频率同时越限的问题,则在薄弱点优先规划具有转动惯量的水电、光热、火电以及核电电源;
10.6)结合资源量、电源实际接入系统情况、机组自身调节特性进行横向对比,以故障后稳态电压恢复水平和系统频率偏差作为校核标准,建立各电源替代关系,形成包含规划电源的新电网系统,返回步骤10.3);
10.7)根据电源替代关系,以清洁能源优先、低造价成本优先,在满足系统稳定要求的情况下选取结果最优的电源规划方案。
2.如权利要求1所述规划方法,其特征在于,所述步骤10.2)中,根据目标年电网情况,基于预设的运行方式安排并按照设定原则优化区域内线路和断面的输电能力。
3.如权利要求2所述规划方法,其特征在于,所述运行方式安排中,风力发电出力Pw按照历史装最高出力水平的80%设置,光伏发电出力Ppv按照历史最高出力水平的50%设置,水力发电出力Phydro按照枯期水利资源情况设置开机水平,火力、热力发电出力Pthermal按照冬季供热负荷需求保证最小开机水平;负荷选取为系统内最大负荷,跨区外送直流按照规划年最大输送功率选取;运行方式设置如下:
式中,Ppvmax是光伏历史最高出力;Pwmax是风电历史最高出力;Rhyrdo是本地区枯期水利资源,fhydro是根据水利资源计算水电机组出力水平的函数;PL是负荷功率,fthermal是根据负荷功率折算供热需求功率的函数。
6.如权利要求1至5任一项所述规划方法,其特征在于,所述第二阶段规划处理的基于电力电量平衡的电源规划评估方法包括以下步骤:
20.1)加入通过第一阶段规划处理得出的规划新增电源;
20.2)输入规划年份各新能源电源装机规模,从历年其中随机选取一年的各新能源8760小时出力标幺值曲线,分别对应相乘得到规划年份新能源出力曲线;
20.3)输入规划年份系统负荷规模,选取最近一年的负荷8760小时标幺值曲线,相乘得到规划年份负荷曲线;
20.4)设置各电源机组、线路、断面的外特性参数以及各类机组分时段运行成本;
20.5)进行逐日生产模拟;
20.6)根据逐日生产运行模拟结果,结合规划地区弃电水平要求,校验新能源弃电水平,若新能源弃电率低于5%或预先设定值,则不作进一步调整,输出储能规划方案;若新能源弃电率高于5%或预先设定值,则规划新增储能电源,其储能功率和容量按照对应方法进行选取,返回步骤20.5)。
7.如权利要求6所述规划方法,其特征在于,所述步骤20.3)中,根据最近一年的8760小时负荷标幺值曲线近似作为目标年份负荷曲线,乘以目标年份负荷总量,得出规划目标年份的8760小时实际负荷曲线。
9.一种新能源富集电网电源规划系统,其特征在于,包括:第一阶段规划处理模块和第二阶段规划处理模块;
所述第一阶段规划处理模块基于规划网架结构,将线路或断面潮流最大作为优化目标,满足电压、频率运行约束条件,对网络元件进行N-1,N-2稳定校核,形成满足电力系统安全稳定要求的电源规划方案;
所述第二阶段规划处理模块是在第一阶段电源规划成立的基础上,通过建立各类电源等效替代关系,对电源布局规划中不同类型电源的配置位置及配置数量进行优化,然后针对所选电源布局规划方案,以运行成本最小为目标函数,以资源约束、负荷需求及机组出力特性、运行成本特征为边界约束,进行电力电量平衡机新能源消纳水平分析,形成最优的布局方案;
所述第一阶段规划处理的电源规划方法包括以下步骤:
10.1)基于预先选定的运行方式,设置新能源开机出力水平和负荷水平;
10.2)提升线路或断面潮流;
10.3)设定约束条件,对全网N-1、N-2进行故障扫描;
10.4)判断,是否出现电压或频率越限情况;若出现,则对电压薄弱点进行分电压等级排序,进入步骤10.5),并优先对高电压等级电网中的电压薄弱节点新增规划电源,分析能源禀赋、建设运行成本,以低成本为最优;
若未出现,则将线路或断面潮流提升5%,直至区外受电达到最大限值,线路或断面潮流无法上涨,输出电源规划方案;
10.5)薄弱点电源规划,根据扫描存在的问题类别,若是单纯的电压越限的问题,则优先规划动态无功设备;若是仅出现频率越限,或电压与频率同时越限的问题,则在薄弱点优先规划具有转动惯量的水电、光热、火电以及核电电源;
10.6)结合资源量、电源实际接入系统情况、机组自身调节特性进行横向对比,以故障后稳态电压恢复水平和系统频率偏差作为校核标准,建立各电源替代关系,形成包含规划电源的新电网系统,返回步骤10.3);
10.7)根据电源替代关系,以清洁能源优先、低造价成本优先,在满足系统稳定要求的情况下选取结果最优的电源规划方案。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011319486.7A CN112491043B (zh) | 2020-11-23 | 2020-11-23 | 一种新能源富集电网电源规划方法及系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011319486.7A CN112491043B (zh) | 2020-11-23 | 2020-11-23 | 一种新能源富集电网电源规划方法及系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112491043A CN112491043A (zh) | 2021-03-12 |
CN112491043B true CN112491043B (zh) | 2022-11-01 |
Family
ID=74933320
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011319486.7A Active CN112491043B (zh) | 2020-11-23 | 2020-11-23 | 一种新能源富集电网电源规划方法及系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112491043B (zh) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113300396B (zh) * | 2021-05-20 | 2022-07-08 | 南瑞集团有限公司 | 一种规划周期内直流传输极限优化方法及系统 |
CN113689068B (zh) * | 2021-07-09 | 2024-04-30 | 国网河北省电力有限公司经济技术研究院 | 一种电力电量平衡规划方法、装置及终端设备 |
CN113852136B (zh) * | 2021-09-24 | 2023-07-25 | 广东电网有限责任公司 | 一种新能源基地外送方案的电源配置方法及装置 |
CN114069671A (zh) * | 2021-11-26 | 2022-02-18 | 国网甘肃省电力公司电力科学研究院 | 一种计及消纳水平的高比例新能源电网储能需求分析方法 |
CN115659779B (zh) * | 2022-09-26 | 2023-06-23 | 国网江苏省电力有限公司南通供电分公司 | 一种多直流馈入受端电网的新能源接入优化策略 |
CN115864397B (zh) * | 2023-02-03 | 2023-05-02 | 国网山东省电力公司东营市东营区供电公司 | 一种电网新能源资源规划优化方法、系统、终端及介质 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109523128A (zh) * | 2018-10-22 | 2019-03-26 | 上海理工大学 | 一种促进消纳的可再生能源容量配置方法 |
CN109978408A (zh) * | 2019-04-09 | 2019-07-05 | 南方电网科学研究院有限责任公司 | 综合能源系统规划运行联合优化方法、装置、设备及介质 |
-
2020
- 2020-11-23 CN CN202011319486.7A patent/CN112491043B/zh active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109523128A (zh) * | 2018-10-22 | 2019-03-26 | 上海理工大学 | 一种促进消纳的可再生能源容量配置方法 |
CN109978408A (zh) * | 2019-04-09 | 2019-07-05 | 南方电网科学研究院有限责任公司 | 综合能源系统规划运行联合优化方法、装置、设备及介质 |
Non-Patent Citations (3)
Title |
---|
N-K重故障下输储协同规划模型及算法;郭铭群 等;《电网技术》;20200520;1-9 * |
Two-Stage Stochastic Power Grid Expansion Considering Multiple N-1-1 Contingencies;Daniel A. Zuniga Vazquez 等;《2019 North American Power Symposium (NAPS)》;20200217;全文 * |
面向新能源消纳的电网互联通道规划;周二彪 等;《高电压技术》;20200831;第46卷(第08期);2933-2940 * |
Also Published As
Publication number | Publication date |
---|---|
CN112491043A (zh) | 2021-03-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112491043B (zh) | 一种新能源富集电网电源规划方法及系统 | |
Li et al. | Model and application of renewable energy accommodation capacity calculation considering utilization level of inter-provincial tie-line | |
CN106099993B (zh) | 一种适应新能源大规模接入的电源规划方法 | |
Lu et al. | Day-ahead optimal dispatching of multi-source power system | |
CN110957717A (zh) | 一种多电源电力系统多目标日前优化调度方法 | |
CN104299173B (zh) | 一种适用于多种能源接入的鲁棒优化日前调度方法 | |
CN111313475A (zh) | 一种功率平衡约束考虑预测误差不确定变量的电力系统调度方法 | |
JP2023042528A (ja) | クラスタ学習に基づく低炭素cspシステム協調的最適化方法及び装置 | |
CN110970905A (zh) | 一种优化风电场电压控制能力的多电源无功配合方法及系统 | |
CN116014797A (zh) | 一种配网新能源接纳能力提升的评估方法 | |
Linlin et al. | Research on multi-objective reactive power optimization of power grid with high proportion of new energy | |
CN116402210A (zh) | 一种综合能源系统多目标优化方法、系统、设备和介质 | |
CN116187509A (zh) | 一种电力系统生产成本测算的方法及装置 | |
CN115842376A (zh) | 电力系统等效惯量趋势与安全状态评估方法、设备和介质 | |
CN117277444B (zh) | 一种新能源基地电源容量优化配置方法及装置 | |
CN106451424A (zh) | 含大规模光伏发电并网的输电网随机规划方法 | |
Sun et al. | Hierarchical Scheduling Control Method for Cascade Hydro‐PV‐Pumped Storage Generation System | |
CN114400716B (zh) | 一种水电站机组扩机的容量选取方法 | |
CN109149630A (zh) | 一种新能源电量消纳能力分析规划方法 | |
CN113346553A (zh) | 一种可再生能源发电站出力占比的评估方法和装置 | |
Lan et al. | Benefits of Variable Speed Pumped Hydro Storage Technology for Increasing Renewable Integration in Regional Power Grids | |
CN111860932A (zh) | 一种考虑风电布置的主动配电网电源规划方法 | |
CN112418561B (zh) | 一种适应全清洁能源电力系统的电网规划方法 | |
Lu et al. | New energy grid connection power control method based on predictive tuning performance and embedded system | |
CN113644669B (zh) | 一种基于储能容量利用率的储能容量配置方法及系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |