CN112459456A - Construction method for H-shaped steel column installation interface operation platform - Google Patents

Construction method for H-shaped steel column installation interface operation platform Download PDF

Info

Publication number
CN112459456A
CN112459456A CN202011099508.3A CN202011099508A CN112459456A CN 112459456 A CN112459456 A CN 112459456A CN 202011099508 A CN202011099508 A CN 202011099508A CN 112459456 A CN112459456 A CN 112459456A
Authority
CN
China
Prior art keywords
steel column
connecting plate
shaped
bracket
operation platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011099508.3A
Other languages
Chinese (zh)
Inventor
张天正
李建辉
武文学
张辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Shougang Construction Group Co Ltd
Original Assignee
Beijing Shougang Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Shougang Construction Group Co Ltd filed Critical Beijing Shougang Construction Group Co Ltd
Priority to CN202011099508.3A priority Critical patent/CN112459456A/en
Publication of CN112459456A publication Critical patent/CN112459456A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/04Means for fastening, supporting, or bracing scaffolds on or against building constructions
    • E04G5/045Means for fastening, supporting, or bracing scaffolds on or against building constructions for fastening scaffoldings on profiles, e.g. I or H profiles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/24Scaffolds essentially supported by building constructions, e.g. adjustable in height specially adapted for particular parts of buildings or for buildings of particular shape, e.g. chimney stacks or pylons

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Clamps And Clips (AREA)

Abstract

A construction method of an H-shaped steel column installation interface operation platform belongs to the technical field of H-shaped steel column installation construction. The U-shaped clamp is fixed with the web plate connecting plate and the wing plate connecting plate to form the adapter, so that the bracket of the operating platform can be welded and fixed with the adapter, the bracket is prevented from being directly welded with the steel column, and the steel column material is prevented from being damaged. The advantage lies in, simple easy operation, utilizes the adaptor that the fastening of U-shaped card and connecting plate formed, has avoided the direct welding with the steel column of operation platform bracket, makes steel column life greatly increased, simultaneously also greatly reduced the potential safety hazard, accumulated valuable experience for similar construction in the future.

Description

Construction method for H-shaped steel column installation interface operation platform
Technical Field
The invention belongs to the technical field of installation and construction of a steel column, and particularly provides a construction method of an H-shaped steel column installation interface operation platform.
Background
During the installation and construction of the H-shaped steel column, the mode that the triangular bracket is directly welded with the flange plate and the web plate of the H-shaped steel column is adopted for the interface operation platform generally, but for the H-shaped steel column made of low alloy steel, the mechanical property of steel is changed because the welding easily causes certain damage to the low alloy steel, so that the service life of the H-shaped steel column is shortened, and meanwhile, the potential safety hazard is increased.
Disclosure of Invention
The invention aims to provide a construction method of an H-shaped steel column installation interface operation platform, which overcomes the problems that welding easily causes certain damage to low alloy steel materials, the mechanical property of steel is changed, the service life of an H-shaped steel column is shortened, and potential safety hazards are increased.
According to the invention, the U-shaped clamp is fixed with the web plate connecting plate and the wing plate connecting plate to form the adapter, so that the bracket of the operating platform can be welded and fixed with the adapter, the bracket is prevented from being directly welded with the steel column, and the material of the steel column is ensured not to be damaged. The method comprises the following specific steps:
firstly, processing a U-shaped clamp 1, a web connecting plate 2 and a wing plate connecting plate 3 according to the section size of an installation steel column 4 (figures 1, 2 and 3);
secondly, fixing the U-shaped clamp 1 with the inner side of a flange plate of the H-shaped steel column 4 through a screw 5 (figure 4);
thirdly, fixing the web connecting plate 2 and the lower bottom surface of the U-shaped card 1 through a screw 5 (figure 5);
fourthly, fixing the wing plate connecting plate 3 and the outer side surface of the U-shaped card 1 through a screw 5 (figure 6);
fifthly, after the screws 5 to be inspected are completely screwed down, the bracket 6 of the operating platform is welded and fixed with the web connecting plate 2 and the wing plate connecting plate 3 of the U-shaped card 1 (figure 7).
The invention has the advantages that the operation is simple and easy, the adapter formed by fastening the U-shaped clamp and the connecting plate is utilized, the bracket of the operation platform is prevented from being directly welded with the steel column, the service life of the steel column is greatly prolonged, the potential safety hazard is greatly reduced, and valuable experience is accumulated for similar construction in the future.
Drawings
Fig. 1 is a front view of a U-shaped card.
Fig. 2 is a front view of a web connection plate.
Figure 3 is a front view of the web of the wing.
FIG. 4 is a top view of the U-shaped clip attached to the steel post.
FIG. 5 is a top view of the web connecting plate and U-shaped card attachment.
FIG. 6 is a top view of the web of the wing plate secured to the U-shaped card.
FIG. 7 is a front view of the bracket, the web plate connecting plate and the wing plate connecting plate of the operation platform welded and fixed.
In the figure, a U-shaped clamp 1, a web connecting plate 2, a wing plate connecting plate 3, a steel column 4, a screw 5 and an operating platform bracket 6.
Detailed Description
Fig. 1-7 illustrate an embodiment of the present invention. The specific implementation mode is as follows:
firstly, processing a U-shaped clamp 1, a web connecting plate 2 and a wing plate connecting plate 3 according to the section size of an installation steel column 4;
secondly, fixing the U-shaped clamp 1 with the inner side of a flange plate of the H-shaped steel column 4 through a screw 5;
thirdly, fixing the web connecting plate 2 and the lower bottom surface of the U-shaped card 1 through a screw 5;
fourthly, fixing the wing plate connecting plate 3 with the outer side surface of the U-shaped card 1 through a screw 5;
fifthly, after the screws 5 to be inspected are completely screwed down, the bracket 6 of the operating platform is welded and fixed with the web connecting plate 2 and the wing plate connecting plate 3 of the U-shaped clamp 1.
In the construction of a steel-making main factory building frame, a new construction method is adopted for an operation platform of an installation butt joint of an H-shaped steel frame steel column made of low alloy steel, namely, a U-shaped clamp is firstly utilized to be fixed with the inner side of a flange plate of the H-shaped steel column through screws, then a web plate connecting plate is fixed with the lower bottom surface of the U-shaped clamp through screws, then a wing plate connecting plate is fixed with the outer side surface of the U-shaped clamp through screws, after all screws to be checked are screwed down, then the bracket of the operation platform is welded and fixed with the web plate and the wing plate connecting plate of the U-shaped clamp, so that the bracket is prevented from being directly welded with the steel column, the steel column material is guaranteed not to be damaged, and the service life.

Claims (1)

1. A construction method of an H-shaped steel column installation interface operation platform is characterized by comprising the following construction steps:
firstly, processing a U-shaped clamp (1), a web connecting plate (2) and a wing plate connecting plate (3) according to the section size of an installation steel column (4);
secondly, fixing the U-shaped clamp (1) with the inner side of a flange plate of the H-shaped steel column (4) through a screw (5);
thirdly, fixing the web connecting plate (2) and the lower bottom surface of the U-shaped card (1) through a screw (5);
fourthly, fixing the wing plate connecting plate (3) with the outer side surface of the U-shaped clamp (1) through a screw (5);
fifthly, after the screws (5) to be inspected are completely screwed down, the bracket (6) of the operating platform is welded and fixed with the web connecting plate (2) and the wing plate connecting plate (3) of the U-shaped clamp (1).
CN202011099508.3A 2020-10-14 2020-10-14 Construction method for H-shaped steel column installation interface operation platform Pending CN112459456A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011099508.3A CN112459456A (en) 2020-10-14 2020-10-14 Construction method for H-shaped steel column installation interface operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011099508.3A CN112459456A (en) 2020-10-14 2020-10-14 Construction method for H-shaped steel column installation interface operation platform

Publications (1)

Publication Number Publication Date
CN112459456A true CN112459456A (en) 2021-03-09

Family

ID=74833441

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011099508.3A Pending CN112459456A (en) 2020-10-14 2020-10-14 Construction method for H-shaped steel column installation interface operation platform

Country Status (1)

Country Link
CN (1) CN112459456A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993746A (en) * 2014-05-05 2014-08-20 中建钢构江苏有限公司 Adjustable steel beam in-place mounting device
CN205637331U (en) * 2016-05-16 2016-10-12 中机国能电力工程有限公司 A staple bolt formula steel corbel for welding box shaped steel post
CN108952135A (en) * 2018-08-22 2018-12-07 中国二冶集团有限公司 The erection method of steel post operation platform fixture and operating platform
CN208650536U (en) * 2018-06-26 2019-03-26 中国华冶科工集团有限公司 Steel column operating platform
CN210918304U (en) * 2019-09-04 2020-07-03 陈红钺 Prefab supports interfacing apparatus for building construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103993746A (en) * 2014-05-05 2014-08-20 中建钢构江苏有限公司 Adjustable steel beam in-place mounting device
CN205637331U (en) * 2016-05-16 2016-10-12 中机国能电力工程有限公司 A staple bolt formula steel corbel for welding box shaped steel post
CN208650536U (en) * 2018-06-26 2019-03-26 中国华冶科工集团有限公司 Steel column operating platform
CN108952135A (en) * 2018-08-22 2018-12-07 中国二冶集团有限公司 The erection method of steel post operation platform fixture and operating platform
CN210918304U (en) * 2019-09-04 2020-07-03 陈红钺 Prefab supports interfacing apparatus for building construction

Similar Documents

Publication Publication Date Title
CN205677340U (en) Elastic rotation cross-arm
CN103255907B (en) Overhanging type scaffold
CN209989982U (en) Novel fastener for connecting structure of transverse and vertical materials of glass curtain wall
CN112459456A (en) Construction method for H-shaped steel column installation interface operation platform
CN211081206U (en) Multi-range segmented electric pole convenient to disassemble and assemble
CN202165696U (en) Cable bridge fixing support clamping device of joist steel
CN210927519U (en) Embedded support fixing table post for small solar power supply electric system
CN201883576U (en) Reinforcing device for hidden frame supported glass curtain wall
CN211449990U (en) Stainless steel three-way pipe convenient to dismouting
CN208486260U (en) Photovoltaic tubular pile head auxiliary device
CN214402673U (en) Switching sub-assembly of H shape steel column interface operation platform
CN216616283U (en) Assembly type steel structure H-shaped column installation correction connection assembly
CN207710707U (en) A kind of tool dismounting hinge point shaft or rolling bearing
CN212689219U (en) Connecting assembly of cross beam and stand column
CN201525710U (en) Standard section joint of tower crane
CN215260202U (en) Air conditioning equipment convenient to installation and change
CN201474207U (en) Assembling type terrace fence
CN204199431U (en) A kind of supporting structure for transformer station
CN204780582U (en) Suspension bridge guardrail
CN216305354U (en) Recyclable wall connecting piece for external scaffold
CN214466811U (en) Water heating pipe joint with good sealing performance
CN203782892U (en) Shockproof device for residence steel structures
CN220621214U (en) Temporary support frame for high-altitude cantilever beam installation
CN107769689B (en) Method for installing photovoltaic bracket on color steel roof
CN214462472U (en) Distance regulator for scaffold bottom layer scaffold board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication