CN112412097A - Jacking reinforcing apparatus with adjustable gaseous film building top bearing is prevented caving in - Google Patents

Jacking reinforcing apparatus with adjustable gaseous film building top bearing is prevented caving in Download PDF

Info

Publication number
CN112412097A
CN112412097A CN202011366182.6A CN202011366182A CN112412097A CN 112412097 A CN112412097 A CN 112412097A CN 202011366182 A CN202011366182 A CN 202011366182A CN 112412097 A CN112412097 A CN 112412097A
Authority
CN
China
Prior art keywords
jacking
block
reinforcing device
film building
groups
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011366182.6A
Other languages
Chinese (zh)
Other versions
CN112412097B (en
Inventor
杨龙生
徐相朝
辛华锋
王现林
王晓莉
杨海庆
李斌
王中杰
刘清
张双鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengshang Construction Co ltd
Original Assignee
Hengshang Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengshang Construction Co ltd filed Critical Hengshang Construction Co ltd
Priority to CN202011366182.6A priority Critical patent/CN112412097B/en
Publication of CN112412097A publication Critical patent/CN112412097A/en
Application granted granted Critical
Publication of CN112412097B publication Critical patent/CN112412097B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0281Repairing or restoring roofing or roof covering
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/04Propping of endangered or damaged buildings or building parts, e.g. with respect to air-raid action
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H15/00Tents or canopies, in general
    • E04H15/20Tents or canopies, in general inflatable, e.g. shaped, strengthened or supported by fluid pressure

Abstract

The invention discloses a bearing anti-sinking adjustable jacking reinforcing device at the top of a gas film building, which comprises a stay bar fixing mechanism, a jacking stay bar mechanism and side support adjusting mechanisms, wherein the jacking stay bar mechanism is movably arranged in the middle of the stay bar fixing mechanism, the side support adjusting mechanisms are arranged in two groups, the two groups of side support adjusting mechanisms are movably arranged at the two sides of the stay bar fixing mechanism, when excessive accumulated snow on the top of the air film building is pressed down, the jacking guide post moves downwards and drives the lower end of the curved rod to move downwards, so that the mounting pins of the curved bar move in the strip-shaped connecting groove, and the mounting pins at the two sides approach to the jacking guide post, and the upper end of curved bar removes and also draws close to the jacking guide pillar in block fixed mounting strip for the stress point of the curved bar upper end pair air film building top of both sides concentrates on jacking guide pillar department, prevents to appear sunkenly at this department because of jacking guide pillar back air film building top that moves down.

Description

Jacking reinforcing apparatus with adjustable gaseous film building top bearing is prevented caving in
Technical Field
The invention relates to the technical field of air film buildings, in particular to an adjustable jacking reinforcing device for bearing and preventing sinking of the top of an air film building.
Background
The air film building refers to a building structure system which uses a special building film material as a shell and is provided with a set of intelligent electromechanical equipment to provide positive pressure of air in the air film building so as to support a building main body.
Inside meeting of air film building sets up the reinforcement steel frame construction often in prior art, consolidate it and handle, but the most both sides that set up in air film building of conventional steel frame construction, air film building's top is rarely had reinforced device to consolidate, air film building top can appear often and cause the top bearing to transship and the sunken imagination in top appears because of accumulating too much snow under big snow sky gas, if extend to air film building's top with steel frame construction, rigid structural configuration, can make the steel construction cause the damage after bearing too much weight, can cause the damage to air film building's top simultaneously.
Aiming at the problems, the invention provides an adjustable jacking reinforcing device for bearing and preventing sinking of the top of a gas film building.
Disclosure of Invention
The invention aims to provide an adjustable jacking reinforcing device capable of preventing the top of a gas film building from bearing and sinking, which comprises a stay bar fixing mechanism, jacking stay bar mechanisms and side support adjusting mechanisms, wherein the jacking stay bar mechanisms are movably arranged in the middle of the stay bar fixing mechanism, the side support adjusting mechanisms are arranged in two groups, and the two groups of side support adjusting mechanisms are movably arranged on two sides of the stay bar fixing mechanism, so that the top of the gas film building can be bearing and jacked, and the top of the gas film building is prevented from sinking due to accumulated snow in snowy days, so that the problems in the background art are solved.
In order to achieve the purpose, the invention provides the following technical scheme: a jacking reinforcing device with adjustable top bearing and anti-sinking functions for a gas film building comprises a supporting rod fixing mechanism, jacking supporting rod mechanisms and side support adjusting mechanisms, wherein the jacking supporting rod mechanisms are movably arranged in the middle of the supporting rod fixing mechanism;
the jacking strut mechanism is provided with a connecting bottom block, a jacking column assembly and a reset spring, the upper end of the connecting bottom block is fixedly welded with the jacking column assembly, the reset spring is movably sleeved on the jacking column assembly, and the lower end of the reset spring is fixedly welded on the upper end surface of the connecting bottom block;
the adjusting mechanism is supported to the both ends movable mounting side of fixed horizontal pole subassembly, and side support adjusting mechanism is provided with regulation bent rod subassembly and block fixed mounting strip piece, and the middle swing joint of adjusting the bent rod subassembly is on fixed horizontal pole subassembly, and lower extreme swing joint is on connecting the bottom block, and upper end activity block connects on block fixed mounting strip piece, and block fixed mounting strip piece fixed mounting is at air film building top.
Further, the reinforcing connecting rod assembly is provided with an arc-shaped bent rod and a connecting sleeve, the arc-shaped bent rod is fixedly welded on the side face of the fixed cross rod assembly, and the connecting sleeve is fixedly welded at one end of the arc-shaped bent rod.
Furthermore, the fixed cross rod assembly is provided with a support rod body and a connection round block, the support rod body is provided with two groups, and the two groups of support rod bodies are fixedly welded on two sides of the connection round block to form the whole fixed cross rod assembly.
Furthermore, the support body of rod is provided with the removal groove head and the notch is connected to the bar, removes the groove head and sets up in the one end of the support body of rod, and the notch is connected to the bar sets up on the lateral wall of removing the groove head.
Furthermore, the connecting round block is provided with an inserting hole and positioning arc-shaped convex blocks, the inserting hole is formed in the middle of the connecting round block, the positioning arc-shaped convex blocks are arranged in two groups, and the two groups of positioning arc-shaped convex blocks are fixedly arranged on the hole wall of the inserting hole and are symmetrically distributed about the circle center of the connecting round block.
Furthermore, the connecting bottom block is provided with two pin connecting groove heads, the two pin connecting groove heads are fixedly welded on the side surface of the connecting bottom block, and the pin connecting groove heads are symmetrically distributed about the circle center of the connecting bottom block.
Further, jacking column subassembly is provided with jacking guide pillar and rubber top, and jacking guide pillar fixed welding is in the upper end of connecting the bottom block, and rubber top fixed mounting is in the upper end of jacking guide pillar, and the jacking guide pillar is provided with camber block guide rail groove, and camber block guide rail groove sets up two sets ofly, and the both sides at the jacking guide pillar are seted up respectively in two sets of camber block guide rail groove.
Furthermore, the adjusting crank rod assembly is provided with a crank rod, connecting holes, an installation pin column and clamping heads, the clamping heads are fixedly welded at the upper ends of the crank rod, the connecting holes are arranged in two groups, the two groups of connecting holes are respectively formed in the lower end and the middle of the crank rod, and the installation pin column is movably installed on the crank rod through the connecting hole formed in the middle of the crank rod.
Furthermore, the clamping fixed mounting strip block is provided with a connecting lug block and a clamping groove rail, the connecting lug block is fixedly welded at the four corners of the lower end of the clamping fixed mounting strip block, and the clamping groove rail is arranged at the upper end of the clamping fixed mounting strip block.
Compared with the prior art, the invention has the following beneficial effects:
1. the invention provides an adjustable jacking reinforcing device for bearing and preventing sinking at the top of a gas film building, which is characterized in that an arc-shaped bent rod with one end welded with a connecting sleeve is fixedly welded on the side surface of a fixed transverse rod assembly, the reinforcing device can be fixedly arranged on a steel frame structure of the side wall in the gas film building through the connecting sleeve during installation, a jacking guide pillar with the top welded with a rubber top head is movably arranged on a connecting round block provided with a splicing hole and arranged on the fixed transverse rod assembly, the upper end of a reset spring sleeved on the jacking guide pillar is fixedly welded on the connecting round block, the rubber top head is contacted with the top of the gas film building, the top of the gas film building is jacked and reinforced through the jacking guide pillar, the phenomenon that the top of the gas film building sinks due to bearing overload is prevented, when excessive snow is accumulated on the top of the gas film building, the jacking guide pillar is pressed down, and the lower end moves down, compare with traditional steel frame construction's reinforcement mode, this device can carry out the regulation that moves down of jacking guide pillar when the bearing of air film building top is transshipped, prevents that the rigid connection at jacking guide pillar and air film building top from causing the damage to air film building top too by force, can effectually protect the air film building.
2. The invention provides an adjustable jacking reinforcing device for bearing and preventing sinking at the top of an air film building, which is characterized in that a curved bar is movably arranged in a strip-shaped connecting groove formed in one end of a supporting rod body through an installation pin, the upper end of the curved bar is movably arranged in a clamping fixed mounting bar block fixed at the top of the air film building through a clamping head, the lower end of the curved bar is movably arranged on a pin connecting groove opening head arranged on a connecting bottom block, when excessive accumulated snow on the top of the air film building is pressed down, the jacking guide post moves down and drives the lower end of the curved bar to move down, so that the installation pin of the curved bar moves in the strip-shaped connecting groove, the installation pin columns at two sides are close to the jacking guide post, the upper end of the curved bar moves in the clamping fixed mounting bar block and also moves close to the jacking guide post, the stress points of the upper ends of the curved bars at two sides to the top of the air film building are concentrated at the jacking guide post, and the top of the, when snow is eliminated, reset spring resets, the jacking guide pillar shifts up, the lower extreme of curved bar is followed the jacking guide pillar and is together shifted up, the installation round pin post is moving in connecting the notch to the bar to keep away from the jacking guide pillar, the upper end of curved bar moves in block fixed mounting bar and also keeps away from to the jacking guide pillar, resumes initial open state, make the curved bar of both sides more even with the atress of jacking guide pillar to the gas film building top, it is better to support the reinforcement effect.
3. According to the adjustable jacking reinforcing device for bearing and preventing sinking at the top of the air film building, the rubber top head is fixedly arranged at the upper end of the jacking guide pillar, so that the damage to the top of the air film building can be reduced through the rubber top head when the jacking guide pillar is in contact with the top of the air film building, the air film building is protected, the positioning arc-shaped convex block is fixedly arranged on the wall of the insertion hole, the arc-shaped clamping guide rail grooves are formed in the two sides of the jacking guide pillar, and are in clamping connection with the positioning arc-shaped convex block, so that when the jacking guide pillar is pressed downwards to move, the smooth movement can be ensured, and the jacking guide pillar can be positioned without rotating when the jacking guide pillar moves downwards.
Drawings
FIG. 1 is a schematic view of the overall structure of the load-bearing anti-sinking adjustable jacking reinforcing device for the top of the air film building;
FIG. 2 is a schematic view of a connecting structure of a brace rod fixing mechanism and a jacking brace rod mechanism of the adjustable jacking reinforcement device for preventing sinking and bearing at the top of a gas film building;
FIG. 3 is a schematic structural view of a brace rod fixing mechanism of the bearing anti-sinking adjustable jacking reinforcement device for the top of the air film building;
FIG. 4 is a schematic structural view of a jacking brace mechanism of the adjustable jacking reinforcement device for preventing sinking of the top bearing of the air film building;
FIG. 5 is a schematic view of a connecting structure of a support rod fixing mechanism and a side support adjusting mechanism of the bearing dent-proof adjustable jacking reinforcing device for the top of the air film building;
FIG. 6 is a schematic structural view of a side support adjusting mechanism of the adjustable jacking and strengthening device for preventing sinking and bearing on the top of the air film building;
FIG. 7 is a schematic structural view of an adjusting curved rod assembly of the adjustable jacking reinforcing device for preventing sinking of the top bearing of the air film building;
fig. 8 is a schematic structural view of a clamping fixed mounting bar block of the adjustable jacking reinforcing device for preventing sinking of the top bearing of the air film building.
In the figure: 1. a strut fixing mechanism; 11. reinforcing the connecting rod assembly; 111. an arc-shaped bent rod; 112. connecting a sleeve; 12. a fixed cross bar assembly; 121. a support rod body; 1211. moving the slot head; 1212. a strip-shaped connecting notch; 122. connecting the round blocks; 1221. inserting holes; 1222. positioning the arc-shaped bump; 2. a jacking stay bar mechanism; 21. connecting the bottom block; 211. a pin connecting groove head; 22. a jacking column assembly; 221. jacking a guide pillar; 2211. the guide rail groove is clamped in an arc shape; 222. a rubber plug; 23. a return spring; 3. a side support adjustment mechanism; 31. adjusting the crank assembly; 311. a curved bar; 312. connecting holes; 313. mounting a pin column; 314. a snap head; 32. clamping and fixing the mounting bar block; 321. connecting the ear blocks; 322. and clamping the groove rail.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1, an adjustable jacking reinforcement device for supporting and preventing sinking at the top of a gas film building comprises a supporting rod fixing mechanism 1, a jacking supporting rod mechanism 2 and side support adjusting mechanisms 3, wherein the jacking supporting rod mechanism 2 is movably installed in the middle of the supporting rod fixing mechanism 1, the side support adjusting mechanisms 3 are arranged in two groups, and the two groups of side support adjusting mechanisms 3 are movably installed at two sides of the supporting rod fixing mechanism 1.
Referring to fig. 2, the stay fixing mechanism 1 is provided with two groups of reinforcing connecting rod assemblies 11 and two groups of fixing cross bar assemblies 12, the two groups of reinforcing connecting rod assemblies 11 are fixedly welded to two sides of the fixing cross bar assemblies 12 to form the whole stay fixing mechanism 1, and the fixed cross bar assemblies 12 are movably provided with the jacking stay mechanisms 2.
Referring to fig. 3, the reinforcing link assembly 11 is provided with an arc-shaped bent rod 111 and a connecting sleeve 112, the arc-shaped bent rod 111 is fixedly welded on a side surface of the fixed cross rod assembly 12, the connecting sleeve 112 is fixedly welded on one end of the arc-shaped bent rod 111, the fixed cross rod assembly 12 is provided with a supporting rod body 121 and a connecting round block 122, the supporting rod body 121 is provided with two groups, the two groups of supporting rod bodies 121 are fixedly welded on two sides of the connecting round block 122 to form the whole fixed cross rod assembly 12, the supporting rod body 121 is provided with a moving slot head 1211 and a strip-shaped connecting slot 1212, the moving slot head 1211 is arranged at one end of the supporting rod body 121, the strip-shaped connecting slot 1212 is arranged on a side wall of the moving slot head 1211, the connecting round block 122 is provided with a plugging hole 1221 and a positioning arc-shaped bump 1222, the plugging hole 1221 is arranged in the middle of the connecting round block 122, the, and the centre of a circle about connecting the circle piece 122 is distributed symmetrically, through with rubber top 222 fixed mounting in the upper end of jacking guide pillar 221, accessible rubber top 222 reduces the damage to the air film building top when making jacking guide pillar 221 and air film building top contact, protect the air film building, simultaneously with the fixed setting on the pore wall of spliced eye 1221 of location arc type lug 1222, and set up arc type block guide rail groove 2211 in the both sides of jacking guide pillar 221, arc type block guide rail groove 2211 is connected with location arc type lug 1222 block, make jacking guide pillar 221 when being pushed down the removal, can guarantee the smooth and easy of removal, and can obtain the location can not take place to rotate when moving down.
Referring to fig. 4, the jacking brace mechanism 2 is provided with a connecting bottom block 21, a jacking column assembly 22 and a return spring 23, the upper end of the connecting bottom block 21 is fixedly welded with the jacking column assembly 22, the return spring 23 is movably sleeved on the jacking column assembly 22, the lower end of the return spring is fixedly welded on the upper end surface of the connecting bottom block 21, the connecting bottom block 21 is provided with two sets of pin connecting groove heads 211, the two sets of pin connecting groove heads 211 are fixedly welded on the side surface of the connecting bottom block 21 and symmetrically distributed about the center of the circle of the connecting bottom block 21, the jacking column assembly 22 is provided with two sets of jacking guide pillars 221 and rubber headers 222, the jacking guide pillars 221 are fixedly welded on the upper end of the connecting bottom block 21, the rubber headers 222 are fixedly installed on the upper ends of the jacking guide pillars 221, the jacking guide pillars 221 are provided with arc-shaped clamping guide rail grooves 2211, the arc-shaped clamping guide rail grooves 2211 of the two sets of guide rails are respectively arranged on two, the arc-shaped bent rod 111 with one end welded with the connecting sleeve 112 is fixedly welded on the side surface of the fixed cross rod component 12, the reinforcing device can be fixedly installed on a steel frame structure of the side wall in the air film building through the connecting sleeve 112 during installation, the jacking guide post 221 with the top welded with the rubber top 222 is movably installed on the connecting round block 122 provided with the inserting hole 1221 and arranged on the fixed cross rod component 12, the upper end of the reset spring 23 sleeved on the jacking guide post 221 is fixedly welded on the connecting round block 122, the rubber top 222 is contacted with the top of the air film building, the top of the air film building is jacked and reinforced through the jacking guide post 221, the phenomenon that the top of the air film building is sunken due to bearing overload is prevented, when the accumulated snow on the top of the air film building is too much, the jacking guide post 221 is pressed downwards, and the lower end moves downwards through the inserting hole 1221 to enable the reset spring, compare with traditional steel frame construction's reinforcement mode, this device can carry out the regulation that moves down of jacking guide pillar 221 when the bearing of air film building top is transshipped, prevents that the rigid connection at jacking guide pillar 221 and air film building top from causing the damage to air film building top excessively by force, can effectually protect the air film building.
Referring to fig. 5-8, the two ends of the fixed cross bar assembly 12 are movably mounted with the side support adjusting mechanisms 3, the side support adjusting mechanisms 3 are provided with adjusting curved bar assemblies 31 and clamping fixed mounting bar blocks 32, the middle of the adjusting curved bar assemblies 31 are movably connected to the fixed cross bar assembly 12, the lower ends are movably mounted on the connecting bottom block 21, the upper ends are movably clamped and connected to the clamping fixed mounting bar blocks 32, the clamping fixed mounting bar blocks 32 are fixedly mounted on the top of the air film building, the adjusting curved bar assemblies 31 are provided with curved bars 311, connecting holes 312, mounting pins 313 and clamping heads 314, the upper ends of the curved bars 311 are fixedly welded with the clamping heads 314, the connecting holes 312 are provided in two groups, the two groups of connecting holes 312 are respectively provided at the lower ends and the middle of the curved bars 311, the mounting pins 313 are movably mounted on the curved bars 311 through the connecting holes 312 provided in the middle of the curved bars 311, the clamping fixed mounting bar blocks 32, the connecting ear block 321 is fixedly welded at four corners of the lower end of the clamping and fixedly mounting bar block 32, the clamping groove rail 322 is arranged at the upper end of the clamping and fixedly mounting bar block 32, the curved bar 311 is movably mounted in a strip-shaped connecting groove 1212 arranged at one end of the supporting rod body 121 through a mounting pin 313, the upper end of the curved bar 311 is movably mounted in the clamping and fixedly mounting bar block 32 fixed at the top of the air film building through a clamping head 314, the lower end of the curved bar 311 is movably mounted on a pin connecting groove head 211 arranged at the connecting bottom block 21, when the jacking guide post 221 with excessive accumulated snow at the top of the air film building is pressed down, the jacking guide post 221 moves down and drives the lower end of the curved bar 311 to move down, so that the mounting pin 313 of the curved bar 311 moves in the strip-shaped connecting groove 1212, the mounting pins 313 at two sides approach the jacking guide post 221, and the upper end of the curved bar 311 moves in the clamping and fixedly mounting bar block 32 and, make the stress point of the curved bar 311 upper end of both sides to the air film building top concentrate on jacking guide pillar 221 department, prevent to appear sunken in this department because of jacking guide pillar 221 moves back air film building top down, eliminate when snow, reset spring 23 resets, jacking guide pillar 221 moves up, the lower extreme of curved bar 311 is followed jacking guide pillar 221 and is together moved up, installation round pin post 313 removes in connecting notch 1212 to the bar, and keep away from to jacking guide pillar 221, the upper end of curved bar 311 removes and also keeps away from to jacking guide pillar 221 in block fixed mounting strip piece 32, resume the state of opening originally, make the curved bar 311 of both sides and the atress of jacking guide pillar 221 to the air film building top more even, it is better to support the reinforcement effect.
In summary, the following steps: the invention provides a bearing anti-sinking adjustable jacking reinforcing device at the top of a gas film building, which comprises a stay bar fixing mechanism 1, a jacking stay bar mechanism 2 and side support adjusting mechanisms 3, wherein the jacking stay bar mechanism 2 is movably arranged in the middle of the stay bar fixing mechanism 1, the side support adjusting mechanisms 3 are arranged in two groups, the two groups of side support adjusting mechanisms 3 are movably arranged at two sides of the stay bar fixing mechanism 1, an arc-shaped bent rod 111 with one end welded with a connecting sleeve 112 is fixedly welded at the side surface of a fixed cross rod component 12, the reinforcing device can be fixedly arranged on a steel frame structure of the inner side wall of the gas film building through the connecting sleeve 112 during installation, a jacking guide pillar 221 with a rubber top head 222 is movably arranged on a connecting round block 122 with an inserting hole 1221 arranged on the fixed cross rod component 12, the upper end of a reset spring 23 sleeved on the jacking guide pillar 221 is fixedly welded on the connecting round block 122, the rubber top head 222 is in contact with the top of the air film building, the top of the air film building is jacked and reinforced through the jacking guide post 221, the phenomenon that the top of the air film building is sunken due to bearing overload is prevented, when the accumulated snow on the top of the air film building is excessive, the jacking guide post 221 is pressed downwards, and the lower end of the jacking guide post moves downwards through the inserting hole 1221 to enable the reset spring 23 to be stretched and deformed; the curved bar 311 is movably arranged in a strip-shaped connecting notch 1212 arranged at one end of the supporting rod body 121 through an installing pin 313, the upper end of the curved bar 311 is movably arranged in a clamping fixed installation strip block 32 fixed at the top of the air film building through a clamping head 314, the lower end of the curved bar 311 is movably arranged on a pin connecting groove mouth 211 arranged on the connecting bottom block 21, when the jacking guide post 221 with excessive snow accumulated on the top of the air film building is pressed downwards, the jacking guide post 221 moves downwards and drives the lower end of the curved bar 311 to move downwards, so that the installing pin 313 of the curved bar 311 moves in the strip-shaped connecting notch 1212, the installing pin 313 at two sides are close to the jacking guide post 221, the upper end of the curved bar 311 moves in the clamping fixed installation strip block 32 and also moves towards the jacking guide post 221, the stress point of the upper end of the curved bar 311 at two sides to the top of the air film building is concentrated at the jacking guide post 221, and the top of the air film building is prevented from sinking at the position after, when snow is eliminated, the return spring 23 is reset, the jacking guide post 221 moves upwards, the lower end of the curved rod 311 moves upwards together with the jacking guide post 221, the mounting pin 313 moves towards the strip-shaped connecting notch 1212 and is far away from the jacking guide post 221, the upper end of the curved rod 311 moves in the clamping and fixing mounting strip block 32 and is also far away from the jacking guide post 221, and the initial opening state is recovered, so that the curved rods 311 and the jacking guide post 221 on the two sides are more uniformly stressed on the top of the air film building, and the supporting and reinforcing effects are better; through the upper end with rubber top 222 fixed mounting at jacking guide pillar 221, accessible rubber top 222 reduces the damage to the air film building top when making jacking guide pillar 221 and air film building top contact, protect the air film building, simultaneously with the fixed setting on the pore wall of spliced eye 1221 of location arc type lug 1222, and set up arc type block guide rail groove 2211 in the both sides of jacking guide pillar 221, arc type block guide rail groove 2211 is connected with location arc type lug 1222 block, make jacking guide pillar 221 when being pushed down and remove, can guarantee the smooth and easy of removal, and can obtain the location can not take place to rotate when moving down.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (9)

1. The utility model provides a jacking reinforcing apparatus with adjustable gas film building top bearing is prevented sunken, includes vaulting pole fixed establishment (1), jacking vaulting pole mechanism (2) and side support adjustment mechanism (3), jacking vaulting pole mechanism (2) movable mounting in the centre of vaulting pole fixed establishment (1), and side support adjustment mechanism (3) set up two sets ofly, and two sets of side support adjustment mechanism (3) movable mounting is in the both sides of vaulting pole fixed establishment (1), its characterized in that: the supporting rod fixing mechanism (1) is provided with a reinforcing connecting rod assembly (11) and a fixed cross rod assembly (12), the reinforcing connecting rod assemblies (11) are arranged in two groups, the two groups of reinforcing connecting rod assemblies (11) are fixedly welded on two sides of the fixed cross rod assembly (12) to form the whole supporting rod fixing mechanism (1), and a jacking supporting rod mechanism (2) is movably installed on the fixed cross rod assembly (12);
the jacking strut mechanism (2) is provided with a connecting bottom block (21), a jacking column assembly (22) and a reset spring (23), the upper end of the connecting bottom block (21) is fixedly welded with the jacking column assembly (22), the reset spring (23) is movably sleeved on the jacking column assembly (22), and the lower end of the reset spring is fixedly welded on the upper end surface of the connecting bottom block (21);
adjusting mechanism (3) is supported to both ends movable mounting side of fixed horizontal pole subassembly (12), side support adjusting mechanism (3) are provided with regulation bent rod subassembly (31) and block fixed mounting strip piece (32), the middle swing joint of regulation bent rod subassembly (31) is on fixed horizontal pole subassembly (12), lower extreme movable mounting is on connecting end piece (21), upper end activity block connects on block fixed mounting strip piece (32), block fixed mounting strip piece (32) fixed mounting is at air film building top.
2. The adjustable jacking reinforcing device of claim 1, wherein the jacking reinforcing device comprises: the reinforcing connecting rod assembly (11) is provided with an arc-shaped bent rod (111) and a connecting sleeve (112), the arc-shaped bent rod (111) is fixedly welded on the side face of the fixed cross rod assembly (12), and the connecting sleeve (112) is fixedly welded at one end of the arc-shaped bent rod (111).
3. The adjustable jacking reinforcing device of claim 1, wherein the jacking reinforcing device comprises: the fixed cross rod assembly (12) is provided with a supporting rod body (121) and a connecting round block (122), the supporting rod body (121) is provided with two groups, and the two groups of supporting rod bodies (121) are fixedly welded on two sides of the connecting round block (122) to form the whole fixed cross rod assembly (12).
4. The adjustable jacking reinforcing device of claim 3, wherein the jacking reinforcing device comprises: the supporting rod body (121) is provided with a movable groove head (1211) and a strip-shaped connecting notch (1212), the movable groove head (1211) is arranged at one end of the supporting rod body (121), and the strip-shaped connecting notch (1212) is arranged on the side wall of the movable groove head (1211).
5. The adjustable jacking reinforcing device of claim 3, wherein the jacking reinforcing device comprises: the connecting round block (122) is provided with an inserting hole (1221) and positioning arc-shaped convex blocks (1222), the inserting hole (1221) is arranged in the middle of the connecting round block (122), the positioning arc-shaped convex blocks (1222) are arranged in two groups, the two groups of positioning arc-shaped convex blocks (1222) are fixedly arranged on the hole wall of the inserting hole (1221), and are symmetrically distributed about the circle center of the connecting round block (122).
6. The adjustable jacking reinforcing device of claim 1, wherein the jacking reinforcing device comprises: the connecting bottom block (21) is provided with two pin connecting groove heads (211), the two pin connecting groove heads (211) are arranged in two groups, and the two pin connecting groove heads (211) are fixedly welded on the side surface of the connecting bottom block (21) and are symmetrically distributed about the circle center of the connecting bottom block (21).
7. The adjustable jacking reinforcing device of claim 1, wherein the jacking reinforcing device comprises: jacking column subassembly (22) are provided with jacking guide pillar (221) and rubber top (222), jacking guide pillar (221) fixed welding is in the upper end of connecting bottom block (21), rubber top (222) fixed mounting is in the upper end of jacking guide pillar (221), and jacking guide pillar (221) are provided with arc type block guide rail groove (2211), arc type block guide rail groove (2211) sets up two sets ofly, two sets of arc type block guide rail groove (2211) are seted up respectively in the both sides of jacking guide pillar (221).
8. The adjustable jacking reinforcing device of claim 1, wherein the jacking reinforcing device comprises: the adjusting curved bar component (31) is provided with a curved bar (311), connecting holes (312), mounting pins (313) and a clamping head (314), the clamping head (314) is fixedly welded at the upper end of the curved bar (311), the connecting holes (312) are arranged in two groups, the two groups of connecting holes (312) are respectively arranged at the lower end and the middle of the curved bar (311), and the mounting pins (313) are movably mounted on the curved bar (311) through the connecting holes (312) arranged in the middle of the curved bar (311).
9. The adjustable jacking reinforcing device of claim 1, wherein the jacking reinforcing device comprises: the clamping fixed mounting strip block (32) is provided with a connecting lug block (321) and a clamping groove rail (322), the connecting lug block (321) is fixedly welded at four corners of the lower end of the clamping fixed mounting strip block (32), and the clamping groove rail (322) is arranged at the upper end of the clamping fixed mounting strip block (32).
CN202011366182.6A 2020-11-29 2020-11-29 Jacking reinforcing apparatus with adjustable gaseous film building top bearing is prevented caving in Active CN112412097B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011366182.6A CN112412097B (en) 2020-11-29 2020-11-29 Jacking reinforcing apparatus with adjustable gaseous film building top bearing is prevented caving in

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011366182.6A CN112412097B (en) 2020-11-29 2020-11-29 Jacking reinforcing apparatus with adjustable gaseous film building top bearing is prevented caving in

Publications (2)

Publication Number Publication Date
CN112412097A true CN112412097A (en) 2021-02-26
CN112412097B CN112412097B (en) 2022-03-25

Family

ID=74843893

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011366182.6A Active CN112412097B (en) 2020-11-29 2020-11-29 Jacking reinforcing apparatus with adjustable gaseous film building top bearing is prevented caving in

Country Status (1)

Country Link
CN (1) CN112412097B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101574920A (en) * 2009-03-11 2009-11-11 何国苗 Car tent topee automatically supported, folded and unfolded by micro machine
CN203257173U (en) * 2013-05-16 2013-10-30 客贝利(厦门)休闲用品有限公司 Tent top folding and unfolding control structure
CH706630B1 (en) * 2013-05-14 2013-12-31 S & P Clever Reinforcement Company Ag Method for pretensioning steel structure e.g. iron bridge, involves vertically driving lifting element to polymer tapes in region between end anchorages for causing traction force tensioning between end regions of polymer tapes
CN107859422A (en) * 2017-10-09 2018-03-30 北京元恒大通科技有限公司 Tent snow-removing device and there is its tent
CN207268109U (en) * 2017-09-25 2018-04-24 约顿瑞地体育文化投资(北京)有限公司 Pneumatic membrane building emergency protecting equipment and pneumatic membrane building
CN210032857U (en) * 2019-05-09 2020-02-07 李莉 Novel ponding tent is prevented on tent top
CN210976060U (en) * 2019-10-30 2020-07-10 深圳市迈博张拉膜结构工程有限公司 Collapse prevention device for air film building
CN111927012A (en) * 2020-10-12 2020-11-13 鲁东大学 Construction device of membrane building auxiliary equipment and use method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101574920A (en) * 2009-03-11 2009-11-11 何国苗 Car tent topee automatically supported, folded and unfolded by micro machine
CH706630B1 (en) * 2013-05-14 2013-12-31 S & P Clever Reinforcement Company Ag Method for pretensioning steel structure e.g. iron bridge, involves vertically driving lifting element to polymer tapes in region between end anchorages for causing traction force tensioning between end regions of polymer tapes
CN203257173U (en) * 2013-05-16 2013-10-30 客贝利(厦门)休闲用品有限公司 Tent top folding and unfolding control structure
CN207268109U (en) * 2017-09-25 2018-04-24 约顿瑞地体育文化投资(北京)有限公司 Pneumatic membrane building emergency protecting equipment and pneumatic membrane building
CN107859422A (en) * 2017-10-09 2018-03-30 北京元恒大通科技有限公司 Tent snow-removing device and there is its tent
CN210032857U (en) * 2019-05-09 2020-02-07 李莉 Novel ponding tent is prevented on tent top
CN210976060U (en) * 2019-10-30 2020-07-10 深圳市迈博张拉膜结构工程有限公司 Collapse prevention device for air film building
CN111927012A (en) * 2020-10-12 2020-11-13 鲁东大学 Construction device of membrane building auxiliary equipment and use method

Also Published As

Publication number Publication date
CN112412097B (en) 2022-03-25

Similar Documents

Publication Publication Date Title
CN217651988U (en) Steel structure beam column connection structure of prefabricated building
CN112412097B (en) Jacking reinforcing apparatus with adjustable gaseous film building top bearing is prevented caving in
CN215484501U (en) Withstand voltage type construction platform
CN213896793U (en) High mound bent cap construction support that can install fast
CN212077613U (en) Bridge expansion device
CN112726385A (en) Elastic limiter for bridge deviation correction
CN218204082U (en) Movable steel guardrail
CN220267215U (en) Positioning protection mechanism for building engineering beam or column
CN111561170A (en) Expansion joint protection device for building engineering
CN216341867U (en) Miniature telescopic chassis
CN217518346U (en) Cloud deck box type power transmission line emergency repair tower
CN218844775U (en) Bailey sheet reinforced support structural member
CN215519825U (en) High scaffold frame of security convenient to remove
CN214219333U (en) Steel construction T roof beam flange board reinforced structure
CN215331373U (en) Winding and laying type building climbing frame net
CN220580688U (en) Shading tent with arched arc top
CN212175374U (en) Pre-buried resistance to compression support steel construction of road construction
CN215926871U (en) A consolidate bearing structure for building engineering
CN210597631U (en) Assembled precast concrete component connection structure
CN219931538U (en) Adjustable spliced jig frame
CN218436638U (en) Through type steel pipe concrete tied arch bridge steel pipe arch main arch assembling support
CN220301859U (en) Building carrier plate midspan supporting equipment
CN211776167U (en) Sports stand suspended formwork
CN216239030U (en) Assembled beam slab connection structure for construction
CN219548412U (en) Building construction reinforcing bar spacing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant