CN112414352B - Method for correcting sampling pose and measuring profile shape of measured object on camshaft - Google Patents

Method for correcting sampling pose and measuring profile shape of measured object on camshaft Download PDF

Info

Publication number
CN112414352B
CN112414352B CN202011247233.3A CN202011247233A CN112414352B CN 112414352 B CN112414352 B CN 112414352B CN 202011247233 A CN202011247233 A CN 202011247233A CN 112414352 B CN112414352 B CN 112414352B
Authority
CN
China
Prior art keywords
instrument
sampling
camshaft
coordinate system
point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011247233.3A
Other languages
Chinese (zh)
Other versions
CN112414352A (en
Inventor
周森
倪颖倩
陶磊
陈龙
周进
郝森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Academy of Metrology and Quality Inspection
Original Assignee
Chongqing Academy of Metrology and Quality Inspection
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Academy of Metrology and Quality Inspection filed Critical Chongqing Academy of Metrology and Quality Inspection
Priority to CN202011247233.3A priority Critical patent/CN112414352B/en
Publication of CN112414352A publication Critical patent/CN112414352A/en
Application granted granted Critical
Publication of CN112414352B publication Critical patent/CN112414352B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B21/00Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
    • G01B21/20Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring contours or curvatures, e.g. determining profile
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01BMEASURING LENGTH, THICKNESS OR SIMILAR LINEAR DIMENSIONS; MEASURING ANGLES; MEASURING AREAS; MEASURING IRREGULARITIES OF SURFACES OR CONTOURS
    • G01B21/00Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant
    • G01B21/22Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring angles or tapers; for testing the alignment of axes
    • G01B21/24Measuring arrangements or details thereof, where the measuring technique is not covered by the other groups of this subclass, unspecified or not relevant for measuring angles or tapers; for testing the alignment of axes for testing alignment of axes

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • A Measuring Device Byusing Mechanical Method (AREA)

Abstract

The invention discloses a sampling pose of a measured object on a camshaftThe correction and profile topography measurement method comprises the following steps of: will cam shaft coordinate system o0x0y0z0Converting into an instrument coordinate OXYZ; and (3) second correction: translating the central axis of the camshaft to the central point of the measured object to ensure that the instrument measuring head can normally sample the measured object, so that the instrument measuring head can further correct the sampling pose relative to the translated central axis of the camshaft in an instrument coordinate system; and (3) third correction: and calculating the included angle deviation of the measured object relative to a reference datum plane in a camshaft coordinate system, and converting the coordinate system of the measured object into an instrument coordinate system according to the included angle deviation, so that the instrument measuring head can correct the sampling pose relative to the outline of the measured object in the instrument coordinate system. And after the sampling pose is corrected, sampling data are obtained and corresponding profile morphology is fitted. The invention solves the problem that the down-sampling path is not matched with the real contour curve of the measured object under the instrument coordinate.

Description

Method for correcting sampling pose and measuring profile shape of measured object on camshaft
Technical Field
The invention relates to the technical field of measurement of a measured object on a camshaft, in particular to a method for correcting a measurement pose of the measured object on the camshaft.
Background
Before the measurement process, the camshaft is clamped on an instrument rotating table and fixed through an upper tip and a lower tip of the instrument, and a connecting line of the upper tip and the lower tip of the instrument is a Z axis parallel to an instrument coordinate system. The instrument coordinate system for measuring the camshaft is OXYZ, and the coordinate system of the camshaft is o0x0y0z0The coordinate system of each object to be measured (journal, cam, etc.) is okxkykzkRotation angle of thetak
The reason for the eccentric error is as follows: 1) the central axis of the camshaft is not parallel to the connecting line of the center, and a space included angle exists, so that an eccentric error, also called an installation error, is caused; 2) measured pair on camshaftThe image (journal, cam, etc.) is eccentric with respect to the camshaft center axis. The reason why the object to be measured is eccentric with respect to the center line of the camshaft is that: firstly, when the measured object is designed, the axis z of the measured objectkTo the central axis z of the camshaft0Are parallel, but zkAnd z0At x0y0With an amount of deviation in the plane. Design time zkAnd z0Unparallel or unparallel caused by machining process, not only the pose of each measured object is compared with that of reference plane x0y0Plane deviation included angle alphakIn the reference plane x0z0Also internally, a deviation angle beta appearsk
Before sampling, the instrument generates a corresponding sampling path according to the input design parameters of the measured object, and controls the sensor to sample according to the generated sampling path. However, due to the eccentric error of the camshaft, the generated adopted path cannot match the spatial posture of the measured object in the instrument coordinate system, so that the sensor cannot sample along the real profile curve of the measured object, and the measured object profile fitted by the sampling point finally has a large deviation from the actual profile. Therefore, how to correct the sampling pose of the measuring head of the instrument is a key for generating a sampling path which can be matched with the outline of the measured object.
Disclosure of Invention
Aiming at the technical defects, the invention provides a method for correcting the sampling pose of a measured object on a camshaft, which solves the technical problem of how to correct the sampling pose of an instrument measuring head in an instrument coordinate system to generate a sampling path capable of matching the outline of the measured object.
In order to solve the technical problems, the technical scheme of the invention is as follows: a method for correcting the sampling pose of a measured object on a camshaft comprises the following steps:
clamping a workpiece on an instrument rotary table, and vertically fixing a cam shaft on the workpiece through an instrument tip; sequentially correcting the pose of the measuring head of the instrument for three times;
first correction: will cam shaft coordinate system o0x0y0z0Converted into the coordinate OXYZ of the instrument so that the coordinate system o of the measured objectkxkykzkAlong with camshaft coordinate system o0x0y0z0The initial transformation is carried out in the instrument coordinate OXYZ, so that the instrument measuring head can initially correct the sampling pose relative to the central axis of the camshaft in the instrument coordinate system;
and (3) second correction: in an instrument coordinate system, translating the central axis of the camshaft to the central point of the measured object to ensure that an instrument measuring head can normally sample the measured object, so that the instrument measuring head can further correct the sampling pose relative to the translated central axis of the camshaft in the instrument coordinate system;
and (3) third correction: and calculating the included angle deviation of the measured object relative to a reference datum plane in a camshaft coordinate system, and converting the coordinate system of the measured object into an instrument coordinate system according to the included angle deviation, so that the instrument measuring head can correct the sampling pose relative to the outline of the measured object in the instrument coordinate system.
Further, a camshaft coordinate system o0x0y0z0Conversion into the instrument coordinates xyz, as follows:
respectively selecting marking points a in the positioning areas of the upper and lower workpiece references0、b0
Sampling the mark points by the instrument measuring head:
sampling for the first time at the initial position to obtain a mark point a0And b0Is sampled at coordinates a1(xa,1,ya,1,za,1) And b1(xb,1,yb,1,zb,1);
The rotary table drives the workpiece to rotate 90 degrees from the initial position, and then secondary sampling is carried out to obtain a mark point a0And b0Is sampled at coordinates a2(xa,2,ya,2,za,2) And coordinates b2(xb,2,yb,2,zb,2);
The third sampling is carried out after the rotary table drives the workpiece to rotate 180 degrees from the initial positionObtaining a mark point a0And b0Is sampled at coordinates a3(xa,3,ya,3,za,3) And coordinates b3(xb,3,yb,3,zb,3);
The fourth sampling is carried out after the rotary table drives the workpiece to rotate 270 degrees from the initial position to obtain a mark point a0And b0Is sampled at coordinates a4(xa,4,ya,4,za,4) And coordinates b4(xb,4,yb,4,zb,4);
Whether the measuring head of the analysis instrument is in the controllable range of the measuring head when the measuring head is at the four sampling positions is judged, and if not, the workpiece is clamped again; if so, determining the eccentric correction amount delta Z of the central axis of the camshaft relative to the Z axis of the instrument coordinate system according to the maximum detection error of the instrument measuring head calibrated in advance;
respectively calculating the eccentric correction quantity of the central axis of the camshaft relative to the X axis and the Y axis of the instrument coordinate system according to the sampling points; and converting the camshaft coordinate system to an instrument coordinate system according to the eccentric correction amount.
Further, a camshaft coordinate system is established as follows:
sampling the upper and lower workpiece references by an instrument measuring head in an instrument coordinate system, fitting sampling points of the upper and lower workpiece references by a least square method to obtain circle center coordinates of the upper and lower workpiece references, and taking a circle center connecting line of the upper and lower workpiece references as Z of a camshaft0Axis and perpendicular to Z0The plane of the axis passing through the reference circle center of the lower workpiece is taken as X0Y0A plane;
the camshaft coordinate system is transformed to the instrument coordinate system as follows:
x′k=(xk·cosα0+Δx)·cosθ0
Figure GDA0003444065290000031
z′k=zk·cosα0·cosβ0+Δz;
in the formula (x)k,yk,zk) Represents a point on the kth measured object in the camshaft coordinate system, (x'k,y′k,z′k) Represents a point (x)k,yk,zk) Converting to the coordinates under the instrument coordinate system; the amount of eccentric correction of the camshaft center axis with respect to the X-axis comprises the angle alpha of the camshaft center axis with respect to the X-axis0And a displacement amount Δ x; the amount of eccentric correction of the camshaft center axis with respect to the Y-axis comprises an angle beta of the camshaft center axis with respect to the Y-axis0And a displacement amount Δ y; theta0The rotation angle of the current measuring point relative to the initial measuring point is represented, and the range is 0-360 degrees.
Further, the second correction is performed as follows:
selecting a mark point c in a tested area of a kth tested objectkMarking point ckCharacteristic points belonging to the middle section of the measured object; in an instrument coordinate system, an instrument measuring head respectively rotates to the following four mark points ckSampling: the initial position, the position rotated by 90 degrees relative to the initial position, the position rotated by 180 degrees relative to the initial position, and the position rotated by 270 degrees relative to the initial position respectively obtain corresponding sampling coordinates: c. Ck,1(xc,k,1,0,zc,k,1)、ck,2(0,yc,k,2,zc,k,2)、ck,3(xc,k,3,0,zc,k,3) And ck,4(0,yc,k,4,zc,k,4) (ii) a Using ck,1(xc,k,1,0,zc,k,1) And ck,3(xc,k,3,0,zc,k,3) Correction of xkOffset in the axial direction by ck,2(0,yc,k,2,zc,k,2) And ck,4(0,yc,k,4,zc,k,4) Correction of ykThe offset in the axial direction, so as to obtain the coordinates after the second correction:
Figure GDA0003444065290000032
Figure GDA0003444065290000033
z″k=z′k
wherein (x'k,y′k,z′k) The coordinate of the point on the kth measured object in the instrument coordinate system after the first correction is shown, (x ″)k,y″k,z″k) And representing the coordinates of the point on the kth measured object under the instrument coordinate system after the second correction.
Further, in the formula, (x ″)k,y″k,z″k) The coordinates of the point on the kth measured object in the instrument coordinate system after the second correction are expressed as (x ″)'k,y″′k,z″′k) And (4) representing the coordinates of the point on the kth measured object in the instrument coordinate system after the third correction, wherein (x, y, z) represents the sampling pose coordinates of the instrument measuring head.
Compared with the prior art, the invention has the following beneficial effects:
1. according to the invention, the sampling pose is gradually corrected through three times of correction, the coordinate system of the measured object is preliminarily converted into the instrument coordinate system through the first correction, so that the subsequent two corrections can be carried out in the instrument coordinate system, and simultaneously, the sampling pose of the instrument measuring head can be preliminarily corrected relative to the central axis of the camshaft in the instrument coordinate system after the first correction is completed. However, since the axis of the measured object often does not coincide with the central axis of the camshaft, the latter two corrections are also required in order to make the sampling pose conform to the profile curve of the measured object.
2. And the sampling pose in the instrument coordinate system is relatively vertical to the central axis of the camshaft, the central axis of the camshaft is translated to the central point of the measured object by the second correction, and the phenomenon that the deviation between the axis of the measured object and the central axis of the camshaft is large and exceeds the controllable range of the instrument measuring head is avoided, so that the instrument measuring head can normally sample the measured object.
3. The third correction is based on the second correction, namely, the instrument measuring head is ensured to be capable of normally sampling the measured object, then the measured object coordinate system is converted into the instrument coordinate system according to the included angle deviation of the measured object relative to the reference datum plane in the camshaft coordinate system (converted into the instrument coordinate system), namely, the central axis of the camshaft is rotated to be coincident with the axis of the measured object, and the sampling pose in the instrument coordinate system is relatively perpendicular to the central axis of the camshaft, so that the sampling pose can be relatively perpendicular to the axis of the measured object in the instrument coordinate system, and the instrument measuring head can correct the sampling pose relative to the outline of the measured object in the instrument coordinate system.
4. The invention corrects the eccentric quantity on the premise of ensuring that the measuring head of the instrument is in a controllable range, ensures the normal work of the measuring head of the instrument, avoids collision with a workpiece in the sampling process and can continuously finish sampling.
5. The method has the advantages of less number of required sampling points, high sampling efficiency and capability of conveniently and quickly correcting the eccentric error of the camshaft.
Drawings
FIG. 1 is a schematic view of workpiece clamping;
FIG. 2 shows a mark a0And b0Schematic diagram of the sampling process of (a);
fig. 3 is a schematic view of a controllable force range of the contact probe;
FIG. 4 is a schematic diagram of the correction of eccentricity of the central axis of the camshaft relative to the X-axis;
FIG. 5 is a schematic diagram of the correction of the eccentricity of the central axis of the camshaft relative to the Y-axis;
FIG. 6 is a schematic diagram of the distribution of feature points on the object under test;
FIG. 7 is a schematic diagram of the correction of the measured object relative to the reference datum plane;
FIG. 8 shows the measured object relative to the reference plane x0y0Schematic diagram of the included angle deviation;
FIG. 9 is a diagram of the measured object relative to the reference plane x0z0Schematic diagram of the included angle deviation.
Detailed Description
One), first correction
Before the measurement process, the camshaft is clamped on an instrument rotary table and fixed through an upper tip and a lower tip of the instrument, and a connecting line of the upper tip and the lower tip of the instrument is a Z axis parallel to a coordinate system of the instrument. The eccentric amount is generated: the central axis of the camshaft is not parallel to the connecting line of the tip, a space included angle exists, and the central axis of the camshaft has a deviation included angle alpha compared with the central axis of the camshaft XZ0The deviation angle β occurs in comparison with YZ0This causes an eccentricity error, which may also be referred to as a mounting error, which is corrected for the first time.
First correction: will cam shaft coordinate system o0x0y0z0Converted into the coordinate OXYZ of the instrument so that the coordinate system o of the measured objectkxkykzkAlong with camshaft coordinate system o0x0y0z0And the initial transformation is carried out into the instrument coordinate OXYZ, so that the instrument measuring head can initially correct the sampling pose relative to the central axis of the camshaft in the instrument coordinate system.
The first correction specifically comprises the following steps:
referring to fig. 1, a workpiece is clamped on an instrument rotary table, and a cam shaft on the workpiece is vertically fixed through an instrument tip;
respectively selecting marking points a in the positioning areas of the upper and lower workpiece references0、b0
Referring to fig. 2, the gauge head samples the mark points, and during sampling, the gauge head and the workpiece rotate synchronously and keep relatively static, so that the movement error of the gauge head is avoided.
Sampling for the first time at the initial position to obtain a mark point a0And b0Is sampled at coordinates a1(xa,1,ya,1,za,1) And b1(xb,1,yb,1,zb,1)。
The rotary table drives the workpiece to rotate 90 degrees from the initial position, and then secondary sampling is carried out to obtain a mark point a0And b0Is sampled at coordinates a2(xa,2,ya,2,za,2) And coordinates b2(xb,2,yb,2,zb,2)。
The third sampling is carried out after the rotary table drives the workpiece to rotate 180 degrees from the initial position to obtain a mark point a0And b0Is sampled at coordinates a3(xa,3,ya,3,za,3) And coordinates b3(xb,3,yb,3,zb,3)。
The fourth sampling is carried out after the rotary table drives the workpiece to rotate 270 degrees from the initial position to obtain a mark point a0And b0Is sampled at coordinates a4(xa,4,ya,4,za,4) And coordinates b4(xb,4,yb,4,zb,4)。
Whether the measuring head of the analysis instrument is in the controllable range of the measuring head when the measuring head is at the four sampling positions is judged, and if not, the workpiece is clamped again; and if so, determining the eccentric correction amount delta Z of the central axis of the camshaft relative to the Z axis of the instrument coordinate system according to the maximum detection error of the instrument measuring head calibrated in advance.
Respectively calculating the eccentric correction quantity of the central axis of the camshaft relative to the X axis and the Y axis of the instrument coordinate system according to the sampling points; and converting the camshaft coordinate system to the instrument coordinate according to the eccentric correction amount.
Referring to fig. 3, when the measuring head of the instrument is a contact measuring head, it is respectively determined whether the stress of the measuring head of the instrument at the four sampling positions is within the controllable stress range, and if not, the workpiece is clamped again; if yes, one third of the maximum detection error of the instrument measuring head calibrated in advance (according to the one third principle of the error) is used as the eccentric correction amount delta Z of the central axis of the camshaft relative to the Z axis. A force measuring value sensor exists on the instrument, and force information can be fed back.
When the measuring head of the instrument is a non-contact measuring head, respectively judging whether the poses of the measuring head at the four sampling positions are within a controllable pose range, and if not, re-clamping the workpiece; if so, taking one third of the maximum detection error of the pre-calibrated instrument measuring head (according to the one third principle of the error) as the eccentric correction amount delta Z of the central axis of the camshaft relative to the Z axis; the position and posture of the measuring head refer to a space coordinate and a space included angle of the measuring head under an instrument coordinate system. The space coordinate refers to the coordinate of X-axis, Y-axis and Z-axis directions under an instrument coordinate system, and the space included angle refers to the space included angle formed by the probe which can not only move along the coordinate axes but also rotate and the coordinate axes.
Referring to FIG. 4, the cylindrical coordinate system is a camshaft coordinate system, and the amount of eccentric correction of the central axis of the camshaft relative to the X axis includes an included angle α of the central axis of the camshaft relative to the X axis0And a displacement amount Δ x, calculated as follows:
by point
Figure GDA0003444065290000061
And point
Figure GDA0003444065290000062
The included angle between the connecting line of (A) and the Z axis is taken as the included angle alpha0Wherein, a point
Figure GDA0003444065290000063
Is a sampling point a1(xa,1,ya,1,za,1) And a3(xa,3,ya,3,za,3) Middle point, point of
Figure GDA0003444065290000064
Is a sampling point b1(xb,1,yb,1,zb,1) And sampling point b3(xb,3,yb,3,zb,3) The middle point of (a);
included angle alpha0The calculation formula of (a) is as follows:
Figure GDA0003444065290000065
the displacement amount Δ x is calculated as follows:
Figure GDA0003444065290000066
referring to FIG. 5, a cylindrical coordinate system refers to a camshaftA coordinate system, the eccentric correction amount of the central axis of the camshaft relative to the Y axis comprises an included angle beta of the central axis of the camshaft relative to the Y axis0And a displacement amount Δ y calculated as follows, respectively:
by point
Figure GDA0003444065290000071
And point
Figure GDA0003444065290000072
The included angle between the connecting line of (b) and the Z axis is taken as the included angle beta0Wherein, a point
Figure GDA0003444065290000073
Is a sampling point a2(xa,2,ya,2,za,2) And a4(xa,4,ya,4,za,4) Middle point, point of
Figure GDA0003444065290000074
Is a sampling point b2(xb,2,yb,2,zb,2) And b4(xb,4,yb,4,zb,4) The middle point of (a);
angle of inclusion beta0The calculation formula of (a) is as follows:
Figure GDA0003444065290000075
the displacement amount Δ y is calculated as follows:
Figure GDA0003444065290000076
the camshaft coordinate system is established as follows:
sampling the upper and lower workpiece references by an instrument measuring head in an instrument coordinate system, fitting sampling points of the upper and lower workpiece references by a least square method to obtain circle center coordinates of the upper and lower workpiece references, and taking a circle center connecting line of the upper and lower workpiece references as Z of a camshaft0A shaft andperpendicular to Z0The plane of the axis passing through the reference circle center of the lower workpiece is taken as X0Y0A plane;
the camshaft coordinate system is transformed to the instrument coordinate system as follows:
x′k=(xk·cosα0+Δx)·cosθ0
Figure GDA0003444065290000077
z′k=zk·cosα0·cosβ0+Δz;
in the formula (x)k,yk,zk) Represents a point on the kth measured object in the camshaft coordinate system, (x'k,y′k,z′k) Represents a point (x)k,yk,zk) Converting to the coordinates under the instrument coordinate system; the amount of eccentric correction of the camshaft center axis with respect to the X-axis comprises the angle alpha of the camshaft center axis with respect to the X-axis0And a displacement amount Δ x; the amount of eccentric correction of the camshaft center axis with respect to the Y-axis comprises an angle beta of the camshaft center axis with respect to the Y-axis0And a displacement amount Δ y; theta0The rotation angle of the current measuring point relative to the initial measuring point is represented, and the range is 0-360 degrees.
The method is used for correcting the installation error of the camshaft, and is a basis for accurately sampling the cam profile on the camshaft, so that the instrument measuring head can adjust the sampling pose on the basis of the sampling path generated according to the cam design parameters, namely the instrument measuring head can adjust the sampling pose relative to the central axis of the camshaft actually installed in an instrument coordinate system. The invention compensates the included angle and offset error, so that the measuring head of the instrument can adjust the angle to be vertical to the central axis of the camshaft, and when the measured object (such as a shaft neck 1 and a cam 2 in figure 1) is coaxial with the central axis of the camshaft, the point on the adopted path can be moved to the outline of the measured object in the instrument coordinate system.
Two), second correction
Due to the camThe central axis of the measured object on the shaft often deviates from the central axis of the camshaft by an angle: 1) during design, the central axis z of the measured objectkTo the central axis z of the camshaft0Parallel, at a reference level x0y0An internal deviation occurs; 2) design time zkAnd z0Unparallel or unparallel caused by machining process, not only the pose of each measured object is compared with that of reference plane x0y0The deviation included angle alpha appearskAt a reference datum plane x0z0Also internally, a deviation angle beta appearsk. Therefore, after the first correction, the requirement of further correction on the condition that the sampling pose is relatively vertical to the axis of the measured object under the instrument coordinate system cannot be met.
Before further correcting the sampling pose according to the included angle deviation, the instrument measuring head needs to be ensured to be capable of normally sampling the measured object, so that the second correction must be carried out: in an instrument coordinate system, the central axis of the camshaft is translated to the central point of the measured object, so that the measured object can be normally sampled by the instrument measuring head, and the sampling pose of the instrument measuring head can be further corrected relative to the translated central axis of the camshaft in the instrument coordinate system.
The second correction is specifically performed as follows:
referring to fig. 6, a mark point c is selected in the measured area of the kth measured objectkMarking point ckCharacteristic points belonging to the middle section of the measured object; in an instrument coordinate system, an instrument measuring head respectively rotates to the following four mark points ckSampling: the initial position, the position rotated by 90 degrees relative to the initial position, the position rotated by 180 degrees relative to the initial position, and the position rotated by 270 degrees relative to the initial position respectively obtain corresponding sampling coordinates: c. Ck,1(xc,k,1,0,zc,k,1)、ck,2(0,yc,k,2,zc,k,2)、ck,3(xc,k,3,0,zc,k,3) And ck,4(0,yc,k,4,zc,k,4) (ii) a Using ck,1(xc,k,1,0,zc,k,1) And ck,3(xc,k,3,0,zc,k,3) Correction of xkOffset in the axial direction by ck,2(0,yc,k,2,zc,k,2) And ck,4(0,yc,k,4,zc,k,4) Correction of ykThe offset in the axial direction, so as to obtain the coordinates after the second correction:
Figure GDA0003444065290000081
Figure GDA0003444065290000082
z″k=zk
wherein (x'k,y′k,z′k) The coordinate of the point on the kth measured object in the instrument coordinate system after the first correction is shown, (x ″)k,y″k,z″k) And representing the coordinates of the point on the kth measured object under the instrument coordinate system after the second correction.
Third), third correction
And (3) third correction: and calculating the included angle deviation of the measured object relative to a reference datum plane in a camshaft coordinate system, and converting the coordinate system of the measured object into an instrument coordinate system according to the included angle deviation, so that the instrument measuring head can correct the sampling pose relative to the outline of the measured object in the instrument coordinate system.
The third correction is specifically performed as follows:
referring to fig. 7 to 9, a mark point d is selected at the upper end of the kth object to be measuredk,1And dk,2The marking point dk,1And dk,2X symmetrically distributed in camshaft coordinate system0z0Two sides of the reference datum plane; selecting a mark point d at the lower end of the kth measured objectk,3The marking point dk,3And mark point dk,1Symmetrically distributed in x parallel to the camshaft coordinate system0y0Parallel crossing mark point ckOn both sides of the reference datum plane;
by instrument probeRespectively obtain the point dk,1、dk,2And dk,3The coordinates of (a): dk,1(xd,k,1,yd,k,1,zd,k,1)、dk,2(xd,k,1,yd,k,1,zd,k,1) And dk,3(xd,k,3,yd,k,3,zd,k,3);
By marking point dk,1(xd,k,1,yd,k,1,zd,k,1) And dk,2(xd,k,1,yd,k,1,zd,k,1) Correction and reference datum plane x0z0Angle of inclination of betakPassing through the mark point dk,1(xd,k,1,yd,k,1,zd,k,1) And dk,3(xd,k,3,yd,k,3,zd,k,3) Correction and reference datum plane x0y0Angle deviation of alphakIn an ideal state, there is no angular deviation, and the calculation formula can be obtained as follows:
Figure GDA0003444065290000091
Figure GDA0003444065290000092
correcting the coordinates of the sampling points of the measured object according to the included angle deviation according to the following formula:
x=x″′k=x″k*cosαk+y″k*sinβk
y=y″′k=y″k*cosαk+y″k*sinβk
z=z″′k=z″k*cosαk*cosβk
wherein (x ″)k,y″k,z″k) The coordinates of the point on the kth measured object in the instrument coordinate system after the second correction are expressed as (x ″)'k,y″′k,z″′k) Denotes the kth measured after the third correctionCoordinates of a point on the object in the instrument coordinate system, (x, y, z) represent sampling pose coordinates of the instrument probe.
Four), contour shape measurement of measured object on camshaft
Generating an initial sampling path in an instrument coordinate system according to design parameters of a measured object, and correcting the sampling pose of an instrument measuring head by adopting the method for correcting the sampling pose of the measured object on the camshaft in the specific embodiment, namely correcting the coordinates of sampling points on the initial sampling path, so that the instrument measuring head corrects the sampling pose in the instrument coordinate system relative to the profile of the measured object;
and the instrument measuring head samples by adopting the corrected sampling pose to obtain sampling data of the profile of the measured object, fits a corresponding profile shape according to the sampling data, and analyzes the fitted profile shape according to the reference datum plane of the camshaft to obtain a corresponding size value.

Claims (10)

1. A method for correcting the sampling pose of a measured object on a camshaft is characterized by comprising the following steps:
clamping a workpiece on an instrument rotary table, and vertically fixing a cam shaft on the workpiece through an instrument tip; sequentially correcting the pose of the measuring head of the instrument for three times;
first correction: will cam shaft coordinate system o0x0y0z0Converted into the coordinate OXYZ of the instrument so that the coordinate system o of the measured objectkxkykzkAlong with camshaft coordinate system o0x0y0z0The initial transformation is carried out in the instrument coordinate OXYZ, so that the instrument measuring head can initially correct the sampling pose relative to the central axis of the camshaft in the instrument coordinate system;
and (3) second correction: in an instrument coordinate system, translating the central axis of the camshaft to the central point of the measured object to ensure that an instrument measuring head can normally sample the measured object, so that the instrument measuring head can further correct the sampling pose relative to the translated central axis of the camshaft in the instrument coordinate system;
and (3) third correction: and calculating the included angle deviation of the measured object relative to a reference datum plane in a camshaft coordinate system, and converting the coordinate system of the measured object into an instrument coordinate system according to the included angle deviation, so that the instrument measuring head can correct the sampling pose relative to the outline of the measured object in the instrument coordinate system.
2. The method according to claim 1, wherein the camshaft coordinate system o is set to0x0y0z0Conversion into the instrument coordinates xyz, as follows:
respectively selecting marking points a in the positioning areas of the upper and lower workpiece references0、b0
Sampling the mark points by the instrument measuring head:
sampling for the first time at the initial position to obtain a mark point a0And b0Is sampled at coordinates a1(xa,1,ya,1,za,1) And b1(xb,1,yb,1,zb,1);
The rotary table drives the workpiece to rotate 90 degrees from the initial position, and then secondary sampling is carried out to obtain a mark point a0And b0Is sampled at coordinates a2(xa,2,ya,2,za,2) And coordinates b2(xb,2,yb,2,zb,2);
The third sampling is carried out after the rotary table drives the workpiece to rotate 180 degrees from the initial position to obtain a mark point a0And b0Is sampled at coordinates a3(xa,3,ya,3,za,3) And coordinates b3(xb,3,yb,3,zb,3);
The fourth sampling is carried out after the rotary table drives the workpiece to rotate 270 degrees from the initial position to obtain a mark point a0And b0Is sampled at coordinates a4(xa,4,ya,4,za,4) And coordinates b4(xb,4,yb,4,zb,4);
Whether the measuring head of the analysis instrument is in the controllable range of the measuring head when the measuring head is at the four sampling positions is judged, and if not, the workpiece is clamped again; if so, determining the eccentric correction amount delta Z of the central axis of the camshaft relative to the Z axis of the instrument coordinate system according to the maximum detection error of the instrument measuring head calibrated in advance;
respectively calculating the eccentric correction quantity of the central axis of the camshaft relative to the X axis and the Y axis of the instrument coordinate system according to the sampling points; and converting the camshaft coordinate system to an instrument coordinate system according to the eccentric correction amount.
3. The method for correcting the sampling pose of the measured object on the camshaft according to claim 2, wherein when the measuring head of the instrument is a contact measuring head, whether the stress of the measuring head of the instrument at four sampling positions is in a controllable stress range is judged, and if not, the workpiece is clamped again; if so, taking one third of the maximum detection error of the pre-calibrated instrument measuring head as the eccentric correction quantity delta Z of the central axis of the camshaft relative to the Z axis;
4. the method for correcting the sampling pose of the measured object on the camshaft according to claim 2, wherein when an instrument measuring head is a non-contact measuring head, whether the pose of the measuring head at four sampling positions is within a controllable pose range is respectively judged, and if not, the workpiece is clamped again; if so, taking one third of the maximum detection error of the pre-calibrated instrument measuring head as the eccentric correction quantity delta Z of the central axis of the camshaft relative to the Z axis; the position and posture of the measuring head refer to a space coordinate and a space included angle of the measuring head under an instrument coordinate system.
5. The method for correcting the sampling pose of the measured object on the camshaft according to claim 2, wherein a camshaft coordinate system is established as follows:
sampling the upper and lower workpiece references by an instrument measuring head in an instrument coordinate system, fitting sampling points of the upper and lower workpiece references by a least square method to obtain circle center coordinates of the upper and lower workpiece references, and taking a circle center connecting line of the upper and lower workpiece references as Z of a camshaft0Axis and perpendicular to Z0The plane of the axis passing through the reference circle center of the lower workpiece is taken as X0Y0A plane;
the camshaft coordinate system is transformed to the instrument coordinate system as follows:
x′k=(xk·cosα0+Δx)·cosθ0
Figure FDA0003444065280000021
z′k=zk·cosα0·cosβ0+Δz;
in the formula (x)k,yk,zk) Represents a point on the kth measured object in the camshaft coordinate system, (x'k,y′k,z′k) Represents a point (x)k,yk,zk) Converting to the coordinates under the instrument coordinate system; the amount of eccentric correction of the camshaft center axis with respect to the X-axis comprises the angle alpha of the camshaft center axis with respect to the X-axis0And a displacement amount Δ x; the amount of eccentric correction of the camshaft center axis with respect to the Y-axis comprises an angle beta of the camshaft center axis with respect to the Y-axis0And a displacement amount Δ y; theta0The rotation angle of the current measuring point relative to the initial measuring point is represented, and the range is 0-360 degrees.
6. The method according to claim 5, wherein the amount of the eccentric correction of the central axis of the camshaft with respect to the X-axis comprises an angle α between the central axis of the camshaft and the X-axis0And a displacement amount Δ x, calculated as follows:
by point
Figure FDA0003444065280000031
And point
Figure FDA0003444065280000032
The included angle between the connecting line of (A) and the Z axis is taken as the included angle alpha0Wherein, a point
Figure FDA0003444065280000033
Is a sampling point a1(xa,1,ya,1,za,1) And a3(xa,3,ya,3,za,3) Middle point, point of
Figure FDA0003444065280000034
Is a sampling point b1(xb,1,yb,1,zb,1) And sampling point b3(xb,3,yb,3,zb,3) The middle point of (a);
included angle alpha0The calculation formula of (a) is as follows:
Figure FDA0003444065280000035
the displacement amount Δ x is calculated as follows:
Figure FDA0003444065280000036
in the formula, Z is a coordinate of a sampling point of the object to be measured in the Z-axis direction.
7. The method according to claim 5, wherein the amount of the eccentric correction of the camshaft center axis with respect to the Y axis includes an angle β between the camshaft center axis and the Y axis0And a displacement amount Δ y calculated as follows, respectively:
by point
Figure FDA0003444065280000037
And point
Figure FDA0003444065280000038
The included angle between the connecting line of (b) and the Z axis is taken as the included angle beta0Wherein, a point
Figure FDA0003444065280000039
Is a sampling point a2(xa,2,ya,2,za,2) And a4(xa,4,ya,4,za,4) Middle point, point of
Figure FDA00034440652800000310
Is a sampling point b2(xb,2,yb,2,zb,2) And b4(xb,4,yb,4,zb,4) The middle point of (a);
angle of inclusion beta0The calculation formula of (a) is as follows:
Figure FDA00034440652800000311
the displacement amount Δ y is calculated as follows:
Figure FDA00034440652800000312
in the formula, Z is a coordinate of a sampling point of the object to be measured in the Z-axis direction.
8. The method for correcting the sampling pose of the measured object on the camshaft according to claim 5, wherein the second correction is specifically performed as follows:
selecting a mark point c in a tested area of a kth tested objectkMarking point ckCharacteristic points belonging to the middle section of the measured object; in an instrument coordinate system, an instrument measuring head respectively rotates to the following four mark points ckSampling: the initial position, the position rotated by 90 degrees relative to the initial position, the position rotated by 180 degrees relative to the initial position, and the position rotated by 270 degrees relative to the initial position respectively obtain corresponding sampling coordinates: c. Ck,1(xc,k,1,0,zc,k,1)、ck,2(0,yc,k,2,zc,k,2)、ck,3(xc,k,3,0,zc,k,3) And ck,4(0,yc,k,4,zc,k,4) (ii) a Using ck,1(xc,k,1,0,zc,k,1) And ck,3(xc,k,3,0,zc,k,3) Correction of xkOffset in the axial direction by ck,2(0,yc,k,2,zc,k,2) And ck,4(0,yc,k,4,zc,k,4) Correction of ykThe offset in the axial direction, so as to obtain the coordinates after the second correction:
Figure FDA0003444065280000041
Figure FDA0003444065280000042
z″k=z′k
wherein (x'k,y′k,z′k) The coordinate of the point on the kth measured object in the instrument coordinate system after the first correction is shown, (x ″)k,y″k,z″k) And representing the coordinates of the point on the kth measured object under the instrument coordinate system after the second correction.
9. The method for correcting the sampling pose of the measured object on the camshaft according to claim 5, wherein the third correction is performed as follows:
selecting a mark point d at the upper end of the kth measured objectk,1And dk,2The marking point dk,1And dk,2X symmetrically distributed in camshaft coordinate system0z0Two sides of the reference datum plane; selecting a mark point d at the lower end of the kth measured objectk,3The marking point dk,3And mark point dk,1Symmetrically distributed in x parallel to the camshaft coordinate system0y0Parallel crossing mark point ckOn both sides of the reference datum plane;
respectively acquiring recording points d by instrument measuring headsk,1、dk,2And dk,3The coordinates of (a): dk,1(xd,k,1,yd,k,1,zd,k,1)、dk,2(xd,k,1,yd,k,1,zd,k,1) And dk,3(xd,k,3,yd,k,3,zd,k,3);
By marking point dk,1(xd,k,1,yd,k,1,zd,k,1) And dk,2(xd,k,1,yd,k,1,zd,k,1) Correction and reference datum plane x0z0Angle of inclination of betakPassing through the mark point dk,1(xd,k,1,yd,k,1,zd,k,1) And dk,3(xd,k,3,yd,k,3,zd,k,3) Correction and reference datum plane x0y0Angle deviation of alphakThe calculation formula is as follows:
Figure FDA0003444065280000043
Figure FDA0003444065280000051
correcting the coordinates of the sampling points of the measured object according to the included angle deviation according to the following formula:
x=x″′k=x″k*cosαk+y″k*sinβk
y=y″′k=y″k*cosαk+y″k*sinβk
z=z″′k=z″k*cosαk*cosβk
wherein (x ″)k,y″k,z″k) The coordinates of the point on the kth measured object in the instrument coordinate system after the second correction are expressed as (x ″)'k,y″′k,z″′k) Indicating the kth quilt after the third correctionCoordinates of a point on the measuring object in an instrument coordinate system, and (x, y and z) represent sampling pose coordinates of a measuring head of the instrument.
10. A contour shape measuring method of a measured object on a camshaft comprises the following steps: generating an initial sampling path in an instrument coordinate system according to the design parameters of the measured object, characterized in that,
the method for correcting the sampling pose of the measured object on the camshaft according to claim 1 is adopted to correct the sampling pose of the measuring head of the instrument, namely, the coordinates of the sampling points on the initial sampling path are corrected, so that the sampling pose of the measuring head of the instrument is corrected in a coordinate system of the instrument relative to the profile of the measured object;
and the instrument measuring head samples by adopting the corrected sampling pose to obtain sampling data of the profile of the measured object, fits a corresponding profile shape according to the sampling data, and analyzes the fitted profile shape according to the reference datum plane of the camshaft to obtain a corresponding size value.
CN202011247233.3A 2020-11-10 2020-11-10 Method for correcting sampling pose and measuring profile shape of measured object on camshaft Active CN112414352B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011247233.3A CN112414352B (en) 2020-11-10 2020-11-10 Method for correcting sampling pose and measuring profile shape of measured object on camshaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011247233.3A CN112414352B (en) 2020-11-10 2020-11-10 Method for correcting sampling pose and measuring profile shape of measured object on camshaft

Publications (2)

Publication Number Publication Date
CN112414352A CN112414352A (en) 2021-02-26
CN112414352B true CN112414352B (en) 2022-04-01

Family

ID=74782367

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011247233.3A Active CN112414352B (en) 2020-11-10 2020-11-10 Method for correcting sampling pose and measuring profile shape of measured object on camshaft

Country Status (1)

Country Link
CN (1) CN112414352B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113639673B (en) * 2021-08-19 2023-01-31 江苏科技大学 Non-contact measurement method for phase angle and profile of cam of large camshaft

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103499302A (en) * 2013-09-27 2014-01-08 吉林大学 Camshaft diameter online measuring method based on structured light visual imaging system
CN111283477A (en) * 2019-12-26 2020-06-16 北京工业大学 Feature line-based cambered surface cam profile error measurement and evaluation method

Family Cites Families (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3933383A1 (en) * 1989-10-06 1991-04-18 Hitachi Ltd Positioning crankshaft reference markings - by pulse train generated from gear crown of flywheel and sensor
DE19734695C1 (en) * 1997-08-11 1998-11-05 Leica Mikroskopie & Syst Method of correcting measurement errors of coordinate measurement machine e.g. for semiconductor industry
US6789039B1 (en) * 2000-04-05 2004-09-07 Microsoft Corporation Relative range camera calibration
US6766775B2 (en) * 2001-11-01 2004-07-27 Ford Global Technologies, Llc Method and system for increasing the estimation accuracy of cam phase angle in an engine with variable cam timing
US6948357B1 (en) * 2004-03-08 2005-09-27 Wen-Tsun Chang Cam shaft intake angle examining device
RU2322587C1 (en) * 2006-12-26 2008-04-20 Сергей Иванович Нефедов Positive displacement machine device (versions)
WO2014016466A1 (en) * 2012-07-26 2014-01-30 Wärtsilä Finland Oy Method and arrangement to control powers of at least two generator sets
CN103148828B (en) * 2013-03-08 2016-01-20 北京工业大学 A kind of gear wheel measuring method exempting from mounting and adjusting
US9573198B1 (en) * 2013-06-06 2017-02-21 The Boeing Company Double eccentric positioning apparatus
CN103925902B (en) * 2014-04-08 2016-11-02 北京工业大学 A kind of profile error measurement apparatus based on the equidistant model of globoid cam and measuring method
CN203877451U (en) * 2014-06-03 2014-10-15 天津源天晟科技发展有限公司 Posture correcting mechanism
CN105571523A (en) * 2015-12-23 2016-05-11 中国科学院长春光学精密机械与物理研究所 Tooth error vision measurement method for involute of straight toothed spur gear
CN106204610A (en) * 2016-07-20 2016-12-07 张家港长安大学汽车工程研究院 Peg-in-hole assembly automatic centering system based on image procossing
CN107560583B (en) * 2017-08-25 2019-04-26 重庆市计量质量检测研究院 The axial line bearing calibration of cylindrical workpiece and its diameter measuring method for being segmented section
CN108645323B (en) * 2018-06-21 2019-06-14 北京工业大学 Involute spur gear wheel total profile deviation assessment method under the influence of installation error
CN108645322B (en) * 2018-06-21 2019-06-14 北京工业大学 Involute spur gear wheel circular pitch deviation assessment method under the influence of installation error
CN111238372B (en) * 2020-02-24 2021-05-25 重庆市计量质量检测研究院 Synchronous detection method for joint position error of double-compound coordinate measurement system
CN111649705A (en) * 2020-06-30 2020-09-11 中国计量科学研究院 Eccentric shaft for calibrating camshaft measuring instrument and calibrating method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103499302A (en) * 2013-09-27 2014-01-08 吉林大学 Camshaft diameter online measuring method based on structured light visual imaging system
CN111283477A (en) * 2019-12-26 2020-06-16 北京工业大学 Feature line-based cambered surface cam profile error measurement and evaluation method

Also Published As

Publication number Publication date
CN112414352A (en) 2021-02-26

Similar Documents

Publication Publication Date Title
US20220379423A1 (en) In-place non-contact detection method for shaft workpiece
CN109029293B (en) Method for calibrating position and pose errors of line scanning measuring head in blade surface type detection
US8250952B2 (en) Method of machine tool calibration
CN112781496B (en) Measuring head pose calibration method of non-contact measuring system
JP2015127714A (en) Surface sensor offset
CN110514127B (en) Automatic light beam direction calibration method based on section line method
JP5618770B2 (en) Robot calibration apparatus and calibration method
JP2017194451A (en) Error identification method for machine tool, and error identification system
CN112461177A (en) On-machine calibration method for point laser measuring head
CN112880592B (en) Inclination calibration method of numerical control turntable center based on mandrel
WO2020174585A1 (en) Cutting device and contact position identification program
CN112414352B (en) Method for correcting sampling pose and measuring profile shape of measured object on camshaft
WO2003014847A2 (en) Method for automatically correcting the systematic errors in measurement and manufacturing machines and apparatus for implementing the method
CN114012719B (en) Zero calibration method and system for six-axis robot
CN111678471A (en) Error identification and compensation method for rotary table of cylindrical coordinate measuring machine
CN107900781A (en) Caliberating device and scaling method for the contact on-line detecting system of lathe
CN110645935B (en) Accurate calibration method for installation offset of integrated displacement sensor of numerical control rotating shaft
CN114253217A (en) Five-axis machine tool RTCP automatic calibration method with self-correction function
JP3880030B2 (en) V-groove shape measuring method and apparatus
CN111895905B (en) Error compensation method for hexagonal axis straightness detection system
JP4345607B2 (en) Rotation center calculation method and work positioning apparatus using this method
CN112414353B (en) Camshaft eccentricity error correction method
CN115139338B (en) Robot TCP quick high-precision calibration method
US7277818B2 (en) Method and program for leveling aspherical workpieces
US11274913B2 (en) Aligning components in relation to a coordinate measuring machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant