CN112452592A - Gas-insulated bus duct and production process thereof - Google Patents

Gas-insulated bus duct and production process thereof Download PDF

Info

Publication number
CN112452592A
CN112452592A CN202011318400.9A CN202011318400A CN112452592A CN 112452592 A CN112452592 A CN 112452592A CN 202011318400 A CN202011318400 A CN 202011318400A CN 112452592 A CN112452592 A CN 112452592A
Authority
CN
China
Prior art keywords
bus duct
fixed
fixedly provided
fixing
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011318400.9A
Other languages
Chinese (zh)
Inventor
陈卫东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Aimhigh Electric Co ltd
Original Assignee
Jiangsu Aimhigh Electric Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Aimhigh Electric Co ltd filed Critical Jiangsu Aimhigh Electric Co ltd
Priority to CN202011318400.9A priority Critical patent/CN112452592A/en
Publication of CN112452592A publication Critical patent/CN112452592A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0221Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work characterised by the means for moving or conveying the objects or other work, e.g. conveyor belts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0278Arrangement or mounting of spray heads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B15/00Details of spraying plant or spraying apparatus not otherwise provided for; Accessories
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B9/00Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour
    • B05B9/03Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour characterised by means for supplying liquid or other fluent material
    • B05B9/04Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour characterised by means for supplying liquid or other fluent material with pressurised or compressible container; with pump
    • B05B9/0403Spraying apparatus for discharge of liquids or other fluent material, without essentially mixing with gas or vapour characterised by means for supplying liquid or other fluent material with pressurised or compressible container; with pump with pumps for liquids or other fluent material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B30PRESSES
    • B30BPRESSES IN GENERAL
    • B30B3/00Presses characterised by the use of rotary pressing members, e.g. rollers, rings, discs
    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25DPROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
    • C25D17/00Constructional parts, or assemblies thereof, of cells for electrolytic coating
    • CCHEMISTRY; METALLURGY
    • C25ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
    • C25DPROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
    • C25D5/00Electroplating characterised by the process; Pretreatment or after-treatment of workpieces
    • C25D5/08Electroplating with moving electrolyte e.g. jet electroplating

Abstract

The invention relates to the technical field of bus duct production, in particular to a gas-insulated bus duct and a production process thereof. According to the bus duct shell positioning device, the first sliding rail, the first sliding groove, the first sliding block, the air cylinder, the clamping plate and the sensor are arranged, the sensor is arranged to sense and monitor the bus duct shell, when the bus duct is sensed, the sensor controls the air cylinder to stretch out, so that the clamping plate clamps the bus duct shell, the bus duct shell is fixed on the surface of the first conveying device to be positioned, the bus duct shell is prevented from being deviated, production errors are reduced, the production efficiency is improved, and the practicability of the bus duct shell positioning device is improved.

Description

Gas-insulated bus duct and production process thereof
Technical Field
The invention relates to the technical field of bus duct production, in particular to a gas insulation bus duct and a production process thereof.
Background
The bus duct, it is a kind of enclosed metal apparatus formed by copper, aluminium bus post, is used for distributing the greater power for every component of the decentralized system, has replaced the wire and cable more and more in the project of the electric power transmission trunk line of indoor low pressure, has already popularized in developed country abroad, and our country hong Kong, Macau, etc., in Guangdong Guangzhou of our country, the more than 12 stories building distribution room is qualified for the next round of competitions, namely lead to the more than 90% of the main trunk line of the floor and use the bus duct; a bus duct is used from the 630KVA transformer to the power distribution cabinet, and a gas insulation bus duct adopts a separated air insulation type, so that the heat dissipation of the bus duct is improved, and the impedance is reduced; the internal insulation part adopts high-strength epoxy resin, so that the frost resistance and thermal stability of the bus duct are improved.
The gas insulation bus duct is the production through the assembly line when production, when the assembly line transportation, needs to fix a position the centre gripping to the shell of bus duct, but bus duct production assembly line commonly used does not have the anchor clamps to bus duct shell centre gripping, makes the bus duct shell take place the skew easily when carrying to cause production error, and then can influence the production efficiency of gas insulation bus duct, consequently need design gas insulation bus duct and production technology.
Disclosure of Invention
The invention aims to provide a gas-insulated bus duct and a production process thereof, and aims to solve the problems that a common bus duct production line provided in the background art does not have a clamp for clamping a bus duct shell, so that the bus duct shell is easy to deviate during conveying, production errors are caused, and the production efficiency of the gas-insulated bus duct is influenced.
In order to achieve the purpose, the invention provides the following technical scheme: a production process of a gas-insulated bus duct comprises the first step of placing a bus duct shell on the surface of a conveying table, clamping by a positioning device,
secondly, the conveying table conveys the bus duct shell and the positioning device together to the lower part of the press roll for press roll forming,
thirdly, after the bus duct shell is formed, the bus duct shell is continuously conveyed to a paint spraying position to carry out paint spraying and electroplating on the bus duct shell,
and fourthly, after the paint spraying and the electroplating are finished, detecting the shell of the bus duct, and discharging after the detection is qualified.
A gas insulation bus duct production device comprises a device body, wherein the device body comprises a production line body, a first conveying device is fixedly mounted at the top end of the production line body, a first motor is fixedly connected with one end of the first conveying device, a first arch frame is fixedly mounted at the top end of the production line body, a hydraulic telescopic cylinder is fixedly mounted at the top end of the first arch frame, the hydraulic telescopic cylinder penetrates through the first arch frame and extends to one end inside the first arch frame, a pressing roller wheel is fixedly mounted at one end of the pressing roller wheel, a second motor is fixedly connected with one end of the pressing roller wheel, a second conveying device is fixedly mounted at one side of the first conveying device at the top end of the production line body, a third motor is fixedly connected with one end of the second conveying device, a second arch frame is fixedly mounted at the top end of the production line body, and the second arch frame is positioned above the second conveying device, the top fixed mounting of No. two hunch-shaped framves has the lacquer workbin, the one end fixedly connected with water pump of lacquer workbin, the one end fixedly connected with conveyer pipe of water pump, the bottom fixed mounting of No. two hunch-shaped framves has the spray gun, and the one end of spray gun and the one end fixed connection of conveyer pipe, the one end movable mounting of spray gun has the shower nozzle, one side fixed mounting of No. two hunch-shaped framves in production line body top has No. three hunch-shaped framves, the inside fixed mounting of No. three hunch-shaped framves has the detector body, the one end fixed mounting of No. three hunch-shaped framves has the mount, the positive fixed mounting of mount has the display instrument, the one end fixed mounting of production line body has the play work or material rest, the bottom fixed mounting of production line body has No. two fixed plates, the positive fixed mounting, the utility model discloses a positioning clamping mechanism, including the slide rail, the inside both ends of a conveyor and No. two conveyors all fixed mounting have a slide rail, a spout has all been seted up to the inside of slide rail, the inside all even slidable mounting of spout has a slider, the inside all fixed mounting of slider has the cylinder, the all fixedly connected with sensor of one end of cylinder, the all fixed mounting of one end of grip block has the sensor.
Preferably, the one end of lacquer workbin is provided with the closing mechanism, the closing mechanism includes the fixed axle, the one end fixed mounting of lacquer workbin has the fixed axle, the one end movable mounting of fixed axle has the baffle, the one end fixed mounting of baffle has a connecting axle No. one, the one end fixed mounting of a connecting axle has a fixing clip pole No. one, the one end fixed mounting of baffle has the connecting plate, the one end fixed mounting of connecting plate has No. two springs, and the one end and a fixing clip pole fixed connection of No. two springs, the one end fixed mounting of lacquer workbin has the fixed block, a draw-in groove has been seted up to the one end of fixed block, the one end of a fixing clip pole extends to the inside of a draw-in groove.
Preferably, the both ends of shower nozzle are provided with fixed establishment, fixed establishment includes fixed box, the equal fixed mounting in both ends of shower nozzle has fixed box, the inside movable mounting all of fixed box has the fixing clip to tie, the inside fixed mounting all of fixed box has No. three springs, and the one end and the fixing clip of No. three springs bolt fixed connection, the one end fixed mounting of fixing clip bolt has a pull rod No. one, and the one end of a pull rod extends to the outside of fixed box, No. two draw-in grooves have all been seted up at the both ends of spray gun, the one end of fixing clip bolt all extends to the inside of No. two draw-in grooves.
Preferably, the front surface of the third arch frame is provided with an overhauling mechanism, the overhauling mechanism comprises a hinge, hinges are uniformly and fixedly arranged on the front surface of the third arch frame, one end of each hinge is fixedly provided with an access door, the front of the access door is fixedly provided with a second fixing clamping rod, the front of the third arch frame is fixedly provided with a connecting block, a cavity is arranged inside the connecting block, a second connecting shaft is fixedly arranged inside the cavity, one end of the second connecting shaft is fixedly connected with a third fixing clamping rod, a fourth spring is fixedly arranged in the cavity, one end of the fourth spring is fixedly connected with the third fixing clamping rod, one end of the second fixing clamping rod extends into the cavity and is mutually clamped with the third fixing clamping rod, no. two pull rods are fixedly mounted at one end of the third fixing clamping rod, and one end of each pull rod extends to the outer side of the connecting block.
Preferably, the front of mount is provided with clean mechanism, clean mechanism includes No. two slide rails, the even fixed mounting in front of mount has No. two slide rails, No. two spouts have all been seted up to the inside of No. two slide rails, the inside of No. two spouts all has a slider No. two, the one end of No. two sliders all fixedly connected with cleaning brush, and the one end of cleaning brush supports the surface of closing at the display instrument.
Preferably, the one end of ejection of compact frame is fixed with the fixed plate No. one, the even fixed mounting of one end of fixed plate has a spring No. one, the one end of a spring all fixed mounting have the stopper.
Preferably, the clamping plate is provided with anti-skid grains at one end.
Preferably, a first magnetic block is fixedly mounted at one end of the second sliding block, a second magnetic block is fixedly mounted at one end of the second sliding chute, and the first magnetic block and the second magnetic block are mutually adsorbed.
Compared with the prior art, the invention has the beneficial effects that:
1. through being provided with slide rail, spout, slider, cylinder, grip block and sensor No. one, set up the sensor and respond to the monitoring to the bus duct shell, when sensing the bus duct, sensor control cylinder stretches out for the grip block carries out the centre gripping to the bus duct shell, fixes the bus duct shell and fixes a position conveyor's on the surface, prevents that the skew from appearing in the bus duct shell, reduces the error of production, improves production efficiency, has promoted the practicality of this device.
2. Through being provided with fixed axle, baffle, connecting axle, a fixing clip pole, connecting plate, No. two springs, fixed block and draw-in groove, the fixing clip pole of baffle one end promotes the block by the elasticity of No. two springs in the fixed block of a draw-in groove inside, fixes the one end at the lacquer workbin with the baffle, makes it seal the lacquer case, prevents that the inside lacquer of lacquer workbin from outwards unrestrained, has promoted the practicality of this device.
Drawings
FIG. 1 is a schematic sectional elevation view of the structure of the present invention;
FIG. 2 is a schematic front view of the structure of the present invention;
FIG. 3 is a schematic top view of the structure of the present invention;
FIG. 4 is a partially enlarged view of the positioning and clamping mechanism of the present invention;
FIG. 5 is an enlarged view of a portion of the structure at A in FIG. 1 according to the present invention;
FIG. 6 is an enlarged view of a portion of the structure shown at B in FIG. 1 according to the present invention;
FIG. 7 is an enlarged schematic view of a portion of the structure of the maintenance mechanism of the present invention;
FIG. 8 is an enlarged view of a portion of the cleaning mechanism of the present invention;
fig. 9 is a partially enlarged schematic view of the structure of the discharging frame of the invention.
In the figure: 100. a device body; 110. a production line body; 111. a first conveying device; 112. a first arch frame; 113. a hydraulic telescopic cylinder; 114. a pressure roller; 115. a second conveying device; 116. a second arch frame; 117. a paint box; 118. a water pump; 119. a delivery pipe; 120. a spray gun; 121. a spray head; 122. a third arch frame; 123. a detector body; 124. a fixed mount; 125. a display instrument; 126. a discharging frame; 127. a first fixing plate; 128. a first spring; 129. a blocking block; 130. a second fixing plate; 131. a control panel; 200. positioning the clamping mechanism; 210. a first slide rail; 211. a first chute; 212. a first sliding block; 213. a cylinder; 214. a clamping plate; 215. a sensor; 216. anti-skid lines; 300. a sealing mechanism; 310. a fixed shaft; 311. a baffle plate; 312. a first connecting shaft; 313. fixing the clamping rod; 314. a connecting plate; 315. a second spring; 316. a fixed block; 317. a first card slot; 400. a fixing mechanism; 410. a fixing box; 411. fixing the clamping bolt; 412. a third spring; 413. a first pull rod; 414. a second card slot; 500. a maintenance mechanism; 510. a hinge; 511. an access door; 512. fixing a clamping rod II; 513. connecting blocks; 514. a cavity; 515. a second connecting shaft; 516. fixing a clamping rod III; 517. a fourth spring; 518. a second pull rod; 600. a cleaning mechanism; 610. a second sliding rail; 611. a second chute; 612. a second sliding block; 613. a cleaning brush; 614. a first magnetic block; 615. and a second magnetic block.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-9, an embodiment of the present invention is shown:
a production process of a gas-insulated bus duct comprises the first step of placing a bus duct shell on the surface of a conveying table, clamping by a positioning device,
secondly, the conveying table conveys the bus duct shell and the positioning device together to the lower part of the press roll for press roll forming,
thirdly, after the bus duct shell is formed, the bus duct shell is continuously conveyed to a paint spraying position to carry out paint spraying and electroplating on the bus duct shell,
and fourthly, after the paint spraying and the electroplating are finished, detecting the shell of the bus duct, and discharging after the detection is qualified.
The gas-insulated bus duct production device comprises a device body 100, wherein a hydraulic telescopic cylinder 113, a water pump 118, a spray gun 120, a detector body 123 and a sensor 215 which are used in the device body 100 are all products which can be directly purchased in the market, the principle and the connection mode of the device body are the prior art which are well known to those skilled in the art, and therefore the description is omitted, the device body 100 comprises a production line body 110, a first conveying device 111 is fixedly installed at the top end of the production line body 110, a first motor is fixedly connected to one end of the first conveying device 111, a first arch frame 112 is fixedly installed at the top end of the production line body 110, a hydraulic telescopic cylinder 113 is fixedly installed at the top end of the first arch frame 112, a pressure roller wheel 114 is fixedly installed at one end, which extends to the inside of the first arch frame 112, and a second motor is fixedly connected to one end of the pressure roller wheel 114, a second conveying device 115 is fixedly installed on one side of a first conveying device 111 at the top end of the production line body 110, a third motor is fixedly connected to one end of the second conveying device 115, a second arch 116 is fixedly installed at the top end of the production line body 110, the second arch 116 is located above the second conveying device 115, a paint box 117 is fixedly installed at the top end of the second arch 116, a water pump 118 is fixedly connected to one end of the paint box 117, a conveying pipe 119 is fixedly connected to one end of the water pump 118, a spray gun 120 is fixedly installed at the bottom end of the second arch 116, one end of the spray gun 120 is fixedly connected to one end of the conveying pipe 119, a spray head 121 is movably installed at one end of the spray gun 120, a third arch 122 is fixedly installed on one side of the second arch 116 at the top end of the production line body 110, a detector body 123 is fixedly installed inside the third arch 122, and a fixing frame 124 is fixedly installed at one end of the third arch, the front of the fixing frame 124 is fixedly provided with a display 125, one end of the production line body 110 is fixedly provided with a discharge frame 126, the bottom end of the production line body 110 is fixedly provided with a second fixing plate 130, the front of the second fixing plate 130 is fixedly provided with a control panel 131, the output end of the control panel 131 is respectively electrically connected with the input end of the hydraulic telescopic cylinder 113, the input end of the water pump 118, the input end of the spray gun 120, the input end of the detector body 123 and the input end of the sensor 215, the first conveying device 111 and the second conveying device 115 are internally provided with a positioning and clamping mechanism 200, the positioning and clamping mechanism 200 comprises a first slide rail 210, two ends of the first conveying device 111 and the second conveying device 115 are fixedly provided with a first slide rail 210, the first slide groove 211 is arranged in the first slide rail 210, the first slide block 212 is uniformly and slidably arranged in the first slide groove 211, and an air cylinder 213 is fixedly arranged in, all fixedly connected with sensors 215 of one end of cylinder 213, all fixed mounting of one end of grip block 214 has sensor 215, set up sensor 215 and respond to the monitoring to the bus duct shell, when sensing the bus duct, sensor 215 control cylinder 213 stretches out, make grip block 214 carry out the centre gripping to the bus duct shell, fix the bus duct shell at conveyor 111 on the surface fix a position, prevent that the skew from appearing in the bus duct shell, reduce the error of production, and the production efficiency is improved, and the practicality of the device is improved.
Further, one end of the paint box 117 is provided with a sealing mechanism 300, the sealing mechanism 300 comprises a fixed shaft 310, one end of the paint box 117 is fixedly provided with the fixed shaft 310, one end of the fixed shaft 310 is movably provided with a baffle 311, one end of the baffle 311 is fixedly provided with a first connecting shaft 312, one end of the first connecting shaft 312 is fixedly provided with a first fixing clamping rod 313, one end of the baffle 311 is fixedly provided with a connecting plate 314, one end of the connecting plate 314 is fixedly provided with a second spring 315, one end of the second spring 315 is fixedly connected with the first fixing clamping rod 313, one end of the paint box 117 is fixedly provided with a fixing block 316, one end of the fixing block 316 is provided with a first clamping groove 317, one end of the first fixing clamping rod 313 extends to the inside of the first clamping groove 317, the first fixing clamping rod 313 at one end of the baffle 311 is pushed by the elasticity of the second spring 315 to be clamped in, fix baffle 311 in the one end of paint case 117, make it seal paint case 117, prevent that the inside paint vehicle of paint case 117 from outwards spilling, promoted the practicality of this device.
Further, two ends of the nozzle 121 are provided with fixing mechanisms 400, each fixing mechanism 400 comprises a fixing box 410, two ends of the nozzle 121 are fixedly provided with the fixing boxes 410, the fixing bolts 411 are movably arranged in the fixing boxes 410, the third springs 412 are fixedly arranged in the fixing boxes 410, one end of the third spring 412 is fixedly connected with the fixed bolt 411, one end of the fixed bolt 411 is fixedly provided with a first pull rod 413, one end of the first pull rod 413 extends to the outer side of the fixed box 410, two ends of the spray gun 120 are both provided with a second clamping groove 414, one end of the fixed clamping bolt 411 extends to the inner part of the second clamping groove 414, the fixed clamping bolt 411 is arranged to be clamped in the second clamping groove 414 arranged at two ends of the spray gun 120, can fix shower nozzle 121, prevent that shower nozzle 121 from taking place to drop in the spraying, also conveniently dismantle the washing to shower nozzle 121 simultaneously, promote the practicality of this device.
Further, the front surface of the third arch frame 122 is provided with an overhaul mechanism 500, the overhaul mechanism 500 comprises a hinge 510, the front surface of the third arch frame 122 is uniformly and fixedly provided with the hinge 510, one end of the hinge 510 is fixedly provided with an overhaul door 511, the front surface of the overhaul door 511 is fixedly provided with a second fixing clamping rod 512, the front surface of the third arch frame 122 is fixedly provided with a connecting block 513, the inside of the connecting block 513 is provided with a cavity 514, the inside of the cavity 514 is fixedly provided with a second connecting shaft 515, one end of the second connecting shaft 515 is fixedly connected with a third fixing clamping rod 516, the inside of the cavity 514 is fixedly provided with a fourth spring 517, one end of the fourth spring 517 is fixedly connected with the third fixing clamping rod 516, one end of the second fixing clamping rod 512 extends to the inside of the cavity 514 to be clamped with the third fixing clamping rod 516, one end of the third fixing clamping rod 516 is fixedly provided with a second pull rod 518, and one end of the second pull rod 518 extends to the outside of the, the access door 511 that can open is set up in the front of No. three bow member 122, conveniently maintains it when detector body 123 breaks down, seals detector body 123 in the inside of No. three bow member 122 simultaneously and has also played certain guard action, prevents that it from receiving the destruction, has promoted the practicality of this device.
Further, the front of mount 124 is provided with cleaning mechanism 600, cleaning mechanism 600 includes No. two slide rails 610, the even fixed mounting in front of mount 124 has No. two slide rails 610, No. two spouts 611 have all been seted up to the inside of No. two slide rails 610, the inside of No. two spouts 611 all has slidable mounting No. two sliders 612, the one end of No. two sliders 612 all fixedly connected with cleaning brush 613, and the one end of cleaning brush 613 supports the surface of closing at display instrument 125, the pulling cleaning brush 613 can clean the surface of display instrument 125, detach the dust on display instrument 125 surface, conveniently look over data, the condition that timely understanding detected, reduce the error of production, the practicality of this device has been promoted.
Further, the one end of play work or material rest 126 is fixed with fixed plate 127 No. one, the even fixed mounting of one end of fixed plate 127 has spring 128 No. one, the one end of spring 128 is all fixed mounting to have and blocks piece 129, it can play the effect that blocks when the gas insulated bus duct ejection of compact to set up fixed plate 127, spring 128 and block piece 129 can play the effect of buffering simultaneously, the striking that receives when making the bus duct ejection of compact is harm, make its more stable ejection of compact that carries on, the practicality of this device has been promoted.
Further, antiskid line 216 has all been seted up to the one end of grip block 214, sets up the frictional force that antiskid line 216 can increase grip block 214 centre gripping, makes better the fixing a position of bus duct shell, has promoted the practicality of this device.
Furthermore, a first magnetic block 614 is fixedly mounted at one end of the second slider 612, a second magnetic block 615 is fixedly mounted at one end of the second sliding groove 611, the first magnetic block 614 and the second magnetic block 615 are mutually adsorbed, the first magnetic block 614 and the second magnetic block 615 are adsorbed, the cleaning brush 613 can be fixed above the display 125, the cleaning brush 613 is prevented from slipping off to influence data viewing, and the practicability of the device is improved.
The working principle is as follows: when the gas insulation bus duct is produced, firstly, a bus duct shell is placed on the first conveying device 111, the operation control panel 131 starts the sensor 215, after the sensor 215 senses the shell position, the control cylinder 213 stretches out, the clamping plate 214 clamps and positions the bus duct shell, after the positioning is completed, the operation control panel 131 controls the first motor to start, the first conveying device 111 conveys the bus duct shell, after the bus duct shell is conveyed to the lower part of the first arch frame 112, the first fixing clamping rod 313 is operated to control the second motor and the hydraulic telescopic cylinder 113 to start, and the pressure roller wheel 114 performs pressure roller forming on the bus duct shell.
Then, the molded bus duct shell is conveyed to a second conveying device 115, a positioning and clamping mechanism 200 arranged on the second conveying device 115 also clamps and positions the bus duct shell, then a third motor is started by operating a control panel 131 to enable the second conveying device 115 to convey the molded shell, and after the molded shell is conveyed to the lower part of a second arch-shaped frame 116, a water pump 118 and a spray gun 120 are controlled to spray paint and electroplate the bus duct shell.
After painting and electroplating, the bus duct shell is conveyed to the lower part of the third arch frame 122, the detector body 123 is started to detect the bus duct shell, the detected numerical value is displayed on the display instrument 125, and after the detection is qualified, the formed gas-insulated bus duct is discharged.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (9)

1. The production process of the gas-insulated bus duct is characterized in that: the specific production process comprises the following steps:
firstly, a bus duct shell is placed on the surface of a conveying table and is clamped by a positioning device,
secondly, the conveying table conveys the bus duct shell and the positioning device together to the lower part of the press roll for press roll forming,
thirdly, after the bus duct shell is formed, the bus duct shell is continuously conveyed to a paint spraying position to carry out paint spraying and electroplating on the bus duct shell,
and fourthly, after the paint spraying and the electroplating are finished, detecting the shell of the bus duct, and discharging after the detection is qualified.
2. A gas-insulated busway production apparatus according to claim 1, comprising an apparatus body (100), characterized in that: the device body (100) comprises a production line body (110), a first conveying device (111) is fixedly mounted at the top end of the production line body (110), a first motor is fixedly connected with one end of the first conveying device (111), a first arch frame (112) is fixedly mounted at the top end of the production line body (110), a hydraulic telescopic cylinder (113) is fixedly mounted at the top end of the first arch frame (112), the hydraulic telescopic cylinder (113) penetrates through the first arch frame (112) and extends to one end inside the first arch frame (112), a pressing roller (114) is fixedly mounted at one end of the pressing roller (114), a second motor is fixedly connected with one end of the pressing roller (114), a second conveying device (115) is fixedly mounted at one side of the first conveying device (111) at the top end of the production line body (110), a third motor is fixedly connected with one end of the second conveying device (115), a second arch frame (116) is fixedly mounted at the top end of the production line body (110), and No. two hunch-shaped framves (116) are located the top of No. two conveyor (115), the top fixed mounting of No. two hunch-shaped framves (116) has lacquer workbin (117), the one end fixedly connected with water pump (118) of lacquer workbin (117), the one end fixedly connected with conveyer pipe (119) of water pump (118), the bottom fixed mounting of No. two hunch-shaped framves (116) has spray gun (120), and the one end of spray gun (120) and the one end fixed connection of conveyer pipe (119), the one end movable mounting of spray gun (120) has shower nozzle (121), one side fixed mounting of No. two hunch-shaped framves (116) in production line body (110) top has No. three hunch-shaped framves (122), the inside fixed mounting of No. three hunch-shaped framves (122) has detector body (123), the one end fixed mounting of No. three hunch-shaped framves (122) has mount (124), the positive, one end of the production line body (110) is fixedly provided with a discharge frame (126), the bottom end of the production line body (110) is fixedly provided with a second fixing plate (130), the front of the second fixing plate (130) is fixedly provided with a control panel (131), the insides of the first conveying device (111) and the second conveying device (115) are both provided with a positioning clamping mechanism (200), the positioning clamping mechanism (200) comprises a first sliding rail (210), the two ends of the insides of the first conveying device (111) and the second conveying device (115) are both fixedly provided with a first sliding rail (210), the inside of the first sliding rail (210) is both provided with a first sliding groove (211), the inside of the first sliding groove (211) is both provided with a first sliding block (212) in an even sliding manner, the inside of the first sliding block (212) is both fixedly provided with an air cylinder (213), and one end of the air cylinder (213) is both fixedly connected with a clamping plate (214), and one end of the clamping plate (214) is fixedly provided with a sensor (215).
3. A gas-insulated bus duct production apparatus as set forth in claim 2, wherein: one end of the paint box (117) is provided with a sealing mechanism (300), the sealing mechanism (300) comprises a fixed shaft (310), a fixed shaft (310) is fixedly arranged at one end of the paint box (117), a baffle plate (311) is movably arranged at one end of the fixed shaft (310), one end of the baffle (311) is fixedly provided with a first connecting shaft (312), one end of the first connecting shaft (312) is fixedly provided with a first fixing clamping rod (313), one end of the baffle (311) is fixedly provided with a connecting plate (314), one end of the connecting plate (314) is fixedly provided with a second spring (315), one end of the second spring (315) is fixedly connected with the first fixing clamping rod (313), one end of the paint box (117) is fixedly provided with a fixed block (316), one end of the fixed block (316) is provided with a first clamping groove (317), one end of the first fixing clamping rod (313) extends to the inside of the first clamping groove (317).
4. A gas-insulated bus duct production apparatus as set forth in claim 2, wherein: the both ends of shower nozzle (121) are provided with fixed establishment (400), fixed establishment (400) are including fixed box (410), the both ends of shower nozzle (121) are all fixed mounting have fixed box (410), the inside of fixed box (410) is all movable mounting has fixing clip bolt (411), the inside of fixed box (410) is all fixed mounting has No. three spring (412), and the one end and the fixing clip bolt (411) fixed connection of No. three spring (412), the one end fixed mounting of fixing clip bolt (411) has pull rod (413), and the one end of a pull rod (413) extends to the outside of fixed box (410), No. two draw-in grooves (414) have all been seted up at the both ends of spray gun (120), the one end of fixing clip bolt (411) all extends to the inside of No. two draw-in grooves (414).
5. A gas-insulated bus duct production apparatus as set forth in claim 2, wherein: the front of the third arch-shaped frame (122) is provided with an overhaul mechanism (500), the overhaul mechanism (500) comprises a hinge (510), the front of the third arch-shaped frame (122) is uniformly and fixedly provided with the hinge (510), one end of the hinge (510) is fixedly provided with an access door (511), the front of the access door (511) is fixedly provided with a second fixing clamping rod (512), the front of the third arch-shaped frame (122) is fixedly provided with a connecting block (513), the inside of the connecting block (513) is provided with a cavity (514), the inside of the cavity (514) is fixedly provided with a second connecting shaft (515), one end of the second connecting shaft (515) is fixedly connected with a third fixing clamping rod (516), the inside of the cavity (514) is fixedly provided with a fourth spring (517), and one end of the fourth spring (517) is fixedly connected with the third fixing clamping rod (516), the inside and No. three fixed calorie of pole (516) mutual block that the one end of No. two fixed calorie of pole (512) extends to cavity (514), the one end fixed mounting of No. three fixed calorie of pole (516) has No. two pull rods (518), and the one end of No. two pull rods (518) extends to the outside of connecting block (513).
6. A gas-insulated bus duct production apparatus as set forth in claim 2, wherein: the front of mount (124) is provided with clean mechanism (600), clean mechanism (600) includes No. two slide rails (610), the even fixed mounting in front of mount (124) has No. two slide rails (610), No. two spout (611) have all been seted up to the inside of No. two slide rails (610), the inside of No. two spout (611) has No. two slider (612) of slidable mounting all, the one end of No. two slider (612) all fixedly connected with cleaning brush (613), and the one end of cleaning brush (613) is to closing on the surface of display instrument (125).
7. A gas-insulated bus duct production apparatus as set forth in claim 2, wherein: one end of the discharging frame (126) is fixed with a fixing plate (127), one end of the fixing plate (127) is uniformly and fixedly provided with a spring (128), and one end of the spring (128) is fixedly provided with a blocking block (129).
8. A gas-insulated bus duct production apparatus as set forth in claim 2, wherein: one end of the clamping plate (214) is provided with anti-skid grains (216).
9. A gas-insulated bus duct production device according to claim 6, characterized in that: one end of the second sliding block (612) is fixedly provided with a first magnetic block (614), one end of the second sliding groove (611) is fixedly provided with a second magnetic block (615), and the first magnetic block (614) and the second magnetic block (615) are mutually adsorbed.
CN202011318400.9A 2020-11-23 2020-11-23 Gas-insulated bus duct and production process thereof Pending CN112452592A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011318400.9A CN112452592A (en) 2020-11-23 2020-11-23 Gas-insulated bus duct and production process thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011318400.9A CN112452592A (en) 2020-11-23 2020-11-23 Gas-insulated bus duct and production process thereof

Publications (1)

Publication Number Publication Date
CN112452592A true CN112452592A (en) 2021-03-09

Family

ID=74800051

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011318400.9A Pending CN112452592A (en) 2020-11-23 2020-11-23 Gas-insulated bus duct and production process thereof

Country Status (1)

Country Link
CN (1) CN112452592A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113381257A (en) * 2021-04-29 2021-09-10 贵州华夏电气有限公司 Power bus duct connector assembling system and assembling method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113381257A (en) * 2021-04-29 2021-09-10 贵州华夏电气有限公司 Power bus duct connector assembling system and assembling method thereof

Similar Documents

Publication Publication Date Title
CN205942572U (en) Dustproof computer case
CN209362828U (en) A kind of television enclosure paint line
CN112452592A (en) Gas-insulated bus duct and production process thereof
CN207114079U (en) A kind of pantograph carbon slide loss real-time monitoring device
CN214917270U (en) Gas insulation bus duct production device
CN214868456U (en) Efficient welding tool mechanism for air pipe flange
CN208485319U (en) A kind of electrothermal tube feeding device
CN204741228U (en) Insulating couple of three -phase short circuit grounding
CN206022901U (en) A kind of can fixing internal cable electric cabinet
CN106081199B (en) A kind of minaudiere installing mechanism
CN104540360B (en) Mounting bracket adjustable type wall cabinet
CN206516965U (en) A kind of drawer type integral low pressure distribution JP cabinets
CN212780305U (en) Quartz glass product can detection device
CN207082708U (en) DTU line loss terminal current automatic crimping structures
CN220688029U (en) Gas input device for sizing elevator door
CN207027679U (en) A kind of shedding mechanism of lampshade extruder
CN206283740U (en) It is easy to data center's integrated box body of positive foliation line
CN216180440U (en) Rack is adjusted with being convenient for to mechanical flange
CN219740986U (en) Network server storage rack convenient to sort and place
CN214031617U (en) Adjustable lifting machine aircraft nose structure
CN211776306U (en) Steel pipe pole for power transmission
CN213227285U (en) Injection molding machine collector convenient to assemble and disassemble
CN204697447U (en) A kind of anti-slip server bracket
CN210956366U (en) Closed transformer becomes rack
CN208453376U (en) It is a kind of to automatically adjust horizontal labelling machine rack

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination