CN112376712A - Fixing frame for buried water stop belt at construction joint and using method of fixing frame - Google Patents

Fixing frame for buried water stop belt at construction joint and using method of fixing frame Download PDF

Info

Publication number
CN112376712A
CN112376712A CN202011234539.5A CN202011234539A CN112376712A CN 112376712 A CN112376712 A CN 112376712A CN 202011234539 A CN202011234539 A CN 202011234539A CN 112376712 A CN112376712 A CN 112376712A
Authority
CN
China
Prior art keywords
connecting rod
splint
water stop
fixing frame
construction joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011234539.5A
Other languages
Chinese (zh)
Other versions
CN112376712B (en
Inventor
苏丹凤
苏文庭
陈一宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Zhongya United Construction Engineering Co ltd
Original Assignee
Xiamen Zhongya United Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiamen Zhongya United Construction Engineering Co ltd filed Critical Xiamen Zhongya United Construction Engineering Co ltd
Priority to CN202011234539.5A priority Critical patent/CN112376712B/en
Publication of CN112376712A publication Critical patent/CN112376712A/en
Application granted granted Critical
Publication of CN112376712B publication Critical patent/CN112376712B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/66Sealings
    • E04B1/68Sealings of joints, e.g. expansion joints
    • E04B1/6806Waterstops
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/18Adjusting tools; Templates
    • E04G21/1841Means for positioning building parts or elements
    • E04G21/185Means for positioning building parts or elements for anchoring elements or elements to be incorporated in the structure

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Clamps And Clips (AREA)

Abstract

The utility model relates to a mount that buries formula waterstop in construction joint department, it includes a plurality of splint subassemblies, and each splint subassembly all includes splint and two installation mechanisms that are used for supporting two splint respectively that two symmetries set up, and two installation mechanisms set up on the contrary that one end all is provided with the holder of dismantling the connection with wall body atress reinforcing bar, and two splint are through split bolt locking, and the waterstop is by the centre gripping between two splint. The application has the effect of being convenient for production, transportation, storage and use.

Description

Fixing frame for buried water stop belt at construction joint and using method of fixing frame
Technical Field
The application relates to the technical field of buried water stops, in particular to a fixing frame for a buried water stop at a construction joint and a using method of the fixing frame.
Background
The construction joint refers to a joint formed between the concrete poured before and after the concrete is poured in sections due to design requirements or construction requirements in the concrete pouring process. Since the later-poured concrete cannot be mixed with the solidified earlier-poured concrete, the concrete can be layered, and the joint surface of the two times of concrete layering is called a construction joint. Because the construction joints can be subject to water seepage, water stops are arranged at the construction joints in order to prevent the water seepage phenomenon. The water stop is generally made of natural rubber and various synthetic rubbers, and has a width of 250-500 mm and a thickness of 6-10 mm.
Related technology such as chinese patent with publication number CN107152092B discloses a method for installing a buried water stop at a construction joint and a fixing frame used in the method. Its technical scheme main points are including bracing piece, jib, clamping piece and split bolt, the bracing piece is two at least, every bracing piece both ends and wall body atress steel bar connection, the jib includes two reinforcing bars side by side to the overlap joint on the bracing piece, the clamping piece is the steel sheet of arranging in pairs, and at least two pairs, every two steel sheets to the clamping piece respectively with the steel bar welding that corresponds, all be equipped with the bolt through-hole on every pair of clamping piece, supply to pass the split bolt, the waterstop is by the centre gripping between every pair of clamping piece, every pair of clamping piece is through the locking of split bolt.
Also disclosed in chinese patent No. CN103670451B, is a mounting device for a buried rubber water stop in a tunnel, which comprises a clamping plate assembly, a channel steel, and a channel steel bracket; two ends of the channel steel are respectively connected with a channel steel bracket, and the channel steel brackets are welded; two bolt holes are drilled in the channel steel every 1 m, and the clamping plate assembly and the water stop belt are connected through bolts. The clamping plate assembly consists of a clamping plate, a gasket strip and a plastic rubber mat; the filler strip is welded on the clamping plate, and a layer of plastic rubber mat is additionally arranged between the clamping plate and the water stop belt and comprises a clamping plate, channel steel and a channel steel bracket.
In view of the above-mentioned related technologies, the present inventors believe that the fixing frame for installing the existing water stop (i.e., the installation device disclosed in the patent with the publication number CN 103670451B) needs to use a suspension rod (or channel steel) to hoist the clamping plate assembly, and the channel steel or the suspension rod is generally formed by cutting a relatively long metal strip, so that the fixing frame has significant defects in production, transportation, storage and use, and thus needs to be improved.
Disclosure of Invention
In order to improve production, transportation, the storage and the awkward problem of current waterstop mount, this application provides a mount that buries formula waterstop in being used for construction joint department, adopts following technical scheme:
the utility model provides a mount for burying formula waterstop in construction joint department, includes a plurality of splint subassemblies, each splint subassembly all includes splint and two installation mechanisms that are used for supporting two splint respectively that two symmetries set up, two installation mechanism sets up on the contrary that one end all is provided with the holder of dismantling the connection with wall body atress reinforcing bar, two splint are through split bolt locking, and the waterstop is by the centre gripping between two splint.
Through adopting above-mentioned technical scheme, utilize the connected relation between holder and the wall body atress reinforcing bar to realize the quick installation of splint, then utilize by splint and installation component combination formed the splint subassembly directly to the waterstop carry out the fixed clamp tightly can, each splint subassembly can part production, and need not to utilize the jib to support, consequently be convenient for production, transportation, storage and use.
Preferably, each clamp installation mechanism all includes installation department and splint, scalable connection between installation department and the splint, the holder sets up respectively in the installation department and the opposite one end that sets up of splint with split bolt on.
Through adopting above-mentioned technical scheme, utilize telescopic connection's installation department and splint to make this splint subassembly can be applicable to the wall body atress reinforcing bar connection use of different operating modes.
Preferably, the one end that the installation part is close to the holder is provided with first sleeve, be provided with on the splint and wear to establish first telescopic threaded rod, wherein one end of threaded rod is provided with first spacing ring, the cover is equipped with the first powerful spring of both ends respectively with first spacing ring and first sleeve butt on the threaded rod, it has the first nut of the one end butt of keeping away from first spacing ring with first sleeve to go back threaded connection on the threaded rod.
Through adopting above-mentioned technical scheme, utilize first powerful spring can be with being provided with the threaded rod of first spacing ring and with first sleeve top from, utilize first nut can adjust the interval between first sleeve and the first spacing ring to realize the effect of the interval adjustment of stretching out and drawing back between splint and the installation department.
Preferably, the clamping part comprises a hook and a fastening bolt, the fastening bolt is in threaded connection with the hook, and when the hook hooks the wall stressed steel bars, the fastening bolt abuts against the wall stressed steel bars so that the wall stressed steel bars are abutted in the hook.
By adopting the technical scheme, the hook can be used for hooking the wall stressed steel bars, so that the connection between the clamping piece and the wall stressed steel bars is simply realized, the fixed connection between the clamping piece and the wall stressed steel bars can be realized by the cooperation between the fastening bolt and the hook, and the connection between the clamping plate and the wall stressed steel bars is firmer and more stable.
Preferably, the installation department includes head rod and second connecting rod, the one end rotation that head rod and second connecting rod set up in opposite directions is connected, holder and threaded rod set up respectively in the opposite one end that sets up of head rod and second connecting rod and serve.
Through adopting above-mentioned technical scheme, utilize the cooperation between head rod and the second connecting rod for during the installation splint, can install the head rod on the wall body atress reinforcing bar that is located the below, then support the second connecting rod on the wall body atress reinforcing bar that is located the top, thereby play the effect of lever, make the installation department can be more stable support splint.
Preferably, the first connecting rod is rotatably connected with the clamping piece, and the second connecting rod is rotatably connected with the first sleeve.
Through adopting above-mentioned technical scheme, rotate through making head rod and holder and be connected to make second connecting rod and first sleeve rotate and be connected, thereby make the installation department have a bigger adjustment range, further improve splint subassembly's application scope.
Preferably, the second connecting rod is connected with a limiting part in a threaded manner, and when the second connecting rod abuts against the wall stressed steel bar, the limiting part abuts against the part, far away from the water stop, of the wall stressed steel bar.
Through adopting above-mentioned technical scheme, utilize the locating part can play the effect of restriction second connecting rod and wall body atress reinforcing bar butt position for when the second connecting rod supported on wall body atress reinforcing bar, the difficult emergence of second connecting rod was removed.
Preferably, two one side that splint set up in opposite directions all is provided with the rubber pad, two all be provided with the sawtooth line on the side that the rubber pad set up in opposite directions.
Through adopting above-mentioned technical scheme, utilize the effect that sets up the rubber pad on the splint and can cushion, avoid the waterstop surface to produce and press from both sides the trace, utilize the sawtooth line can increase joint strength between rubber pad and the waterstop.
In a second aspect, the present application provides a method for using a fixture as described above, comprising the steps of:
fixing the clamping plate component and the water stop belt, and then placing the clamping plate component and the water stop belt at a construction joint;
fixing the clamping piece on the stressed steel bar of the wall body preliminarily, and adjusting the position of the clamping plate;
step three, the position of the clamping plate is further adjusted through the first connecting rod and the second connecting rod, and the first connecting rod and the second connecting rod can play a role in lever support;
and step four, completely fixing the clamping piece on the stressed steel bar of the wall body.
Through adopting above-mentioned technical scheme, the fixed mounting of waterstop is convenient high-efficient more, and the workman only needs to use a spanner instrument can install and dismantle each splint subassembly, and the splint subassembly occupation space after dismantling is little, is convenient for deposit and transport.
In summary, the present application includes at least one of the following beneficial technical effects:
the fixing frame does not need to be additionally provided with a longer suspender, so that the production, transportation, storage and use of each clamping plate component are facilitated;
each splint subassembly has higher control range, can be applicable to the wall body atress reinforcing bar of different specifications and use the restriction little.
Drawings
Fig. 1 is a schematic view illustrating a use of a fixing frame according to a first embodiment of the present application;
FIG. 2 is a front view of the fixing frame according to the first embodiment of the present application;
FIG. 3 is a front view of a mounting mechanism according to a first embodiment of the present application;
FIG. 4 is a front view of the retraction assembly according to the first embodiment of the present application;
fig. 5 is a front view of the fixing frame according to the second embodiment of the present application;
fig. 6 is a front view of a fixing frame according to a third embodiment of the present application.
Reference numerals: 1. wall body stress steel bars; 2. a cleat assembly; 21. a splint; 22. an installation mechanism; 221. an installation part; 2211. a first connecting rod; 2212. a second connecting rod; 2213. a clamping member; 2214. a limiting member; 2215. hooking; 2216. fastening a bolt; 2217. a guide portion; 222. a telescoping assembly; 2221. a first sleeve; 2222. a threaded rod; 2223. a first strong spring; 2224. a first nut; 2225. a first limit ring; 23. a second sleeve; 231. a second stop collar; 232. a second strong spring; 233. a second nut; 24. a third connecting rod; 3. a water stop; 4. and (4) oppositely pulling the bolts.
Detailed Description
The present application is described in further detail below with reference to figures 1-6.
The embodiment of the application discloses a mount that buries formula waterstop in being used for construction joint department.
Example 1:
referring to fig. 1, the fixing frame comprises a plurality of clamping plate assemblies 2, each clamping plate assembly 2 comprises two clamping plates 21 which are symmetrically arranged mutually and an installation mechanism 22 used for supporting the clamping plates 21, one ends of the two installation mechanisms 22 which are oppositely arranged are respectively connected with wall stress steel bars 1 arranged on two sides of a construction joint, a cross-over tie bolt 4 between the two clamping plates 21 is locked, and a water stop 3 is clamped between the two clamping plates 21.
Referring to fig. 1 and 2, each installation mechanism 22 includes an installation portion 221 for connecting wall body stress steel bar 1 and a telescopic assembly 222 for connecting installation portion 221 and clamping plate 21, installation portion 221 is connected with clamping plate 21 through telescopic assembly 222 between the one end that sets up in opposite directions, the interval between installation portion 221 and clamping plate 21 can be adjusted through telescopic assembly 222, the one end of installation portion 221 far from clamping plate 21 is connected with wall body stress steel bar 1, and the one end of clamping plate 21 far from installation portion 221 is used for clamping water stop 3.
Referring to fig. 1 and 3, the mounting portion 221 includes a first connecting rod 2211, a second connecting rod 2212, a clamping member 2213 and a limiting member 2214, two ends of the first connecting rod 2211 are rotatably connected to the second connecting rod 2212 and the clamping member 2213, axes of rotation axes between the first connecting rod 2211 and the clamping member 2212 and the clamping member 2213 are perpendicular to an axis of the first connecting rod 2211, and axes of rotation axes between the first connecting rod 2211 and the clamping member 2212 and the clamping member 2213 are parallel to each other.
Referring to fig. 3, the clamping member 2213 includes an arc-shaped hook 2215 and a fastening bolt 2216 in threaded connection with the hook 2215, the hook 2215 is made of elastic steel, two ends of the hook 2215 are each provided with a guide portion 2217 which is curved towards the center of the circle far away from the hook 2215, the fastening bolt 2216 is in threaded connection with one end of the hook 2215, and the axis of the hook 2215 is perpendicular to the axis of the first connecting rod 2211; wherein, the outer side of the hook 2215 is rotatably connected with the first connecting rod 2211.
Referring to fig. 3, the limiting member 2214 is sleeved on the second connecting rod 2212 and is in threaded connection with the outer wall of the second connecting rod 2212, and when the position of the limiting member 2214 needs to be adjusted, only the limiting member 2214 needs to be rotated.
When the installation part 221 and the wall body stressed steel bar 1 need to be connected, only the hook 2215 needs to be hooked on one of the wall body stressed steel bars 1 which are horizontally arranged, then the fastening bolt 2216 is screwed to ensure that the hook 2215 is firmly connected with the wall body stressed steel bar 1, then the positions of the first connecting rod 2211 and the second connecting rod 2212 are adjusted, so that the second connecting rod 2212 can be lapped on the other wall body stressed steel bar 1 which is horizontally arranged, and finally, the limiting part 2214 is rotated to ensure that the limiting part 2214 can be abutted to the outer wall of the wall body stressed steel bar 1.
Referring to fig. 2 and 4, a rubber pad (not shown) is disposed on a side of the clamping plate 21 close to the water stop 3, and a sawtooth line (not shown) is disposed on a side of the rubber pad far from the clamping plate 21; wherein, the upper end of the clamping plate 21 is provided with a through hole for the split bolt 4 to penetrate.
When the water stop 3 needs to be clamped and fixed, only the two clamping plates 21 are matched with the left side surface and the right side surface of the water stop 3 respectively, and then the two clamping plates 21 clamp the water stop 3 by using the split bolts 4.
Referring to fig. 2 and 4, the telescopic assembly 222 includes a first sleeve 2221, a threaded rod 2222, a first strong spring 2223 and a first nut 2224, wherein the outer wall of the first sleeve 2221 is rotatably connected to the second connecting rod 2212, the axis of the rotating shaft between the first sleeve 2221 and the second connecting rod 2212 is perpendicular to the axis of the first sleeve 2221, and the vertical plane of the axis of the first sleeve 2221 is parallel to the vertical plane of the second connecting rod 2212; wherein, one of them one end of threaded rod 2222 is connected with splint 21, and first sleeve 2221 is worn to establish by the other end of threaded rod 2222, is provided with the first spacing ring 2225 that sets up the round around the axis circumference of threaded rod 2222 on one of them end of threaded rod 2222, and first powerful spring 2223 is located on the threaded rod 2222 and both ends respectively with first spacing ring 2225 and first sleeve 2221 butt, the same threaded rod 2222 of first nut 2224 is kept away from the one end threaded connection of first spacing ring 2225.
When the distance between the two clamping plates 21 needs to be adjusted to ensure the clamping effect, the first nut 2224 can be rotated to adjust the distance between the first sleeve 2221 and the first stop collar 2225, so that the effect of indirectly adjusting the distance between the mounting part 221 and the clamping plate 21 is achieved, and finally the effect of adjusting the distance between the two mounting parts 221 which are symmetrically arranged with each other is achieved.
When the installation mechanism 22 is installed and the distance between the two clamping plates 21 is too large, the worker can adjust the actual length of the telescopic assembly 222 to ensure that the two clamping plates 21 can clamp the water stop 3.
The implementation principle of the embodiment 1 is as follows:
when this splint subassembly 2 is fixed to needs, only need to catch on the wall body atress reinforcing bar 1 that the level setting just is located the low department with crotch 2215 earlier, then support second connecting rod 2212 on the wall body atress reinforcing bar 1 that the level setting just is located the eminence, then adjust the angle between first connecting rod 2211 and the second connecting rod 2212, and through the position of adjusting locating part 2214, make second connecting rod 2212 can with wall body atress reinforcing bar 1 stable connection, locking fastening bolt 2216 at last in order to ensure the fixed connection between crotch 2215 and the wall body atress reinforcing bar 1 can.
Example 2:
referring to fig. 5, the present embodiment is different from embodiment 1 in that a second sleeve 23 is disposed on the clamping member 2213, one end of the first connecting rod 2211, which is far away from the second connecting rod 2212, penetrates through the second sleeve 23, a second limiting ring 231, which is circumferentially disposed around an axis of the first connecting rod 2211, is disposed on one end of the first connecting rod 2211, which is far away from the second connecting rod 2212, a second strong spring 232, which has two ends respectively abutted against the second limiting ring 231 and the second sleeve 23, is sleeved on the first connecting rod 2211, and a second nut 233, which is abutted against one end of the second sleeve 23, which is far away from the second limiting ring 231, is further threadedly connected to the first connecting rod 2211.
Compared with the embodiment 1, this technical scheme can be through the mounted position between first connecting rod 2211 and the holder 2213, it is effectual to reach the interval between adjustment holder 2213 and the second connecting rod 2212, further improve the application scope of this splint subassembly 2, simultaneously, utilize cooperation between first connecting rod 2211 and the second sleeve 23 and the cooperation between second connecting rod 2212 and the first sleeve 2221, make splint 21 can do universal angle modulation, thereby make this splint subassembly 2 not only can be used for the installation of the waterstop 3 of vertical setting to use, can also be used for the installation of the waterstop 3 of horizontal setting to use, further improve the application scope of this splint subassembly 2.
Example 3:
referring to fig. 6, the present embodiment is different from embodiment 1 in that the telescopic assembly 222 is configured as a third connecting rod 24, one end of the third connecting rod 24 away from the clamping plate 21 is rotatably connected to the second connecting rod 2212, and the first connecting rod 2211 is fixedly connected to the clamping member 2213.
Compared with the embodiment 1, the technical scheme has the advantages of lowest implementation cost, simpler structure and convenient implementation and popularization.
The embodiment of the application also discloses a using method for the fixing frame, which comprises the following steps:
fixing the clamping plate component 2 and the water stop belt 3, and then placing the clamping plate component 2 and the water stop belt 3 at a construction joint;
step two, the clamping piece 2213 is preliminarily fixed on the wall stressed steel bar 1, and the position of the clamping plate 21 is adjusted;
step three, the position of the clamping plate 21 is further adjusted through the first connecting rod 2211 and the second connecting rod 2212, and the first connecting rod 2211 and the second connecting rod 2212 can play a role of lever support;
and step four, completely fixing the clamping piece 2213 on the stressed steel bar 1 of the wall body.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (9)

1. The utility model provides a mount that is arranged in burying formula waterstop of construction joint department, includes a plurality of splint subassemblies (2), its characterized in that: each splint subassembly (2) all include splint (21) and two installation mechanism (22) that are used for supporting two splint (21) respectively that two symmetries set up, two installation mechanism (22) set up the opposite one end and all are provided with holder (2213) of being connected with wall body atress reinforcing bar (1) can dismantle, two splint (21) are through split bolt (4) locking, and waterstop (3) are by the centre gripping between two splint (21).
2. The fixing frame for the buried water stop at a construction joint according to claim 1, wherein: each clamp installation mechanism (22) all includes installation department (221) and splint (21), scalable connection between installation department (221) and splint (21), holder (2213) and split bolt (4) set up respectively on one end that installation department (221) and splint (21) set up on the contrary.
3. The fixing frame for the buried water stop at a construction joint according to claim 2, wherein: the one end that installation department (221) is close to holder (2213) is provided with first sleeve (2221), be provided with threaded rod (2222) of wearing to establish first sleeve (2221) on splint (21), wherein one end of threaded rod (2222) is provided with first spacing ring (2225), the cover is equipped with first powerful spring (2223) that both ends respectively with first spacing ring (2225) and first sleeve (2221) butt on threaded rod (2222), it has first nut (2224) of the one end butt of keeping away from first spacing ring (2225) with first sleeve (2221) to go back threaded connection on threaded rod (2222).
4. The fixing frame for the buried water stop at a construction joint according to claim 1, wherein: the clamping piece (2213) comprises a hook (2215) and a fastening bolt (2216), the fastening bolt (2216) is in threaded connection with the hook (2215), and when the hook (2215) hooks the wall stress steel bar (1), the fastening bolt (2216) abuts against the wall stress steel bar (1) to enable the wall stress steel bar (1) to abut against the hook (2215).
5. The fixing frame for the buried water stop at a construction joint according to claim 2, wherein: the installation department (221) includes head rod (2211) and second connecting rod (2212), the one end rotation that head rod (2211) and second connecting rod (2212) set up in opposite directions is connected, holder (2213) and threaded rod (2222) set up respectively on head rod (2211) and the opposite one end that sets up of second connecting rod (2212).
6. The fixing frame for the buried water stop at the construction joint and the using method thereof according to claim 5, wherein: the first connecting rod (2211) is rotatably connected with the clamping piece (2213), and the second connecting rod (2212) is rotatably connected with the first sleeve (2221).
7. The fixing frame for the buried water stop at a construction joint according to claim 5, wherein: and the second connecting rod (2212) is connected with a limiting part (2214) in a threaded manner, and when the second connecting rod (2212) abuts against the wall stress steel bar (1), the limiting part (2214) abuts against the part, away from the water stop belt (3), of the wall stress steel bar (1).
8. The fixing frame for the buried water stop at a construction joint according to claim 1, wherein: rubber pads are arranged on one sides of the two clamping plates (21) which are arranged oppositely, and sawtooth grains are arranged on one side faces of the two rubber pads which are arranged oppositely.
9. A method of using a holder according to any of claims 1 to 8, comprising the steps of:
fixing the clamping plate component (2) and the water stop (3), and then placing the clamping plate component (2) and the water stop (3) at a construction joint;
step two, preliminarily fixing the clamping piece (2213) on the stressed steel bar (1) of the wall body, and adjusting the position of the clamping plate (21);
step three, the position of the clamping plate (21) is further adjusted through the first connecting rod (2211) and the second connecting rod (2212), and the first connecting rod (2211) and the second connecting rod (2212) can play a role in lever support;
and step four, completely fixing the clamping piece (2213) on the stressed steel bar (1) of the wall body.
CN202011234539.5A 2020-11-07 2020-11-07 Fixing frame for buried water stop belt at construction joint and using method of fixing frame Active CN112376712B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011234539.5A CN112376712B (en) 2020-11-07 2020-11-07 Fixing frame for buried water stop belt at construction joint and using method of fixing frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011234539.5A CN112376712B (en) 2020-11-07 2020-11-07 Fixing frame for buried water stop belt at construction joint and using method of fixing frame

Publications (2)

Publication Number Publication Date
CN112376712A true CN112376712A (en) 2021-02-19
CN112376712B CN112376712B (en) 2021-11-12

Family

ID=74579431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011234539.5A Active CN112376712B (en) 2020-11-07 2020-11-07 Fixing frame for buried water stop belt at construction joint and using method of fixing frame

Country Status (1)

Country Link
CN (1) CN112376712B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113217042A (en) * 2021-05-25 2021-08-06 洛阳腾飞市政工程有限公司 Middle-buried steel-edge rubber water stop mounting device
CN114016467A (en) * 2021-11-30 2022-02-08 杭州萧山水利建筑工程有限公司 Dyke bank protection parting rubber waterstop positioner
TWI758166B (en) * 2021-04-19 2022-03-11 方建弘 Building, standing board assembly and holder thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103670451A (en) * 2013-12-09 2014-03-26 中铁五局(集团)有限公司 Mounting tool of embedded longitudinal rubber waterstop in tunnel and using method thereof
CN203756197U (en) * 2014-02-20 2014-08-06 中铁十局集团第三建设有限公司 Fixation device of water-stop belt
JP5848430B1 (en) * 2014-12-24 2016-01-27 株式会社アークエース Structure for fixing objects to reinforcing bars
CN206859273U (en) * 2017-06-26 2018-01-09 北京中润宝成工程技术有限公司 A kind of vertical fixing device for installing of middle buried water stop
CN211735532U (en) * 2020-01-16 2020-10-23 中建中新建设工程有限公司 Steel-edged rubber waterstop reinforcing clamp

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103670451A (en) * 2013-12-09 2014-03-26 中铁五局(集团)有限公司 Mounting tool of embedded longitudinal rubber waterstop in tunnel and using method thereof
CN203756197U (en) * 2014-02-20 2014-08-06 中铁十局集团第三建设有限公司 Fixation device of water-stop belt
JP5848430B1 (en) * 2014-12-24 2016-01-27 株式会社アークエース Structure for fixing objects to reinforcing bars
CN206859273U (en) * 2017-06-26 2018-01-09 北京中润宝成工程技术有限公司 A kind of vertical fixing device for installing of middle buried water stop
CN211735532U (en) * 2020-01-16 2020-10-23 中建中新建设工程有限公司 Steel-edged rubber waterstop reinforcing clamp

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
TWI758166B (en) * 2021-04-19 2022-03-11 方建弘 Building, standing board assembly and holder thereof
CN113217042A (en) * 2021-05-25 2021-08-06 洛阳腾飞市政工程有限公司 Middle-buried steel-edge rubber water stop mounting device
CN113217042B (en) * 2021-05-25 2023-12-26 洛阳腾飞建设工程集团有限公司 Middle-buried steel edge rubber water stop belt mounting device
CN114016467A (en) * 2021-11-30 2022-02-08 杭州萧山水利建筑工程有限公司 Dyke bank protection parting rubber waterstop positioner

Also Published As

Publication number Publication date
CN112376712B (en) 2021-11-12

Similar Documents

Publication Publication Date Title
CN112376712B (en) Fixing frame for buried water stop belt at construction joint and using method of fixing frame
CN211341788U (en) Cast in situ concrete wall strutting arrangement
EP0338142B1 (en) Stanchion or post
CN217603498U (en) Combined pipeline mounting tool
CN111422318A (en) Supporting device for ship body section and mounting method
CN206988672U (en) Ground pump pipe union bracing means and ruggedized construction
CN215484876U (en) Auxiliary frame for replacing connecting rod of bolt ball net rack
CN211078254U (en) Tower machine attaches wall device
CN212359148U (en) Reinforcing device for damping and reducing noise of concrete pump pipe
CN212510459U (en) High-efficient no leakage steel gas cylinder for vehicle
CN212078774U (en) Load-bearing tripod
CN114604786A (en) Tower crane wall attaching structure and construction method thereof
CN209428964U (en) A kind of adjustable pump line attached wall structure of elasticity
CN209854649U (en) Bottom adjusting and reinforcing device for vertical steel formwork
CN220132739U (en) Adjustable self-balancing temporary rope clamp device for boom replacement
CN113958810B (en) General support for oil pump installation of concrete mixing transport vehicle
CN217232718U (en) Highway guardrail template
CN210263931U (en) Building construction template anchor clamps
CN217537908U (en) Floor-penetrating self-fixing device for turnover type concrete pump pipe
CN214393904U (en) Fixing tool applied to opposite installation of water supply and drainage nodular cast iron pipes
CN219754545U (en) Installation component of two lining built-in fittings in tunnel
CN219792234U (en) Rope anti-shaking device of gantry crane
CN218971996U (en) Support hanger suitable for air pipe installation in narrow space
CN113998640B (en) Well lid installation device
CN219841150U (en) Thermal-insulated fixed pipe support convenient to adjust

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant