CN112459461B - Building pouring top plate convenient to assemble - Google Patents

Building pouring top plate convenient to assemble Download PDF

Info

Publication number
CN112459461B
CN112459461B CN202011480930.3A CN202011480930A CN112459461B CN 112459461 B CN112459461 B CN 112459461B CN 202011480930 A CN202011480930 A CN 202011480930A CN 112459461 B CN112459461 B CN 112459461B
Authority
CN
China
Prior art keywords
pouring
plate
support
keel
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011480930.3A
Other languages
Chinese (zh)
Other versions
CN112459461A (en
Inventor
黄淑芹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lingbi Branch Of Anhui Yinuo Youth Industrial Design Co Ltd
Original Assignee
Lingbi Branch Of Anhui Yinuo Youth Industrial Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lingbi Branch Of Anhui Yinuo Youth Industrial Design Co Ltd filed Critical Lingbi Branch Of Anhui Yinuo Youth Industrial Design Co Ltd
Priority to CN202011480930.3A priority Critical patent/CN112459461B/en
Publication of CN112459461A publication Critical patent/CN112459461A/en
Application granted granted Critical
Publication of CN112459461B publication Critical patent/CN112459461B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G9/00Forming or shuttering elements for general use
    • E04G9/02Forming boards or similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G17/00Connecting or other auxiliary members for forms, falsework structures, or shutterings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a building pouring top plate convenient to assemble, wherein a keel mounting seat is fixedly sleeved outside a main keel support, fixing support rods are fixedly arranged inside a plurality of mounting sleeves, a pouring assembly consists of a first pouring plate and a second pouring plate, one end of a push rod is fixedly connected with a limiting block, the first pouring plate and the second pouring plate consist of an upper supporting plate body and a lower supporting plate body, and the top of the lower supporting plate body is fixedly provided with the upper supporting plate body. So that the first casting plate and the second casting plate are fastened again from the edge.

Description

Building pouring top plate convenient to assemble
Technical Field
The invention relates to the technical field of cast roof plates, in particular to a building cast roof plate convenient to assemble.
Background
And pouring the mixed concrete material into a bin, leveling the bin and tamping the concrete material to be compact in the concrete pouring process. The pouring is required to be continuous and uniform, and the concrete is prevented from being separated; the leveling is to evenly spread the whole poured bin surface and fill the concrete material by a manual or mechanical method; tamping compaction is also called vibration tamping, and includes two types of mechanical vibration and mechanical vibration, and a mechanical vibration method is generally adopted in hydraulic engineering.
The publication No. CN209637206U discloses a high wall concrete one-time pouring forming template, which comprises a flat template, an angle template, a flat top plate and an angle top plate, wherein the flat template is connected with the angle template through a connecting column and is fixed through a positioning pin; the flat template and the angle template are both double-layer structural plates, and each double-layer structural plate comprises a constant temperature layer and a heat insulation layer; a pair of pull ropes is connected between the two opposite double-layer structural plates. The utility model discloses an through adopting the flat die plate, angle template integrated configuration and constant temperature layer, the setting of heat preservation, according to service environment, the water tank provides circulation cold water or hot water for the constant temperature layer, resources are saved, the setting of louvre reduces its self weight simultaneously, constant temperature environment when guaranteeing concrete placement operation improves the construction quality of concrete, improves and pours efficiency, effectively shortens the time limit for a project, and the compound mode is simple, is convenient for install and dismantle, uses in a flexible way, through the equipment template, realizes different wall structure's one-time pouring.
The publication No. CN211164511U discloses a building roof pouring mold, which comprises a bottom plate, a construction joint mold and a mold keel for supporting the bottom plate, wherein a front side template, a right side template, a left side template and a rear side template are fixedly installed on the bottom plate, the construction joint mold comprises a cylinder and a slider I which are fixedly connected with each other, a round hole is formed in the cylinder and a round pipe is inserted in the round hole, a dovetail groove is formed in one side of the bottom plate where the front side template is installed, the slider I is slidably clamped in the dovetail groove of the bottom plate, the building roof pouring mold is divided into a first pouring area and a second pouring area by the construction joint mold, a mold release agent is coated on the round pipe, the position of the construction joint can be adjusted according to the actual situation on site by arranging the construction joint mold capable of sliding left and right, after the construction joint is formed, the round pipe and the cylinder can be sequentially taken down, the recycling of the construction joint mold is realized, and the mold is also solved, the problem that the quality defect of the concrete exists because the wood is embedded in the concrete and cannot be taken out.
When the existing pouring template is used, the whole plate needs to be hoisted to the top of the supporting component for supporting, the roof is large in size, the space needing hoisting is large, the hoisting transportation difficulty exists, meanwhile, when the roof is poured, when the roof space is large, the corresponding supporting column needs to be poured for supporting, the supporting column is generally poured before the roof is poured, two pouring procedures are needed, the machining efficiency is low, in the pouring process, when the pouring is uneven, more pouring gravels can be accumulated in local places, the roof is extruded, and the pouring is uneven.
Disclosure of Invention
The invention aims to provide a building pouring roof convenient to assemble, and aims to solve the problems that when the existing pouring template provided by the background technology is used, an entire sheet of plate needs to be hoisted to the top of a supporting component for supporting, the hoisting and transporting are difficult due to the large size of the roof, the space needing hoisting is large, and meanwhile when the roof is poured, corresponding supporting columns need to be poured for supporting when the roof space is large, and the supporting columns generally need to be poured before the roof is poured, so that two pouring processes are needed, the processing efficiency is low, and in the pouring process, when the pouring is uneven, more pouring gravels are accumulated in local positions to extrude the roof, so that the pouring is uneven.
In order to achieve the purpose, the invention provides the following technical scheme: a building pouring top plate convenient to assemble comprises a supporting component, a first supporting rod, a second supporting rod, a main keel support, a vice keel support, a pouring component, a first pouring plate and a second pouring plate, wherein the supporting component comprises the main keel support, the vice keel support, a fixing support rod, the first supporting rod and the second supporting rod, the keel support is fixedly sleeved outside the main keel support, the two ends of the keel support are fixedly connected with fixing seats, fixing grooves are formed in the fixing seats, the vice keel support is fixedly arranged in the fixing grooves, a plurality of mounting sleeves are fixedly arranged on the side surface of the vice keel support, the mounting sleeves are uniformly arranged at equal intervals, the fixing support rod is fixedly arranged in each mounting sleeve, and the pouring component comprises the first pouring plate and the second pouring plate, the fixed second that is equipped with in one side of first board of pouring pours the board, the spout has all been fixed to have been seted up to one side of first board bottom of pouring and one side of second board bottom of pouring, the inside sliding connection of spout has the slide, the side fixedly connected with slide of slide, the one end fixedly connected with push rod of slide, the one end fixedly connected with stopper of push rod, first board and the second of pouring are pour the board and are constituteed by last supporting plate body and under bracing plate body, the fixed supporting plate body that is equipped with in top of under bracing plate body.
Preferably, the bottom fixed mounting of fossil fragments mount pad has the backing plate, the bottom fixed mounting of backing plate has the second bracing piece, the equal fixed mounting in both ends of main joist support has the supporting seat, just the bottom fixed mounting of supporting seat has first bracing piece.
Preferably, a limiting frame is fixedly mounted on one side of the bottom end of the first pouring plate and the other side of the bottom end of the second pouring plate, and the limiting frame and the limiting block are matched with each other.
Preferably, the side fixed mounting of first board of pouring has two installation casings, two the equal fixed mounting in inside of installation casing has the pivot, and two the middle part of pivot is fixed the cover respectively and is equipped with first toothed disc and second toothed disc, just first toothed disc and second toothed disc intermeshing.
Preferably, two the equal fixed cover in top of pivot is equipped with the wire reel, just the external fixation winding of wire reel has the pull wire, the equal fixed mounting of avris and the second that the board bottom was pour to the first avris of pouring the board bottom has the wire wheel, one side fixed mounting of slide bottom has the link, the pull wire is walked around wire wheel and link fixed connection, the middle part fixed mounting on wire reel top has the hand wheel.
Preferably, the bottom fixed mounting who goes up the supporting plate body has a plurality of end section of thick bamboos, smooth chamber has been seted up to the bottom of end section of thick bamboo, the inside sliding connection in smooth chamber has the feeler lever, the avris fixed mounting who goes up the supporting plate body bottom has the curb plate.
Preferably, a plurality of limiting ring bodies are fixedly mounted at the tops in the lower supporting plate body, a plurality of pressure sensors are fixedly mounted in the limiting ring bodies, and the limiting ring bodies are matched with the contact rods.
Preferably, the side fixed mounting of false keel support has vertical support column to pour the casing, the fixed cover in top that the casing was pour to vertical support column is equipped with the support frame, the top fixed mounting of support frame has horizontal support column to pour the casing, just logical groove has been seted up to the junction that casing and vertical support column were pour to horizontal support column.
Preferably, a clamping plate is fixedly mounted at one side of the bottom end of the first pouring plate, a clamping groove is formed in the clamping plate, a clamping rod is fixedly mounted at one side of the bottom end of the second pouring plate, and the clamping rod and the clamping groove are matched with each other.
The invention has the technical effects and advantages that:
(1) the utility model provides a roof is pour to building convenient to equipment, pour the subassembly and pour the board by two first boards and the second of pouring that can dismantle the concatenation and constitute, the bottom of the board is pour to first board and the second is when the concatenation, at first the concatenation department of pouring board and second through joint board and joint pole's cooperation is tentatively fixed to first board of pouring, then rotate first toothed disc and second toothed disc, it rotates to drive two reels, it slides to stimulate the slide through the pull wire, the stopper that drives its one end when the slide is gliding enters into corresponding spacing inside, thereby pour the board to first board of pouring and second from the edge and fix once more, structural design when dismantling the equipment, convenient transportation, it is all comparatively convenient when hoist and mount and install simultaneously.
(2) The utility model provides a roof is pour to building convenient to equipment, it pours the casing to be equipped with vertical support column in false keel support one side, and vertical support column pours the outside of casing and be equipped with rather than the horizontal support column of being connected and pour the casing, when first board and the second of pouring are pour the board, can carry out vertical support column in step and pour the casing and pour the operation with horizontal support column, make vertical support column and horizontal support column and roof integrated into one piece, and support intensity is high, and connection stability is good, it is convenient to pour simultaneously.
(3) The utility model provides a roof is pour to building convenient to equipment, first board and the second of pouring are pour the board and are constituteed by last supporting plate body and lower support plate body, further dismantle the equipment installation, and go up the backup pad bottom and be equipped with a plurality of feelers and support, cooperate the inside spacing ring body and the pressure sensors of lower support plate body, pour the board when pouring when first board and second are pour the board, when somewhere is pour the unbalance, must pour the volume too much, can pile up in a department, cause the feeler lever here to bear great pressure, thereby trigger the pressure sensors that correspond, send out the police dispatch newspaper, thereby evenly pour and provide supplementary to people.
Drawings
FIG. 1 is a schematic structural diagram of the present invention.
FIG. 2 is a schematic structural diagram of the support assembly of the present invention.
Fig. 3 is a schematic structural view of the pouring shell of the vertical support column of the invention.
Fig. 4 is a schematic structural view of a casting assembly of the present invention.
Fig. 5 is a schematic structural view of a second casting slab according to the present invention.
Fig. 6 is a schematic structural view of an upper support plate body according to the present invention.
Fig. 7 is a schematic structural view of a lower support plate according to the present invention.
Fig. 8 is an enlarged schematic structural view of the trolley of the present invention.
Fig. 9 is an enlarged schematic view of the clamping plate of the present invention.
In the figure: 1. a support assembly; 2. pouring the assembly; 3. a first casting plate; 4. a second pouring plate; 5. a first support bar; 6. a second support bar; 7. a main keel bracket; 8. a keel mounting base; 9. a fixed seat; 10. a false keel bracket; 11. pouring the shell by the vertical support columns; 12. a supporting seat; 13. installing a sleeve; 14. fixing the supporting rod; 15. a slide base; 16. a slide plate; 17. a push rod; 18. hanging a ring; 19. a limiting block; 20. a limiting frame; 21. a wire guide wheel; 22. a pull wire; 23. a hand wheel; 24. a first gear plate; 25. a second gear wheel disc; 26. a wire spool; 27. installing a shell; 28. an upper support plate body; 29. a lower supporting plate body; 30. a feeler lever; 31. a side plate; 32. a bottom cylinder; 33. a limiting ring body; 34. a pressure sensor; 35. a through groove; 36. a support frame; 37. pouring the shell by the transverse support columns; 38. a clamping and connecting plate; 39. a clamping and connecting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
The invention provides a building pouring top plate convenient to assemble as shown in figures 1-9, which comprises a support assembly 1, a first support rod 5, a second support rod 6, a main keel support 7, a keel mounting seat 8, a vice keel support 10, a pouring assembly 2, a first pouring plate 3 and a second pouring plate 4, wherein the support assembly 1 consists of the main keel support 7, the keel mounting seat 8, the vice keel support 10, a fixed support rod 14, the first support rod 5 and the second support rod 6, the keel mounting seat 8 is fixedly sleeved outside the main keel support 7, two ends of the keel mounting seat 8 are fixedly connected with fixed seats 9, fixed grooves are formed inside the fixed seats 9, the vice keel support 10 is fixedly arranged inside the fixed grooves, a plurality of mounting sleeves 13 are fixedly arranged on the side surface of the vice keel support 10, the mounting sleeves 13 are uniformly arranged at equal intervals, the fixing support rods 14 are fixedly arranged inside the mounting sleeves 13, pour subassembly 2 and pour board 4 by first board 3 and the second of pouring and constitute, the board 4 is pour to the fixed second that is equipped with in one side of first board 3 of pouring, the equal fixed spout that has seted up in one side of first board 3 bottom of pouring and one side of the 4 bottoms of second pouring, the inside sliding connection of spout has slide 16, slide 16's side fixedly connected with slide 15, slide 15's one end fixedly connected with push rod 17, the one end fixedly connected with stopper 19 of push rod 17, first board 3 of pouring and second pouring 4 are pour by last supporting plate body 28 and under bracing plate body 29 and are constituteed, under bracing plate body 29's the fixed supporting plate body 28 that is equipped with in top.
The bottom fixed mounting of fossil fragments mount pad 8 has the backing plate, and the bottom fixed mounting of backing plate has second bracing piece 6, and the equal fixed mounting in both ends of main joist support 7 has supporting seat 12, and the bottom fixed mounting of supporting seat 12 has first bracing piece 5, and the avris of supporting component 1 supports through first bracing piece 5, and the middle part of supporting component 1 supports through many second bracing pieces 6.
The equal fixed mounting in one side of first board 3 bottom of pouring and the opposite side of second 4 bottoms of pouring has spacing 20, and spacing 20 and stopper 19 mutually support, and stopper 19 can insert inside spacing 20 to make first board 3 of pouring and the second position of pouring 4 fixed.
Two installation shells 27 are fixedly installed on the side surfaces of the first pouring plate 3, rotating shafts are fixedly installed inside the two installation shells 27, the middle parts of the two rotating shafts are respectively and fixedly sleeved with a first gear disc 24 and a second gear disc 25, the first gear disc 24 is meshed with the second gear disc 25,
the top parts of the two rotating shafts are fixedly sleeved with wire reels 26, traction wires 22 are fixedly wound outside the wire reels 26, the side edge of the bottom end of the first pouring plate 3 and the side edge of the bottom end of the second pouring plate 4 are fixedly provided with wire guide wheels 21, one side of the bottom end of the sliding seat 15 is fixedly provided with a hanging ring 18, the traction wires 22 bypass the wire guide wheels 21 and are fixedly connected with the hanging ring 18, the middle part of the top end of the wire reels 26 is fixedly provided with a hand wheel 23, the hand wheel 23 is rotated to drive the first gear disc 24 to rotate, the first gear disc 24 is meshed with the second gear disc 25, the first gear disc 24 and the second gear disc 25 rotate towards two opposite directions to drive the two wire reels 26 to rotate, the slide seat 15 is pulled to slide through the traction wire 22, the slide seat 15 drives the push rod 17 to move while sliding, the push rod 17 drives the limit block 19 at one end of the push rod 17 to enter the corresponding limit frame 20 while moving, and therefore the first pouring plate 3 and the second pouring plate 4 are fixed again from the edge.
The bottom end of the upper supporting plate body 28 is fixedly provided with a plurality of bottom barrels 32, the bottom end of each bottom barrel 32 is provided with a sliding cavity, the inside of each sliding cavity is slidably connected with a contact rod 30, and the side of the bottom end of the upper supporting plate body 28 is fixedly provided with a side plate 31.
Top fixed mounting in the lower support plate body 29 has a plurality of spacing ring bodies 33, the equal fixed mounting in inside of a plurality of spacing ring bodies 33 has pressure sensors 34, and spacing ring body 33 and feeler lever 30 mutually support, when first board 3 and the second of pouring are pouring, when the place is poured unbalancedly, it is excessive to probably pour the volume, can pile up in a department, the feeler lever 30 that causes here bears great pressure, thereby trigger the pressure sensors 34 that correspond the position, send out the police dispatch newspaper, thereby evenly pour and provide supplementary to people.
The side fixed mounting of false keel support 10 has vertical support column to pour casing 11, and the fixed cover in top that casing 11 was pour to vertical support column is equipped with support frame 36, and the top fixed mounting of support frame 36 has horizontal support column to pour casing 37, and horizontal support column pours casing 37 and vertical support column and pours the junction of casing 11 and seted up logical groove 35.
One side fixed mounting of first 3 bottoms of pouring board has joint board 38, and the joint groove has been seted up to the inside of joint board 38, and one side fixed mounting of second 4 bottoms of pouring board has joint pole 39, and joint pole 39 mutually supports with the joint groove.
Referring to fig. 1-2, specifically, during installation, a keel installation seat 8 is installed on a main keel support 7, a false keel support 10 is installed through a fixing seat 9 on the side surface of the keel installation seat 8, a fixing support rod 14 is installed inside the false keel support 10, a vertical support column pouring shell 11 is arranged on one side of the false keel support 10, a transverse support column pouring shell 37 connected with the vertical support column pouring shell 11 is arranged outside the vertical support column pouring shell 11, when the first pouring plate 3 and the second pouring plate 4 are poured, pouring operation of the vertical support column pouring shell 11 and the transverse support column pouring shell 37 can be synchronously performed, so that the vertical support column and the transverse support column are integrally formed with a top plate, the supporting strength is high, the connection stability is good, and pouring is convenient.
Referring to fig. 1 to 5, specifically, the first casting plate 3 and the second casting plate 4 are both composed of an upper supporting plate 28 and a lower supporting plate 29, and are further detachably assembled and installed, and a plurality of feeler levers 30 and a bottom cylinder 32 are arranged at the bottom of the upper supporting plate 28 for supporting, and are matched with a limiting ring body 33 and a pressure sensor 34 inside the lower supporting plate 29, when the first casting plate 3 and the second casting plate 4 are cast and unbalanced in a certain place, the required casting amount is too much, and the feeler levers 30 are accumulated in one place, so that the feeler levers 30 bear a large pressure, and the pressure sensors 34 in the corresponding place are triggered.
The working principle of the invention is as follows: the pouring assembly 2 is composed of a first pouring plate 3 and a second pouring plate 4 which are detachably spliced, when the bottom ends of the first pouring plate 3 and the second pouring plate 4 are spliced, firstly, a clamping plate 38 at the bottom edge side of the first pouring plate 3 and a clamping rod 39 at the bottom edge side of the second pouring plate 4 are matched to preliminarily fix the spliced part of the first pouring plate 3 and the second pouring plate 4, then a hand wheel 23 is rotated to drive a first gear disc 24 to rotate, the first gear disc 24 is meshed with a second gear disc 25, the first gear disc 24 and the second gear disc 25 rotate towards two opposite directions to drive two wire reels 26 to rotate, a slide carriage 15 is pulled to slide through a traction wire 22, the slide carriage 15 drives a push rod 17 to move while sliding, the push rod 17 drives a limiting block 19 at one end of the push rod 17 to enter into a corresponding limiting frame 20 while moving, so that the first pouring plate 3 and the second pouring plate 4 are fixed again from the edge, the structure design is convenient to transport when the combined type keel frame is disassembled and assembled, the lifting and the installation are both convenient, the bottom of the pouring component 2 is supported by the supporting component 1, when the combined type keel frame is installed, firstly, the keel installing seat 8 is installed on the main keel support 7, then the auxiliary keel support 10 is installed through the fixing seat 9 on the side surface of the keel installing seat 8, the fixing support rod 14 is installed inside the auxiliary keel support 10, the vertical support column pouring shell 11 is arranged on one side of the auxiliary keel support 10, the transverse support column pouring shell 37 connected with the vertical support column pouring shell 11 is arranged outside the vertical support column pouring shell 11, when the first pouring plate 3 and the second pouring plate 4 are poured, the pouring operation of the vertical support column pouring shell 11 and the transverse support column pouring shell 37 can be synchronously carried out, so that the vertical support column and the transverse support column are integrally formed with the top plate, the supporting strength is high, the connection stability is good, and the pouring is convenient at the same time, first board 3 and the second of pouring are pour board 4 and are constituteed by last backup pad body 28 and lower support plate body 29, further demountable assembly installation, and go up backup pad body 28 bottom and be equipped with a plurality of feeler levers 30 and end section of thick bamboo 32 and support, cooperate the inside spacing ring body 33 and the pressure sensors 34 of lower support plate body 29, when first board 3 and the second of pouring are pouring, when the place is poured unbalancedly, must pour the volume too much, can pile up in a department, the feeler lever 30 that causes here bears great pressure, thereby trigger the pressure sensors 34 that corresponds the position, send out the police dispatch newspaper, thereby evenly pour to people and provide supplementary.
In the description of the present invention, unless otherwise expressly specified or limited, the terms "disposed," "mounted," "connected," and "secured" are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integral to; can be mechanically or electrically connected; either directly or indirectly through intervening media, either internally or in any other relationship. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
The standard parts used by the invention can be purchased from the market, and the special-shaped parts can be customized according to the description and the description of the attached drawings.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. A building pouring top plate convenient to assemble comprises a supporting component (1), a first supporting rod (5), a second supporting rod (6), a main keel support (7), a keel mounting seat (8), a vice keel support (10), a pouring component (2), a first pouring plate (3) and a second pouring plate (4), and is characterized in that the supporting component (1) consists of the main keel support (7), the keel mounting seat (8), the vice keel support (10), a fixing supporting rod (14), the first supporting rod (5) and the second supporting rod (6), the keel mounting seat (8) is fixedly sleeved on the outer portion of the main keel support (7), fixing seats (9) are fixedly connected to two ends of the keel mounting seat (8), fixing grooves are formed in the fixing seats (9), the vice keel support (10) is fixedly mounted in the fixing grooves, the utility model discloses a vice keel support (10) is characterized in that side fixed mounting has a plurality of installation sleeve (13), and the even equidistance setting of a plurality of installation sleeve (13), and is a plurality of the equal fixed mounting in inside of installation sleeve (13) has fixed branch (14), pour subassembly (2) and pour board (4) by first board (3) and the second and constitute, first one side of pouring board (3) is fixed to be equipped with the second and pours board (4), the first one side of pouring board (3) bottom and the second are pour the equal fixed spout of having seted up in one side of board (4) bottom, the inside sliding connection of spout has slide (16), the side fixedly connected with slide (15) of slide (16), the one end fixedly connected with push rod (17) of slide (15), the one end fixedly connected with stopper (19) of push rod (17), first board (3) of pouring and second are pour board (4) and constitute by last supporting plate body (28) and under bracing plate body (29) and are supported The top of the lower supporting plate body (29) is fixedly provided with an upper supporting plate body (28);
two mounting shells (27) are fixedly mounted on the side surfaces of the first pouring plate (3), rotating shafts are fixedly mounted in the two mounting shells (27), a first gear disc (24) and a second gear disc (25) are fixedly sleeved in the middle of each rotating shaft, and the first gear disc (24) is meshed with the second gear disc (25); two the equal fixed cover in top of pivot is equipped with wire reel (26), just the external fixation of wire reel (26) twines there is pull wire (22), the equal fixed mounting of avris and the second of pouring board (4) bottom of first avris and second pour board (3) bottom has wire wheel (21), one side fixed mounting of slide (15) bottom has link (18), wire wheel (21) and link (18) fixed connection are walked around in pull wire (22), the middle part fixed mounting on wire reel (26) top has hand wheel (23).
2. The easy-to-assemble cast-in-building roof plate according to claim 1, wherein a base plate is fixedly installed at the bottom end of the keel installation seat (8), a second support rod (6) is fixedly installed at the bottom end of the base plate, support seats (12) are fixedly installed at both ends of the main keel support (7), and first support rods (5) are fixedly installed at the bottom ends of the support seats (12).
3. The easy-to-assemble cast-in-building roof plate according to claim 1, wherein a limiting frame (20) is fixedly mounted on one side of the bottom end of the first casting plate (3) and the other side of the bottom end of the second casting plate (4), and the limiting frame (20) and the limiting block (19) are matched with each other.
4. The easy-to-assemble building pouring top plate of claim 1, wherein a plurality of bottom cylinders (32) are fixedly mounted at the bottom end of the upper supporting plate body (28), a sliding cavity is formed at the bottom end of each bottom cylinder (32), a feeler lever (30) is slidably connected inside the sliding cavity, and a side plate (31) is fixedly mounted at the side of the bottom end of the upper supporting plate body (28).
5. The easy-to-assemble building pouring top plate according to claim 4, wherein a plurality of limiting ring bodies (33) are fixedly mounted at the top of the lower supporting plate body (29), a pressure sensor (34) is fixedly mounted inside each limiting ring body (33), and the limiting ring bodies (33) are matched with the contact rods (30).
6. The easy-to-assemble building pouring top plate according to claim 1, wherein a vertical support column pouring shell (11) is fixedly installed on the side face of the false keel support (10), a support frame (36) is fixedly sleeved on the top of the vertical support column pouring shell (11), a transverse support column pouring shell (37) is fixedly installed on the top of the support frame (36), and a through groove (35) is formed in the joint of the transverse support column pouring shell (37) and the vertical support column pouring shell (11).
7. The easy-to-assemble building pouring top plate according to claim 1, wherein a clamping plate (38) is fixedly installed at one side of the bottom end of the first pouring plate (3), a clamping groove is formed in the clamping plate (38), a clamping rod (39) is fixedly installed at one side of the bottom end of the second pouring plate (4), and the clamping rod (39) and the clamping groove are matched with each other.
CN202011480930.3A 2020-12-16 2020-12-16 Building pouring top plate convenient to assemble Active CN112459461B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011480930.3A CN112459461B (en) 2020-12-16 2020-12-16 Building pouring top plate convenient to assemble

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011480930.3A CN112459461B (en) 2020-12-16 2020-12-16 Building pouring top plate convenient to assemble

Publications (2)

Publication Number Publication Date
CN112459461A CN112459461A (en) 2021-03-09
CN112459461B true CN112459461B (en) 2021-12-14

Family

ID=74802946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011480930.3A Active CN112459461B (en) 2020-12-16 2020-12-16 Building pouring top plate convenient to assemble

Country Status (1)

Country Link
CN (1) CN112459461B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113530209B (en) * 2020-08-13 2022-08-05 张宗玉 Recoverable building template
CN113216602A (en) * 2021-05-21 2021-08-06 深圳市正奥科技发展有限公司 Assembled building template
CN114059793B (en) * 2021-12-01 2022-11-18 成都理工大学 Civil engineering building structure reinforcing apparatus

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470021A (en) * 2013-09-29 2013-12-25 深圳汇林达科技有限公司 Template fast disassembling system
CN103967273A (en) * 2014-04-16 2014-08-06 云南昆钢钢结构有限公司 Concrete formwork supporting device for floor slab concreting

Family Cites Families (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2123478C3 (en) * 1971-05-12 1974-10-24 Armin 7500 Karlsruhe Kleiber Multiple formwork for the production of large-scale prefabricated parts made of concrete or the like
DE4011624A1 (en) * 1990-04-11 1991-10-17 Langer Ruth Geb Layher SCAFFOLDING FLOOR
JP2700770B2 (en) * 1994-12-01 1998-01-21 株式会社白石 Automatic lining device
CN2234476Y (en) * 1995-10-08 1996-09-04 张震 Concrete floor forming board
FR2840001B1 (en) * 2002-05-27 2005-05-27 Jalmat Ind Mediterranee FORMING BEAM AND METHOD OF MANUFACTURING THE SAME
CN102587640B (en) * 2012-03-05 2014-05-07 哈尔滨工业大学 Intelligent formwork and steel-wood combined upright column frame safety monitoring system
CN102587647B (en) * 2012-03-19 2014-12-31 山东普瑞玛模板有限公司 Early-removal formwork system for concreting of constructions comprising beams, plates and columns
CN104196234A (en) * 2014-08-27 2014-12-10 广东浩和绿色建筑研究有限公司 Construction formwork back shore structure
CN206917252U (en) * 2017-04-27 2018-01-23 王玉孝 A kind of concrete-pouring template being easily installed
CN208122277U (en) * 2018-04-08 2018-11-20 中国水利水电第十二工程局有限公司 One kind can collapse template
CN108756227A (en) * 2018-06-05 2018-11-06 温州市中强建设工程有限公司 The structure on two sides and its construction method of a kind of concrete column support top post-cast strip
CN208618798U (en) * 2018-07-12 2019-03-19 重庆房地产职业学院 A kind of construction top board template support component
CN109518962B (en) * 2018-12-03 2021-06-29 佛山博睿恩精密科技有限公司 Semi-solid forming assembling template
CN209145278U (en) * 2018-12-04 2019-07-23 北京住总集团有限责任公司 A kind of constructing device for realizing the disassembly of top plate supporting system subregion
CN109653488A (en) * 2019-01-14 2019-04-19 广西汉瑞金属科技有限公司 A kind of modular unit and its installation method of building template support system
CN209924446U (en) * 2019-04-16 2020-01-10 江苏林之源木业有限公司 Prevent and remove building templates in gap
CN211201177U (en) * 2019-09-16 2020-08-07 中建筑港集团有限公司 Monitoring system for cast-in-place concrete
CN111572143A (en) * 2020-05-22 2020-08-25 北京启顺京腾科技有限责任公司 Composite template for building and manufacturing method thereof
CN111716496B (en) * 2020-06-29 2021-07-16 江苏江中集团有限公司 Preparation mold processing of assembled building cement partition plate
CN111719858B (en) * 2020-07-10 2021-05-11 西安建工市政交通集团有限公司 Steel structure prefabricated formwork for building

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103470021A (en) * 2013-09-29 2013-12-25 深圳汇林达科技有限公司 Template fast disassembling system
CN103967273A (en) * 2014-04-16 2014-08-06 云南昆钢钢结构有限公司 Concrete formwork supporting device for floor slab concreting

Also Published As

Publication number Publication date
CN112459461A (en) 2021-03-09

Similar Documents

Publication Publication Date Title
CN112459461B (en) Building pouring top plate convenient to assemble
CN111749714B (en) Window-by-window layered pouring system for circular water delivery tunnel wall and construction method
CN205243003U (en) Prefabricated U -shaped segment girder template of stub matching
CN112706282A (en) Beam and slab prefabricating process by adopting fold line pre-tensioning method
CN105401717B (en) Creeping formwork frame body
CN213679576U (en) Aerated concrete wallboard transportation construction equipment
CN112252134B (en) Easily-detachable road gutter inlet template and construction method thereof
CN111231070B (en) Prefabricated superimposed sheet preparation mould of assembled
CN211306798U (en) Demoulding device is used in production of concrete prefabricated member
CN109469319B (en) Core tube die lifting equipment of towering special-shaped structure system
CN207633749U (en) A kind of seamless cast-in-place inner separation wall body molding machine
CN210599012U (en) Automatic setting mechanism for secondary lining end mold of tunnel
CN214070037U (en) Novel community security system
CN112459504B (en) Aerated concrete wallboard installation method
CN110528828B (en) Mounting bracket of civil air defense door frame easy to mount and dismount
CN212053740U (en) Reducing type round mould support frame
CN219820120U (en) Device for prefabricating reinforced concrete circular pipe culvert by vibration method
CN214687184U (en) Sewage concrete pipeline pours device
CN115217266B (en) Building external wall panel with heat insulation structure
CN218656711U (en) Sand core feeding table for casting brake disc
CN219470695U (en) Pier body top die supporting device
CN117513604A (en) Low-risk thermal insulation wall pouring molding construction process and aluminum template
CN217400089U (en) Light concrete core-filled composite wallboard with compressive load strength
CN217708294U (en) Hydraulic gantry cable reel pay-off rack with brake
CN112627509B (en) Assembly type wedge-shaped inner support device for shaft-shaped steel-clad concrete wall and construction method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant