CN112371400A - Paint spraying device for shipbuilding - Google Patents

Paint spraying device for shipbuilding Download PDF

Info

Publication number
CN112371400A
CN112371400A CN202011419825.9A CN202011419825A CN112371400A CN 112371400 A CN112371400 A CN 112371400A CN 202011419825 A CN202011419825 A CN 202011419825A CN 112371400 A CN112371400 A CN 112371400A
Authority
CN
China
Prior art keywords
baffle
main pipe
paint
shipbuilding
fixing plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011419825.9A
Other languages
Chinese (zh)
Inventor
黄世柳
陆国达
孙浩文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cssc Xijiang Shipyard Co ltd
Original Assignee
Cssc Xijiang Shipyard Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cssc Xijiang Shipyard Co ltd filed Critical Cssc Xijiang Shipyard Co ltd
Priority to CN202011419825.9A priority Critical patent/CN112371400A/en
Publication of CN112371400A publication Critical patent/CN112371400A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B13/00Machines or plants for applying liquids or other fluent materials to surfaces of objects or other work by spraying, not covered by groups B05B1/00 - B05B11/00
    • B05B13/02Means for supporting work; Arrangement or mounting of spray heads; Adaptation or arrangement of means for feeding work
    • B05B13/0278Arrangement or mounting of spray heads
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B05SPRAYING OR ATOMISING IN GENERAL; APPLYING FLUENT MATERIALS TO SURFACES, IN GENERAL
    • B05BSPRAYING APPARATUS; ATOMISING APPARATUS; NOZZLES
    • B05B12/00Arrangements for controlling delivery; Arrangements for controlling the spray area
    • B05B12/16Arrangements for controlling delivery; Arrangements for controlling the spray area for controlling the spray area
    • B05B12/32Shielding elements, i.e. elements preventing overspray from reaching areas other than the object to be sprayed
    • B05B12/36Side shields, i.e. shields extending in a direction substantially parallel to the spray jet

Landscapes

  • Application Of Or Painting With Fluid Materials (AREA)

Abstract

The invention discloses a paint spraying device for shipbuilding, which comprises a header pipe, a bottom plate and a baffle plate, wherein the header pipe is internally provided with the partition plate, the upper end and the lower end of the header pipe are respectively provided with a paint injection pipe, the left side surface of the header pipe is provided with more than one paint outlet pipe, the outer wall surfaces of the paint outlet pipes are respectively provided with threads and are respectively connected with a cylinder body through thread meshing, the end surface of the cylinder body is respectively provided with a spray head, the center of one end of the baffle plate is provided with a mounting opening, the baffle plate is sleeved on the header pipe through the mounting opening, and the two sides of the baffle plate, which are positioned at the. The invention has simple structure, can adjust the height of the partition plate according to the proportion of the colors of the ship body, can directly finish the distribution of two colors of the ship body by one-time spraying, can separate the upper color from the lower color through the baffle, avoids the mixing, has the same length as the height of the ship body, can directly finish the coating of the ship body in the height direction by one-time spraying, and greatly increases the area.

Description

Paint spraying device for shipbuilding
Technical Field
The invention relates to the technical field of shipbuilding, in particular to a paint spraying device for shipbuilding.
Background
Shipbuilding refers to the manufacturing industry of building or manufacturing ships, generally in the berths or docks in professional facilities shipbuilding factories, the technology of shipbuilding itself is very wide, from the use of hull to engine, shipbuilding technology can be divided into several categories, including the hull, this part is based on basic design and structural design, can be subdivided into steel ship, aluminum alloy ship, glass steel ship, cement ship, wooden ship, leather ship, plastic tube raft according to the material; the ochre is equipped with other equipment besides the electronic equipment, the navigation instrument, the furniture and the host; the marine steam turbine, the gas turbine, the diesel engine, the nuclear reactor and the motor are used, and before the ship is constructed to be launched, the outer wall of the ship body needs to be painted.
The conventional operation mode is that an operator holds a spray gun by hand, and surface treatment operation is carried out on a built scaffold or in a working bucket of an overhead working truck, the mode is low in efficiency and small in spraying area, the outer wall surface of the existing ship body is divided into two general colors for increasing attractiveness, the existing spraying equipment can only spray in one color, and the efficiency is further reduced.
Disclosure of Invention
The technical problem to be solved by the invention is to provide a paint spraying device for a shipbuilding, which aims to solve the problems in the background technology.
The invention is realized by the following technical scheme: a paint spraying device for shipbuilding comprises a header pipe, a bottom plate and a baffle plate, wherein the upper end and the lower end of the header pipe are arranged in a sealing way, sealing bearings are arranged in the upper end and the lower end of the header pipe in an embedded way, a partition plate is arranged in the header pipe, a first screw hole is arranged at the center of the partition plate, a screw rod is connected in the first screw hole in a threaded way, the upper end and the lower end of the screw rod are all arranged in the inner ring of the sealing bearing, the, a first hand wheel is arranged, the upper end and the lower end of the main pipe are both provided with paint injection pipes, the left side surface of the main pipe is provided with more than one paint outlet pipe, the outer wall surface of the paint outlet pipe is provided with threads, the spray heads are arranged on the end faces of the barrels, mounting openings are formed in the centers of one ends of the baffles, the baffles are sleeved on the header pipe through the mounting openings, and extruding mechanisms for locking and fixing the baffles are arranged on the two sides of the baffles, which are located at the mounting openings.
As preferred technical scheme, the extrusion mechanism all includes the extrusion piece, the double-screw bolt, first fixed plate, the second hand wheel, slider and ball bearing, extrusion piece one end all sets up on the edge of baffle, the other end all extends to in the installing port, and all offset with the outer wall of house steward, first fixed plate all installs on the extrusion piece, the second fixed plate all installs on the baffle, ball bearing all embedded installation is on first fixed plate, all be equipped with the second screw hole on the second fixed plate, the equal threaded connection of double-screw bolt is in the second screw hole, stud one end is all installed in ball bearing's inner ring, the second hand wheel is all installed on the other end of double-screw bolt, the slider is all installed on the extrusion piece, the baffle just all is equipped with the spout to slider department, slider one end is all slidable mounting in the spout.
As the preferred technical scheme, install the panel on the bottom surface of house steward, install more than one bracing piece between panel and the bottom plate, install more than one universal wheel of area brake on the bottom surface of bottom plate.
As a preferable technical scheme, a rubber layer is arranged on one end face of the baffle, which is far away from the main pipe.
As the preferred technical scheme, the inner cavity of the header pipe and the partition plates are arranged in a hexagonal structure and matched with each other.
The invention has the beneficial effects that: the invention has simple structure, can adjust the height of the partition plate according to the proportion of the colors of the ship body, can directly finish the distribution of two colors of the ship body by one-time spraying, can separate the upper color from the lower color through the baffle, avoids the mixing, has the same length of the main pipe as the height of the ship body, can directly finish the coating in the height direction of the ship body by one-time spraying, greatly increases the area, and can finish the work by only moving along the ship body.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below, it is obvious that the drawings in the following description are only some embodiments of the present invention, and for those skilled in the art, other drawings can be obtained according to the drawings without creative efforts.
FIG. 1 is a schematic view of the overall structure of the present invention;
fig. 2 is a schematic structural view of the pressing mechanism of the present invention.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like or similar reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the accompanying drawings are illustrative only for the purpose of explaining the present invention, and are not to be construed as limiting the present invention.
In the description of the present invention, it is to be understood that the terms "center", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outer", etc., indicate orientations or positional relationships based on those shown in the drawings, and are only for convenience of description and simplicity of description, and do not indicate or imply that the devices or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, are not to be construed as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can, for example, be fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meanings of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1 and 2, the paint spraying device for shipbuilding of the invention comprises a header pipe 15, a bottom plate 12 and a baffle plate 6, wherein the upper end and the lower end of the header pipe 15 are sealed, sealing bearings 1 are embedded in the upper end and the lower end of the header pipe 15, a partition plate 8 is arranged inside the header pipe 15, a first screw hole is arranged at the center of the partition plate 8, a screw 9 is connected with the first screw hole through threads, the upper end and the lower end of the screw 9 are all arranged in an inner ring of the sealing bearing 1, the lower end of the screw 9 extends to the outside and is provided with a first hand wheel 13, paint injection pipes 7 are arranged at the upper end and the lower end of the header pipe 15, more than one paint outlet pipe 2 is arranged on the left side surface of the header pipe 15, threads are arranged on the outer wall surface of the paint outlet pipes 2 and are all connected with a cylinder 3 through thread meshing, a spray nozzle 4 is arranged on the end surface of the cylinder 3, and the two sides of the baffle 6 positioned at the mounting opening are both provided with an extrusion mechanism for locking and fixing the baffle.
In this embodiment, the extrusion mechanisms each include an extrusion block 16, a stud 19, a first fixing plate 17, a second fixing plate 21, a second wheel 22, a slider 24, and a ball bearing 18, one end of the extrusion block 16 is disposed on the edge of the baffle 6, the other end extends into the mounting opening, and are all pressed against the outer wall surface of the main pipe 15, the first fixing plates 17 are all arranged on the extrusion blocks 16, the second fixing plates 21 are all arranged on the baffle 6, the ball bearings 18 are all embedded on the first fixing plates 17, the second fixing plates 21 are all provided with second screw holes, the studs 19 are all in threaded connection with the second screw holes, one end of each stud 19 is mounted in an inner ring of the ball bearing 18, the second hand wheels 22 are mounted at the other ends of the studs 19, the sliding blocks 24 are mounted on the extrusion block 16, sliding grooves 23 are formed in positions, opposite to the sliding blocks, of the baffle 6, and one ends of the sliding blocks 24 are slidably mounted in the sliding grooves 23.
In this embodiment, the bottom surface of the main pipe 15 is provided with the panel 11, more than one support rod is arranged between the panel 11 and the bottom plate 12, and more than one universal wheel 14 with a brake is arranged on the bottom surface of the bottom plate 12.
In the embodiment, the rubber layer 5 is arranged on the end face, away from the main pipe, of the baffle 6, so that after the baffle is in contact with the outer wall face of the ship body, the sealing performance between the baffle and the ship body is improved through the rubber layer, and the paint is prevented from being mixed.
In this embodiment, house steward 15's inner chamber and division board 8 all are the hexagon structure setting, and the rotation of division board has been avoided to the phase-match between the two, makes the division board only can reciprocate along house steward vertically.
When the device is used, the height of the partition plate is adjusted according to the distribution proportion of the upper pigment and the lower pigment of the ship body, the first hand wheel is rotated during adjustment, the screw rod is driven by the rotation of the first hand wheel, the partition plate is driven by the rotation of the screw rod to be tightly attached to the inner wall of the main pipe to move up and down until the partition plate is positioned in the middle of the two pigments on the ship body, so that the two paints can be injected into the upper end and the lower end of the partition plate along different paint injection pipes, the paints can enter different paint outlet pipes and the cylinder body until being sprayed out of the spray head, if the paint sprayed out of the spray head positioned at the upper end of the partition plate is black, the paint sprayed out of the spray head at the lower end of the partition plate is red, the two;
after the partition plate is adjusted, the baffle plate also needs to be adjusted, so that the baffle plate and the partition plate are arranged oppositely, during adjustment, the baffle plate is sleeved on the header pipe through the mounting port, the second hand wheel is rotated, the stud is driven by rotation of the second hand wheel, the first fixing plate and the extrusion block are driven by rotation of the stud until the extrusion block is clamped on the header pipe, and therefore the baffle plate is effectively positioned.
Wherein, the barrel can be rotatory along going out the lacquer pipe, makes the barrel adjust according to the radian of hull, makes the shower nozzle can be close to the hull as far as, has avoided and has contacted the hull with the distance between the hull too big.
The length of the main pipe is the same as the height of the ship body, so that the ship body can be directly coated in the height direction by one-time spraying, and the area is greatly increased.
The above description is only an embodiment of the present invention, but the scope of the present invention is not limited thereto, and any changes or substitutions that are not thought of through the inventive work should be included in the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope defined by the claims.

Claims (5)

1. The utility model provides a paint spraying apparatus for shipbuilding which characterized in that: comprises a main pipe (15), a bottom plate (12) and a baffle plate (6), the upper end and the lower end of the main pipe (15) are arranged in a sealing way, a sealing bearing (1) is arranged in the upper end and the lower end of the main pipe (15) in an embedded way, a partition plate (8) is arranged inside the main pipe (15), a first screw hole is arranged at the center of the partition plate (8), a screw rod (9) is connected with the screw rod in the first screw hole in a threaded way, the upper end and the lower end of the screw rod (9) are arranged in the inner ring of the sealing bearing (1), the lower end of the screw rod (9) extends to the outside and is provided with a first hand wheel (13), paint injection pipes (7) are arranged at the upper end and the lower end of the main pipe (15), more than one paint outlet pipe (2) is arranged on the left side surface of the main pipe (15), threads are arranged on the outer wall surface of the paint, the center department of the one end of baffle (6) is equipped with the installing port, and baffle (6) are located house steward (15) through the installing port cover on, and baffle (6) are located the both sides of installing port and all install the extrusion mechanism who fixes the baffle locking.
2. The shipbuilding painting apparatus according to claim 1, characterized in that: the extruding mechanisms respectively comprise extruding blocks (16), studs (19), first fixing plates (17), second fixing plates (21), second hand wheels (22), sliding blocks (24) and ball bearings (18), one ends of the extruding blocks (16) are arranged on the edges of the baffle plates (6), the other ends of the extruding blocks extend into the mounting holes and are abutted against the outer wall surfaces of the header pipes (15), the first fixing plates (17) are respectively arranged on the extruding blocks (16), the second fixing plates (21) are respectively arranged on the baffle plates (6), the ball bearings (18) are respectively arranged on the first fixing plates (17) in an embedded mode, second screw holes are respectively arranged on the second fixing plates (21), the studs (19) are respectively connected into the second screw holes in a threaded mode, one ends of the studs (19) are respectively arranged in inner rings of the ball bearings (18), the second hand wheels (22) are respectively arranged at the other ends of the studs (19), the sliding blocks (24) are respectively arranged on the extruding blocks (16), the baffle (6) are just right to slider department and all are equipped with spout (23), and slider (24) one end is all slidable mounting in spout (23).
3. The shipbuilding painting apparatus according to claim 1, characterized in that: the bottom surface of the main pipe (15) is provided with a panel (11), more than one supporting rod is arranged between the panel (11) and the bottom plate (12), and more than one universal wheel (14) with a brake is arranged on the bottom surface of the bottom plate (12).
4. The shipbuilding painting apparatus according to claim 1, characterized in that: and a rubber layer (5) is arranged on one end surface of the baffle (6) far away from the main pipe.
5. The shipbuilding painting apparatus according to claim 1, characterized in that: the inner cavity of the header pipe (15) and the partition plate (8) are arranged in a hexagonal structure and are matched with each other.
CN202011419825.9A 2020-12-08 2020-12-08 Paint spraying device for shipbuilding Pending CN112371400A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011419825.9A CN112371400A (en) 2020-12-08 2020-12-08 Paint spraying device for shipbuilding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011419825.9A CN112371400A (en) 2020-12-08 2020-12-08 Paint spraying device for shipbuilding

Publications (1)

Publication Number Publication Date
CN112371400A true CN112371400A (en) 2021-02-19

Family

ID=74589292

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011419825.9A Pending CN112371400A (en) 2020-12-08 2020-12-08 Paint spraying device for shipbuilding

Country Status (1)

Country Link
CN (1) CN112371400A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113828440A (en) * 2021-08-06 2021-12-24 安庆中船柴油机有限公司 Protective spraying method for exposed surface of marine main engine

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0838972A (en) * 1994-07-28 1996-02-13 Chugai Ro Co Ltd Stripe coating die coater
JP2000102755A (en) * 1998-09-29 2000-04-11 Mochizuki Kiko Seisakusho:Kk Paint dividing structure in coating device and parallel multicolor coating method using the same
KR20050024661A (en) * 2003-09-01 2005-03-11 현대중공업 주식회사 Automatic painting system for hull shell which consists of two column of the stacker crane structure
US20050196543A1 (en) * 2004-02-02 2005-09-08 Morton John S. Cost effective automated preparation and coating methodology for large surfaces
CN101658831A (en) * 2008-08-28 2010-03-03 郭照沛 Coating machine for wall coatings
KR20120109959A (en) * 2011-03-25 2012-10-09 풍림산업 주식회사 Multi injection type painting apparatus for building exterior wall
CN204134777U (en) * 2014-09-23 2015-02-04 国家电网公司 Electric pole warning picture spray equipment
CN206425125U (en) * 2017-01-20 2017-08-22 茂名市五金厂 A kind of full-automatic spray-painting plant of steel drum
CN108488508A (en) * 2018-04-13 2018-09-04 无锡市东鹏金属制品有限公司 A kind of automobile shock-avoiding suspension device bracket casting
CN108754930A (en) * 2018-07-10 2018-11-06 安徽宏铭服饰有限公司 The integral type of colour mixture cloth dyes drying unit
CN110359678A (en) * 2019-07-09 2019-10-22 浙江汉斯建筑装饰工程有限公司 A kind of interior decoration rotary broom
CN210058680U (en) * 2019-05-31 2020-02-14 湖北四桥机械设备有限公司 A many colours paint spraying apparatus for building engineering mould preparation
CN210753372U (en) * 2019-07-30 2020-06-16 无锡市兴隆船舶有限公司 Paint spraying device for shipbuilding
CN211257713U (en) * 2019-10-31 2020-08-14 四川长江飞瑞能源科技有限公司 Paint spraying equipment for decoration and finishing of building engineering
CN214320630U (en) * 2020-12-08 2021-10-01 中船西江造船有限公司 Paint spraying device for shipbuilding

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0838972A (en) * 1994-07-28 1996-02-13 Chugai Ro Co Ltd Stripe coating die coater
JP2000102755A (en) * 1998-09-29 2000-04-11 Mochizuki Kiko Seisakusho:Kk Paint dividing structure in coating device and parallel multicolor coating method using the same
KR20050024661A (en) * 2003-09-01 2005-03-11 현대중공업 주식회사 Automatic painting system for hull shell which consists of two column of the stacker crane structure
US20050196543A1 (en) * 2004-02-02 2005-09-08 Morton John S. Cost effective automated preparation and coating methodology for large surfaces
CN101658831A (en) * 2008-08-28 2010-03-03 郭照沛 Coating machine for wall coatings
KR20120109959A (en) * 2011-03-25 2012-10-09 풍림산업 주식회사 Multi injection type painting apparatus for building exterior wall
CN204134777U (en) * 2014-09-23 2015-02-04 国家电网公司 Electric pole warning picture spray equipment
CN206425125U (en) * 2017-01-20 2017-08-22 茂名市五金厂 A kind of full-automatic spray-painting plant of steel drum
CN108488508A (en) * 2018-04-13 2018-09-04 无锡市东鹏金属制品有限公司 A kind of automobile shock-avoiding suspension device bracket casting
CN108754930A (en) * 2018-07-10 2018-11-06 安徽宏铭服饰有限公司 The integral type of colour mixture cloth dyes drying unit
CN210058680U (en) * 2019-05-31 2020-02-14 湖北四桥机械设备有限公司 A many colours paint spraying apparatus for building engineering mould preparation
CN110359678A (en) * 2019-07-09 2019-10-22 浙江汉斯建筑装饰工程有限公司 A kind of interior decoration rotary broom
CN210753372U (en) * 2019-07-30 2020-06-16 无锡市兴隆船舶有限公司 Paint spraying device for shipbuilding
CN211257713U (en) * 2019-10-31 2020-08-14 四川长江飞瑞能源科技有限公司 Paint spraying equipment for decoration and finishing of building engineering
CN214320630U (en) * 2020-12-08 2021-10-01 中船西江造船有限公司 Paint spraying device for shipbuilding

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113828440A (en) * 2021-08-06 2021-12-24 安庆中船柴油机有限公司 Protective spraying method for exposed surface of marine main engine

Similar Documents

Publication Publication Date Title
CN214320630U (en) Paint spraying device for shipbuilding
CN205000609U (en) Putty flush coater for building
CN112371400A (en) Paint spraying device for shipbuilding
CN211678352U (en) Decorative plate surface paint spraying device
CN215054994U (en) Waterproof coating injection apparatus of waterproof engineering of building easy to assemble
CN212453432U (en) Novel energy-concerving and environment-protective fluorine carbon aluminium veneer
CN215235255U (en) Steel construction paint spraying apparatus
CN114392866A (en) High-gloss low-film-thickness aluminum alloy hub spraying process and spraying device
CN211359312U (en) Tool for single-side spraying
CN202527308U (en) Double-sprayer spray gun for nano spray plating
CN220716273U (en) Smearing device for color steel plates
CN212791572U (en) Building templates surface spraying device
CN211159404U (en) Dip tank for coating
CN220573765U (en) Double-spray gun structure of SCR mixer
CN215744360U (en) Spraying frock of boats and ships planking limit mouth
CN205926088U (en) Polyphenyl board top layer fire -proof material's spraying device
CN216756883U (en) Spray booth for spray line
CN218223104U (en) Paint spraying equipment with mixing assembly
CN220899390U (en) Fire control spray gun structure
CN215670839U (en) Paint spraying device for energy-saving building
CN216440918U (en) Spray head structure for antirust and anticorrosive paint spraying machine
CN218323725U (en) Building outer wall paint spraying equipment based on building engineering construction
CN221602271U (en) Water diversion device for producing anti-corrosion automobile paint
CN220900885U (en) Pipeline mopping device
CN212441770U (en) Coating device for single-component polyurethane adhesive

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination