CN112482634A - Construction method for installing keel frame of building curtain wall - Google Patents

Construction method for installing keel frame of building curtain wall Download PDF

Info

Publication number
CN112482634A
CN112482634A CN202011401992.0A CN202011401992A CN112482634A CN 112482634 A CN112482634 A CN 112482634A CN 202011401992 A CN202011401992 A CN 202011401992A CN 112482634 A CN112482634 A CN 112482634A
Authority
CN
China
Prior art keywords
keel
fixed
connecting block
groove
fixed connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011401992.0A
Other languages
Chinese (zh)
Inventor
秦碧龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shaanxi Tianfu Xuanyue Technology Co ltd
Original Assignee
Shaanxi Tianfu Xuanyue Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaanxi Tianfu Xuanyue Technology Co ltd filed Critical Shaanxi Tianfu Xuanyue Technology Co ltd
Priority to CN202011401992.0A priority Critical patent/CN112482634A/en
Publication of CN112482634A publication Critical patent/CN112482634A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/88Curtain walls
    • E04B2/96Curtain walls comprising panels attached to the structure through mullions or transoms
    • E04B2/965Connections of mullions and transoms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention relates to the field of agriculture and discloses a construction method for installing a building curtain wall keel frame, which comprises a ground keel, wherein a through groove is formed in the inner wall of the middle of the ground keel, an overhead keel and fixed connecting blocks are inserted into the inner wall of the through groove, the fixed connecting blocks are positioned on two sides of the overhead keel, clamping rods are connected to the outer surfaces of two sides of the two groups of fixed connecting blocks, a fixed sliding plate is connected to the outer surface of the front end of each fixed connecting block, and limit positions are formed on the outer surfaces of the fixed connecting blocks and the fixed sliding plate. The keel frame connecting block is stable in fixing structure and convenient to operate, the connecting block cannot loosen or fall off due to shaking of the connecting block, people can conveniently and randomly adjust the height of the penetrating keel in the penetrating groove, the difference of the penetrating groove positions is greatly reduced, the penetrating keel cannot penetrate well, and the keel frame mounting difficulty is reduced to a certain extent.

Description

Construction method for installing keel frame of building curtain wall
Technical Field
The invention relates to the technical field of building construction, in particular to a construction method for installing a keel frame of a building curtain wall.
Background
The skeleton partition wall is also called the fossil fragments partition wall, mainly is with the fixed back of world fossil fragments, and rethread cross core fossil fragments are connected, then rethread fixture block card post, make its operation of accomplishing the fossil fragments partition wall. However, the connecting piece between the existing keel partition wall and the through keel is not stable enough in structure, so that the through keel is easy to loosen, and therefore, the method for installing and constructing the building curtain wall keel frame is provided.
Disclosure of Invention
Solves the technical problem
Aiming at the defects of the prior art, the invention provides a construction method for installing a keel frame of a building curtain wall.
Technical scheme
In order to achieve the purpose, the invention provides the following technical scheme: the building curtain wall keel frame installation construction method comprises a ground keel, wherein a through groove is formed in the inner wall of the middle of the ground keel, an overhead keel and a fixed connecting block are inserted into the inner wall of the through groove, the fixed connecting block is located on two sides of the overhead keel, clamping rods are connected to the outer surfaces of two sides of the two groups of fixed connecting blocks, a fixed sliding plate is connected to the outer surface of the front end of the fixed connecting block, and limiting holes are formed in the outer surfaces of the fixed connecting block and the fixed sliding plate.
Preferably, the number of the through grooves is a plurality of groups, and the through grooves are vertically distributed and arranged on the inner wall of the keel.
Preferably, the through groove is in sliding connection with the outer surfaces of the two sides of the ceiling keel.
Preferably, the bayonet socket has been seted up between wearing groove and the fixed connection piece, the both sides surface of fixed connection piece all is through kelly and bayonet socket fixed mounting, the spout has been seted up between fixed slide and the fixed connection piece, the rear end surface of fixed slide passes through the inner wall sliding connection of spout and fixed connection piece, the inner wall in spacing hole is connected with the bolt, and the bolt runs through the inner wall of fixed slide and fixed connection piece, the quantity in spacing hole is a plurality of groups, the both ends of roof fossil fragments all offset tightly through the fixed connection piece, scale line connection has been seted up to the both sides inner wall of wearing groove.
The method for installing and constructing the keel frame of the building curtain wall is characterized by comprising the following steps of;
the first step is as follows: firstly, standing the top keel and the bottom keel, and clamping by using keel clamps; the second step is as follows: then the penetrating keel penetrates into the penetrating groove in the middle of each group of ground keels; the third step: selecting the height through the space reserved in the through groove and the scale marks, adjusting the height of the through groove to be-cm, shearing a bayonet between a fixed connecting block at the bottom of the through keel and the ground keel, and clamping the fixed connecting block into the bayonet through a clamping rod for fixing; the fourth step: then, sliding the fixed sliding plate on the surface of the fixed connecting block, and respectively connecting and fixing the fixed sliding plate with the limiting hole through bolts to ensure that the structure between the fixed connecting block and the ground keel is stable; the fifth step: then, a fixed connecting block at the upper end of the penetrating keel is abutted against the upper end of the penetrating keel, a bayonet is cut between the fixed connecting block and the ground keel, and then the fixed connecting block is clamped into the bayonet through a clamping rod for fixing; a sixth step: then the fixed sliding plate on the surface of the upper end fixed connecting block is slid and is respectively connected and fixed with the limiting hole through the bolt, so that the structure between the fixed connecting block and the ground keel is stable. Preferably, the ground keel and the skullet keel are connected by the two ground keels with the inner sides opposite.
Advantageous effects
The invention provides a construction method for installing a keel frame of a building curtain wall, which has the following beneficial effects:
the keel frame connecting block is stable in fixing structure and convenient to operate, the connecting block cannot loosen or fall off due to shaking of the connecting block, people can conveniently and randomly adjust the height of the penetrating keel in the penetrating groove, the difference of the penetrating groove positions is greatly reduced, the penetrating keel cannot penetrate well, and the keel frame mounting difficulty is reduced to a certain extent.
Drawings
FIG. 1 is a schematic view of the overall structure of the construction method for installing the keel frame of the building curtain wall.
FIG. 2 is an inside view of a keel in the method for installing and constructing the keel frame of the building curtain wall.
FIG. 3 is a schematic structural view of a trough in the installation and construction method of the building curtain wall keel frame of the invention.
In the figure: 1. a ceiling keel; 2. a keel; 3. penetrating a groove; 4. a clamping rod; 5. fixing a connecting block; 6. fixing the sliding plate; 7. a limiting hole; 8. a cross-core keel.
Detailed Description
All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Further explaining a technical scheme provided by the invention:
example 1
The utility model provides a building curtain keel frame installation construction method, including ground fossil fragments 2, the middle part inner wall of ground fossil fragments 2 has seted up wear groove 3, it has sky fossil fragments 1 and fixed connection block 5 to wear the inner wall grafting of groove 3, fixed connection block 5 is located the both sides of sky fossil fragments 1, the both sides surface of two sets of fixed connection blocks 5 all is connected with kelly 4, the front end surface of fixed connection block 5 is connected with fixed slide 6, fixed connection block 5 and fixed slide 6's surface has all seted up spacing hole 7.
A construction method for installing a keel frame of a building curtain wall comprises the following specific manufacturing steps:
the first step is as follows: the upper keel 1 and the lower keel 2 are erected firstly, and then are clamped through keel clamps, and the inner sides of the two lower keels 2 are required to be opposite when the lower keel 2 is connected with the upper keel 1, so that the structure is more stable; the second step is as follows: then the penetrating keel 8 penetrates into the penetrating groove 3 in the middle of each group of the ground keels 2; the third step: selecting the height through the space reserved in the through groove 3 and the scale marks, when the height of the through groove 3 is 10cm, adjusting the height of the through keel 8 up and down to 10cm, then cutting a bayonet between the fixed connecting block 5 at the bottom of the through keel 8 and the ground keel 2, and then clamping the fixed connecting block 5 into the bayonet through the clamping rod 4 for fixing, so that one end of the through keel 8 can be fixed by 8 cm; the fourth step: then, sliding the fixed sliding plate 6 on the surface of the fixed connecting block 5, and respectively connecting and fixing the fixed sliding plate with the limiting hole 7 through bolts to stabilize the structure between the fixed connecting block 5 and the ground keel 2; the fifth step: then, the fixed connecting block 5 at the upper end of the penetrating keel 8 is abutted against the upper end of the penetrating keel 8, then a bayonet is cut between the fixed connecting block 5 and the ground keel 2, and then the fixed connecting block 5 is clamped into the bayonet through the clamping rod 4 for fixing; a sixth step: then slide 5 surperficial fixed slide 6 of upper end fixed connection block, be connected fixedly with spacing hole 7 through the bolt respectively, make the stable in structure between fixed connection block 5 and the keel 2, then through the experiment: shaking by hand or applying an up-and-down acting force to the structure to see whether the structure is stable, and after the experiment is finished, no thread shakes in the structure.
In conclusion, the invention only uses one group of embodiments for comparison, the effect is more stable than that of the existing keel frame connecting piece, the connecting piece can not fall off due to shaking, and then people can conveniently and randomly adjust the height of the penetrating keel in the penetrating groove, so that the difference of the penetrating position is greatly reduced, and the penetrating keel can not penetrate well.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The construction method for installing the keel frame of the building curtain wall comprises a ground keel (2), and is characterized in that: wear groove (3) have been seted up to the middle part inner wall of ground fossil fragments (2), the inner wall of wear groove (3) is pegged graft and is had day fossil fragments (1) and fixed connection block (5), fixed connection block (5) are located the both sides of day fossil fragments (1), and are two sets of the both sides surface of fixed connection block (5) all is connected with kelly (4), the front end surface of fixed connection block (5) is connected with fixed slide (6), spacing hole (7) have all been seted up with the surface of fixed slide (6) in fixed connection block (5).
2. The mounting and construction method of the keel frame of the building curtain wall as claimed in claim 1, wherein the number of the through slots (3) is several groups, and the through slots are vertically distributed and arranged on the inner wall of the keel (2).
3. The mounting and construction method of the keel frame of the building curtain wall as claimed in claim 1, wherein the through groove (3) is slidably connected with the outer surfaces of the two sides of the keel (1).
4. The mounting construction method of the building curtain wall keel frame according to claim 1, wherein a bayonet is arranged between the through groove (3) and the fixed connecting block (5), outer surfaces of two sides of the fixed connecting block (5) are fixedly mounted with the bayonet through clamping rods (4), a sliding groove is arranged between the fixed sliding plate (6) and the fixed connecting block (5), an outer surface of the rear end of the fixed sliding plate (6) is in sliding connection with an inner wall of the fixed connecting block (5) through the sliding groove, the inner wall of the limiting hole (7) is connected with a bolt, the bolt penetrates through the inner walls of the fixed sliding plate (6) and the fixed connecting block (5), the limiting holes (7) are arranged in a plurality of groups, two ends of the ceiling keel (1) are tightly abutted through the fixed connecting block (5), and scale marks are arranged on inner walls of two sides of the through groove (3).
5. A construction method for installing the keel frame of the building curtain wall as in any claim from 1 to 4 is characterized by comprising the following steps; the first step is as follows: firstly, the top keel (1) and the bottom keel (2) stand well, and are clamped by keel clamps, and the two bottom keels (2) need to be oppositely arranged in the inner side direction when the bottom keel (2) is connected with the top keel (1), so that the structure is more stable; the second step is as follows: then the penetrating keel (8) penetrates into the penetrating groove (3) in the middle of each group of the ground keels (2); the third step: selecting the height through the space reserved in the through groove (3) and the scale marks, adjusting the height of the through groove (3) to be 1-20cm, cutting a bayonet between a fixed connecting block (5) at the bottom of the through keel (8) and the ground keel (2), and then clamping the fixed connecting block (5) into the bayonet through a clamping rod (4) for fixing; the fourth step: then, a fixed sliding plate (6) on the surface of the fixed connecting block (5) is slid and connected and fixed with the limiting hole (7) through a bolt, so that the structure between the fixed connecting block (5) and the ground keel (2) is stable; the fifth step: then, a fixed connecting block (5) at the upper end of the penetrating keel (8) is abutted against the upper end of the penetrating keel (8), then a bayonet is cut between the fixed connecting block (5) and the ground keel (2), and then the fixed connecting block (5) is clamped into the bayonet through a clamping rod (4) for fixing; a sixth step: then slide fixed slide (6) on upper end fixed connection piece (5) surface, be connected fixedly through bolt and spacing hole (7) respectively, make the stable in structure between fixed connection piece (5) and ground fossil fragments (2).
6. The method for installing and constructing the keel frame of the building curtain wall as claimed in claim 5, wherein in the step (1): when the floor keels (2) are connected with the skullet keel (1), the inner sides of the two floor keels (2) are opposite.
CN202011401992.0A 2020-12-04 2020-12-04 Construction method for installing keel frame of building curtain wall Withdrawn CN112482634A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011401992.0A CN112482634A (en) 2020-12-04 2020-12-04 Construction method for installing keel frame of building curtain wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011401992.0A CN112482634A (en) 2020-12-04 2020-12-04 Construction method for installing keel frame of building curtain wall

Publications (1)

Publication Number Publication Date
CN112482634A true CN112482634A (en) 2021-03-12

Family

ID=74939732

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011401992.0A Withdrawn CN112482634A (en) 2020-12-04 2020-12-04 Construction method for installing keel frame of building curtain wall

Country Status (1)

Country Link
CN (1) CN112482634A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6006382A (en) * 1998-04-30 1999-12-28 Smith; Jerome P. Bed frame insert
CN201981903U (en) * 2011-03-03 2011-09-21 徐晶 Sliding window locking device
CN205036027U (en) * 2015-10-16 2016-02-17 西安外事学院 Used support chassis of architectural decoration
CN107119909A (en) * 2017-04-20 2017-09-01 江苏嘉洋华联建筑装饰股份有限公司 The construction method of calcium silicate board partition wall
CN109746622A (en) * 2017-11-07 2019-05-14 扬州未来塑胶制品有限公司 A kind of welded tube positioning device of welded tube mill

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6006382A (en) * 1998-04-30 1999-12-28 Smith; Jerome P. Bed frame insert
CN201981903U (en) * 2011-03-03 2011-09-21 徐晶 Sliding window locking device
CN205036027U (en) * 2015-10-16 2016-02-17 西安外事学院 Used support chassis of architectural decoration
CN107119909A (en) * 2017-04-20 2017-09-01 江苏嘉洋华联建筑装饰股份有限公司 The construction method of calcium silicate board partition wall
CN109746622A (en) * 2017-11-07 2019-05-14 扬州未来塑胶制品有限公司 A kind of welded tube positioning device of welded tube mill

Similar Documents

Publication Publication Date Title
CN211473000U (en) Curtain wall mounting structure
CN214785251U (en) Cross light steel keel suspended ceiling
CN213062605U (en) Detachable keel of assembled ceiling
CN112482634A (en) Construction method for installing keel frame of building curtain wall
CN209958575U (en) Interlocking type curtain wall plate and curtain wall
CN215519406U (en) Suspension type cell body curtain aluminium alloy
CN212836151U (en) Steel frame dry hanging system
CN212613209U (en) Assembled curtain board fixed knot constructs
CN210797988U (en) Fixing device is used in curtain installation
CN209179268U (en) Window wall system type unitized curtain wall
CN112267610A (en) Ceiling mounting structure and accurate mounting method of keel system thereof
CN106088514A (en) A kind of stone material dry suspending slabstone fixed structure with high anti-seismic function
CN209924247U (en) Simple keel mounting structure
CN117587980B (en) Suspended ceiling structure for indoor decoration
CN219118353U (en) Novel fossil fragments of building
CN216109280U (en) Building engineering decorates fitment combination fossil fragments furred ceiling structure
CN214696263U (en) Novel sound insulation partition wall
CN211286203U (en) Curtain wall keel frame
CN212405819U (en) Connection structure for assembled building wall decoration panel
CN214341613U (en) Curtain box
CN218715367U (en) Dustproof effectual safety net for construction
CN217128687U (en) Cascade connection structure
CN219931507U (en) Hidden horizontal connection structure of horizontal moulding of large-span
CN214593181U (en) Quick support device suitable for automatic greenhouse
CN220377616U (en) Chinese style ancient wind concatenation formula component

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20210312

WW01 Invention patent application withdrawn after publication