CN112381592A - Engineering cost management method - Google Patents

Engineering cost management method Download PDF

Info

Publication number
CN112381592A
CN112381592A CN202011409481.3A CN202011409481A CN112381592A CN 112381592 A CN112381592 A CN 112381592A CN 202011409481 A CN202011409481 A CN 202011409481A CN 112381592 A CN112381592 A CN 112381592A
Authority
CN
China
Prior art keywords
engineering
design
management method
item
project
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011409481.3A
Other languages
Chinese (zh)
Inventor
林燕弟
李梓珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Zhengzheng Engineering Consulting Co ltd
Original Assignee
Guangdong Zhengzheng Engineering Consulting Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Zhengzheng Engineering Consulting Co ltd filed Critical Guangdong Zhengzheng Engineering Consulting Co ltd
Priority to CN202011409481.3A priority Critical patent/CN112381592A/en
Publication of CN112381592A publication Critical patent/CN112381592A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0283Price estimation or determination
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Strategic Management (AREA)
  • Development Economics (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Game Theory and Decision Science (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Human Resources & Organizations (AREA)
  • Primary Health Care (AREA)
  • Tourism & Hospitality (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a project cost management method, which relates to the technical field of project cost management and comprises the following steps: (1) selecting the item; (2) designing an engineering drawing; (3) the project bid; (4) checking the engineering drawing; (5) optimizing the engineering drawing; (6) and carrying out site survey inspection. The engineering cost management method adopts a double contract of an AB edition to be drawn together in a drawing design link, so that the problems in the design process can be clearly specified, the design drawing can be prevented from being modified at will regardless of time, the design standard is reduced, the design process is specified through the contract of the A edition, the specific design budget cost is specified, in addition, a budget limit is increased for preventing the problems in other design processes such as accidents, and the like, the budget limit can be pre-paid in advance, the contract of the B edition is not in the later period, and the specific items and various standard indexes of the design drawing are mainly accounted.

Description

Engineering cost management method
Technical Field
The invention relates to the technical field of engineering cost management, in particular to an engineering cost management method.
Background
With the rapid development of economy in China, a great deal of innovation is implemented on a plurality of industries, and the development of new and old industries is greatly promoted, wherein the construction engineering industry is always the key point of economic development, construction engineering needs to be carried out at the initial stage, advanced construction technology and construction scheme are used, meanwhile, the construction engineering scheme is low, and cost management for effectively controlling the construction cost is needed for better perfecting the construction cost management.
At present, the construction cost management is not complete in component, the cost control effect is not obvious, and the cost investment is more in the preparation work of bidding, so that a construction cost management method is provided.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides a project cost management method, which solves the problems that the prior project cost management proposed in the background art has incomplete components, has an unobvious cost control effect and has more cost investment in bid preparation work.
In order to achieve the above purpose, the invention is realized by the following technical scheme, and the engineering cost management method comprises the following steps:
(1) selecting the item;
(2) designing an engineering drawing;
(3) the project bid;
(4) checking the engineering drawing;
(5) optimizing the engineering drawing;
(6) and carrying out site survey inspection.
Optionally, the engineering cost management method includes the following specific steps:
(1) item selection
Carefully selecting each reported item, estimating the item while selecting the item, and listing corresponding structure types according to the item, wherein the structure types comprise the whole payment process and the basic area of the building;
(2) engineering drawing design
The drawing accounts for a small part of the construction cost, but the design of the drawing can directly influence the later construction process of the building;
(3) project bidding
Firstly, repeatedly reading a bidding document, then drawing material selection in the document, project quotation and integral project quantity, and finally, intensively discussing and calculating the drawn key points;
(4) checking the engineering drawing
Checking the submitted engineering design drawings in a uniform quantity to clear the overall specific engineering quantity;
(5) engineering drawing optimization
The problems in the drawings are checked and are listed in single columns, so that the problems are convenient to observe.
(6) In situ survey inspection
The geology of the building site and the basic elevation on the drawing are checked and calculated, and in addition, the facility environment around the building is checked.
Optionally, a version a and a version B are drawn up, wherein the version a is an early-stage contract and is used for standardizing the overall rules, strictly controlling the design cost, not being changed at will and reducing the design standard, and the version B is a final post-stage draft contract and is used for checking and clearing the design drawing and approving the design standard and various indexes.
Optionally, in the process of checking the engineering drawings, the number of the drawings needs to be checked, the engineering quantity in the drawing list is definitely calculated, meanwhile, missing items are repeatedly checked, the missing items are timely supplemented and changed, the process is long in time, labor is required to be clearly divided, and the responsibility of the engineering drawings is definitely confirmed.
The invention provides a project cost management method, which has the following beneficial effects: the engineering cost management method is characterized in that in a drawing design link, an AB version double contract is adopted for the same planning, so that the problems in the design process can be clearly specified, the design drawing can be prevented from being modified at will regardless of time, the design standard is reduced, the design process is specified through an A version contract, the specific design budget cost is specified, unnecessary cost budget in the design process is avoided, in addition, a budget limit is increased for preventing the problems in other design processes such as accidents and the like, the budget limit amount can be pre-set in advance, the B version contract is not subjected to later contract, and the specific items and various standard indexes of the design drawing are mainly accounted.
Drawings
FIG. 1 is a schematic view of the flow structure of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to specific embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments.
A project cost management method comprises the following steps:
(1) selecting the item;
(2) designing an engineering drawing;
(3) the project bid;
(4) checking the engineering drawing;
(5) optimizing the engineering drawing;
(6) and carrying out site survey inspection.
The engineering cost management method comprises the following specific steps:
(1) item selection
Carefully selecting each reported item, estimating the item while selecting the item, and listing corresponding structure types according to the item, wherein the structure types comprise the whole payment process and the basic area of the building;
(2) engineering drawing design
The drawing accounts for a small part of the construction cost, but the design of the drawing can directly influence the later construction process of the building;
(3) project bidding
Firstly, repeatedly reading a bidding document, then drawing material selection in the document, project quotation and integral project quantity, and finally, intensively discussing and calculating the drawn key points;
(4) checking the engineering drawing
Checking the submitted engineering design drawings in a uniform quantity to clear the overall specific engineering quantity;
(5) engineering drawing optimization
The problems in the drawings are checked and are listed in single columns, so that the problems are convenient to observe.
(7) In situ survey inspection
The geology of the building site and the basic elevation on the drawing are checked and calculated, and in addition, the facility environment around the building is checked.
To sum up, the engineering cost management method comprises the following steps:
(1) selecting items, namely carefully selecting each reported item, estimating the item while selecting the item, and listing corresponding structure types according to the item, wherein the structure types comprise the whole payment process and the basic area of the building;
(2) the design of engineering drawings, wherein the drawings account for a very small part of the construction cost of the project, but the design of the drawings can directly influence the later construction process of the building;
(3) and project bidding, namely repeatedly reading a bidding document, then drawing material selection in the document, project quotation and integral project quantity, and finally intensively discussing and calculating the drawn key points;
(4) checking the engineering drawing: checking the submitted engineering design drawings in a uniform quantity to clear the overall specific engineering quantity;
(5) optimizing the engineering drawing: the problems in the drawings are checked and are listed in single columns, so that the problems are convenient to observe.
(8) And field survey inspection: the geology of the building site and the basic elevation on the drawing are checked and calculated, and in addition, the facility environment around the building is checked.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.

Claims (4)

1. A project cost management method is characterized by comprising the following steps:
(1) selecting the item;
(2) designing an engineering drawing;
(3) the project bid;
(4) checking the engineering drawing;
(5) optimizing the engineering drawing;
(6) and carrying out site survey inspection.
2. A construction cost management method according to claim 1, characterized in that the construction cost management method comprises the following concrete steps:
(1) item selection
Carefully selecting each reported item, estimating the item while selecting the item, and listing corresponding structure types according to the item, wherein the structure types comprise the whole payment process and the basic area of the building;
(2) engineering drawing design
The drawing accounts for a small part of the construction cost, but the design of the drawing can directly influence the later construction process of the building;
(3) project bidding
Firstly, repeatedly reading a bidding document, then drawing material selection in the document, project quotation and integral project quantity, and finally, intensively discussing and calculating the drawn key points;
(4) checking the engineering drawing
Checking the submitted engineering design drawings in a uniform quantity to clear the overall specific engineering quantity;
(5) engineering drawing optimization
The problems in the drawings are checked and are listed in single columns, so that the problems are convenient to observe;
on-site survey inspection
The geology of the building site and the basic elevation on the drawing are checked and calculated, and in addition, the facility environment around the building is checked.
3. A construction cost management method according to claim 2, characterized in that: the method comprises the steps of firstly drawing up a version A and a version B, wherein the version A is an early-stage contract and is used for standardizing the overall rule, strictly controlling the design cost, not being changed at will and reducing the design standard, and the version B is a final draft-making contract at the later stage, checking and clearing the design drawing and approving the design standard and various indexes.
4. A construction cost management method according to claim 2, characterized in that: in the process of checking the engineering drawings, the number of the drawings needs to be checked, the engineering quantity in the drawing list is definitely calculated, meanwhile, missing items are repeatedly checked, the missing items are supplemented and changed in time, the process is long in time, labor is required to be clearly divided, and the responsibility of the engineering drawings is definitely determined.
CN202011409481.3A 2020-12-04 2020-12-04 Engineering cost management method Pending CN112381592A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011409481.3A CN112381592A (en) 2020-12-04 2020-12-04 Engineering cost management method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011409481.3A CN112381592A (en) 2020-12-04 2020-12-04 Engineering cost management method

Publications (1)

Publication Number Publication Date
CN112381592A true CN112381592A (en) 2021-02-19

Family

ID=74590532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011409481.3A Pending CN112381592A (en) 2020-12-04 2020-12-04 Engineering cost management method

Country Status (1)

Country Link
CN (1) CN112381592A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114511303A (en) * 2022-04-06 2022-05-17 四川省大数据中心 Investigation result examination system, method and equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114511303A (en) * 2022-04-06 2022-05-17 四川省大数据中心 Investigation result examination system, method and equipment

Similar Documents

Publication Publication Date Title
Young et al. Improving construction supply network visibility by using automated materials locating and tracking technology
Gelisen et al. Automated productivity-based schedule animation: Simulation-based approach to time-cost trade-off analysis
Simonsson et al. ‘Learning to see’the effects of improved workflow in civil engineering projects
CN112381592A (en) Engineering cost management method
Wu Sustainable growth through industrial robot diffusion: Quasi‐experimental evidence from a Bartik shift‐share design
Antsev et al. Improvement in production process for pipelines manufacturing based on quality management method
CN115271345A (en) Transformer production logistics carbon emission accounting method, system, equipment and medium
Bontinck et al. Improving the uptake of hybrid life cycle assessment in the construction industry
Salim et al. Project delay analysis of highrise building project in Jakarta
Zak et al. BIM superior approach for infrastructure construction in the Czech Republic
Huang et al. Weapon equipment lean maintenance strategy research
Zhang et al. A review of the application of BIM in the assembly construction
Stein et al. Development and improvement of methods of diagnostics of heating systems in modern conditions
Moon et al. Life cycle assessment through on-line database linked with various enterprise database systems
Peshkov Investment support for the implementation of scientific developments as a basis for the production of construction materials
Salih et al. The application of six sigma-supported expert system in construction projects
Dobrotvorskiy et al. Mobile application on android for calculation of round rolls cutting using java technologies
Yi et al. The optimal decision rule of environmental regulation: an analysis of the cement industry
Shahiki Tash et al. Deadweight Loss under Market Power and Environmental Inefficiency in an Imperfect Competition: Iran’s Energy-Intensive Industries Case
Xia et al. Modeling and simulation of boiler coil pipe bending production line based on eM-Plant
Ottesen et al. ESG-Ratings and Returns
CN113807644A (en) Method for recombining and matching engineering quantities under value-earning system
Sharma et al. Green building based on BIM
Zilberova et al. Innovation Intelligent Control Systems in Construction
Gajzler Book Of Building As A Source Of Knowledge About The Object

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210219

RJ01 Rejection of invention patent application after publication