CN112443046A - Steel construction leading-in formula fast-assembling connection structure - Google Patents

Steel construction leading-in formula fast-assembling connection structure Download PDF

Info

Publication number
CN112443046A
CN112443046A CN201910811615.5A CN201910811615A CN112443046A CN 112443046 A CN112443046 A CN 112443046A CN 201910811615 A CN201910811615 A CN 201910811615A CN 112443046 A CN112443046 A CN 112443046A
Authority
CN
China
Prior art keywords
cross beam
leading
connecting plate
pin
clamping
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910811615.5A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan Aluminum Workshop Environmental Material Technology Co ltd
Original Assignee
Foshan Aluminum Workshop Environmental Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan Aluminum Workshop Environmental Material Technology Co ltd filed Critical Foshan Aluminum Workshop Environmental Material Technology Co ltd
Priority to CN201910811615.5A priority Critical patent/CN112443046A/en
Publication of CN112443046A publication Critical patent/CN112443046A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2418Details of bolting

Abstract

The invention provides a steel structure leading-in type quick-assembly connecting structure which comprises a cross beam and an upright post which are vertically connected with each other, wherein the bottom surface of the tail end of the cross beam is provided with an opening, a leading-in pin is fixedly arranged in the cross beam corresponding to the opening of the cross beam, through holes are penetratingly arranged on the top surface and the bottom surface of the cross beam for bolts to pass through, a connecting plate is fixedly arranged on the side surface of the upright post, a clamping block matched with the leading-in pin is arranged at the top of the connecting plate, a clamping opening is arranged at the top of the clamping block and used for clamping the leading-in pin, a screw hole is also arranged on the connecting plate, when the leading-in pin is clamped at the clamping opening, the screw hole is. The invention greatly reduces the manufacturing cost, shortens the on-site construction time, has the positioning function in the assembling process, improves the safety factor in the assembling process, and ensures the use safety of the steel structure by adopting standardized production of the assembly parts.

Description

Steel construction leading-in formula fast-assembling connection structure
Technical Field
The invention relates to the technical field of building curtain wall steel structures, light steel structures and fast-assembly house building structures, in particular to a steel structure leading-in type fast-assembly connecting structure.
Background
The building field, many places need be used to the steelframe and set up the steel construction in order to satisfy the building demand, if building curtain steel construction, light steel construction, fast-assembling house building structure, traditional technique adopts the welding, perhaps adopts being connected of bolt and nut to set up the steel construction, but this kind of mode cost is high, and when setting up, need fix a position moreover, just can fix, consequently the manual work that needs is many, the speed of setting up is slow, set up and dismantle the inflexibility, influence the engineering progress.
Disclosure of Invention
Aiming at the problems, the invention provides a steel structure leading-in type quick-assembly connecting structure, which greatly reduces the manufacturing cost, improves the overall efficiency, shortens the construction time of a site, has the positioning function in the assembling process, improves the safety factor in the assembling process, and ensures the use safety of a steel structure by adopting standardized production of assembling parts.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows:
the utility model provides a steel construction leading-in formula fast-assembling connection structure, crossbeam and stand including mutually perpendicular connects, crossbeam end-to-end connection is in the stand side, the crossbeam is square pipe, its characterized in that with the stand: the bottom surface opening at the tail end of the cross beam is fixedly provided with a leading-in pin inside the cross beam corresponding to the cross beam opening, a through hole is arranged in the top surface and the bottom surface of the cross beam in a penetrating mode and is used for a bolt to pass through, a connecting plate is fixedly arranged on the side surface of the stand column, a clamping block matched with the leading-in pin is arranged at the top of the connecting plate, a clamping opening is arranged at the top of the clamping block and is used for clamping the leading-in pin, a screw hole is further formed in the connecting plate, when the leading-in pin is clamped at the clamping opening, the screw hole corresponds to the through hole, and the bolt penetrates.
Preferably, the two clamping blocks are arranged oppositely.
Preferably, the number of the through holes is two, and the through holes and the screw holes are in one-to-one correspondence.
Preferably, when the guide pin is clamped in the bayonet, the top of the connecting plate is attached to the bottom surface of the cross beam.
Preferably, the connecting plate is horizontally arranged.
Preferably, the length of the connecting plate is greater than the opening length of the bottom surface of the cross beam.
Preferably, the width of the connecting plate is the same as the width of the cross beam.
Preferably, the guide pin is cylindrical in shape.
The invention has the beneficial effects that:
when the guide pin is assembled, the guide pin is clamped into the clamping opening of the clamping block to play a role in positioning, then the bolt is installed, and the cross beam and the upright post are connected and fixed.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is an exploded view of the present invention;
fig. 3 is a perspective view of the cross member 1;
fig. 4 is a schematic view showing the engagement of the lead-in pin 3 with the latch 6.
Detailed Description
The technical solution of the present invention is described below with reference to the accompanying drawings and examples.
As shown in fig. 1 to 4, the steel structure lead-in type quick-assembly connecting structure of the invention comprises a cross beam 1 and an upright post 2 which are vertically connected with each other, the end of the cross beam 1 is connected with the side surface of the upright post 2, the cross beam 1 and the upright post 2 are square tubes, the bottom surface of the end of the cross beam 1 is open, a lead-in pin 3 is fixedly arranged inside the cross beam 1 corresponding to the opening of the cross beam 1, the lead-in pin 3 is a cylindrical iron column with the diameter of 16mm, the lead-in pins 3 are welded at two inner walls inside the cross beam 1, two through holes 4 are respectively arranged in a penetrating manner on the top surface and the bottom surface of the cross beam 1 for bolts 9 to pass through, a connecting plate 5 is fixedly arranged on the side surface of the upright post 2, the connecting plate 5 is horizontally arranged, the length of the connecting plate 5 is greater than the opening length of the bottom surface of the cross beam 1, the width of the, the two clamping blocks 6 are welded on the top of the connecting plate 5, the two clamping blocks 6 are oppositely arranged, the distance between the two clamping blocks 6 is smaller than the distance between the inner walls of the cross beam 1, so that the clamping blocks 6 can be clamped, the top of the clamping block 6 is provided with a bayonet 8 for clamping the leading-in pin 3, the caliber of the bayonet 8 is 17mm, the size in the bayonet 8 is larger than 17mm, a certain margin is provided after the guide pin 3 is clamped into the bayonet 8, the position is convenient to adjust, the connecting plate 5 is also provided with a screw hole 7, the thickness of the connecting plate 5 is 6mm, so that the connecting plate has enough thread length to facilitate the connection of a bolt 9, when the leading-in pin 3 is clamped on the bayonet 8, the top of the connecting plate 5 is attached to the bottom surface of the cross beam 1, the screw holes 7 are arranged corresponding to the through holes 4, and bolts 9 penetrate through the through holes 4 and are screwed into the screw holes 7 to connect and fix the cross beam 1 and the upright post 2.
The invention adopts the lead-in pin 3 to be clamped into the bayonet 8 of the clamping block 6 to play a role of positioning, then the bolt 9 is installed to connect and fix the beam 1 and the upright post 2, and the mode greatly saves labor and is convenient for assembly.
In the description of the present invention, it is to be understood that the terms "upper", "lower", "left", "right", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, are only for convenience in describing the present invention and simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation and a specific orientation configuration and operation, and thus, should not be construed as limiting the present invention. Furthermore, "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it should be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and the like are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be directly connected or indirectly connected through an intermediate member, or they may be connected through two or more elements. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
While one embodiment of the present invention has been described in detail, the description is only a preferred embodiment of the present invention and should not be taken as limiting the scope of the invention. All equivalent changes and modifications made within the scope of the present invention shall fall within the scope of the present invention.

Claims (8)

1. The utility model provides a steel construction leading-in formula fast-assembling connection structure, crossbeam and stand including mutually perpendicular connects, crossbeam end-to-end connection is in the stand side, the crossbeam is square pipe, its characterized in that with the stand: the bottom surface opening at the tail end of the cross beam is fixedly provided with a leading-in pin inside the cross beam corresponding to the cross beam opening, a through hole is arranged in the top surface and the bottom surface of the cross beam in a penetrating mode and is used for a bolt to pass through, a connecting plate is fixedly arranged on the side surface of the stand column, a clamping block matched with the leading-in pin is arranged at the top of the connecting plate, a clamping opening is arranged at the top of the clamping block and is used for clamping the leading-in pin, a screw hole is further formed in the connecting plate, when the leading-in pin is clamped at the clamping opening, the screw hole corresponds to the through hole, and the bolt penetrates.
2. The steel structure lead-in type quick-assembling connecting structure as claimed in claim 1, wherein: the two clamping blocks are oppositely arranged.
3. The steel structure lead-in type quick-assembling connecting structure as claimed in claim 1, wherein: the through holes and the screw holes are two and are in one-to-one correspondence.
4. The steel structure lead-in type quick-assembling connecting structure as claimed in claim 1, wherein: when the guiding pin is clamped on the bayonet, the top of the connecting plate is attached to the bottom surface of the cross beam.
5. The steel structure lead-in type quick-assembling connecting structure as claimed in claim 1, wherein: the connecting plate is horizontally arranged.
6. The steel structure lead-in type quick-assembling connecting structure as claimed in claim 1, wherein: the length of the connecting plate is greater than the length of the opening of the bottom surface of the cross beam.
7. The steel structure lead-in type quick-assembling connecting structure as claimed in claim 1, wherein: the width of the connecting plate is the same as that of the cross beam.
8. The steel structure lead-in type quick-assembling connecting structure as claimed in claim 1, wherein: the guide pin is cylindrical in shape.
CN201910811615.5A 2019-08-30 2019-08-30 Steel construction leading-in formula fast-assembling connection structure Pending CN112443046A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910811615.5A CN112443046A (en) 2019-08-30 2019-08-30 Steel construction leading-in formula fast-assembling connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910811615.5A CN112443046A (en) 2019-08-30 2019-08-30 Steel construction leading-in formula fast-assembling connection structure

Publications (1)

Publication Number Publication Date
CN112443046A true CN112443046A (en) 2021-03-05

Family

ID=74741872

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910811615.5A Pending CN112443046A (en) 2019-08-30 2019-08-30 Steel construction leading-in formula fast-assembling connection structure

Country Status (1)

Country Link
CN (1) CN112443046A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016750A (en) * 2021-11-25 2022-02-08 武汉一冶建筑安装工程有限责任公司 Method for mounting upright post and cross beam in glass curtain wall engineering

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1006424C2 (en) * 1997-06-27 1998-12-29 Remco Ruimtebouw B V Building assembly.
CN201447769U (en) * 2009-07-01 2010-05-05 苏州皇家整体住宅系统有限公司 Cross type column beam
CN202416579U (en) * 2011-12-14 2012-09-05 苏州皇家整体住宅系统股份有限公司 Main beam and secondary beam combined roof beam
CN207314531U (en) * 2017-09-12 2018-05-04 阳地钢(北京)装配式建筑设计研究院有限公司 The column of steel house and crossbeam attachment device
CN108331218A (en) * 2018-04-11 2018-07-27 中国华西企业股份有限公司 Building improves bright frame glass curtain wall
CN208039568U (en) * 2018-03-30 2018-11-02 杜军桦 A kind of open-ended cross piece and upright post connection structure
CN109881779A (en) * 2019-03-29 2019-06-14 王承辉 House frame connection structure
CN210713257U (en) * 2019-08-30 2020-06-09 佛山市铝班匠环保材料科技有限公司 Steel construction leading-in formula fast-assembling connection structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1006424C2 (en) * 1997-06-27 1998-12-29 Remco Ruimtebouw B V Building assembly.
CN201447769U (en) * 2009-07-01 2010-05-05 苏州皇家整体住宅系统有限公司 Cross type column beam
CN202416579U (en) * 2011-12-14 2012-09-05 苏州皇家整体住宅系统股份有限公司 Main beam and secondary beam combined roof beam
CN207314531U (en) * 2017-09-12 2018-05-04 阳地钢(北京)装配式建筑设计研究院有限公司 The column of steel house and crossbeam attachment device
CN208039568U (en) * 2018-03-30 2018-11-02 杜军桦 A kind of open-ended cross piece and upright post connection structure
CN108331218A (en) * 2018-04-11 2018-07-27 中国华西企业股份有限公司 Building improves bright frame glass curtain wall
CN109881779A (en) * 2019-03-29 2019-06-14 王承辉 House frame connection structure
CN210713257U (en) * 2019-08-30 2020-06-09 佛山市铝班匠环保材料科技有限公司 Steel construction leading-in formula fast-assembling connection structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016750A (en) * 2021-11-25 2022-02-08 武汉一冶建筑安装工程有限责任公司 Method for mounting upright post and cross beam in glass curtain wall engineering

Similar Documents

Publication Publication Date Title
CN102561510A (en) Factory assembled latticed light steel structure and manufacturing method thereof
CN112443046A (en) Steel construction leading-in formula fast-assembling connection structure
CN210713257U (en) Steel construction leading-in formula fast-assembling connection structure
CN216239034U (en) Safe formula steel construction node component
CN213805859U (en) Assembled building of firm quick connect structure
CN209817104U (en) House frame connection structure
CN109281401B (en) Steel Fang Tonglian binding structure easy to position and fast connect
CN213897491U (en) Steel house assembling connecting part
CN212427537U (en) Assembled steel construction building fixed establishment
CN210507984U (en) Roof grid structure
CN212926457U (en) Fixing structure for steel structure engineering
CN208899715U (en) The inserting core structure of curtain-wall stand-column bottom
CN220550681U (en) Bottom installation external member of steel construction post
CN218952730U (en) Tray buckle frame cross rod capable of accurately adjusting length
CN216195436U (en) Steel construction connecting piece convenient to equipment
CN211666059U (en) Mounting structure of assembled ceiling
CN219604533U (en) Top frame beam of container movable house
CN220058935U (en) Prefabricated part installation guiding device
CN114319598B (en) Steel structure assembled building
CN214329313U (en) Building steel structure telescopic connecting piece
CN218745932U (en) Crossbeam stand connecting piece installation frock
CN220666682U (en) Adjustable cross beam
CN215485988U (en) Arc controller for module inspection well
CN219794243U (en) Wallboard mounting structure
CN112127516B (en) Light steel wall connecting structure and connecting method based on buckle type and long round hole

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 528000 one of the first floor of No. 11, Lianhe fufu second lane, Longtou village, Shishan town, Nanhai District, Foshan City, Guangdong Province

Applicant after: Foshan Aluminum Workshop Environmental Material Technology Co.,Ltd.

Address before: No. 33, Tangkou workshop, Libei mountain, Ligang Development Zone, Guanyao, Shishan town, Nanhai District, Foshan City, Guangdong Province, 528200

Applicant before: Foshan Aluminum Workshop Environmental Material Technology Co.,Ltd.

CB02 Change of applicant information