CN112431963A - Method for installing pipeline support and hanger - Google Patents

Method for installing pipeline support and hanger Download PDF

Info

Publication number
CN112431963A
CN112431963A CN202011360230.0A CN202011360230A CN112431963A CN 112431963 A CN112431963 A CN 112431963A CN 202011360230 A CN202011360230 A CN 202011360230A CN 112431963 A CN112431963 A CN 112431963A
Authority
CN
China
Prior art keywords
channel steel
adjustable base
bolt
locked
hanger
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011360230.0A
Other languages
Chinese (zh)
Inventor
邓卫星
刘鼎旺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baoye Group Corp Ltd
Original Assignee
Shanghai Baoye Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baoye Group Corp Ltd filed Critical Shanghai Baoye Group Corp Ltd
Priority to CN202011360230.0A priority Critical patent/CN112431963A/en
Publication of CN112431963A publication Critical patent/CN112431963A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/22Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals
    • F16L3/237Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets specially adapted for supporting a number of parallel pipes at intervals for two pipes

Abstract

The invention relates to a method for installing a pipeline support hanger, which is characterized in that a long edge of a channel steel nut is embedded into an installation surface of a C-shaped channel steel along the direction of the installation surface of the C-shaped channel steel; rotating the lock catch by 90 degrees, and then loosening to enable the lock catch teeth to be aligned with and occluded with the steel coil edge teeth of the C-shaped groove; placing the connecting piece, and pre-tightening through a hexagon bolt; and finally locking by using a spanner, locking the torque by 50 N.m, and repeating the step to finish the connection of the cross arm and the vertical rod of the support and hanger. The adjustable base adopts an M12 anchor bolt to root and is mainly used for rooting on an inclined plane, the angle is adjusted to be locked, after the locking, the vertical rod needs to be kept vertical, the bottom of the adjustable base is penetrated through a channel steel nut and a 70mm bolt, when the adjustable base is installed, the bolt is penetrated through the channel steel from the notch direction, the adjustable base is locked by the force of 50 N.m, and then the other end of the adjustable base is locked by the nut. The invention does not need to process the cutting angle steel, thereby saving working procedures and labor.

Description

Method for installing pipeline support and hanger
Technical Field
The invention relates to a pipeline support and hanger, in particular to an installation method of a pipeline support and hanger.
Background
The method is characterized in that an owner and a design have high requirements on the net height of a building, and a finished product support hanger is adopted as a required project, so that the precision requirement on the cross arm elevation of the support hanger is high, the traditional building form is complex, the building form of haunched plates is adopted in multiple places, the pipeline support hanger is difficult to install, the vertical rod is difficult to keep vertical, in order to meet the requirement on the net height of the building, improve the utilization rate of a pipeline installation space, and solve the problem that the support hanger on the haunched plates is difficult to install, the method for installing the pipeline support hanger is invented.
Disclosure of Invention
The invention aims to overcome the defects of the prior art, provides an installation method of a pipeline support and hanger, solves the problem that the support and hanger is difficult to install on an armpit, and increases the elevation adjustable range of a cross arm of the pipeline support and hanger.
In order to solve the technical problem, the invention is realized as follows:
a method for installing a pipeline support hanger is characterized by comprising the following steps: embedding the long edge of the channel steel nut into the installation surface of the C-shaped channel steel along the direction of the installation surface of the C-shaped channel steel; rotating the lock catch by 90 degrees, and then loosening to enable the lock catch teeth to be aligned with and occluded with the steel coil edge teeth of the C-shaped groove; placing the connecting piece, and pre-tightening through a hexagon bolt; and finally locking by using a spanner, locking the torque by 50 N.m, and repeating the step to finish the connection of the cross arm and the vertical rod of the support and hanger.
The adjustable base adopts an M12 anchor bolt to root and is mainly used for rooting on an inclined plane, the angle is adjusted to be locked, after the locking, the vertical rod needs to be kept vertical, the bottom of the adjustable base is penetrated through a channel steel nut and a 70mm bolt, when the adjustable base is installed, the bolt is penetrated through the channel steel from the notch direction, the adjustable base is locked by the force of 50 N.m, and then the other end of the adjustable base is locked by the nut.
The invention has the beneficial effects that: according to the method, the cross arm and the vertical rod of the support and hanger are fixed in a bolt fixing mode by utilizing the engagement of the tooth of the channel steel nut and the C-shaped channel steel, so that the adjustment precision of the elevation of the cross arm of the support and hanger is ensured to be within 1 cm; the adjustable base is arranged on the haunching plate, so that the verticality of the vertical rod of the support hanger is guaranteed.
The invention aims to solve the problems of high precision of the cross arm of the pipeline supporting and hanging bracket and difficulty in fixing the supporting and hanging bracket on the haunched plate, and compared with the traditional angle steel bracket, the angle steel does not need to be processed and cut, thereby saving working procedures and labor. Compared with the traditional angle steel, the angle steel is also tidier and more beautiful.
Drawings
The invention is described in further detail below with reference to the following figures and embodiments:
fig. 1 is a schematic structural diagram of the present application.
Detailed Description
As shown in fig. 1: a method for installing a pipeline support hanger comprises the steps of embedding a long edge of a channel steel nut 2 into an installation surface of a C-shaped channel steel along the direction of the installation surface of the C-shaped channel steel 1; rotating the lock catch by 90 degrees, and then loosening to enable the lock catch teeth to be aligned with and occluded with the steel coil edge teeth of the C-shaped groove; placing the connecting piece 5 and pre-tightening through a hexagon bolt; and finally locking by using a spanner, locking the torque by 50 N.m, and repeating the step to finish the connection of the cross arm and the vertical rod of the support and hanger.
The adjustable base 3 takes root by adopting an M12 anchor bolt 4, is mainly used for taking root on an inclined plane, is locked after the angle is adjusted, the vertical rod is kept vertical after the locking, the bottom of the adjustable base is penetrated by adopting a channel steel nut and a 70mm bolt, the bolt is penetrated from the direction of a channel steel notch during the installation, and is locked by the force of 50 N.m, and then the other end of the adjustable base is locked by a nut.
The working principle is as follows:
the channel steel nut is fixed with the C-shaped channel steel, the upright stanchion is fixed with the cross arm through the connecting piece, the adjustable base adopts an M12 anchor bolt to root on the inclined plane, the angle is adjusted and then the adjustable base is locked, and the upright stanchion is kept vertical after the adjustable base is locked.

Claims (1)

1. A method for installing a pipeline support hanger is characterized by comprising the following steps: embedding the long edge of the channel steel nut into the installation surface of the C-shaped channel steel along the direction of the installation surface of the C-shaped channel steel; rotating the lock catch by 90 degrees, and then loosening to enable the lock catch teeth to be aligned with and occluded with the steel coil edge teeth of the C-shaped groove; placing the connecting piece, and pre-tightening through a hexagon bolt; finally locking by using a spanner, locking the torque by 50 N.m, and repeating the step to finish the connection of the cross arm and the vertical rod of the support and hanger;
the adjustable base adopts an M12 anchor bolt to root and is mainly used for rooting on an inclined plane, the angle is adjusted to be locked, after the locking, the vertical rod needs to be kept vertical, the bottom of the adjustable base is penetrated through a channel steel nut and a 70mm bolt, when the adjustable base is installed, the bolt is penetrated through the channel steel from the notch direction, the adjustable base is locked by the force of 50 N.m, and then the other end of the adjustable base is locked by the nut.
CN202011360230.0A 2020-11-27 2020-11-27 Method for installing pipeline support and hanger Pending CN112431963A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011360230.0A CN112431963A (en) 2020-11-27 2020-11-27 Method for installing pipeline support and hanger

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011360230.0A CN112431963A (en) 2020-11-27 2020-11-27 Method for installing pipeline support and hanger

Publications (1)

Publication Number Publication Date
CN112431963A true CN112431963A (en) 2021-03-02

Family

ID=74699315

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011360230.0A Pending CN112431963A (en) 2020-11-27 2020-11-27 Method for installing pipeline support and hanger

Country Status (1)

Country Link
CN (1) CN112431963A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112944184A (en) * 2021-03-09 2021-06-11 贵州航天新力科技有限公司 Integral transverse vibration-resistant support hanger

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3772745A (en) * 1972-08-31 1973-11-20 Heckethorn Manuf Co U-bolt clamp assembly
CN207246558U (en) * 2017-08-28 2018-04-17 福建省恒基建设股份有限公司 A kind of assembled architecture pipeline suspension and support
CN108105472A (en) * 2017-11-17 2018-06-01 江苏壹鼎崮机电科技有限公司 A kind of locking antidetonation suspension and support for pipe laying
CN209084177U (en) * 2018-06-30 2019-07-09 河南大森机电股份有限公司 A kind of anti-dropout suspension and support
CN210423957U (en) * 2019-08-09 2020-04-28 河南安诺尼机械设备有限公司 Gantry type support hanger and building using same
CN210950405U (en) * 2019-11-26 2020-07-07 江苏采元科技有限公司 Antidetonation gallows suitable for air conditioning engineering system
CN111536315A (en) * 2020-04-28 2020-08-14 安固士(天津)建筑材料有限公司 Novel SR series medium-sized electromechanical pipeline supporting and hanging bracket system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3772745A (en) * 1972-08-31 1973-11-20 Heckethorn Manuf Co U-bolt clamp assembly
CN207246558U (en) * 2017-08-28 2018-04-17 福建省恒基建设股份有限公司 A kind of assembled architecture pipeline suspension and support
CN108105472A (en) * 2017-11-17 2018-06-01 江苏壹鼎崮机电科技有限公司 A kind of locking antidetonation suspension and support for pipe laying
CN209084177U (en) * 2018-06-30 2019-07-09 河南大森机电股份有限公司 A kind of anti-dropout suspension and support
CN210423957U (en) * 2019-08-09 2020-04-28 河南安诺尼机械设备有限公司 Gantry type support hanger and building using same
CN210950405U (en) * 2019-11-26 2020-07-07 江苏采元科技有限公司 Antidetonation gallows suitable for air conditioning engineering system
CN111536315A (en) * 2020-04-28 2020-08-14 安固士(天津)建筑材料有限公司 Novel SR series medium-sized electromechanical pipeline supporting and hanging bracket system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112944184A (en) * 2021-03-09 2021-06-11 贵州航天新力科技有限公司 Integral transverse vibration-resistant support hanger

Similar Documents

Publication Publication Date Title
WO2016061414A9 (en) Undercut clip anchor system for cladding of materials
CN206467848U (en) A kind of portable back of the body bolt stone material quick-mount system
CN112431963A (en) Method for installing pipeline support and hanger
CN204551840U (en) A kind of Novel stone curtain-wall dried hanging hang structure
CN204983519U (en) Novel soft and hard package installation metal pendant
CN205189403U (en) A steel instrument for making enclosure bears down on one
CN212053244U (en) Simple adjustable support bracket
CN112627493A (en) Scaffold bottom support rapid adjusting device and method
CN219060717U (en) Imitative stone prefab mounting structure
CN210950216U (en) Gallows structure is used in building engineering construction
CN206289817U (en) The mounting structure of curtain wall in a kind of adjustable stone material room
CN105350770B (en) For making the construction tool that enclosure wall bears down on one
CN211899147U (en) Unit curtain wall switching system easy for small space side hanging three-dimensional adjustment
CN217232687U (en) Adjustable positioning buckle for upright rod base of overhanging scaffold
CN219569437U (en) Support for dry construction of concrete block
CN217326101U (en) Anti-cracking anchorage device for micro-expansive concrete of underground through channel
CN216920845U (en) Support structure with three-dimensional roll adjustment function
CN218207407U (en) T-shaped bolt with spring piece
KR20200085497A (en) Solar panel support device
CN204898704U (en) Tower machine rag bolt mounting bracket with adjustable
CN215803224U (en) Adjustable formwork hanging support for building construction
CN216949362U (en) Floor supporting template capable of being finely adjusted
CN217925068U (en) Construction formwork supporting construction
CN211258001U (en) Reinforced structure for angle steel tower
CN214109648U (en) Variable positioning fixture

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210302

RJ01 Rejection of invention patent application after publication