CN112431131A - Multifunctional measuring equipment for road and bridge construction and use method - Google Patents

Multifunctional measuring equipment for road and bridge construction and use method Download PDF

Info

Publication number
CN112431131A
CN112431131A CN202011363912.7A CN202011363912A CN112431131A CN 112431131 A CN112431131 A CN 112431131A CN 202011363912 A CN202011363912 A CN 202011363912A CN 112431131 A CN112431131 A CN 112431131A
Authority
CN
China
Prior art keywords
gear
plate
main body
bin
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011363912.7A
Other languages
Chinese (zh)
Inventor
王凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Fangduo Construction Co ltd
Original Assignee
Wenzhou Fangduo Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wenzhou Fangduo Construction Co ltd filed Critical Wenzhou Fangduo Construction Co ltd
Priority to CN202011363912.7A priority Critical patent/CN112431131A/en
Publication of CN112431131A publication Critical patent/CN112431131A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/10Railings; Protectors against smoke or gases, e.g. of locomotives; Maintenance travellers; Fastening of pipes or cables to bridges
    • E01D19/106Movable inspection or maintenance platforms, e.g. travelling scaffolding or vehicles specially designed to provide access to the undersides of bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses multifunctional measuring equipment for road and bridge construction, which comprises a main body box, wherein a placing bin is arranged in the middle of the top of the main body box, electric lifting rods are symmetrically arranged on two sides of the top of the placing bin, the output ends of the electric lifting rods are jointly provided with an installing plate, a second rotating shaft is arranged in the center of the top of the installing plate, and the top end of the second rotating shaft is fixedly connected with the bottom end of a lifting measuring assembly. According to the invention, through the matched use of the main body box, the telescopic rod, the placing bin, the annular bulge, the bottom plate and the baffle plate, after the first rack extends out of the main body box, a user directly takes away the baffle plate, and then manually rotates the baffle plate, so that one surface of the baffle plate can face the laser range finder, the measurement precision of the laser range finder can be conveniently improved, and the baffle plate can be retracted into the placing bin again when the device is not used, and the baffle plate assembly is prevented from being lost or damaged due to accidents when the device is not used.

Description

Multifunctional measuring equipment for road and bridge construction and use method
Technical Field
The invention relates to the technical field of measuring devices, in particular to measuring equipment for multifunctional road and bridge construction and a using method thereof.
Background
The road bridge is generally a structure erected on rivers, lakes and seas to enable vehicles, pedestrians and the like to smoothly pass through, and is also extended to be a structure which spans mountain stream, unfavorable geology or meets other traffic requirements to enable the vehicles, pedestrians and the like to pass through more conveniently in order to adapt to the modern high-speed developed traffic industry.
The existing measuring equipment for road and bridge construction has the following defects:
firstly, when the current measuring equipment for road and bridge construction is used for measuring a bridge, a baffle is often used, and the traditional measuring equipment for road and bridge construction cannot accommodate a baffle component, so that the baffle component is easily lost or damaged when the equipment is not used;
secondly, when the current measuring equipment for road and bridge construction supports the equipment, the equipment support is often pulled out and opened manually, which is very troublesome and is not beneficial to the rapid operation of the measuring equipment for road and bridge construction;
when measuring equipment is used in the construction of present road bridge simultaneously, often only one deck shell protects laser range finder, and bridge detection team often need carry a lot of devices, and numerous devices lead to laser range finder to receive collision damage together very easily, are unfavorable for this measuring equipment is used in the construction of road bridge's daily transportation and use.
Disclosure of Invention
The invention aims to provide a multifunctional measuring device for road and bridge construction and a using method thereof, so as to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme: a multifunctional measuring device for road and bridge construction comprises a main body box, wherein a placing bin is installed at the middle position of the top in the main body box, electric lifting rods are symmetrically installed at two sides of the top of the placing bin, a mounting plate is installed at the output end of each electric lifting rod together, a second rotating shaft is arranged at the center position of the top of the mounting plate, the top end of each second rotating shaft is fixedly connected with the bottom end of a lifting measuring assembly, a backing plate is arranged inside the placing bin, a lifting rod is installed at the center position of the top of the backing plate, a baffle is hinged to the top end of the lifting rod, the lifting measuring assembly matched with the second rotating shaft is arranged at the center position of the top of the main body box, a control panel is installed at the top of the lifting measuring assembly, a first rotating shaft is arranged at the edge position of the top of the main body box, and the bottom end of the first rotating shaft extends to, a hand wheel is mounted at the top of the first rotating shaft, supporting components matched with the mounting plate are commonly arranged at four corners inside the main box, tool bins are symmetrically arranged at the middle positions of two ends inside the main box, and the control panel is electrically connected with the electric lifting rod through a wire;
the supporting component comprises a first gear, a sliding block, a sliding groove, a gearwheel, a second rotating rod, a first rack, a belt, a first rotating rod, a second rack and a belt pulley, the sliding grooves are symmetrically arranged at the two ends of the two sides of the inner part of the main body box, a sliding block is arranged in the sliding groove, a first rack is arranged on the outer side of the sliding block, second rotating rods are symmetrically arranged at the bottoms of the two sides in the main box, first rotating rods are symmetrically arranged at the tops of the two sides in the main box, and a first gear is arranged at the middle position of the outer side of the first rotating rod, belt pulleys are symmetrically arranged at the two ends of the outer sides of the first rotating rod and the second rotating rod, belts are arranged on the outer sides of the two groups of belt pulleys together, the two ends of the outer side of the second rotating rod are symmetrically provided with large gears meshed with the first gear rack, and the edge positions of the two sides of the bottom of the mounting plate are symmetrically provided with second gear racks meshed with the first gear rack;
the lift measuring subassembly includes glass window, connecting gear, installation storehouse, battery, sieve and laser range finder, the top of main part case is provided with the installation storehouse, the top of second pivot and the bottom fixed connection in installation storehouse, the connecting gear with wide gear intermeshing is installed to the bottom in the installation storehouse outside, the inside intermediate position department of connecting gear is provided with the sieve, and laser range finder is installed at the top of definite sieve, the battery is installed to the interior bottom in installation storehouse, the top in the installation storehouse outside is provided with the glass window, control panel passes through the wire and is connected with laser range finder electricity, the battery passes through the wire and is connected with laser range finder electricity.
Preferably, the bottom plate is installed jointly to the bottom of first rack, and the non-centre of a circle position department at bottom plate top is provided with the annular arch of mutually supporting with the backing plate, the annular groove of mutually supporting with the annular arch is seted up to main part bottom of the case portion non-centre of a circle position department.
Preferably, the edge position department of installation storehouse bottom evenly installs the gyro wheel, the position department of the non-centre of a circle in installation board top is provided with the gyro wheel groove of mutually supporting with the gyro wheel.
Preferably, the top of the installation bin is provided with a top plate in a threaded manner, and the top of the inner side of the installation bin is provided with threads matched with the top plate.
Preferably, the bottom of the bottom plate is provided with a rubber layer, and the bottom of the rubber layer is provided with anti-skid grains.
Preferably, the side is installed to the bottom in the main part case outside, the four corners position department of side bottom all installs the universal wheel, and is provided with arresting gear on the universal wheel.
Preferably, a fixing screw is arranged on the top thread of the outer side of the telescopic rod.
Preferably, one end of the outer side of the tool bin is hinged with a bin door, and a handle is installed on the outer side of the bin door.
Preferably, the edge position of the top of the installation bin is provided with a sealing ring, and the edge position of the top of the installation bin is provided with an installation groove matched with the sealing ring.
Preferably, the measuring equipment for the multifunctional road and bridge construction and the using method thereof comprise the following steps:
step one, can remove equipment to assigned position department through the universal wheel before the use, after that, through the extension of control panel control electric lift pole, at the in-process of electric lift pole extension, the lift measuring subassembly that promotes the mounting panel top stretches out from the main part incasement portion, and the mounting panel drives the second rack and rises, utilize the cooperation of second rack and first gear, drive first dwang and rotate, the cooperation of rethread belt and belt pulley drives the second dwang and rotates, the cooperation of rethread bull gear and first rack, force first rack to stretch out downwards from the inside of main part case gradually.
Step two, then take out backing plate, telescopic rod and the baffle at bottom plate top from annular protruding inboard, then manually rotate the baffle 90 for the baffle is the vertical state with backing plate place plane, manually place the other end that the bridge needs to be measured with the baffle after that, and make the baffle keep away from the one side of telescopic rod towards the main part case, manually extend telescopic rod again for laser range finder and baffle are in same height.
And thirdly, manually rotating a hand wheel, driving a wide gear to rotate through a first rotating shaft, driving an installation bin to slowly rotate through the matching of the wide gear and a connecting gear until the glass window completely faces the baffle, and then controlling a laser range finder to start working through a control panel to measure the actual distance between the main body box and the baffle.
And step four, regularly opening a top plate at the top of the installation bin, overhauling the laser range finder, taking out the laser range finder when the storage battery is damaged, and taking out the sieve plate from the inside of the installation bin, so that the storage battery is taken out from the inside of the installation bin for replacement.
Compared with the prior art, the invention provides the multifunctional measuring equipment for road and bridge construction, which has the following beneficial effects:
1. according to the invention, through the matched use of the main body box, the base plate, the telescopic rod, the placing bin, the annular bulge, the bottom plate and the baffle plate, after the equipment stretches out the first rack from the inside of the main body box, the base plate, the telescopic rod and the baffle plate are separated from the inside of the placing bin, then a user directly takes away the baffle plate, and then manually rotates the baffle plate, so that one surface of the baffle plate can face the laser range finder from the front side, the measurement precision of the laser range finder is improved conveniently, the baffle plate can be retracted into the placing bin again when the equipment is not used, and the phenomenon that the baffle plate assembly is lost or damaged due to accidents when the equipment is not used is avoided.
2. According to the invention, through the matching use of the main body box, the supporting component, the placing bin, the annular bulge, the mounting plate, the bottom plate, the baffle plate, the annular groove and the electric lifting rod, when the device is used, the electric lifting rod drives the mounting plate to ascend, the second rack also ascends along with the ascending, the first rotating rod is driven to rotate by the matching of the second rack and the first gear, the second rotating rod is driven to rotate by the matching of the belt and the belt pulley, the first rack is forced to gradually extend downwards from the inside of the main body box through the matching of the large gear and the first rack, the manual operation of an operator is not needed in the whole process, the operation is simple and very convenient, and the device is favorable for quick supporting and use.
3. According to the invention, through the matched use of the control panel, the lifting measurement component, the hand wheel, the main box, the placing bin, the wide gear, the first rotating shaft, the second rotating shaft, the mounting plate and the electric lifting rod, when equipment is not needed, the mounting plate can be driven to descend by the electric lifting rod, so that the mounting bin is completely retracted into the inner top of the main box, and thus when the laser range finder does not work, the laser range finder can be protected in a double-layer mode through the main box and the mounting bin, the damage of the laser range finder caused by collision of the equipment in the transportation work is avoided, and the protection effect of the equipment on the laser range finder is greatly improved.
Drawings
FIG. 1 is a perspective view of the present invention;
FIG. 2 is a front cross-sectional view of the present invention;
FIG. 3 is a top view of the present invention;
FIG. 4 is a top cross-sectional view of the present invention;
FIG. 5 is a front view of the present invention in use;
FIG. 6 is a front cross-sectional view of the present invention in use;
FIG. 7 is a perspective view of the mounting cartridge of the present invention;
FIG. 8 is a schematic view of a baffle of the present invention.
In the figure: 1. a control panel; 2. a lift measurement assembly; 201. a glass window; 202. a connecting gear; 203. installing a bin; 204. a storage battery; 205. a sieve plate; 206. a laser range finder; 3. a hand wheel; 4. a main body case; 5. a side edge; 6. a tool magazine; 7. a support assembly; 701. a first gear; 702. a slider; 703. a chute; 704. a bull gear; 705. a second rotating lever; 706. a first rack; 707. a belt; 708. a first rotating lever; 709. a second rack; 710. a belt pulley; 8. a base plate; 9. lifting and shrinking the rod; 10. placing a bin; 11. a wide gear; 12. a first rotating shaft; 13. an annular projection; 14. a second rotating shaft; 15. mounting a plate; 16. a base plate; 17. a baffle plate; 18. an annular groove; 19. an electric lifting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example one
Referring to fig. 1-8, the present invention provides a technical solution: a multifunctional measuring device for road and bridge construction comprises a main body box 4, a placing bin 10 is installed at the middle position of the top in the main body box 4, electric lifting rods 19 are symmetrically installed on two sides of the top of the placing bin 10, an installation plate 15 is installed at the output end of each electric lifting rod 19, a second rotating shaft 14 is arranged at the center position of the top of each installation plate 15, the top end of each second rotating shaft 14 is fixedly connected with the bottom end of a lifting measuring component 2, a backing plate 8 is arranged inside the placing bin 10, a lifting rod 9 is installed at the center position of the top of each backing plate 8, a baffle plate 17 is hinged to the top end of each lifting rod 9, the lifting measuring components 2 matched with the second rotating shafts 14 are arranged at the center position of the top of the main body box 4, a control panel 1 is installed at the top of each lifting measuring component 2, a first rotating shaft 12 is arranged at the edge position of the top of the main body box 4, and the bottom ends of the, hand wheel 3 is installed at the top of first pivot 12, and the inside four corners position department of main part case 4 is provided with the supporting component 7 of mutually supporting with mounting panel 15 jointly, and the intermediate position department symmetry at the inside both ends of main part case 4 is provided with instrument storehouse 6, and control panel 1 passes through the wire and is connected with electric lift rod 19 electricity.
As a preferable embodiment of the present embodiment: the supporting component 7 comprises a first gear 701, a sliding block 702, sliding grooves 703, a gearwheel 704, a second rotating rod 705, a first rack 706, a belt 707, a first rotating rod 708, a second rack 709 and a pulley 710, the sliding grooves 703 are symmetrically formed at two ends of two sides inside the main body box 4, the sliding block 702 is arranged inside the sliding grooves 703, the first rack 706 is installed at the outer side of the sliding block 702, the second rotating rod 705 is symmetrically arranged at the bottom of two sides inside the main body box 4, the first rotating rod 708 is symmetrically arranged at the top of two sides inside the main body box 4, the first gearwheel 701 is installed at the middle position of the outer side of the first rotating rod 708, the pulleys 710 are symmetrically installed at two ends of the outer sides of the first rotating rod 708 and the second rotating rod 705, the belts 707 are jointly arranged at the outer sides of the two groups of pulleys 710, the gearwheel 704 meshed with the first rack 706 is symmetrically installed, the edge positions of two sides of the bottom of the mounting plate 15 are symmetrically provided with second racks 709 which are meshed with the first gear 701, when the electric lifting rod 19 pushes the mounting plate 15 to ascend, the second racks 709 and the first gear 701 are matched to drive the first rotating rod 708 to rotate, the second rotating rod 705 is driven to rotate through the matching of the belt 707 and the belt pulley 710, the first racks 706 are forced to gradually extend downwards from the inside of the main body box 4 through the matching of the large gear 704 and the first racks 706, and therefore the four groups of first racks 706 are matched with the bottom plate 16 to stably support the whole device.
As a preferable embodiment of the present embodiment: the lifting measurement assembly 2 comprises a glass window 201, a connecting gear 202, an installation bin 203, a storage battery 204, a sieve plate 205 and a laser range finder 206, the top of the main body box 4 is provided with the installation bin 203, the top end of the second rotating shaft 14 is fixedly connected with the bottom of the installation bin 203, the bottom of the outer side of the installation bin 203 is provided with the connecting gear 202 meshed with the wide gear 11, the middle position inside the connecting gear 202 is provided with the sieve plate 205, the top of the exact sieve plate 205 is provided with the laser range finder 206, the inner bottom of the installation bin 203 is provided with the storage battery 204, the top of the outer side of the installation bin 203 is provided with the glass window 201, the control panel 1 is electrically connected with the laser range finder 206 through a wire, the storage battery 204 is electrically connected with the laser range finder 206 through a wire, the electric lifting rod 19 pushes the installation plate 15 to lift up, so that the installation bin 203 extends out of the, is very convenient.
As a preferable embodiment of the present embodiment: the bottom end of the first rack 706 is jointly provided with the bottom plate 16, the non-circle center position at the top of the bottom plate 16 is provided with the annular protrusion 13 matched with the backing plate 8, the non-circle center position at the bottom of the main box 4 is provided with the annular groove 18 matched with the annular protrusion 13, so that parts related to the baffle 17 can be conveniently taken back into the interior of the storage bin 10, and the supporting stability of the device can be improved.
As a preferable embodiment of the present embodiment: the top screw thread of installation storehouse 203 is installed the roof, and the inboard top of installation storehouse 203 is provided with the screw thread with roof looks adaptation, is convenient for unscrew the roof, overhauls the inside laser range finder 206 of installation storehouse 203.
As a preferable embodiment of the present embodiment: the top screw thread of installation storehouse 203 is installed the roof, and the inboard top of installation storehouse 203 is provided with the screw thread with roof looks adaptation, is convenient for unscrew the roof, overhauls the inside laser range finder 206 of installation storehouse 203.
Example two
Referring to fig. 1-8, the present invention provides a technical solution: a multifunctional measuring device for road and bridge construction comprises a main body box 4, a placing bin 10 is installed at the middle position of the top in the main body box 4, electric lifting rods 19 are symmetrically installed on two sides of the top of the placing bin 10, an installation plate 15 is installed at the output end of each electric lifting rod 19, a second rotating shaft 14 is arranged at the center position of the top of each installation plate 15, the top end of each second rotating shaft 14 is fixedly connected with the bottom end of a lifting measuring component 2, a backing plate 8 is arranged inside the placing bin 10, a lifting rod 9 is installed at the center position of the top of each backing plate 8, a baffle plate 17 is hinged to the top end of each lifting rod 9, the lifting measuring components 2 matched with the second rotating shafts 14 are arranged at the center position of the top of the main body box 4, a control panel 1 is installed at the top of each lifting measuring component 2, a first rotating shaft 12 is arranged at the edge position of the top of the main body box 4, and the bottom ends of the, hand wheel 3 is installed at the top of first pivot 12, and the inside four corners position department of main part case 4 is provided with the supporting component 7 of mutually supporting with mounting panel 15 jointly, and the intermediate position department symmetry at the inside both ends of main part case 4 is provided with instrument storehouse 6, and control panel 1 passes through the wire and is connected with electric lift rod 19 electricity.
As a preferable embodiment of the present embodiment: the supporting component 7 comprises a first gear 701, a sliding block 702, sliding grooves 703, a gearwheel 704, a second rotating rod 705, a first rack 706, a belt 707, a first rotating rod 708, a second rack 709 and a pulley 710, the sliding grooves 703 are symmetrically formed at two ends of two sides inside the main body box 4, the sliding block 702 is arranged inside the sliding grooves 703, the first rack 706 is installed at the outer side of the sliding block 702, the second rotating rod 705 is symmetrically arranged at the bottom of two sides inside the main body box 4, the first rotating rod 708 is symmetrically arranged at the top of two sides inside the main body box 4, the first gearwheel 701 is installed at the middle position of the outer side of the first rotating rod 708, the pulleys 710 are symmetrically installed at two ends of the outer sides of the first rotating rod 708 and the second rotating rod 705, the belts 707 are jointly arranged at the outer sides of the two groups of pulleys 710, the gearwheel 704 meshed with the first rack 706 is symmetrically installed, the edge positions of two sides of the bottom of the mounting plate 15 are symmetrically provided with second racks 709 which are meshed with the first gear 701, when the electric lifting rod 19 pushes the mounting plate 15 to ascend, the second racks 709 and the first gear 701 are matched to drive the first rotating rod 708 to rotate, the second rotating rod 705 is driven to rotate through the matching of the belt 707 and the belt pulley 710, the first racks 706 are forced to gradually extend downwards from the inside of the main body box 4 through the matching of the large gear 704 and the first racks 706, and therefore the four groups of first racks 706 are matched with the bottom plate 16 to stably support the whole device.
As a preferable embodiment of the present embodiment: the lifting measurement assembly 2 comprises a glass window 201, a connecting gear 202, an installation bin 203, a storage battery 204, a sieve plate 205 and a laser range finder 206, the top of the main body box 4 is provided with the installation bin 203, the top end of the second rotating shaft 14 is fixedly connected with the bottom of the installation bin 203, the bottom of the outer side of the installation bin 203 is provided with the connecting gear 202 meshed with the wide gear 11, the middle position inside the connecting gear 202 is provided with the sieve plate 205, the top of the exact sieve plate 205 is provided with the laser range finder 206, the inner bottom of the installation bin 203 is provided with the storage battery 204, the top of the outer side of the installation bin 203 is provided with the glass window 201, the control panel 1 is electrically connected with the laser range finder 206 through a wire, the storage battery 204 is electrically connected with the laser range finder 206 through a wire, the electric lifting rod 19 pushes the installation plate 15 to lift up, so that the installation bin 203 extends out of the, is very convenient.
As a preferable embodiment of the present embodiment: the bottom end of the first rack 706 is jointly provided with the bottom plate 16, the non-circle center position at the top of the bottom plate 16 is provided with the annular protrusion 13 matched with the backing plate 8, the non-circle center position at the bottom of the main box 4 is provided with the annular groove 18 matched with the annular protrusion 13, so that parts related to the baffle 17 can be conveniently taken back into the interior of the storage bin 10, and the supporting stability of the device can be improved.
As a preferable embodiment of the present embodiment: the edge position department of installation storehouse 203 bottom evenly installs the gyro wheel, and the position department of the non-centre of a circle in installation board 15 top is provided with the gyro wheel groove of mutually supporting with the gyro wheel, helps improving installation storehouse 203 pivoted stability.
As a preferable embodiment of the present embodiment: the top screw thread of installation storehouse 203 is installed the roof, and the inboard top of installation storehouse 203 is provided with the screw thread with roof looks adaptation, is convenient for unscrew the roof, overhauls the inside laser range finder 206 of installation storehouse 203.
As a preferable embodiment of the present embodiment: side 5 is installed to the bottom in the main part case 4 outside, and the universal wheel is all installed to the four corners position department of 5 bottoms in side, and is provided with arresting gear on the universal wheel, is convenient for remove whole equipment to appointed position department.
As a preferable embodiment of the present embodiment: one end in the 6 outsides of instrument storehouse articulates there is the door, and the handle is installed in the outside of door, is convenient for open the door and takes out the instrument that needs to use from instrument storehouse 6 insidely.
As a preferable embodiment of the present embodiment: the border position department at installation storehouse 203 top is provided with the sealing washer, and the border position department at installation storehouse 203 top is provided with the mounting groove of mutually supporting with the sealing washer, helps improving the leakproofness of its contact site behind installation storehouse 203 withdraws main part case 4 inside.
A use method of measuring equipment for multifunctional road and bridge construction comprises the following use steps:
step one, before use, the device can be moved to a designated position through a universal wheel, then the control panel 1 controls the electric lifting rod 19 to extend, in the process of extending the electric lifting rod 19, the lifting measurement component 2 at the top of the mounting plate 15 is pushed to extend out of the main body box 4, the mounting plate 15 drives the second rack 709 to ascend, the first rotating rod 708 is driven to rotate by the cooperation of the second rack 709 and the first gear 701, the second rotating rod 705 is driven to rotate by the cooperation of the belt 707 and the belt pulley 710, and the first rack 706 is forced to gradually extend out of the main body box 4 downwards by the cooperation of the large gear 704 and the first rack 706.
Step two, taking out the backing plate 8, the telescopic rod 9 and the baffle 17 on the top of the bottom plate 16 from the inner side of the annular protrusion 13, manually rotating the baffle 17 for 90 degrees, enabling the baffle 17 to be vertical to the plane of the backing plate 8, manually placing the baffle 17 at the other end of the bridge to be measured, enabling one surface of the baffle 17 far away from the telescopic rod 9 to face the main body box 4, and manually extending the telescopic rod 9, so that the laser range finder 206 and the baffle 17 are at the same height.
And step three, manually rotating the hand wheel 3, driving the wide gear 11 to rotate through the first rotating shaft 12, driving the installation bin 203 to slowly rotate through the cooperation of the wide gear 11 and the connecting gear 202 until the glass window 201 completely faces the baffle 17, then controlling the laser range finder 206 to start working through the control panel 1, and measuring the actual distance between the main box 4 and the baffle 17.
And step four, regularly opening a top plate at the top of the installation bin 203, overhauling the laser range finder 206, taking out the laser range finder 206 when the storage battery 204 is damaged, and taking out the screen plate 205 from the inside of the installation bin 203, so that the storage battery 204 is taken out from the inside of the installation bin 203 for replacement.
In summary, the following steps: the multifunctional measuring equipment for road and bridge construction and the using method thereof are characterized in that before use, the device is powered on, before use, the equipment is moved to a specified position through a universal wheel, then an electric lifting rod 19 is controlled to extend through a control panel 1, in the process of extending the electric lifting rod 19, a lifting measuring component 2 at the top of a mounting plate 15 is pushed to extend out of the inside of a main body box 4, the mounting plate 15 drives a second rack 709 to ascend, the first rotating rod 708 is driven to rotate through the matching of the second rack 709 and a first gear 701, then the second rotating rod 705 is driven to rotate through the matching of a belt 707 and a belt pulley 710, then the first rack 706 is forced to gradually extend out downwards from the inside of the main body box 4 through the matching of a large gear 704 and the first rack 706, then a baffle 17 at the top of a bottom plate 16 is taken out of the inner side of an annular bulge 13, then the baffle 17 is, the plane of the baffle 17 and the plane of the backing plate 8 are in a vertical state, then the baffle 17 is manually placed at the other end of the bridge to be measured, one surface, away from the telescopic rod 9, of the baffle 17 faces the main box 4, then the telescopic rod 9 is manually extended, the laser range finder 206 and the baffle 17 are in the same height, then the hand wheel 3 is manually rotated, the wide gear 11 is driven to rotate through the first rotating shaft 12, the installation bin 203 is driven to slowly rotate through the matching of the wide gear 11 and the connecting gear 202 until the glass window 201 completely faces the baffle 17, then the laser range finder 206 is controlled to start working through the control panel 1, and the actual distance between the main box 4 and the baffle 17 is measured; the roof at the top of the installation bin 203 is opened periodically, the laser range finder 206 is overhauled, when the storage battery 204 is damaged, the laser range finder 206 can be taken out, the screen plate 205 is taken out from the inside of the installation bin 203, and the storage battery 204 is taken out from the inside of the installation bin 203 for replacement.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. The utility model provides a measuring equipment is used in construction of multi-functional road and bridge, includes main part case (4), its characterized in that: the middle position of the top in the main body box (4) is provided with a placing bin (10), two sides of the top of the placing bin (10) are symmetrically provided with electric lifting rods (19), the output end of each electric lifting rod (19) is provided with a mounting plate (15), the center position of the top of each mounting plate (15) is provided with a second rotating shaft (14), the top end of each second rotating shaft (14) is fixedly connected with the bottom end of the corresponding lifting measurement component (2), a backing plate (8) is arranged inside the placing bin (10), a lifting rod (9) is arranged at the center position of the top of the backing plate (8), the top end of each lifting rod (9) is hinged with a baffle (17), the center position of the top of the main body box (4) is provided with a lifting measurement component (2) matched with the second rotating shaft (14), and the top of the lifting measurement component (2) is provided with a control panel (1), main part case (4) top border position department is provided with first pivot (12), and the bottom of first pivot (12) extends to the inside of main part case (4) and installs wide gear (11), hand wheel (3) are installed at the top of first pivot (12), the inside four corners position department of main part case (4) is provided with jointly and mutually supports supporting component (7) with mounting panel (15), the intermediate position department symmetry at the inside both ends of main part case (4) is provided with tool storage (6), control panel (1) is connected through wire and electric lift pole (19) electricity.
2. The multifunctional measuring equipment for road and bridge construction according to claim 1, wherein: the supporting component (7) comprises a first gear (701), a sliding block (702), a sliding groove (703), a large gear (704), a second rotating rod (705), a first rack (706), a belt (707), a first rotating rod (708), a second rack (709) and a belt pulley (710), the sliding groove (703) is symmetrically formed in two ends of two sides in the main body box (4), the sliding block (702) is arranged in the sliding groove (703), the first rack (706) is installed on the outer side of the sliding block (702), the second rotating rod (705) is symmetrically arranged at the bottom of two sides in the main body box (4), the first rotating rod (708) is symmetrically arranged at the top of two sides in the main body box (4), the first gear (701) is installed in the middle position of the outer side of the first rotating rod (708), and the belt pulley (710) is symmetrically installed at two ends of the outer sides of the first rotating rod (708) and the second rotating rod (705), two sets of the outside of belt pulley (710) is provided with belt (707) jointly, the both ends symmetry installation in second dwang (705) outside and first rack (706) intermeshing's gear wheel (704), the border position department symmetry of mounting panel (15) bottom both sides is installed second rack (709) with first gear (701) intermeshing.
3. The multifunctional measuring equipment for road and bridge construction according to claim 1, wherein: the lifting measurement assembly (2) comprises a glass window (201), a connecting gear (202), an installation bin (203), a storage battery (204), a sieve plate (205) and a laser range finder (206), the installation bin (203) is arranged at the top of the main body box (4), the top end of the second rotating shaft (14) is fixedly connected with the bottom of the installation bin (203), the connecting gear (202) meshed with the wide gear (11) is installed at the bottom of the outer side of the installation bin (203), the sieve plate (205) is arranged at the middle position inside the connecting gear (202), the laser range finder (206) is installed at the top of the exact sieve plate (205), the storage battery (204) is installed at the inner bottom of the installation bin (203), the glass window (201) is arranged at the top of the outer side of the installation bin (203), and the control panel (1) is electrically connected with the laser range finder (206) through a wire, the storage battery (204) is electrically connected with the laser range finder (206) through a lead.
4. The multifunctional measuring equipment for road and bridge construction according to claim 2, wherein: bottom plate (16) are installed jointly to the bottom of first rack (706), and the non-centre of a circle position department at bottom plate (16) top is provided with the annular arch (13) of mutually supporting with backing plate (8), ring channel (18) of mutually supporting with annular arch (13) are seted up to the non-centre of a circle position department in main part case (4) bottom.
5. The multifunctional measuring equipment for road and bridge construction according to claim 3, wherein: the edge position department of installation storehouse (203) bottom evenly installs the gyro wheel, the position department of the non-centre of a circle in mounting panel (15) top is provided with the gyro wheel groove of mutually supporting with the gyro wheel.
6. The multifunctional measuring equipment for road and bridge construction according to claim 3, wherein: the top of the installation bin (203) is provided with a top plate in a threaded manner, and the top of the inner side of the installation bin (203) is provided with threads matched with the top plate.
7. The multifunctional measuring equipment for road and bridge construction according to claim 1, wherein: side (5) are installed to the bottom in main part case (4) outside, the four corners position department of side (5) bottom all installs the universal wheel, and is provided with arresting gear on the universal wheel.
8. The multifunctional measuring equipment for road and bridge construction according to claim 1, wherein: one end in the outer side of the tool bin (6) is hinged with a bin door, and a handle is installed on the outer side of the bin door.
9. The multifunctional measuring equipment for road and bridge construction according to claim 3, wherein: the edge position department at installation storehouse (203) top is provided with the sealing washer, and the edge position department at installation storehouse (203) top is provided with the mounting groove of mutually supporting with the sealing washer.
10. A method for using the measuring device for multifunctional road and bridge construction, which is the measuring device for multifunctional road and bridge construction according to the claims 1-9, and comprises the following steps:
the device is moved to a specified position through a universal wheel before use, then an electric lifting rod (19) is controlled to extend through a control panel (1), in the process that the electric lifting rod (19) extends, a lifting measurement component (2) at the top of a mounting plate (15) is pushed to extend out of the interior of a main body box (4), the mounting plate (15) drives a second rack (709) to ascend, the first rotating rod (708) is driven to rotate by matching of the second rack (709) and a first gear (701), the second rotating rod (705) is driven to rotate by matching of a belt (707) and a belt pulley (710), and the first rack (706) is forced to gradually extend out of the interior of the main body box (4) downwards by matching of a large gear (704) and the first rack (706);
secondly, taking out the backing plate (8), the telescopic rod (9) and the baffle (17) at the top of the bottom plate (16) from the inner side of the annular protrusion (13), manually rotating the baffle (17) by 90 degrees to enable the baffle (17) to be vertical to the plane of the backing plate (8), manually placing the baffle (17) at the other end of the bridge to be measured, enabling one surface, far away from the telescopic rod (9), of the baffle (17 to face the main body box (4), and manually extending the telescopic rod (9) to enable the laser range finder (206) and the baffle (17) to be at the same height;
thirdly, manually rotating a hand wheel (3), driving a wide gear (11) to rotate through a first rotating shaft (12), driving an installation bin (203) to slowly rotate through the matching of the wide gear (11) and a connecting gear (202) until a glass window (201) completely faces to a baffle (17), then controlling a laser range finder (206) to start working through a control panel (1), and measuring the actual distance between a main box (4) and the baffle (17);
and step four, regularly opening a top plate at the top of the installation bin (203), overhauling the laser range finder (206), taking out the laser range finder (206) when the storage battery (204) is damaged, and taking out the sieve plate (205) from the interior of the installation bin (203), so that the storage battery (204) is taken out from the interior of the installation bin (203) for replacement.
CN202011363912.7A 2020-11-27 2020-11-27 Multifunctional measuring equipment for road and bridge construction and use method Pending CN112431131A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011363912.7A CN112431131A (en) 2020-11-27 2020-11-27 Multifunctional measuring equipment for road and bridge construction and use method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011363912.7A CN112431131A (en) 2020-11-27 2020-11-27 Multifunctional measuring equipment for road and bridge construction and use method

Publications (1)

Publication Number Publication Date
CN112431131A true CN112431131A (en) 2021-03-02

Family

ID=74697820

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011363912.7A Pending CN112431131A (en) 2020-11-27 2020-11-27 Multifunctional measuring equipment for road and bridge construction and use method

Country Status (1)

Country Link
CN (1) CN112431131A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112938710A (en) * 2021-03-22 2021-06-11 嘉兴和昌电梯控制技术有限公司 Waterproof car roof maintenance box and fixing device thereof
CN116929220A (en) * 2023-07-20 2023-10-24 山西路桥智慧交通信息科技有限公司 Bridge construction measuring device

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08161038A (en) * 1994-12-09 1996-06-21 Murata Mach Ltd Unmanned carrier
JP2010107268A (en) * 2008-10-29 2010-05-13 Audio Technica Corp Laser marking device
CN206248090U (en) * 2016-12-15 2017-06-13 毕祥光 A kind of road and bridge construction measurement apparatus
CN207440286U (en) * 2017-11-29 2018-06-01 钟庆利 Civil engineering laser range finder
BG3112U1 (en) * 2018-10-22 2019-02-28 „Бефт“ Еоод Three-dimensional scanner with adjustable support structure
CN209043298U (en) * 2018-11-26 2019-06-28 浙江东方工程管理有限公司 A kind of Project Supervising detection device
CN209355921U (en) * 2019-01-24 2019-09-06 天津新辰科技有限公司 A kind of total station for mapping
CN210800612U (en) * 2019-11-18 2020-06-19 马宇航 Surveying and mapping engineering application equipment based on computer CAD technology
CN211176094U (en) * 2019-11-13 2020-08-04 江苏知境光电科技有限公司 Engineering laser range finder
CN211262232U (en) * 2020-02-11 2020-08-14 厦门九嘉信息科技有限公司 Engineering surveying and mapping system
CN211601952U (en) * 2019-11-28 2020-09-29 朱廷萃 Laser direction indicator for hydraulic engineering
CN211928169U (en) * 2020-03-12 2020-11-13 广东宏达工贸集团有限公司 A interplanar spacing detection device for automatic system engineering

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08161038A (en) * 1994-12-09 1996-06-21 Murata Mach Ltd Unmanned carrier
JP2010107268A (en) * 2008-10-29 2010-05-13 Audio Technica Corp Laser marking device
CN206248090U (en) * 2016-12-15 2017-06-13 毕祥光 A kind of road and bridge construction measurement apparatus
CN207440286U (en) * 2017-11-29 2018-06-01 钟庆利 Civil engineering laser range finder
BG3112U1 (en) * 2018-10-22 2019-02-28 „Бефт“ Еоод Three-dimensional scanner with adjustable support structure
CN209043298U (en) * 2018-11-26 2019-06-28 浙江东方工程管理有限公司 A kind of Project Supervising detection device
CN209355921U (en) * 2019-01-24 2019-09-06 天津新辰科技有限公司 A kind of total station for mapping
CN211176094U (en) * 2019-11-13 2020-08-04 江苏知境光电科技有限公司 Engineering laser range finder
CN210800612U (en) * 2019-11-18 2020-06-19 马宇航 Surveying and mapping engineering application equipment based on computer CAD technology
CN211601952U (en) * 2019-11-28 2020-09-29 朱廷萃 Laser direction indicator for hydraulic engineering
CN211262232U (en) * 2020-02-11 2020-08-14 厦门九嘉信息科技有限公司 Engineering surveying and mapping system
CN211928169U (en) * 2020-03-12 2020-11-13 广东宏达工贸集团有限公司 A interplanar spacing detection device for automatic system engineering

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112938710A (en) * 2021-03-22 2021-06-11 嘉兴和昌电梯控制技术有限公司 Waterproof car roof maintenance box and fixing device thereof
CN112938710B (en) * 2021-03-22 2022-03-25 嘉兴和昌电梯控制技术有限公司 Waterproof car roof maintenance box and fixing device thereof
CN116929220A (en) * 2023-07-20 2023-10-24 山西路桥智慧交通信息科技有限公司 Bridge construction measuring device
CN116929220B (en) * 2023-07-20 2024-04-09 山西路桥智慧交通信息科技有限公司 Bridge construction measuring device

Similar Documents

Publication Publication Date Title
CN112431131A (en) Multifunctional measuring equipment for road and bridge construction and use method
CN209744321U (en) Street lamp pole convenient to overhaul circuit
CN112628661A (en) Intelligent street lamp capable of automatically replacing bulb
CN218455213U (en) Building energy-saving lighting device
CN207363350U (en) The carrier vehicle device that a kind of safe Anti-inclining slides
CN210705055U (en) Automobile sealing strip fixed length frock
CN211178518U (en) Photoelectric detection device with adjustable height
CN203766632U (en) Car-mounted built-in concealed extendable step structure
CN112150844A (en) Traffic light for emergency road
CN213579247U (en) Wall crack width measuring equipment for building monitoring
CN213921119U (en) Material transfer device for construction
CN221343872U (en) Construction auxiliary device
CN218386425U (en) Electric inspection flying car for overhead line
CN212890270U (en) Novel automobile maintenance intelligent controller
CN213925944U (en) Warning equipment for municipal construction
CN218124157U (en) Automatic laying tool of underground garage crane span structure cable
CN212500087U (en) Electric power communication car convenient to remove
CN210760561U (en) Automatic recognition device for traffic signal lamp in automobile based on machine vision
CN221625771U (en) Mounting equipment for anti-collision guardrail templates
CN212364111U (en) Surface defect detection device for integrated optoelectronic device
CN218801108U (en) Edge trimmer for paint detection test plate
CN113511129B (en) Mobile detection vehicle for environment detection
CN216696038U (en) Crack detection equipment is used in elevator accessory production
CN213748343U (en) Distance measuring device for architectural design
CN221517710U (en) Clamping and fixing device for subway platform door production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210302

RJ01 Rejection of invention patent application after publication