CN112367679B - Method and device for evaluating number of accessible users - Google Patents
Method and device for evaluating number of accessible users Download PDFInfo
- Publication number
- CN112367679B CN112367679B CN202011360922.5A CN202011360922A CN112367679B CN 112367679 B CN112367679 B CN 112367679B CN 202011360922 A CN202011360922 A CN 202011360922A CN 112367679 B CN112367679 B CN 112367679B
- Authority
- CN
- China
- Prior art keywords
- service
- interval
- sinr
- users
- duty ratio
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 40
- 238000004088 simulation Methods 0.000 claims abstract description 55
- 238000004891 communication Methods 0.000 claims abstract description 30
- 238000011156 evaluation Methods 0.000 claims description 35
- 238000012545 processing Methods 0.000 claims description 34
- 238000003860 storage Methods 0.000 claims description 18
- 238000010295 mobile communication Methods 0.000 claims description 7
- 238000005516 engineering process Methods 0.000 claims description 6
- 238000011144 upstream manufacturing Methods 0.000 claims description 6
- 230000006870 function Effects 0.000 description 23
- 238000010586 diagram Methods 0.000 description 11
- 230000035515 penetration Effects 0.000 description 9
- 238000004590 computer program Methods 0.000 description 8
- 238000005070 sampling Methods 0.000 description 7
- 230000000694 effects Effects 0.000 description 4
- 230000003287 optical effect Effects 0.000 description 4
- 230000008878 coupling Effects 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 230000007774 longterm Effects 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 102100040401 DNA topoisomerase 3-alpha Human genes 0.000 description 1
- 101000611068 Homo sapiens DNA topoisomerase 3-alpha Proteins 0.000 description 1
- 238000003491 array Methods 0.000 description 1
- 230000003190 augmentative effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000004422 calculation algorithm Methods 0.000 description 1
- 238000004364 calculation method Methods 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 235000019800 disodium phosphate Nutrition 0.000 description 1
- 238000000802 evaporation-induced self-assembly Methods 0.000 description 1
- 239000000835 fiber Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 230000002093 peripheral effect Effects 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000005855 radiation Effects 0.000 description 1
- 230000007480 spreading Effects 0.000 description 1
- 238000003892 spreading Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000008685 targeting Effects 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/06—Testing, supervising or monitoring using simulated traffic
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W24/00—Supervisory, monitoring or testing arrangements
- H04W24/08—Testing, supervising or monitoring using real traffic
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Abstract
The invention provides a method and a device for evaluating the number of accessible users, relates to the technical field of communication, and solves the problem of estimating service bearing capacity (the number of accessible users) of a base station bearing a plurality of different services in multiple scenes. Simulating according to a scene map, equipment types and access network equipment parameters, and determining simulation point duty ratios in different SINR intervals; determining actual throughput of different SINR intervals according to the simulated point duty ratio in the different SINR intervals and rated throughput in the different SINR intervals corresponding to the equipment type; determining the actual service duty ratio of each service in each SINR interval according to the rated service duty ratio of each service; and determining the rated number of users of the access network equipment to be built, which can access the preset service, according to the duty ratio of the simulation points in different SINR intervals, the actual throughput of the different SINR intervals and the actual service duty ratio of each service in each SINR interval.
Description
Technical Field
The present invention relates to the field of communications technologies, and in particular, to a method and an apparatus for evaluating the number of accessible users.
Background
Currently, as a fifth Generation mobile communication technology (5 th-Generation, 5G) communication system that is in full coverage, three functions or services, that is, an Ultra-large bandwidth (eMBB (Enhanced Mobile Broadband)), a low latency high reliability service (Ultra-reliable and Low Latency Communications), and multiple access (mMTC (massive Machine Type of Communication)), respectively, are provided. The eMBB performs guarantee and performance enhancement of communication service through a large bandwidth and MU-User Multiple-Input Multiple-Output (MU-MIMO) technology, and is generally used for carrying services such as AR (Augmented Reality ), VR (Virtual Reality), high-definition video, high-definition live broadcast and the like; the uRLLC is used for guaranteeing the communication quality of the service with higher time delay requirement, such as remote operation and fine control; mctc is generated due to the requirement of massive user access capability, and is mainly used for solving the problem that the traditional mobile communication cannot well support the application of the internet of things and the vertical industry, and is mainly used for application scenes targeting sensing and data acquisition, such as smart cities, environment monitoring, smart home and forest fire prevention, and the like, and the scenes have the characteristics of small data packets, low power consumption, massive connection and the like.
In summary, the characteristics of these 3 kinds of services are different, and the three are not completely split, and some services may comprehensively require multiple characteristics. Therefore, for the development of 5G devices and services, the number of users allowed to access by each base station for different services cannot be estimated by simply neglecting the service types to complete network resource planning and configuration, so a method for estimating the service bearing capacity (number of users capable of accessing) of base stations bearing multiple different services in multiple scenarios is needed.
Disclosure of Invention
The invention provides a method and a device for evaluating the number of accessible users, which solve the problem of estimating the service bearing capacity (the number of accessible users) of a base station bearing a plurality of different services in multiple scenes.
In order to achieve the above purpose, the invention adopts the following technical scheme:
in a first aspect, an embodiment of the present invention provides a method for evaluating the number of accessible users, including: acquiring a scene map and configuration parameters of the access network equipment to be built, and acquiring service parameters and rated service duty ratio of each service in at least one service to be accessed by the access network equipment to be built; the configuration parameters comprise equipment types and access network equipment parameters; simulating according to the scene map, the equipment type and the access network equipment parameters, and determining the simulation point duty ratio in different SINR intervals; determining actual throughput of different SINR intervals according to the simulated point duty ratio in the different SINR intervals and rated throughput in the different SINR intervals corresponding to the equipment type; determining the actual service duty ratio of each service in each SINR interval according to the rated service duty ratio of each service; determining the rated number of users of the access network equipment to be built, which can access the preset service, according to the actual throughput of different SINR intervals and the actual service duty ratio of each service in each SINR interval; the preset service is a service in at least one service.
Based on the above technical solution, in the case that the to-be-deployed base station is to deploy a plurality of different types of to-be-deployed services, the embodiment of the present application first obtains a scene map and configuration parameters of the to-be-deployed access network device, and service parameters and rated service duty ratio of each service in at least one service to be accessed by the to-be-deployed access network device. And then, simulating according to the scene map, the equipment type and the access network equipment parameters, and determining the simulation point duty ratio in different SINR intervals. Determining actual throughput of different SINR intervals according to the simulated point duty ratio in the different SINR intervals and rated throughput in the different SINR intervals corresponding to the equipment type; and determining the actual service duty ratio of each service in each SINR interval according to the rated service duty ratio of each service. And finally, determining the rated user number of the access network equipment to be built for accessing the preset service according to the actual throughput of different SINR intervals and the actual service duty ratio of each service in each SINR interval.
In addition, when the access network equipment is a base station, the base station can determine the rated user number of the access preset service according to the method for evaluating the number of the access users. Therefore, an operator can estimate the bearing capacity of the planned base station according to the rated number of each preset service accessible by the planned base station, and the estimation of the service bearing capacity (the number of accessible users) of the base station bearing a plurality of different services in multiple scenes is reasonably realized.
In a second aspect, the present invention provides an evaluation device for the number of accessible users, including: an acquisition unit and a processing unit.
Specifically, the acquiring unit is configured to acquire a scene map and a configuration parameter of the access network device to be built, and a service parameter and a rated service duty ratio of each service in at least one service to be accessed by the access network device to be built. Wherein the configuration parameters include device type and access network device parameters.
The processing unit is configured to perform simulation according to the scene map acquired by the acquiring unit, the equipment type acquired by the acquiring unit, and the access network equipment parameter acquired by the acquiring unit, and determine the simulation point duty ratio in different SINR intervals. The processing unit is further configured to determine actual throughput in different SINR intervals according to the simulated point duty ratio in the different SINR intervals and the rated throughput in the different SINR intervals corresponding to the device type acquired by the acquiring unit. And the processing unit is also used for determining the actual service duty ratio of each service in each SINR interval according to the rated service duty ratio of each service acquired by the acquisition unit. The processing unit is further configured to determine a rated user number of the access network device to be built for accessing the preset service according to the actual throughput of the different SINR intervals and the actual service duty ratio of each service in each SINR interval. The preset service is a service in at least one service.
In an embodiment, the processing unit is further configured to perform a typical scene simulation according to the typical scene simulation parameter corresponding to the device type acquired by the acquiring unit, and determine a second SINR and throughput acquired at least one typical location. The typical scene simulation data are obtained by simulating a typical scene under the first mobile communication technology, wherein the typical scene comprises at least one of a dense urban area, a suburban area and an open area. The processing unit is further configured to determine a rated throughput in different SINR intervals corresponding to the device type according to the second SINR and the throughput acquired at the at least one typical location.
In one embodiment, the actual traffic ratio satisfies the following formula:
P=P G +P M +P B ;
wherein P represents the actual service duty ratio, P G Representing the corresponding service duty ratio of the first interval, P M Representing the corresponding service duty ratio of the second interval, P B The traffic duty ratio corresponding to the third interval is represented, the first interval is an interval in which the SINR is greater than the first threshold, the second interval is an interval in which the SINR is less than or equal to the first threshold and greater than the second threshold, and the third interval is an interval in which the SINR is less than or equal to the second threshold.
In an embodiment, the processing unit is specifically configured to determine, according to a duty ratio of a simulation point in a different SINR interval, a corresponding throughput in the different SINR interval, and an actual service duty ratio of each service in each SINR interval, a number of users that can be accessed by a preset service in each SINR interval. The processing unit is specifically configured to determine, according to the number of users accessible to the preset service in each SINR interval, the rated number of users accessible to the preset service by the access network device to be built.
In an embodiment, the throughput includes an uplink throughput and a downlink throughput, and in this case, the processing unit is specifically configured to determine, according to a duty ratio of a simulation point in a different SINR interval, a corresponding uplink throughput in the different SINR interval, and an actual service duty ratio of each service in each SINR interval, a first number of users that can be accessed by the preset service in each SINR interval. The processing unit is specifically configured to determine, according to the duty ratio of the simulation point in the different SINR intervals, the corresponding downlink throughput in the different SINR intervals, and the actual service duty ratio of each service in each SINR interval, a second number of users that can be accessed by the preset service in each SINR interval. The processing unit is specifically configured to determine, according to the first user number and the second user number, a rated user number for which the access network device can access the preset service.
In one embodiment, the first number of users satisfies the following formula:
wherein ,indicating the number of first users accessible in the first section,/->Indicating the number of first users that the second section is accessible to, ">Indicating the number of first users accessible in the third interval, and (2)>Representing the service duty ratio of the specified service in the first interval,/- >Representing the service duty ratio of the ith service in the first interval, n represents the total number of services to be accessed by the access network equipment to be built, and +.>Indicating the corresponding upstream throughput in the first interval,/->Indicating the corresponding upstream throughput in the second interval,indicating the corresponding uplink throughput in a third interval, designating the service as one of at least one service, wherein the first interval is an interval in which SINR is greater than a first threshold, and the second interval isThe SINR is smaller than or equal to the first threshold value and is larger than the interval of the second threshold value, the third interval is the interval of the SINR smaller than or equal to the second threshold value, i and n are integers larger than 0, and i is [1, n ]]。
In one embodiment, the second number of users satisfies the following equation:
wherein ,indicating the number of second users accessible in the first zone, ">Indicating a second number of users, which are accessible in a second zone, ">Indicating the number of second users, which can be accessed in the third zone, ">Representing the service duty ratio of the specified service in the first interval,/->Representing the service duty ratio of the ith service in the first interval, n represents the total number of services to be accessed by the access network equipment to be built, and +.>Representing a first inter-interval pairDownlink throughput of response, +.>Indicating the corresponding downstream throughput in the second interval, Indicating the corresponding downlink throughput in a third interval, designating the service as one of at least one service, wherein the first interval is an interval in which the SINR is greater than a first threshold, the second interval is an interval in which the SINR is less than or equal to the first threshold and greater than the second threshold, the third interval is an interval in which the SINR is less than or equal to the second threshold, i and n are integers greater than 0, and i E [1, n]。
In one embodiment, the number of rated users satisfies the following formula:
N=N G +N M +N B ;
wherein N represents the number of rated users, N G Indicating the number of users accessible by the access network equipment in the first interval, N M Indicating the number of users to which the access network device is to be connected in the second interval, N B Indicating the number of users to which the access network device is to be built to be accessible in a third interval,indicating the number of first users accessible in the first section,/->Indicating the number of first users that the second section is accessible to, ">Indicating the number of first users accessible in the third interval, and (2)>Indicating the number of second users accessible in the first zone, ">Indicating a second number of users, which are accessible in a second zone, ">The second user number indicating that the third section is accessible is a section in which the SINR is greater than the first threshold, the second section is a section in which the SINR is less than or equal to the first threshold and greater than the second threshold, and the third section is a section in which the SINR is less than or equal to the second threshold.
In a third aspect, the present invention provides an evaluation device for the number of accessible users, including: communication interface, processor, memory, bus; the memory is used for storing computer execution instructions, and the processor is connected with the memory through a bus. When the accessible user number evaluation device is running, the processor executes the computer-executable instructions stored in the memory, so that the accessible user number evaluation device executes the accessible user number evaluation method provided in the first aspect.
In a fourth aspect, the present invention provides a computer-readable storage medium comprising instructions. The instructions, when executed on a computer, cause the computer to perform the method of evaluating the number of accessible users as provided in the first aspect above.
In a fifth aspect, the present invention provides a computer program product for, when run on a computer, causing the computer to perform the method of evaluating the number of accessible users as set forth in the first aspect.
It should be noted that the above-mentioned computer instructions may be stored in whole or in part on the first computer readable storage medium. The first computer readable storage medium may be packaged together with the processor of the user accessible evaluation device, or may be packaged separately from the processor of the user accessible evaluation device, which is not limited in the present invention.
The description of the second, third, fourth and fifth aspects of the present invention may refer to the detailed description of the first aspect; further, the advantageous effects described in the second aspect, the third aspect, the fourth aspect, and the fifth aspect may refer to the advantageous effect analysis of the first aspect, and are not described herein.
In the present invention, the names of the above-mentioned evaluation means of the number of accessible users do not constitute a limitation on the devices or function modules themselves, which may appear under other names in an actual implementation. Insofar as the function of each device or function module is similar to that of the present invention, it falls within the scope of the claims of the present invention and the equivalents thereof.
These and other aspects of the invention will be more readily apparent from the following description.
Drawings
In order to more clearly illustrate the embodiments of the invention or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a simplified schematic diagram of a system architecture to which an evaluation method of the number of accessible users is applied according to an embodiment of the present invention;
fig. 2 is a schematic flow chart of an evaluation method of the number of accessible users according to an embodiment of the present invention;
fig. 3 is a second flow chart of a method for evaluating the number of accessible users according to an embodiment of the present invention;
fig. 4 is a schematic diagram of a correlation degree of an evaluation method of the number of accessible users according to an embodiment of the present invention;
FIG. 5 is a second schematic diagram of a correlation degree evaluation method of the number of accessible users according to an embodiment of the present invention;
fig. 6 is a schematic diagram of SINR-downlink throughput when the correlation of the method for evaluating the number of accessible users is 0.3 according to an embodiment of the present invention;
fig. 7 is a third flow chart of a method for evaluating the number of accessible users according to an embodiment of the present invention;
FIG. 8 is a flow chart of a method for evaluating the number of accessible users according to an embodiment of the present invention;
fig. 9 is a schematic structural diagram of an evaluation device capable of accessing a user number according to an embodiment of the present invention;
FIG. 10 is a second schematic diagram of an evaluation device for accessing a user number according to an embodiment of the present invention;
Fig. 11 is a schematic structural diagram of a computer program product of an evaluation method of the number of accessible users according to an embodiment of the present invention.
Detailed Description
Embodiments of the present invention are described below with reference to the accompanying drawings.
The following description of the embodiments of the present invention will be made clearly and completely with reference to the accompanying drawings, in which it is apparent that the embodiments described are only some embodiments of the present invention, but not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
In order to clearly describe the technical solution of the embodiments of the present invention, in the embodiments of the present invention, the terms "first", "second", etc. are used to distinguish the same item or similar items having substantially the same function and effect, and those skilled in the art will understand that the terms "first", "second", etc. do not limit the number and execution order.
At present, due to different characteristics of various services of 5G, when the service bearing capacity of a 5G planned base station is estimated before deployment, the number of users which can be accessed by each base station for different services cannot be estimated by adopting a simple mode of neglecting service types. Therefore, a method for estimating the service carrying capacity (the number of accessible users) of a cell carrying multiple different services in multiple scenarios is needed.
In view of the above problems, an embodiment of the present application provides an evaluation method of the number of accessible users, where the method is applied to an evaluation device of the number of accessible users. The device can be a server of an operator to which the base station belongs, or any other feasible device with processing computing capability.
Fig. 1 is a simplified schematic diagram of a system architecture to which the embodiment of the present invention may be applied, as shown in fig. 1, where the system architecture may include: an access network device 1, a terminal 2 and a server 3 are proposed. The terminal 2 accesses the service through the planned access network device 1, and the server 3 is used for acquiring a scene map and configuration parameters of the planned access network device 1 and a guarantee bandwidth of a preset service which can be initiated by the terminal 2.
The evaluation device of the number of accessible users in the embodiment of the present invention may be the server 3 shown in fig. 1, or may be a part of devices in the server 3. Such as a chip system in the server 3. The chip system is adapted to support the server 3 for the functions involved in implementing the first aspect and any one of its possible implementations. Such as: and acquiring a scene map and configuration parameters of the access network equipment 1 to be built, and guaranteeing the bandwidth of the preset service which can be initiated by the terminal 2. The chip system includes a chip, and may also include other discrete devices or circuit structures.
In the embodiment of the invention, the access network equipment to be built can be a base station or a base station controller for wireless communication, etc. In an embodiment of the present invention, the base station may be a global system for mobile communications (globalsystem for mobil ecommunication, GSM), a base station (basetransceiver station, BTS) in code division multiple access (code division multiple access, CDMA), a base station (node B, NB) in wideband code division multiple access (wideband code division multiple access, WCDMA), a base station (evolvedNode B, eNB) in long term evolution (Long Term Evolution, LTE), an eNB in the internet of things (internet of things, ioT) or narrowband internet of things (narrow band-internetof things, NB-IoT), a base station in a future 5G mobile communication network or a future evolved public land mobile network (public land mobile network, PLMN), which is not limited in this embodiment of the present invention.
The terminal is used for providing voice and/or data connectivity services to the user. The terminals may be variously named, for example, user Equipment (UE), access terminals, terminal units, terminal stations, mobile stations, remote terminals, mobile devices, wireless communication devices, vehicle user equipment, terminal agents or end devices, etc. Optionally, the terminal may be a handheld device, an in-vehicle device, a wearable device, or a computer with a communication function, which is not limited in any way in the embodiment of the present invention. For example, the handheld device may be a smart phone. The in-vehicle device may be an in-vehicle navigation system. The wearable device may be a smart bracelet. The computer may be a personal digital assistant (personal digital assistant, PDA) computer, a tablet computer, or a laptop computer (laptop computer).
The following describes the method for evaluating the number of accessible users provided in the embodiment of the present invention, taking the device for evaluating the number of accessible users as a server 3 and the device for planning access network as a planning base station in connection with the communication system shown in fig. 1.
As shown in fig. 2, the method for evaluating the number of accessible users includes the following steps S11-S15:
s11, the server 3 acquires a scene map and configuration parameters of the planned base station, and service parameters and rated service duty ratio of each service in at least one service to be accessed by the planned base station. Wherein the configuration parameters include device type and access network device parameters.
In one implementation, the server 3 determines whether the number of accessible users of the proposed base station can be evaluated by analyzing the nominal service duty cycle of each of the at least one service to which the proposed base station is to access.
Specifically, by collecting the occupation proportion of different services in the to-be-constructed area (i.e. the coverage area of the to-be-constructed base station), by defining the occupation proportion of typical services in the to-be-constructed area, several types with the largest occupation proportion of the services can be selected for analysis, and the services with less occupation proportion, such as TOP3, are abandoned as the effective occupation proportion of the services. The service duty ratio is the service duty ratio of extracting the actual service duty ratio according to the user's requirement as shown in table 1 or the service duty ratio of the typical positions (good point, middle point and bad point) as shown in table 2. Two services are:
Table 1 actual traffic duty cycle
Service class | A | B | C |
Service duty cycle | P A | P B | P C |
Table 2 traffic duty cycle for typical locations
Service class | A | B | C |
Good point service duty cycle | P G | P G | P G |
Service duty cycle of midpoint | P M | P M | P M |
Service duty cycle of difference point | P B | P B | P B |
In practical applications, if the service duty ratio of the typical location cannot be provided, the service duty ratio of the typical location (such as the good point, the middle point, and the bad point) may be represented by the actual service duty ratio. Wherein the actual service ratio of any one of the service in the first section (also called good point), the service in the second section (also called middle point) and the service in the third section (also called difference point) satisfies the following formula:
P=P G +P M +P B 。
when P is greater than or equal to the preset threshold, the determination server 3 may evaluate the number of accessible users of the proposed base station. For example, the preset threshold may be 0.6.
In one implementation, the access network device parameters include one or more of the following: simulation scene, inter-station Distance (english full name: inter-Site Distance, abbreviated as: ISD), number of sites (total number of surrounding base stations), base station antenna height, channel model, subcarrier spacing, traffic model, number of users per sector, user distribution, indoor and outdoor user distribution (different penetration loss duty ratio), user mobility, frequency band, system bandwidth, physical resource block (english full: physical Resource Block, abbreviated PRB), frame structure, evolved node B (abbreviated eNB) transmit power, number of antenna elements, number of antenna element radiation pattern, number of transmit/receive units, base station noise figure, antenna downtilt, UE antenna height, minimum Distance between base station and user, number of UE receive antennas, UE noise figure, number of UE transmit antennas, UE transmit power, downlink Single user Multiple-Input Multiple-Output antenna system (abbreviated DL SU-MIMO) maximum number of streams, downlink Multi-user Multiple-Input Multiple-Output antenna system (abbreviated DL MU-MIMO) maximum number of streams, uplink Single user Multiple-Input Multiple-Output antenna system (abbreviated DL-MU-MIMO) maximum number of streams, uplink Single user Multiple-Input Multiple-Output Multiple antenna system (abbreviated DL-MU-MIMO) maximum number of streams, uplink Multiple-MIMO maximum number of streams, uplink Multiple-Output Multiple-Output antenna system (hereinafter abbreviated DL-MIMO) maximum number of streams, uplink Multiple-Output system (SU-Multiple-Output system, uplink Multiple-Output system (SU-Multiple, one or more of a propagation model and a handover margin.
S12, the server 3 carries out simulation according to the scene map, the equipment type and the access network equipment parameters, and determines the simulation point duty ratio in the intervals of different signal to interference plus noise ratios (Signal to Interference plus Noise Ratio, SINR).
In one implementation, the device types include 6 transceiver components (transmitter and receiver, TR for short), 8TR, 16TR, 32TR, and 64TR.
In one implementation, the scene map includes a three-dimensional (3D) map and a layout diagram.
It should be noted that, in practical application, the server 3 performs simulation according to the scene map, the device type and the access network device parameter, and determining the simulation point duty ratio in different SINR intervals includes:
1. scene reproduction method
The server 3 obtains a 3D map with specified precision (for example, a 3D map with the precision of 2 m×2 m), and after importing the 3D map into simulation software (for example, atoll), configures device type and access network device parameters, performs user point scattering simulation, and then determines SINR of at least one simulation point.
2. Scene false seeking method
The method is suitable for a scene without base station construction, and under the condition that only buildings and other building information (such as a planning chart) are known, the duty ratio conditions of different types of penetration loss need to be calculated, and the specific conditions are shown in a table 3:
TABLE 3 Table 3
Type of penetration loss | Penetration loss duty cycle |
Outdoor (outoor) | |
Indoor low penetration loss | |
Indoor high penetration loss |
Then, the server 3 performs simulation using system simulation software (e.g., matlab, etc.) based on the penetration loss ratio, the device type, and the access network device parameters, performs user spreading point simulation, and then determines SINR of at least one simulation point. The penetration loss ratio is determined by scene construction by different penetration loss models defined in 38.901 standard.
Then, according to the SINR of at least one simulation point, the simulation point duty ratio in different SINR intervals is determined.
Illustratively, the different SINR intervals may be (- + -infinity, 4.5] (4.5, 12.5), and (12.5, + -infinity), then the respective duty cycles of the simulation points within the different SINR intervals are:
wherein ,PG The total number of simulation points representing SINR greater than 12.5dB is N all The ratio of P M Representing that SINR is less than or equal to 12.5dB and that the total number of emulation points with SINR greater than 4.5dB is N all The ratio of P B The total number of simulation points representing SINR less than 4.5dB is N all The ratio of N all The total number of simulation points when the server 3 performs the simulation according to the scene map, the device type and the access network device parameters is represented.
S13, the server 3 determines actual throughput of different SINR intervals according to the simulation point duty ratio of the different SINR intervals and rated throughput of the different SINR intervals corresponding to the equipment type.
In one possible way, the actual throughput of the different SINR intervals satisfies the following equation:
wherein ,representing the actual line throughput corresponding to the first interval,/->Representing the actual offline throughput corresponding to the first interval,/->Representing the actual line throughput corresponding to the second interval,/->Indicating the actual offline throughput corresponding to the second interval,/->Representing the actual line throughput corresponding to the third interval,/-> the actual offline throughput, P, corresponding to the third interval G Representing the corresponding simulation point duty ratio of the first interval, P M Representing the corresponding simulation point duty ratio of the second interval, P B Representing the corresponding simulation point duty ratio of the third interval, < >>Nominal uplink throughput of a proposed base station of device type tpye in a first interval,/>Indicating the nominal downlink throughput of a proposed base station of device type tpye in a first interval,nominal uplink throughput of a proposed base station of device type tpye in the second interval,/for the second interval>Indicating the nominal downlink throughput of a proposed base station of device type tpye in the second interval,/>Nominal uplink throughput of a proposed base station of device type tpye in a third interval,/>The nominal downlink throughput of the proposed base station of the device type tpye in the third interval is indicated, and the type may be any one of 6TR, 8TR, 16TR, 32TR and 64 TR.
S14, the server 3 determines the actual service duty ratio of each service in each SINR interval according to the rated service duty ratio of each service.
In one embodiment, the actual traffic ratio satisfies the following formula:
P=P G +P M +P B ;
wherein P represents the actual service duty ratio, P G Representing the corresponding service duty ratio of the first interval, P M Representing the corresponding service duty ratio of the second interval, P B The traffic duty ratio corresponding to the third interval is represented, the first interval is an interval in which the SINR is greater than the first threshold, the second interval is an interval in which the SINR is less than or equal to the first threshold and greater than the second threshold, and the third interval is an interval in which the SINR is less than or equal to the second threshold.
S15, the server 3 determines the rated number of users of the planned base station which can access the preset service according to the duty ratio of the simulation points in different SINR intervals, the actual throughput of the different SINR intervals and the actual service duty ratio of each service in each SINR interval. The preset service is a service in at least one service.
Based on the above technical solution, in the case that the proposed base station is to deploy a plurality of different types of services to be deployed, the embodiment of the present application first obtains a scene map and configuration parameters of the proposed base station, and service parameters and rated service duty ratio of each service in at least one service to be accessed by the proposed base station. And then, simulating according to the scene map, the equipment type and the access network equipment parameters, and determining the simulation point duty ratio in different SINR intervals. Determining actual throughput of different SINR intervals according to the simulated point duty ratio in the different SINR intervals and rated throughput in the different SINR intervals corresponding to the equipment type; and determining the actual service duty ratio of each service in each SINR interval according to the rated service duty ratio of each service. And finally, determining the rated user number of the preset service accessible to the planned base station according to the actual throughput of different SINR intervals and the actual service duty ratio of each service in each SINR interval.
In an implementation manner, referring to fig. 2, as shown in fig. 3, the method for evaluating the number of accessible users according to the embodiment of the present invention further includes S16 and S17.
S16, the server 3 carries out typical scene simulation according to typical scene simulation parameters corresponding to the equipment type, and determines second SINR and throughput acquired at least one typical position. The typical scene simulation data are obtained by simulating a typical scene under the first mobile communication technology, wherein the typical scene comprises at least one of a dense urban area, a suburban area and an open area.
Specifically, typical scene simulation parameters are second SINR and throughput acquired at different sampling points in a laboratory environment. The throughput may be, for example, an average throughput.
In practical applications, when a single terminal and a plurality of terminals are placed at a single sampling point, the corresponding SINR and throughput data will change. Therefore, in order to more accurately calculate the SINR and average throughput of a single sampling point, a 4-terminal placement for each sampling point is described herein as an example.
First, different sampling points are selected. Then, more than 4 (including 4) terminals are placed at each sampling point, and SINR collected by each terminal is collected, and uplink throughput and downlink throughput of user datagram protocol (User Datagram Protocol, UDP) service are performed. The reason for choosing to place 4 UEs here is that the throughput of a base station when fully loaded can be simulated when placing 4 UEs, since one UE supports at most 4 downlink and each base station supports 16 downlink simultaneously. Of course, in practical application, when the maximum number of uplink times supported by the base station is N and the maximum number of uplink times supported by the UE is N, the number of UEs supported by the base station when the base station is fully loaded is When the maximum number of downlink times supported by the base station is N and the maximum number of downlink times supported by the UE is N, the number of UE supported by the base station when fully loaded is +.>
For example, assuming 6 points of SINR 22, SINR 18, SINR 9, SINR 6, SINR 0 and SINR-2 are sampling points, the recorded data is shown in Table 4.
TABLE 4 Table 4
In FIG. 4, point o is an antenna of a base station corresponding to a cell, point a is UE-a, point b is UE-b, point c is UE-c, and point d is UE-d. The point a, the point b, the point c and the point d are respectively located on the boundary of the same concentric circle o, and the SINR of each UE located on the same concentric circle is the same. Specifically, the correlation degree between the UEs can be placed according to the correlation degree actually required; for example, the correlation between UE-a and UE-b is illustrated as an example, and the calculation manner of the correlation between other UEs is the same as that of the correlation between UE-a and UE-b, which is not described here again.
Specifically, the correlation is equal to an included angle formed by connecting any two UE with the base station antenna respectively; such as: an included angle theta is formed by a connecting line of the point a in the horizontal direction and the circle center o (representing the position of the base station antenna) and a connecting line of the point b in the horizontal direction and the circle center o; or an included angle theta is formed by a connecting line of the point d in the horizontal direction and the circle center o (representing the position of the base station antenna) and a connecting line of the point b in the horizontal direction and the circle center o; or, as shown in fig. 5, the included angle θ is formed by the connection line between the point a and the circle center o in the vertical direction and the connection line between the point b and the circle center o in the horizontal direction.
Specifically, mode 1, mode 2, mode 3, mode 4, mode 5, and mode 6 each represent that 4 UEs are simultaneously placed at positions corresponding to the same SINR.
By measuring the corresponding throughput for SINR 22, SINR 18, SINR 9, SINR 6, SINR 0 and SINR-2 for each correlation, the SINR-average throughput curve for the same correlation is fitted. As shown in fig. 6 (SINR on the abscissa and average throughput on the ordinate), an average throughput curve of SINR at correlation of 0.3 is given; wherein the average throughput of each point is equal to the average of the throughput of each UE at the same SINR.
The SINR-average throughput curves with correlation of 0.3, 0.5 and 0.8 are finally obtained, as shown in the following formula:
T 0.3SINR (SINR)=f 1 (SINR);
T 0.5SINR (SINR)=f 2 (SINR);
T 0.8SINR (SINR)=f 3 (SINR)。
based on the formula of single correlation, calculating average throughput under single SINR:
wherein ,n1 The number of the selected correlation degrees; since the invention selects only three correlations of 0.3, 0.5 and 0.8, n is 1 Equal to 3.
Illustratively, the descriptions are given by taking SINR of 22, SINR of 18, SINR of 9, SINR of 6, SINR of 0, and SINR of-2, and correlation degrees of 0.3, 0.5, and 0.8 as examples:
The average throughput for SINR 18, SINR 9, SINR 6, SINR 0 and SINR-2 is calculated in the same manner as the average throughput for SINR 22, and will not be described here.
For different SINR-average throughput values, calculating average throughput T in a certain SINR interval _SINR_gap :
Illustratively, the SINR intervals (- ++4.5 ], (4.5, 12.5), and (12.5, ++infinity) are illustrated as shown in table 5, wherein the points with SINR of-2, -1, 0, 1, 2, 3, and 4 are selected as typical points, respectively, when n_gap is equal to 10, and the points with SINR of 5, 6, 7, 8, 9, 10, 11, and 12 are selected as typical points, when n_gap is equal to 8, and SINR of [12.5, 22.5] are selected as typical points, when n_gap is equal to 10, when n_gap is equal to 8, respectively.
TABLE 5
From the data recorded in table 5, the average throughput for different intervals at the same SINR position can be calculated, respectively.
And S17, the server 3 determines rated throughput in different SINR intervals corresponding to the equipment type according to the second SINR and throughput acquired at least one typical position.
Specifically, the nominal throughput of the proposed base station of any device type at each typical location is the average throughput of the proposed base station of any device type at each typical location.
Illustratively, taking device types of 4TR, 32TR and 64TR as examples, typical locations are good points, middle points and bad points, rated throughput in different SINR intervals corresponding to different device types are shown in table 6.
TABLE 6
In an embodiment, as shown in fig. 7 in conjunction with fig. 2, S15 may be specifically implemented by S150 and S151 described below.
S150, the server 3 determines the number of users which can be accessed by the preset service in each SINR interval according to the duty ratio of the simulation points in the different SINR intervals, the corresponding throughput in the different SINR intervals and the actual service duty ratio of each service in each SINR interval.
In one implementation, the throughput includes an uplink throughput and a downlink throughput, in which case, as shown in fig. 8 in conjunction with fig. 7, S150 may be implemented specifically by S1500 and S1501 described below, and S151 may be implemented specifically by S1510 described below.
S1500, the server 3 determines the first user number which can be accessed by the preset service in each SINR interval according to the duty ratio of the simulation points in the different SINR intervals, the corresponding uplink throughput in the different SINR intervals and the actual service duty ratio of each service in each SINR interval.
In one embodiment, the first number of users satisfies the following formula:
wherein ,indicating the number of first users accessible in the first section,/->Indicating the number of first users that the second section is accessible to, ">Indicating the number of first users accessible in the third interval, and (2)>Representing the service duty ratio of the specified service in the first interval,/->Represents the service duty ratio of the ith service in the first interval, n represents the total number of services to be accessed by the base station to be built,indicating the corresponding upstream throughput in the first interval,/->Indicating the corresponding upstream throughput in the second interval,/->Indicating the corresponding uplink throughput in a third interval, designating the service as one of at least one service, wherein the first interval is an interval in which the SINR is greater than a first threshold, the second interval is an interval in which the SINR is less than or equal to the first threshold and greater than the second threshold, the third interval is an interval in which the SINR is less than or equal to the second threshold, i and n are integers greater than 0, and i E [1, n]。
S1501, the server 3 determines the second user number accessible by the preset service in each SINR interval according to the duty ratio of the simulation points in the different SINR intervals, the corresponding downlink throughput in the different SINR intervals and the actual service duty ratio of each service in each SINR interval.
In one embodiment, the second number of users satisfies the following equation:
wherein ,indicating the number of second users accessible in the first zone, ">Indicating a second number of users, which are accessible in a second zone, ">Indicating the number of second users, which can be accessed in the third zone, ">Representing the service duty ratio of the specified service in the first interval,/->Represents the service duty ratio of the ith service in the first interval, n represents the total number of services to be accessed by the base station to be built,indicating the corresponding downstream throughput in the first interval,/->Indicating the corresponding downstream throughput in the second interval,/->Indicating the corresponding downlink throughput in a third interval, designating the service as one of at least one service, wherein the first interval is an interval in which the SINR is greater than a first threshold, the second interval is an interval in which the SINR is less than or equal to the first threshold and greater than the second threshold, the third interval is an interval in which the SINR is less than or equal to the second threshold, i and n are integers greater than 0, and i E [1, n]。
S151, the server 3 determines the rated user number of the preset service accessible to the planned base station according to the accessible user number of the preset service in each SINR interval.
S1510, the server 3 determines the rated number of users of the planned base station which can access the preset service according to the first user number and the second user number.
In one embodiment, the number of rated users satisfies the following formula:
N=N G +N M +N B ;
Wherein N represents the number of rated users, N G Indicating the number of users accessible by the base station in the first interval, N M Indicating the number of users accessible by the base station in the second interval, N B Indicating the number of users to which the base station is to be built to be accessible in the third interval,indicating the number of first users accessible in the first section,/->Indicating the number of first users that the second section is accessible to, ">Indicating the number of first users accessible in the third interval, and (2)>Indicating the number of second users accessible in the first zone, ">Indicating a second number of users, which are accessible in a second zone, ">Indicating a second number of users accessible in a third zone, a first zoneThe interval is a section where SINR is greater than a first threshold, the second section is a section where SINR is less than or equal to the first threshold and greater than the second threshold, and the third section is a section where SINR is less than or equal to the second threshold.
The foregoing description of the solution provided by the embodiments of the present invention has been mainly presented in terms of a method. To achieve the above functions, it includes corresponding hardware structures and/or software modules that perform the respective functions. Those of skill in the art will readily appreciate that the various illustrative elements and algorithm steps described in connection with the embodiments disclosed herein may be implemented as hardware or combinations of hardware and computer software. Whether a function is implemented as hardware or computer software driven hardware depends upon the particular application and design constraints imposed on the solution. Skilled artisans may implement the described functionality in varying ways for each particular application, but such implementation decisions should not be interpreted as causing a departure from the scope of the present invention.
According to the embodiment of the invention, the function modules of the evaluation device which can be accessed to the user number can be divided according to the method example, for example, each function module can be divided corresponding to each function, and two or more functions can be integrated in one processing module. The integrated modules may be implemented in hardware or in software functional modules. It should be noted that, in the embodiment of the present invention, the division of the modules is schematic, which is merely a logic function division, and other division manners may be implemented in actual implementation.
Fig. 9 is a schematic structural diagram of an evaluation device 10 capable of accessing a user number according to an embodiment of the present invention. The evaluation device 10 of the number of accessible users is configured to obtain a scene map and configuration parameters of the access network device to be built, and service parameters and rated service duty ratio of each service in at least one service to be accessed by the access network device to be built. And simulating according to the scene map, the equipment type and the access network equipment parameters, and determining the simulation point duty ratio in different SINR intervals. And determining the actual throughput of different SINR intervals according to the simulated point duty ratio in the different SINR intervals and the rated throughput in the different SINR intervals corresponding to the equipment type. And determining the actual service duty ratio of each service in each SINR interval according to the rated service duty ratio of each service. And determining the rated number of users of the access network equipment to be built, which can access the preset service, according to the actual throughput of different SINR intervals and the actual service duty ratio of each service in each SINR interval. The evaluation device 10 of the number of accessible users may comprise an acquisition unit 101 and a processing unit 102.
The acquiring unit 101 is configured to acquire a scene map and configuration parameters of the access network device to be built, and service parameters and a rated service duty ratio of each service in at least one service to be accessed by the access network device to be built. For example, in connection with fig. 2, the acquisition unit 101 may be used to perform S11.
And the processing unit 102 is configured to perform simulation according to the scene map acquired by the acquiring unit 101, the device type acquired by the acquiring unit 101, and the access network device parameter acquired by the acquiring unit 101, and determine the simulation point duty ratio in different SINR intervals. The processing unit 102 is further configured to determine actual throughput in different SINR intervals according to the simulated point duty in the different SINR intervals and the rated throughput in the different SINR intervals corresponding to the device type acquired by the acquiring unit 101. The processing unit 102 is further configured to determine an actual service duty ratio of each service in each SINR interval according to the rated service duty ratio of each service acquired by the acquiring unit 101. The processing unit 102 is further configured to determine, according to the actual throughput of different SINR intervals and the actual service duty ratio of each service in each SINR interval, a rated number of users where the access network device can access the preset service. For example, in connection with fig. 2, the processing unit 102 may be used to perform S12, S13, S14 and S15. In connection with fig. 3, the processing unit 102 may be used to perform S16 and S17. In connection with fig. 7, the processing unit 102 may be used to perform S150 and S151. In connection with fig. 8, the processing unit 102 may be used to perform S1500, S1501 and S1510.
All relevant contents of each step related to the above method embodiment may be cited to the functional descriptions of the corresponding functional modules, and their effects are not described herein.
Of course, the evaluation device 10 for the number of accessible users provided in the embodiment of the present invention includes, but is not limited to, the above modules, for example, the evaluation device 10 for the number of accessible users may further include a storage unit 103. The storage unit 103 may be used for storing program code of the evaluation device 10 of the number of write-accessible users, and may also be used for storing data generated during operation of the evaluation device 10 of the number of write-accessible users, such as data in a write request or the like.
Fig. 10 is a schematic structural diagram of an evaluation device 10 for the number of accessible users according to an embodiment of the present invention, and as shown in fig. 10, the evaluation device 10 for the number of accessible users may include: at least one processor 51, a memory 52, a communication interface 53 and a communication bus 54.
The following describes each component of the user accessible evaluation device 10 in detail with reference to fig. 10:
the processor 51 is a control center of the user-accessible evaluation device 10, and may be one processor or a plurality of processing elements. For example, processor 51 is a central processing unit (Central Processing Unit, CPU), but may also be an integrated circuit (Application Specific Integrated Circuit, ASIC), or one or more integrated circuits configured to implement embodiments of the present invention, such as: one or more DSPs, or one or more field programmable gate arrays (Field Programmable Gate Array, FPGAs).
In a particular implementation, processor 51 may include one or more CPUs, such as CPU0 and CPU1 shown in FIG. 10, as an example. Also, as an embodiment, the evaluation device 10 of the number of accessible users may include a plurality of processors, such as the processor 51 and the processor 55 shown in fig. 10. Each of these processors may be a Single-core processor (Single-CPU) or a Multi-core processor (Multi-CPU). A processor herein may refer to one or more devices, circuits, and/or processing cores for processing data (e.g., computer program instructions).
The Memory 52 may be, but is not limited to, a Read-Only Memory (ROM) or other type of static storage device that can store static information and instructions, a random access Memory (Random Access Memory, RAM) or other type of dynamic storage device that can store information and instructions, an electrically erasable programmable Read-Only Memory (Electrically Erasable Programmable Read-Only Memory, EEPROM), a compact disc (Compact Disc Read-Only Memory, CD-ROM) or other optical disk storage, optical disk storage (including compact disc, laser disc, optical disc, digital versatile disc, blu-ray disc, etc.), magnetic disk storage media or other magnetic storage devices, or any other medium that can be used to carry or store desired program code in the form of instructions or data structures and that can be accessed by a computer. The memory 52 may be stand alone and be coupled to the processor 51 via a communication bus 54. Memory 52 may also be integrated with processor 51.
In a specific implementation, the memory 52 is used to store data in the present invention and to execute software programs of the present invention. The processor 51 may perform various functions of the air conditioner by running or executing a software program stored in the memory 52 and calling data stored in the memory 52.
The communication interface 53 uses any transceiver-like means for communicating with other devices or communication networks, such as a radio access network (Radio Access Network, RAN), a wireless local area network (Wireless Local Area Networks, WLAN), a terminal, a cloud, etc. The communication interface 53 may include a receiving unit implementing a receiving function and a transmitting unit implementing a transmitting function.
The communication bus 54 may be an industry standard architecture (Industry Standard Architecture, ISA) bus, an external device interconnect (Peripheral Component Interconnect, PCI) bus, or an extended industry standard architecture (Extended Industry Standard Architecture, EISA) bus, among others. The bus may be classified as an address bus, a data bus, a control bus, etc. For ease of illustration, only one thick line is shown in fig. 10, but not only one bus or one type of bus.
As an example, in connection with fig. 9, the acquisition unit 101 in the user accessible evaluation device 10 implements the same function as the communication interface 53 in fig. 10, the processing unit 102 implements the same function as the processor 51 in fig. 10, and the storage unit 103 implements the same function as the memory 52 in fig. 10.
Another embodiment of the present invention also provides a computer-readable storage medium having stored therein instructions which, when executed on a computer, cause the computer to perform the method shown in the above-described method embodiment.
In some embodiments, the disclosed methods may be implemented as computer program instructions encoded on a computer-readable storage medium in a machine-readable format or encoded on other non-transitory media or articles of manufacture.
FIG. 11 schematically illustrates a conceptual partial view of a computer program product provided by an embodiment of the invention, the computer program product comprising a computer program for executing a computer process on a computing device.
In one embodiment, a computer program product is provided using signal bearing medium 410. The signal bearing medium 410 may include one or more program instructions that when executed by one or more processors may provide the functionality or portions of the functionality described above with respect to fig. 2. Thus, for example, referring to the embodiment shown in FIG. 2, one or more features of S11-S15 may be carried by one or more instructions associated with signal bearing medium 410. Further, the program instructions in fig. 11 also describe example instructions.
In some examples, signal bearing medium 410 may comprise a computer readable medium 411 such as, but not limited to, a hard disk drive, compact Disk (CD), digital Video Disk (DVD), digital tape, memory, read-only memory (ROM), or random access memory (random access memory, RAM), among others.
In some implementations, the signal bearing medium 410 may include a computer recordable medium 412 such as, but not limited to, memory, read/write (R/W) CD, R/W DVD, and the like.
In some implementations, the signal bearing medium 410 may include a communication medium 413 such as, but not limited to, a digital and/or analog communication medium (e.g., fiber optic cable, waveguide, wired communications link, wireless communications link, etc.).
The signal bearing medium 410 may be conveyed by a communication medium 413 in wireless form (e.g., a wireless communication medium conforming to the IEEE 802.41 standard or other transmission protocol). The one or more program instructions may be, for example, computer-executable instructions or logic-implemented instructions.
In some examples, a data-writing apparatus such as described with respect to fig. 2 may be configured to provide various operations, functions, or actions in response to program instructions through one or more of computer-readable medium 411, computer-recordable medium 412, and/or communication medium 413.
From the foregoing description of the embodiments, it will be apparent to those skilled in the art that, for convenience and brevity of description, only the above-described division of functional modules is illustrated, and in practical application, the above-described functional allocation may be implemented by different functional modules according to needs, i.e. the internal structure of the apparatus is divided into different functional modules to implement all or part of the functions described above.
In the several embodiments provided by the present invention, it should be understood that the disclosed apparatus and method may be implemented in other manners. For example, the apparatus embodiments described above are merely illustrative, e.g., the division of the modules or units is merely a logical functional division, and there may be additional divisions when actually implemented, e.g., multiple units or components may be combined or integrated into another apparatus, or some features may be omitted, or not performed. Alternatively, the coupling or direct coupling or communication connection shown or discussed with each other may be an indirect coupling or communication connection via some interfaces, devices or units, which may be in electrical, mechanical or other form.
The units described as separate parts may or may not be physically separate, and the parts displayed as units may be one physical unit or a plurality of physical units, may be located in one place, or may be distributed in a plurality of different places. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
In addition, each functional unit in the embodiments of the present invention may be integrated in one processing unit, or each unit may exist alone physically, or two or more units may be integrated in one unit. The integrated units may be implemented in hardware or in software functional units.
The integrated units, if implemented in the form of software functional units and sold or used as stand-alone products, may be stored in a readable storage medium. Based on such understanding, the technical solution of the embodiments of the present invention may be essentially or a part contributing to the prior art or all or part of the technical solution may be embodied in the form of a software product stored in a storage medium, including several instructions for causing a device (may be a single-chip microcomputer, a chip or the like) or a processor (processor) to perform all or part of the steps of the method described in the embodiments of the present invention. And the aforementioned storage medium includes: a usb disk, a removable hard disk, a ROM, a RAM, a magnetic disk, or an optical disk, etc.
The foregoing is merely illustrative of specific embodiments of the present invention, and the scope of the present invention is not limited thereto, but any changes or substitutions within the technical scope of the present invention should be covered by the scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.
Claims (10)
1. An evaluation method for the number of accessible users, comprising:
acquiring a scene map and configuration parameters of a planned access network device, and acquiring service parameters and rated service duty ratio of each service in at least one service to be accessed by the planned access network device; the configuration parameters comprise the equipment type of the access network equipment and the access network equipment parameters;
simulating according to the scene map, the equipment type and the access network equipment parameters, and determining the simulation point duty ratio in different SINR intervals;
determining actual throughput of different SINR intervals according to the simulated point duty ratio in the different SINR intervals and rated throughput in the different SINR intervals corresponding to the equipment type;
determining the actual service duty ratio of each service in each SINR interval according to the rated service duty ratio of each service; wherein the actual service duty cycle satisfies the following formula:
P=P G +P M +P B ;
Wherein P represents the actual service duty ratio, P G Representing the corresponding service duty ratio of the first interval, P M Representing the corresponding service duty ratio of the second interval, P B Representing a traffic duty ratio corresponding to a third interval, wherein the first interval is an interval in which the SINR is greater than a first threshold, the second interval is an interval in which the SINR is less than or equal to the first threshold and greater than a second threshold, and the third interval is an interval in which the SINR is less than or equal to the second threshold;
determining the rated number of users of the access network equipment to be built, which can access the preset service, according to the duty ratio of the simulation points in the different SINR intervals, the actual throughput of the different SINR intervals and the actual service duty ratio of each service in each SINR interval; wherein the preset service is a service in the at least one service.
2. The method for evaluating the number of accessible users according to claim 1, wherein before determining the actual throughput of the different SINR intervals according to the simulated point duty ratio in the different SINR intervals and the rated throughput in the different SINR intervals corresponding to the device type, the method for evaluating the number of accessible users further comprises:
performing typical scene simulation according to typical scene simulation parameters corresponding to the equipment types, and determining second SINR and throughput acquired at least one typical position; the typical scene simulation data are obtained by simulating a typical scene under a first mobile communication technology, wherein the typical scene comprises at least one of a dense urban area, a suburban area and an open area;
And determining rated throughput in the different SINR intervals corresponding to the equipment type according to the second SINR and throughput acquired at the at least one typical position.
3. The method for evaluating the number of accessible users according to claim 1, wherein said determining the rated number of users for which the access network device is to be able to access the preset service according to the duty ratio of the simulation point in the different SINR intervals, the actual throughput of the different SINR intervals, and the actual service duty ratio of each service in each SINR interval comprises:
determining the number of users which can be accessed by a preset service in each SINR interval according to the duty ratio of the simulation points in the different SINR intervals, the corresponding throughput in the different SINR intervals and the actual service duty ratio of each service in each SINR interval;
and determining the rated number of users of the access network equipment to be built, which can access the preset service, according to the number of users of the preset service, which can be accessed in each SINR interval.
4. The method for evaluating the number of accessible users according to claim 3, wherein the throughput comprises an uplink throughput and a downlink throughput;
the determining the number of accessible users of the preset service in each SINR interval according to the duty ratio of the emulation points in the different SINR intervals, the corresponding throughput in the different SINR intervals, and the actual service duty ratio of each service in each SINR interval, includes:
Determining the first user number which can be accessed by the preset service in each SINR interval according to the duty ratio of the simulation points in the different SINR intervals, the corresponding uplink throughput in the different SINR intervals and the actual service duty ratio of each service in each SINR interval;
determining a second user number accessible by the preset service in each SINR interval according to the duty ratio of the simulation point in the different SINR intervals, the corresponding downlink throughput in the different SINR intervals and the actual service duty ratio of each service in each SINR interval;
the determining, according to the number of users accessible to the preset service in each SINR interval, the rated number of users accessible to the preset service by the access network device to be built includes:
and determining the rated user number of the preset service accessible to the access network equipment to be built according to the first user number and the second user number.
5. The method of evaluating the number of accessible users according to claim 4, wherein the first number of users satisfies the following formula:
wherein ,indicating the number of first users accessible in the first section,/->Indicating the number of first users that the second section is accessible to, ">Indicating the number of first users accessible in the third interval, and (2) >Representing the service duty cycle of the specified service in said first interval,/>Representing the service duty ratio of the ith service in the first interval, n represents the total number of services to be accessed by the access network equipment to be built,/for the service>Representing the corresponding upstream throughput in said first interval,/>Representing the corresponding upstream throughput in said second interval,/>Representing the corresponding uplink throughput in the third interval, wherein the specified service is a service in the at least one service, the first interval is an interval in which the SINR is greater than a first threshold, the second interval is an interval in which the SINR is less than or equal to the first threshold and greater than a second threshold, the third interval is an interval in which the SINR is less than or equal to the second threshold, i and n are integers greater than 0, and i e [1, n]。
6. The method of evaluating the number of accessible users according to claim 4, wherein the second number of users satisfies the following formula:
wherein ,indicating the number of second users accessible in the first zone, ">Indicating a second number of users, which are accessible in a second zone, ">Indicating the number of second users, which can be accessed in the third zone, ">Representing the service duty cycle of the specified service in said first interval,/ >Representing the service duty ratio of the ith service in the first interval, n represents the total number of services to be accessed by the access network equipment to be built,/for the service>Representing the corresponding downstream throughput in said first interval,/>Representing the corresponding downstream throughput in said second interval, +.>Representing the corresponding downlink throughput in the third interval, wherein the specified service is a service in the at least one service, the first interval is an interval in which the SINR is greater than a first threshold, the second interval is an interval in which the SINR is less than or equal to the first threshold and greater than a second threshold, the third interval is an interval in which the SINR is less than or equal to the second threshold, i and n are integers greater than 0, and i e [1, n]。
7. The method of evaluating the number of accessible users according to claim 4, wherein the number of rated users satisfies the following formula:
N=N G +N M +N B ;
wherein N represents the number of rated users, N G Indicating the number of users accessible by the access network equipment in the first interval, N M Indicating the number of users accessible by the access network equipment in the second interval, N B Indicating the number of users accessible by the proposed access network device in a third interval,representing a first number of users accessible in said first zone,/for each user >Representing the number of first users accessible in the second interval,/for the second interval>Representing the number of first users accessible in said third interval,/for each user>A second number of users, which indicates that said first zone is accessible,/for>Indicating a second number of users, which are accessible in said second zone,/for>The second user number that indicates that the third section is accessible is represented by the first section being a section in which SINR is greater than a first threshold, the second section being a section in which SINR is less than or equal to the first threshold and greater than a second threshold, and the third section being a section in which SINR is less than or equal to the second threshold.
8. An evaluation device for the number of accessible users, comprising:
the system comprises an acquisition unit, a service management unit and a service management unit, wherein the acquisition unit is used for acquiring a scene map and configuration parameters of the access network equipment to be built, and service parameters and rated service duty ratio of each service in at least one service to be accessed by the access network equipment to be built; the configuration parameters comprise the equipment type of the access network equipment and the access network equipment parameters;
the processing unit is used for simulating according to the scene map acquired by the acquisition unit, the equipment type acquired by the acquisition unit and the access network equipment parameter acquired by the acquisition unit, and determining the simulation point occupation ratio in different SINR intervals;
The processing unit is further configured to determine an actual throughput of the different SINR intervals according to the simulated point duty ratio in the different SINR intervals and the rated throughput of the different SINR intervals corresponding to the equipment type acquired by the acquiring unit;
the processing unit is further configured to determine an actual service duty ratio of each service in each SINR interval according to the rated service duty ratio of each service acquired by the acquiring unit; wherein the actual service duty cycle satisfies the following formula:
P=P G +P M +P B ;
wherein P represents the actual service duty ratio, P G Representing the corresponding service duty ratio of the first interval, P M Representing the corresponding service duty ratio of the second interval, P B Representing the service duty ratio corresponding to a third interval, wherein the first interval is an area with SINR greater than a first threshold valueThe second interval is an interval in which the SINR is smaller than or equal to the first threshold value and larger than the second threshold value, and the third interval is an interval in which the SINR is smaller than or equal to the second threshold value;
the processing unit is further configured to determine a rated number of users to which the access network device can access a preset service according to the actual throughput of the different SINR intervals and the actual service duty ratio of each service in each SINR interval; wherein the preset service is a service in the at least one service.
9. A computer readable storage medium comprising instructions which, when run on a computer, cause the computer to perform the method of evaluating the number of accessible users as claimed in any of the preceding claims 1-7.
10. An evaluation device for the number of accessible users, comprising: communication interface, processor, memory, bus;
the memory is used for storing computer execution instructions, and the processor is connected with the memory through the bus;
when the device for evaluating the number of accessible users is operated, the processor executes the computer-executable instructions stored in the memory to cause the device for evaluating the number of accessible users to perform the method for evaluating the number of accessible users as claimed in any one of the preceding claims 1-7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011360922.5A CN112367679B (en) | 2020-11-27 | 2020-11-27 | Method and device for evaluating number of accessible users |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011360922.5A CN112367679B (en) | 2020-11-27 | 2020-11-27 | Method and device for evaluating number of accessible users |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112367679A CN112367679A (en) | 2021-02-12 |
CN112367679B true CN112367679B (en) | 2023-05-26 |
Family
ID=74535472
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011360922.5A Active CN112367679B (en) | 2020-11-27 | 2020-11-27 | Method and device for evaluating number of accessible users |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112367679B (en) |
Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1782578A2 (en) * | 2004-08-12 | 2007-05-09 | Interdigital Technology Corporation | Method and system for controlling access to a wireless communication medium |
CN101098172A (en) * | 2006-06-27 | 2008-01-02 | 中兴通讯股份有限公司 | Method for evaluating special channel uplink loading and capacity in WCDMA system |
CN101111045A (en) * | 2007-09-05 | 2008-01-23 | 中兴通讯股份有限公司 | Load test approach and system for WiMAX base station |
CN101119131A (en) * | 2007-09-19 | 2008-02-06 | 中兴通讯股份有限公司 | Method for estimating uplink load of user facility |
CN101124741A (en) * | 2004-12-23 | 2008-02-13 | 高通股份有限公司 | Traffic interference cancellation |
CN101472298A (en) * | 2007-12-24 | 2009-07-01 | 联想(北京)有限公司 | User scheduling method and apparatus for TDD multi-input multi-output down emission system |
CN102037688A (en) * | 2008-05-20 | 2011-04-27 | 艾利森电话股份有限公司 | Partitioning entity and method for partitioning capacity |
CN102404778A (en) * | 2010-09-16 | 2012-04-04 | 普天信息技术研究院有限公司 | Load estimation method |
CN102984717A (en) * | 2011-09-07 | 2013-03-20 | 中兴通讯股份有限公司 | Method and system for system capacity estimation |
EP2635088A1 (en) * | 2012-02-28 | 2013-09-04 | Alcatel Lucent | Apparatus, Method and Computer Program for Controlling Transmission Points in a Mobile Communication System |
WO2014027171A2 (en) * | 2012-08-16 | 2014-02-20 | University Of Manchester | Communication system and method |
CN104168634A (en) * | 2014-08-28 | 2014-11-26 | 北京工业大学 | Distributed user location awareness cell closing method for LTE-A cellular network |
CN105493545A (en) * | 2013-04-26 | 2016-04-13 | 华为技术有限公司 | Network energy efficiency simulation and evaluation methods and apparatuses |
CN106686634A (en) * | 2017-03-20 | 2017-05-17 | 重庆信科设计有限公司 | Base station business energy consumption relationship testing method |
CN110198552A (en) * | 2019-04-29 | 2019-09-03 | 中国联合网络通信集团有限公司 | A kind of calculation method and device of downlink throughput capacity |
CN110621025A (en) * | 2019-09-17 | 2019-12-27 | 中国联合网络通信集团有限公司 | Equipment model selection method and device |
CN111818586A (en) * | 2020-07-30 | 2020-10-23 | 中国联合网络通信集团有限公司 | User access method and access network equipment |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102158310A (en) * | 2011-02-15 | 2011-08-17 | 中兴通讯股份有限公司 | Method and device for realizing multi-cell precoding |
-
2020
- 2020-11-27 CN CN202011360922.5A patent/CN112367679B/en active Active
Patent Citations (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1782578A2 (en) * | 2004-08-12 | 2007-05-09 | Interdigital Technology Corporation | Method and system for controlling access to a wireless communication medium |
CN101124741A (en) * | 2004-12-23 | 2008-02-13 | 高通股份有限公司 | Traffic interference cancellation |
CN101098172A (en) * | 2006-06-27 | 2008-01-02 | 中兴通讯股份有限公司 | Method for evaluating special channel uplink loading and capacity in WCDMA system |
CN101111045A (en) * | 2007-09-05 | 2008-01-23 | 中兴通讯股份有限公司 | Load test approach and system for WiMAX base station |
CN101119131A (en) * | 2007-09-19 | 2008-02-06 | 中兴通讯股份有限公司 | Method for estimating uplink load of user facility |
CN101472298A (en) * | 2007-12-24 | 2009-07-01 | 联想(北京)有限公司 | User scheduling method and apparatus for TDD multi-input multi-output down emission system |
CN102037688A (en) * | 2008-05-20 | 2011-04-27 | 艾利森电话股份有限公司 | Partitioning entity and method for partitioning capacity |
CN102404778A (en) * | 2010-09-16 | 2012-04-04 | 普天信息技术研究院有限公司 | Load estimation method |
CN102984717A (en) * | 2011-09-07 | 2013-03-20 | 中兴通讯股份有限公司 | Method and system for system capacity estimation |
EP2635088A1 (en) * | 2012-02-28 | 2013-09-04 | Alcatel Lucent | Apparatus, Method and Computer Program for Controlling Transmission Points in a Mobile Communication System |
WO2014027171A2 (en) * | 2012-08-16 | 2014-02-20 | University Of Manchester | Communication system and method |
CN105493545A (en) * | 2013-04-26 | 2016-04-13 | 华为技术有限公司 | Network energy efficiency simulation and evaluation methods and apparatuses |
CN104168634A (en) * | 2014-08-28 | 2014-11-26 | 北京工业大学 | Distributed user location awareness cell closing method for LTE-A cellular network |
CN106686634A (en) * | 2017-03-20 | 2017-05-17 | 重庆信科设计有限公司 | Base station business energy consumption relationship testing method |
CN110198552A (en) * | 2019-04-29 | 2019-09-03 | 中国联合网络通信集团有限公司 | A kind of calculation method and device of downlink throughput capacity |
CN110621025A (en) * | 2019-09-17 | 2019-12-27 | 中国联合网络通信集团有限公司 | Equipment model selection method and device |
CN111818586A (en) * | 2020-07-30 | 2020-10-23 | 中国联合网络通信集团有限公司 | User access method and access network equipment |
Non-Patent Citations (3)
Title |
---|
"R4-093488_Sensitivity_Level_for_TDD_HomeNodeB_1.0".3GPP tsg_ran\WG4_Radio.2009,全文. * |
A_study_on_single-cell_point-to-multipoint_transmission_for_public_safety_communications_with_eMBMS_LTE_networks;Mikko S¨aily;《IEEE XPLORE》;全文 * |
智能无线通信技术研究概况;梁应敞;《中国优秀硕士学位论文全文数据库(电子期刊)信息科技辑》;全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN112367679A (en) | 2021-02-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112333753B (en) | Method and device for evaluating number of accessible users | |
US20200336194A1 (en) | Joint beam reporting for wireless networks | |
CN104853379B (en) | A kind of quality of wireless network appraisal procedure and device | |
CN106879017B (en) | Method and device for judging coverage quality of LTE (Long term evolution) network | |
EP3531736B1 (en) | Method and apparatus for transmitting reference signals | |
CN104956705A (en) | Algorithm for physical cell identifier allocation | |
CN111669776B (en) | Edge rate determining method and device | |
EP3185597A1 (en) | Method, base station, and terminal for wireless link processing | |
WO2022017012A1 (en) | Network configuration method and apparatus | |
CN105635980A (en) | Uplink signal processing method, device and system | |
CN112333754B (en) | Method and device for estimating number of accessible users | |
CN112383936B (en) | Method and device for evaluating number of accessible users | |
CN112333755A (en) | Method and device for estimating number of users accessible to base station to be deployed | |
CN112165723B (en) | Measurement method and communication device | |
CN111542082B (en) | Method and device for determining coverage rate of downlink edge | |
CN112367679B (en) | Method and device for evaluating number of accessible users | |
Karimi et al. | Measurement based mobility emulation platform for next generation wireless networks | |
CN112738815B (en) | Method and device for evaluating number of accessible users | |
Jiang et al. | On the outage probability of information sharing in cognitive vehicular networks | |
CN111586733B (en) | Edge rate determining method and device | |
CN112153679B (en) | Network switching method and device | |
CN112312448B (en) | Method and device for evaluating RRC connection number | |
US9560487B2 (en) | Method and apparatus for wireless location tracking | |
CN112584416B (en) | Method and device for evaluating number of accessible users | |
CN111669763B (en) | Method and device for determining station spacing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |