CN112379410A - Optimization method and system for seismic acquisition and observation system - Google Patents

Optimization method and system for seismic acquisition and observation system Download PDF

Info

Publication number
CN112379410A
CN112379410A CN202011193650.4A CN202011193650A CN112379410A CN 112379410 A CN112379410 A CN 112379410A CN 202011193650 A CN202011193650 A CN 202011193650A CN 112379410 A CN112379410 A CN 112379410A
Authority
CN
China
Prior art keywords
observation system
shot
optimized
points
line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011193650.4A
Other languages
Chinese (zh)
Inventor
肖虎
李红远
杨国平
张洪涛
凡辰池
张宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
BGP Inc
Original Assignee
China National Petroleum Corp
BGP Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, BGP Inc filed Critical China National Petroleum Corp
Priority to CN202011193650.4A priority Critical patent/CN112379410A/en
Publication of CN112379410A publication Critical patent/CN112379410A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/24Recording seismic data
    • G01V1/247Digital recording of seismic data, e.g. in acquisition units or nodes
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01VGEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
    • G01V1/00Seismology; Seismic or acoustic prospecting or detecting
    • G01V1/16Receiving elements for seismic signals; Arrangements or adaptations of receiving elements
    • G01V1/20Arrangements of receiving elements, e.g. geophone pattern

Abstract

The invention provides an optimization method and system for an earthquake acquisition observation system, which can optimize an excitation point and a receiving point at the boundary of the receiving line direction of a work area according to the content of the invention during earthquake acquisition, meet the requirement that the required coverage times are not changed when the coverage times are gradually reduced, and simultaneously solve the problem that the construction efficiency cannot be ensured due to insufficient equipment investment.

Description

Optimization method and system for seismic acquisition and observation system
Technical Field
The invention relates to the technical field of seismic exploration, in particular to a method and a system for optimizing a seismic acquisition observation system.
Background
With the popularization and application of the technology of 'two widths and one height', the equipment demand is larger and larger, and meanwhile, in order to ensure the offset effect of data, the requirement of forbidding abandoning partial arrangement of the receiving direction outside a shot point is put forward in partial projects, namely, the covering times of the gradual reduction of the covering times are ensured to be kept unchanged.
Due to insufficient equipment, part of projects have the condition, if partial arrangement of shot points in the external line receiving direction is abandoned, the whole line bundle can be constructed, but the range of the coverage frequency gradual reducing belt is reduced, the coverage frequency of different surface elements is reduced, and the requirements of project exploration are not met; due to the missing part of the collecting equipment, the whole wire harness can not be subjected to rolling construction. Under the condition of lacking of the collecting equipment, if rolling along the receiving line direction is adopted, in order to achieve the expected production efficiency, the paying-off efficiency can only be improved, the arrangement rolling is faster, more personnel are required to be arranged, and meanwhile, more transporting equipment is added to pour the collecting equipment from the back row to the front row; or the whole wire harness is constructed in a block mode, and more repeated arrangement needs to be laid among blocks in the block mode; both of these approaches undoubtedly increase costs. If gather and adopt the horizontal roll mode, want to alleviate unwrapping wire pressure, only invest more collection equipment, the reality can't allocate more equipment. Therefore, in this case, neither the conventional vertical scroll nor the lateral scroll can be implemented.
Disclosure of Invention
In order to solve at least one of the above problems, an aspect of the present invention provides a seismic acquisition observation system optimization method, including:
dividing the boundary of an original earthquake acquisition observation system into a first part and a second part, wherein the first part is an observation system with a full coverage boundary unchanged, and the second part is a receiving point to be optimized and a corresponding shot point;
and rotating the shot-receiver points of the second part according to the symmetrical axis of the covering times, and combining the rotated second part and the first part to form the optimized seismic acquisition observation system.
In certain embodiments, further comprising:
adjusting the line distance between the first part and the second part in the optimized seismic acquisition observation system to be the line distance between the first part and the second part in the original seismic acquisition observation system;
and simulating blasting by adopting the optimized template in the seismic acquisition observation system to generate a relation file.
In certain embodiments, further comprising:
and performing shot line retraction operation on the shot points in the optimized earthquake acquisition observation system, and increasing the receiving points with the shot line distance as a unit in the receiving lines containing the relationship when the shot points retract one shot line.
In certain embodiments, further comprising:
and performing shot line retraction operation on the shot points in the optimized earthquake acquisition observation system, wherein when one shot line is added to each shot point, the receiver points retract to the receiver points in the optimized part, and the receiver line retracts to the receiver points with the shot line distance as a unit.
The invention also provides an optimization system of the seismic acquisition observation system, which comprises the following components:
the system comprises a boundary dividing module, a first part and a second part, wherein the boundary of an original earthquake acquisition and observation system is divided into the first part and the second part, the first part is an observation system with a full coverage boundary which is not changed, and the second part is a receiving point to be optimized and a corresponding shot point;
and the optimization module is used for rotating the shot-geophone points of the second part according to the symmetrical axis of the covering times and combining the rotated second part and the first part to form the optimized seismic acquisition observation system.
In certain embodiments, further comprising:
the adjusting module is used for adjusting the line distance between the first part and the second part in the optimized seismic acquisition and observation system into the line distance between the first part and the second part in the original seismic acquisition and observation system;
and the relation file generation module is used for simulating blasting by adopting the optimized template in the earthquake acquisition observation system to generate a relation file.
In certain embodiments, further comprising:
and the retraction operation module is used for performing gun line retraction operation on the shot points in the optimized earthquake acquisition observation system, and increasing receiving points with the gun line distance as a unit in the receiving lines containing the relationship when the shot points retract one gun line.
In certain embodiments, further comprising:
and the retraction operation module is used for performing retraction shot line operation on the shot points in the optimized earthquake acquisition and observation system, when one shot line is added to each shot point, the wave detection point retracts receiving points in the optimized part, and the receiving lines retract the receiving points with the shot line distance as a unit.
A third aspect of the invention provides a computer device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, the processor implementing the steps of the method as described above when executing the program.
A fourth aspect of the invention provides a computer-readable storage medium having stored thereon a computer program which, when being executed by a processor, carries out the steps of the method as set forth above.
The invention has the beneficial effects that:
the invention provides an optimization method and system for an earthquake acquisition observation system, which can optimize an excitation point and a receiving point at the boundary of the receiving line direction of a work area according to the content of the invention during earthquake acquisition, meet the requirement that the required coverage times are not changed when the coverage times are gradually reduced, and simultaneously solve the problem that the construction efficiency cannot be ensured due to insufficient equipment investment.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and other drawings can be obtained by those skilled in the art without creative efforts.
Fig. 1 is a schematic structural diagram of an 8L6S120T orthogonal stencil in an embodiment of the present invention.
Fig. 2 is a diagram of an observation system and a coverage number obtained after the 8L6S120T template Inline is scrolled 30 times and Xline is scrolled 4 times in the embodiment of the present invention.
Fig. 3 is a diagram of a range of reception permutations in an embodiment of the present invention.
FIG. 4 is a shot-check diagram of the remaining portion after being intercepted according to the embodiment of the present invention.
FIG. 5 is a diagram of shot ranges and associated receive permutations in accordance with an embodiment of the present invention.
FIG. 6 is a diagram of shot coverage times associated with and received permutation captured in an embodiment of the present invention.
FIG. 7 is a shot distribution diagram of shot points cut out after 180-degree rotation around a symmetry axis in the embodiment of the invention.
FIG. 8 is an observation system after optimization according to an embodiment of the present invention.
FIG. 9a is a diagram of the coverage times of the original observation system of FIG. 2 according to an embodiment of the present invention.
FIG. 9b is a diagram illustrating the coverage times of the merged observation system of FIG. 8 according to an embodiment of the present invention.
Fig. 9c is a graph of the number of covered times obtained by subtracting the number of covered times obtained in fig. 9a and 9b according to the embodiment of the present invention.
FIG. 10 is a schematic diagram of arrangement pieces corresponding to the remaining part of the shots after combination according to the embodiment of the invention.
Fig. 11 is a schematic diagram of arrangement pieces corresponding to optimized partial shots after combination according to an embodiment of the present invention.
Fig. 12 is a schematic diagram of the adjusted observation system and the arrangement pieces corresponding to the optimized partial shots in the embodiment of the present invention.
FIG. 13a is a diagram of the coverage times of the original observation system of FIG. 2 according to an embodiment of the present invention.
FIG. 13b is a diagram illustrating the coverage times of the adjusted observation system of FIG. 12 according to an embodiment of the present invention.
Fig. 13c is a graph of the number of times of coverage obtained by subtracting the number of times of coverage obtained in fig. 13a and 13b according to an embodiment of the present invention.
FIG. 14 is a diagram illustrating a general scheme adjustment according to an embodiment of the present invention.
FIG. 15 is a schematic flow chart of a method for optimizing the seismic acquisition and observation system in the embodiment of the invention.
FIG. 16 shows a schematic block diagram of a computer device suitable for use in implementing embodiments of the present invention.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present invention, and it is apparent that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
In the prior art, due to insufficient equipment, part of projects have the condition, if partial arrangement of shot points in the external line receiving direction is abandoned, the whole line bundle can be constructed, but the range of a coverage frequency gradual reduction belt is reduced, the coverage frequency of different surface elements is reduced, and the requirements of project exploration are not met; due to the missing part of the collecting equipment, the whole wire harness can not be subjected to rolling construction. Under the condition of lacking of the collecting equipment, if rolling along the receiving line direction is adopted, in order to achieve the expected production efficiency, the paying-off efficiency can only be improved, the arrangement rolling is faster, more personnel are required to be arranged, and meanwhile, more transporting equipment is added to pour the collecting equipment from the back row to the front row; or the whole wire harness is constructed in a block mode, and more repeated arrangement needs to be laid among blocks in the block mode; both of these approaches undoubtedly increase costs. If gather and adopt the horizontal roll mode, want to alleviate unwrapping wire pressure, only invest more collection equipment, the reality can't allocate more equipment. Therefore, in this case, neither the conventional vertical scroll nor the lateral scroll can be implemented.
In order to solve the outstanding problem that the expected construction efficiency of three-dimensional acquisition cannot be achieved due to insufficient investment of acquisition equipment, an earthquake acquisition boundary optimization operation method is provided, namely, under the condition that the partial arrangement of the shot point in the external wire receiving direction is abandoned, the whole bundle construction can be carried out, and the requirement that the coverage times of the project requirement are gradually reduced and the coverage times are kept unchanged is met through the earthquake acquisition boundary optimization. The method effectively solves the problem that the construction efficiency cannot be ensured due to insufficient equipment investment.
As shown in fig. 15, in one aspect, the present invention provides a method for optimizing a seismic acquisition observation system, including:
s1: dividing the boundary of an original earthquake acquisition observation system into a first part and a second part, wherein the first part is an observation system with a full coverage boundary unchanged, and the second part is a receiving point to be optimized and a corresponding shot point;
s2: and rotating the shot-receiver points of the second part according to the symmetrical axis of the covering times, and combining the rotated second part and the first part to form the optimized seismic acquisition observation system.
The invention provides an optimization method of an earthquake acquisition observation system, which can optimize an excitation point and a receiving point at the boundary of the receiving line direction of a work area according to the content of the invention during earthquake acquisition, meet the requirement that the required coverage times are not changed when the coverage times are gradually reduced, and simultaneously solve the problem that the construction efficiency cannot be ensured due to insufficient equipment investment.
In certain embodiments, further comprising:
adjusting the line distance between the first part and the second part in the optimized seismic acquisition observation system to be the line distance between the first part and the second part in the original seismic acquisition observation system;
and simulating blasting by adopting the optimized template in the seismic acquisition observation system to generate a relation file.
In certain embodiments, further comprising:
and performing shot line retraction operation on the shot points in the optimized earthquake acquisition observation system, and increasing the receiving points with the shot line distance as a unit in the receiving lines containing the relationship when the shot points retract one shot line.
In certain embodiments, further comprising:
and performing shot line retraction operation on the shot points in the optimized earthquake acquisition observation system, wherein when one shot line is added to each shot point, the receiver points retract to the receiver points in the optimized part, and the receiver line retracts to the receiver points with the shot line distance as a unit.
It can be understood that, when the method is based on the conventional earthquake acquisition operation, part of receiving points in the external wire receiving direction of the shot point are abandoned aiming at the defects of acquisition equipment, and the wave detection point and the shot point outside the construction boundary of the shot point can be optimized under the condition of carrying out whole-wire bundle construction. The method can ensure that the data boundary before and after optimization is not changed, the range of the coverage time gradual reduction band is not reduced, the coverage time is not less than the coverage time before optimization, and the specific implementation conditions are as follows:
1) searching an optimization scheme that a coverage boundary does not change once and a full coverage boundary does not change, wherein the implementation of the step mainly comprises the following two steps of a) and b):
a) dividing the boundary of a conventional acquisition observation system into two parts, wherein one part is an observation system with a full coverage boundary unchanged, and the other part is a receiving point to be optimized and a corresponding shot point;
b) rotating the shot-geophone points of the other part of observation systems according to the symmetrical axis of the covering times; and combining the rotated observation system with the observation system with unchanged full coverage times. According to the combined scheme, multiple blasting devices and few placing devices are arranged at the boundary, so that the contradiction of insufficient receiving devices is solved, and the covering times of the original construction area are guaranteed to be unchanged.
2) Finding a general method to ensure that the position of a primary coverage boundary is not changed, the times of full coverage are not changed or an optimization scheme is added, and realizing the steps mainly comprises the following two steps:
c) for the two parts of the merging scheme in the step 1), the line distance between the two parts is adjusted to be consistent with the line distance of the original design observation system scheme, the shot point still uses the original template to simulate blasting to generate a relation file, after demonstration, the position of the primary coverage boundary is unchanged, the full coverage boundary is increased, and the optimization purpose is also achieved.
d) On the basis of the adjusted observation system, retracting the whole shot line of the shot point, increasing receiving points on the basis of the optimized part by the demodulator probe, and increasing the receiving points with the shot line distance as a unit by the receiving lines containing the relationship when the shot point retracts one shot line; or on the basis of the original observation system, when one shot line is added to each shot point, the receiving points are retracted in the optimized part by the demodulator probe, and when one shot line is added, the receiving points take the receiving line retraction shot line distance as a unit. The number of the gun lines is increased or retracted, and the number of the single-side receiving tracks is divided by (the gun line distance is divided by the receiving point distance) at most.
Specifically, an observation system template parameter is set: the 8L6S120T orthonormal template, where the receive line is 300 meters apart, the fire line is 300 meters apart, the receive point is 50 meters apart, and the fire point is 50 meters apart. The template of the observation system is shown in figure 1.
Rolling by using a set observation system template, wherein Inline rolls for 30 times and Xline rolls for 4 times; and covering the distributed observation system template for 40 times. As shown in fig. 2.
According to the laid observation system, one line spacing length is reserved outside the shot point at the boundary, namely 6 lines are reserved for each receiving line outside the shot point, and the gray part in the box is 11 intercepted detection lines. As shown in fig. 3.
Fig. 4 is a shot point distribution diagram of the remaining portion after cutting.
FIG. 5 is a diagram taken of 11 survey lines and associated shots.
Fig. 6 is a plot of the number of coverage of a receiver line, i.e., associated shot point, taken, which is found to be symmetrical, with the expression of the axis of symmetry in the vertical direction being:
Xleft1=XR1+XS1
Xright1=XRN+XSM
Xsymmetry=(Xleft1+Xright1)/2
XR1horizontal coordinate of the leftmost receiver point, XS1As the horizontal coordinate of the leftmost shot point, Xleft1Horizontal coordinates of the leftmost one-time overlay; xRNIs the horizontal coordinate, X, of the rightmost receiving pointSMIs the horizontal coordinate of the rightmost shot point, Xright1Horizontal coordinates of the rightmost one-time coverage; xsymmetryThe average value of the left side primary coverage and the right side primary coverage is the symmetry axis of the intercepted part in the vertical direction.
And 7, intercepting a shot point distribution diagram after the shot points rotate 180 degrees around the symmetry axis, and combining the shot points (figure 4) of the rest part of the intercepted shot points and figure 7 to obtain a combined observation system (figure 8).
Fig. 9a and 9b show the coverage times of the original observation system and the coverage times of the boundary-optimized observation system, which are all 0 by performing a forward subtraction (fig. 9 c). Therefore, the purpose of optimizing the boundary is achieved, the requirement of the first party can be met by a method of more blasting (on the premise of high-efficiency acquisition) and less equipment placement, the contradiction of insufficient receiving equipment is solved, and the unchanged covering times of the original construction area are ensured.
According to the above theoretical basis, there are cases where:
after the shot-geophone points of the intercepted part are optimized and merged with the shot-geophone points of the rest part, the situation that the distance of the gun line is increased exists, as shown in figure 8.
And secondly, redundant equipment exists after optimization, and whether the optimized method can reduce part of shot points and increase part of receiving arrangement can still achieve the purpose of keeping the covering times unchanged or increasing.
Through the two parts of shot points and the corresponding arrangement pieces (fig. 10 and fig. 11) of the optimized observation system, the distance between the two parts of shot lines is increased by 150 meters, and the number of the wave detection points corresponding to the optimized part of shot points is still 3 unused reception points, so that further optimization is carried out, the distance between the shot lines at the combined joint is adjusted from 450 meters to 300 meters, and the number of the reception arrangement of the optimized part is increased by 3 (150 meters), as shown in fig. 12.
The coverage times of the adjusted observation system and the original observation system are subtracted, the coverage of one time is unchanged, the full coverage is increased, the coverage times are gradually decreased, and the coverage times are increased in a strip mode, as shown in fig. 13a to 13 c. The aim of unchanged or increased covering times is also achieved.
On the basis of the adjusted observation system, retracting the whole shot line of the shot point, increasing receiving points on the basis of the optimized part by the demodulator probe, wherein each time the shot point retracts one shot line, the receiving points increase the shot line distance as a unit; or on the basis of the original observation system, when one shot line is added to each shot point, the receiving points are retracted in the optimized part by the demodulator probe, and when one shot line is added, the receiving points take the receiving line retraction shot line distance as a unit. The number of gun lines is increased or retracted, at most the number of single receiver tracks divided by (gun line spacing divided by receiver dot spacing), see fig. 14.
It can be understood that the present invention has the following effects:
1) in the three-dimensional acquisition construction, by utilizing the boundary optimization of the invention, if the vibroseis is efficiently acquired, the construction can be carried out in a way of more blasting and less path swinging, and the investment of receiving equipment can be reduced;
2) in the three-dimensional acquisition construction, by utilizing the boundary optimization of the invention, if the well and gun excitation is carried out, the number of the excited guns can be properly optimized, the construction is carried out in a way of properly placing the number of tracks, and the excitation and receiving investment are balanced.
The invention also provides an optimization system of the seismic acquisition observation system, which comprises the following components:
the system comprises a boundary dividing module, a first part and a second part, wherein the boundary of an original earthquake acquisition and observation system is divided into the first part and the second part, the first part is an observation system with a full coverage boundary which is not changed, and the second part is a receiving point to be optimized and a corresponding shot point;
and the optimization module is used for rotating the shot-geophone points of the second part according to the symmetrical axis of the covering times and combining the rotated second part and the first part to form the optimized seismic acquisition observation system.
The invention provides an optimization system of an earthquake acquisition observation system, which can optimize an excitation point and a receiving point at the boundary of the receiving line direction of a work area according to the content of the optimization system during earthquake acquisition, meet the requirement that the required coverage times are not changed when the coverage times are gradually reduced, and simultaneously solve the problem that the construction efficiency cannot be ensured due to insufficient equipment investment.
In certain embodiments, further comprising:
the adjusting module is used for adjusting the line distance between the first part and the second part in the optimized seismic acquisition and observation system into the line distance between the first part and the second part in the original seismic acquisition and observation system;
and the relation file generation module is used for simulating blasting by adopting the optimized template in the earthquake acquisition observation system to generate a relation file.
In certain embodiments, further comprising:
and the retraction operation module is used for performing gun line retraction operation on the shot points in the optimized earthquake acquisition observation system, and increasing receiving points with the gun line distance as a unit in the receiving lines containing the relationship when the shot points retract one gun line.
In certain embodiments, further comprising:
and the retraction operation module is used for performing retraction shot line operation on the shot points in the optimized earthquake acquisition and observation system, when one shot line is added to each shot point, the wave detection point retracts receiving points in the optimized part, and the receiving lines retract the receiving points with the shot line distance as a unit.
The apparatuses, modules or units described in the above embodiments may be implemented by a computer chip or an entity, or implemented by a product with certain functions. A typical implementation device is a computer device, which may be, for example, a personal computer, a laptop computer, a cellular telephone, a camera phone, a smart phone, a personal digital assistant, a media player, a navigation device, an email device, a game console, a tablet computer, a wearable device, or a combination of any of these devices.
In a typical example, the computer device specifically comprises a memory, a processor and a computer program stored on the memory and executable on the processor, the processor implementing the method performed by the client as described above when executing the program, or the processor implementing the method performed by the server as described above when executing the program.
Referring now to FIG. 16, there is illustrated a schematic block diagram of a computer device 600 suitable for use in implementing embodiments of the present invention.
As shown in fig. 16, the computer apparatus 600 includes a Central Processing Unit (CPU)601 which can perform various appropriate works and processes according to a program stored in a Read Only Memory (ROM)602 or a program loaded from a storage section 608 into a Random Access Memory (RAM)) 603. In the RAM603, various programs and data necessary for the operation of the system 600 are also stored. The CPU601, ROM602, and RAM603 are connected to each other via a bus 604. An input/output (I/O) interface 605 is also connected to bus 604.
The following components are connected to the I/O interface 605: an input portion 606 including a keyboard, a mouse, and the like; an output portion 607 including a display such as a Cathode Ray Tube (CRT), a Liquid Crystal Display (LCD), and the like, and a speaker; a storage section 608 including a hard disk and the like; and a communication section 609 including a network interface card such as a LAN card, a modem, or the like. The communication section 609 performs communication processing via a network such as the internet. The driver 610 is also connected to the I/O interface 605 as needed. A removable medium 611 such as a magnetic disk, an optical disk, a magneto-optical disk, a semiconductor memory, or the like is mounted on the drive 610 as necessary, so that a computer program read out therefrom is mounted as necessary on the storage section 608.
In particular, according to an embodiment of the present invention, the processes described above with reference to the flowcharts may be implemented as a computer software program. For example, embodiments of the invention include a computer program product comprising a computer program tangibly embodied on a machine-readable medium, the computer program comprising program code for performing the method illustrated in the flow chart. In such embodiments, the computer program may be downloaded and installed from a network through the communication section 609, and/or installed from the removable medium 611.
Computer-readable media, including both non-transitory and non-transitory, removable and non-removable media, may implement information storage by any method or technology. The information may be computer readable instructions, data structures, modules of a program, or other data. Examples of computer storage media include, but are not limited to, phase change memory (PRAM), Static Random Access Memory (SRAM), Dynamic Random Access Memory (DRAM), other types of Random Access Memory (RAM), Read Only Memory (ROM), Electrically Erasable Programmable Read Only Memory (EEPROM), flash memory or other memory technology, compact disc read only memory (CD-ROM), Digital Versatile Discs (DVD) or other optical storage, magnetic cassettes, magnetic tape magnetic disk storage or other magnetic storage devices, or any other non-transmission medium that can be used to store information that can be accessed by a computing device. As defined herein, a computer readable medium does not include a transitory computer readable medium such as a modulated data signal and a carrier wave.
For convenience of description, the above devices are described as being divided into various units by function, and are described separately. Of course, the functions of the units may be implemented in the same software and/or hardware or in a plurality of software and/or hardware when implementing the invention.
The present invention is described with reference to flowchart illustrations and/or block diagrams of methods, apparatus (systems) and computer program products according to embodiments of the invention. It will be understood that each flow and/or block of the flow diagrams and/or block diagrams, and combinations of flows and/or blocks in the flow diagrams and/or block diagrams, can be implemented by computer program instructions. These computer program instructions may be provided to a processor of a general purpose computer, special purpose computer, embedded processor, or other programmable data processing apparatus to produce a machine, such that the instructions, which execute via the processor of the computer or other programmable data processing apparatus, create means for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing apparatus to function in a particular manner, such that the instructions stored in the computer-readable memory produce an article of manufacture including instruction means which implement the function specified in the flowchart flow or flows and/or block diagram block or blocks.
These computer program instructions may also be loaded onto a computer or other programmable data processing apparatus to cause a series of operational steps to be performed on the computer or other programmable apparatus to produce a computer implemented process such that the instructions which execute on the computer or other programmable apparatus provide steps for implementing the functions specified in the flowchart flow or flows and/or block diagram block or blocks.
It should also be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, method, article, or apparatus that comprises the element.
As will be appreciated by one skilled in the art, embodiments of the present invention may be provided as a method, system, or computer program product. Accordingly, the present invention may take the form of an entirely hardware embodiment, an entirely software embodiment or an embodiment combining software and hardware aspects. Furthermore, the present invention may take the form of a computer program product embodied on one or more computer-usable storage media (including, but not limited to, disk storage, CD-ROM, optical storage, and the like) having computer-usable program code embodied therein.
The invention may be described in the general context of computer-executable instructions, such as program modules, being executed by a computer. Generally, program modules include routines, programs, objects, components, data structures, etc. that perform particular tasks or implement particular abstract data types. The invention may also be practiced in distributed computing environments where tasks are performed by remote processing devices that are linked through a communications network. In a distributed computing environment, program modules may be located in both local and remote computer storage media including memory storage devices.
The embodiments in the present specification are described in a progressive manner, and the same and similar parts among the embodiments can be referred to each other, and each embodiment focuses on the differences from the other embodiments. In particular, as for the system embodiment, since it is substantially similar to the method embodiment, the description is simple, and for the relevant points, reference may be made to part of the description of the method embodiment.
In the description of the present specification, reference to the description of the terms "one embodiment," "some embodiments," "an example," "a specific example," or "some examples," etc., means that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the embodiments of the present specification. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example.
Furthermore, the various embodiments or examples and features of the various embodiments or examples described in this specification can be combined and combined by those skilled in the art without contradiction. The above description is only an embodiment of the present disclosure, and is not intended to limit the present disclosure. Various modifications and changes may occur to those skilled in the art to which the embodiments of the present disclosure pertain. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the embodiments of the present specification should be included in the scope of the claims of the embodiments of the present specification.

Claims (10)

1. A seismic acquisition observation system optimization method is characterized by comprising the following steps:
dividing the boundary of an original earthquake acquisition observation system into a first part and a second part, wherein the first part is an observation system with a full coverage boundary unchanged, and the second part is a receiving point to be optimized and a corresponding shot point;
and rotating the shot-receiver points of the second part according to the symmetrical axis of the covering times, and combining the rotated second part and the first part to form the optimized seismic acquisition observation system.
2. The seismic acquisition observation system optimization method of claim 1, further comprising:
adjusting the line distance between the first part and the second part in the optimized seismic acquisition observation system to be the line distance between the first part and the second part in the original seismic acquisition observation system;
and simulating blasting by adopting the optimized template in the seismic acquisition observation system to generate a relation file.
3. The seismic acquisition observation system optimization method of claim 2, further comprising:
and performing shot line retraction operation on the shot points in the optimized earthquake acquisition observation system, and increasing the receiving points with the shot line distance as a unit in the receiving lines containing the relationship when the shot points retract one shot line.
4. The seismic acquisition observation system optimization method of claim 2, further comprising:
and performing shot line retraction operation on the shot points in the optimized earthquake acquisition observation system, wherein when one shot line is added to each shot point, the receiver points retract to the receiver points in the optimized part, and the receiver line retracts to the receiver points with the shot line distance as a unit.
5. An seismic acquisition observation system optimization system, comprising:
the system comprises a boundary dividing module, a first part and a second part, wherein the boundary of an original earthquake acquisition and observation system is divided into the first part and the second part, the first part is an observation system with a full coverage boundary which is not changed, and the second part is a receiving point to be optimized and a corresponding shot point;
and the optimization module is used for rotating the shot-geophone points of the second part according to the symmetrical axis of the covering times and combining the rotated second part and the first part to form the optimized seismic acquisition observation system.
6. The seismic acquisition observation system optimization system of claim 5, further comprising:
the adjusting module is used for adjusting the line distance between the first part and the second part in the optimized seismic acquisition and observation system into the line distance between the first part and the second part in the original seismic acquisition and observation system;
and the relation file generation module is used for simulating blasting by adopting the optimized template in the earthquake acquisition observation system to generate a relation file.
7. The seismic acquisition observation system optimization system of claim 6, further comprising:
and the retraction operation module is used for performing gun line retraction operation on the shot points in the optimized earthquake acquisition observation system, and increasing receiving points with the gun line distance as a unit in the receiving lines containing the relationship when the shot points retract one gun line.
8. The seismic acquisition observation system optimization system of claim 6, further comprising:
and the retraction operation module is used for performing retraction shot line operation on the shot points in the optimized earthquake acquisition and observation system, when one shot line is added to each shot point, the wave detection point retracts receiving points in the optimized part, and the receiving lines retract the receiving points with the shot line distance as a unit.
9. A computer device comprising a memory, a processor and a computer program stored on the memory and executable on the processor, characterized in that the steps of the method of any of claims 1 to 4 are implemented when the program is executed by the processor.
10. A computer-readable storage medium, on which a computer program is stored which, when being executed by a processor, carries out the steps of the method of any one of claims 1 to 4.
CN202011193650.4A 2020-10-30 2020-10-30 Optimization method and system for seismic acquisition and observation system Pending CN112379410A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011193650.4A CN112379410A (en) 2020-10-30 2020-10-30 Optimization method and system for seismic acquisition and observation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011193650.4A CN112379410A (en) 2020-10-30 2020-10-30 Optimization method and system for seismic acquisition and observation system

Publications (1)

Publication Number Publication Date
CN112379410A true CN112379410A (en) 2021-02-19

Family

ID=74576075

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011193650.4A Pending CN112379410A (en) 2020-10-30 2020-10-30 Optimization method and system for seismic acquisition and observation system

Country Status (1)

Country Link
CN (1) CN112379410A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5648938A (en) * 1993-10-06 1997-07-15 Ensign Geophysics Limited Seismic data acquisition
JP2003207577A (en) * 2002-01-15 2003-07-25 Takamisawa Cybernetics Co Ltd Earthquake waveform data collection device and earthquake observation system
CN102998698A (en) * 2011-09-08 2013-03-27 中国石油天然气集团公司 Method for acquiring large-azimuth seismic data by aid of bunched submarine cables
CN105388517A (en) * 2015-10-21 2016-03-09 中国海洋石油总公司 Orthogonal beam line observation system for offshore three-dimensional seismic exploration
US20160154127A1 (en) * 2014-11-27 2016-06-02 Schlumberger Technology Corporation Method of seismic signal source placement for seismic acquisition system
CN106154315A (en) * 2016-08-24 2016-11-23 中国石油化工股份有限公司 A kind of high-density seismic acquisition method symmetrically and evenly
CN106855635A (en) * 2016-12-09 2017-06-16 中国石油天然气集团公司 A kind of method and apparatus of the bin attributes information for determining orthogonal observation system
CN111352150A (en) * 2018-12-21 2020-06-30 中国石油天然气集团有限公司 Method and device for optimizing seismic source production combination mode

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5648938A (en) * 1993-10-06 1997-07-15 Ensign Geophysics Limited Seismic data acquisition
JP2003207577A (en) * 2002-01-15 2003-07-25 Takamisawa Cybernetics Co Ltd Earthquake waveform data collection device and earthquake observation system
CN102998698A (en) * 2011-09-08 2013-03-27 中国石油天然气集团公司 Method for acquiring large-azimuth seismic data by aid of bunched submarine cables
US20160154127A1 (en) * 2014-11-27 2016-06-02 Schlumberger Technology Corporation Method of seismic signal source placement for seismic acquisition system
CN105388517A (en) * 2015-10-21 2016-03-09 中国海洋石油总公司 Orthogonal beam line observation system for offshore three-dimensional seismic exploration
CN106154315A (en) * 2016-08-24 2016-11-23 中国石油化工股份有限公司 A kind of high-density seismic acquisition method symmetrically and evenly
CN106855635A (en) * 2016-12-09 2017-06-16 中国石油天然气集团公司 A kind of method and apparatus of the bin attributes information for determining orthogonal observation system
CN111352150A (en) * 2018-12-21 2020-06-30 中国石油天然气集团有限公司 Method and device for optimizing seismic source production combination mode

Non-Patent Citations (6)

* Cited by examiner, † Cited by third party
Title
JIANG YU: "Optimization of a multi-vessel wide-azimuth observation system for seismic observation in offshore production zones: A case study on Xihu sag, East China Sea", CHINA PETROLEUM EXPLORATION, vol. 21, no. 04, 31 July 2016 (2016-07-31), pages 1 - 7 *
VENNEER G J O.: "Responses to wide azimuth acquisition special section", THE LEADING EDGE, vol. 22, no. 01, 31 December 2003 (2003-12-31), pages 6 - 30 *
冯凯 等: "一种优化的过渡带三维观测系统", 石油物探, vol. 47, no. 05, 30 September 2008 (2008-09-30), pages 511 - 518 *
杨国平;宁宏晓;肖虎;赵君;李红远;: "单点宽频检波器应用探讨", 物探装备, no. 05, 25 October 2019 (2019-10-25) *
肖虎 等: "Zipper技术在三维地震采集中的应用", 中国石油学会2019年物探技术研讨会论文集, 31 December 2019 (2019-12-31), pages 116 - 118 *
肖虎 等: "三维地震采集等效观测技术", SPG/SEG南京2020年国际地球物理会议论文集(中文), 30 September 2020 (2020-09-30), pages 77 - 79 *

Similar Documents

Publication Publication Date Title
CN108090916B (en) Method and apparatus for tracking the targeted graphical in video
CN109242967B (en) Three-dimensional terrain rendering method and device
CN107783186B (en) A kind of near-surface velocity modeling method and device
CN107817525B (en) A kind of near surface constant speed fill method and device
US20220375186A1 (en) Method and apparatus for generating bounding box, device and storage medium
US11113878B2 (en) Screen tile pair-based binocular rendering pipeline process and method
CN111127603B (en) Animation generation method and device, electronic equipment and computer readable storage medium
CN113870436A (en) Image processing method and device, electronic equipment and storage medium
US6856312B1 (en) Method for generating three-dimensional form data and apparatus therefor
CN112379410A (en) Optimization method and system for seismic acquisition and observation system
CN112379436A (en) Method and device for calculating static correction value of seismic data excited by mixed seismic source
CN111870953A (en) Height map generation method, device, equipment and storage medium
CN106842334A (en) A kind of electromagnetic exploration method and device
Sekiguchi Efficient seismic ray tracing based on the shortest path method
CN109493423A (en) The calculation method and device of the midpoint of three-dimensional earth model surface two o'clock
CN111337973B (en) Seismic data reconstruction method and system
CN114826368B (en) Method and device for determining uplink worst geometric shape of NGSO satellite constellation system
CN110619675B (en) OsgEarth-based surface vector data loading method
CN106094035B (en) A kind of residual static correction computational methods quickly handled based on unit
CN109118563B (en) Method for extracting digital orthographic image from LOD paging surface texture model
CN107341843B (en) Massive point cloud dynamic display method and system based on real color
CN114598380B (en) Method and device for determining downlink worst geometric shape of NGSO satellite constellation system
CN116912395B (en) Graphics hybrid rendering method and device based on OpenGL and storage medium
CN113436325B (en) Image processing method and device, electronic equipment and storage medium
CN111999767B (en) Offset imaging method and device for undulating surface

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination