CN112363826B - Project resource comprehensive management system, method, terminal and storage medium - Google Patents

Project resource comprehensive management system, method, terminal and storage medium Download PDF

Info

Publication number
CN112363826B
CN112363826B CN202011148265.8A CN202011148265A CN112363826B CN 112363826 B CN112363826 B CN 112363826B CN 202011148265 A CN202011148265 A CN 202011148265A CN 112363826 B CN112363826 B CN 112363826B
Authority
CN
China
Prior art keywords
resource
terminal
server
cleaning
unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011148265.8A
Other languages
Chinese (zh)
Other versions
CN112363826A (en
Inventor
王伟
申晨
宋宜飞
姜丹
盛华
张秋实
于皓杰
李清源
丁月明
费扬
杨小婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Rizhao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Rizhao Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Rizhao Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN202011148265.8A priority Critical patent/CN112363826B/en
Publication of CN112363826A publication Critical patent/CN112363826A/en
Application granted granted Critical
Publication of CN112363826B publication Critical patent/CN112363826B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5005Allocation of resources, e.g. of the central processing unit [CPU] to service a request
    • G06F9/5027Allocation of resources, e.g. of the central processing unit [CPU] to service a request the resource being a machine, e.g. CPUs, Servers, Terminals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/14Network architectures or network communication protocols for network security for detecting or protecting against malicious traffic
    • H04L63/1408Network architectures or network communication protocols for network security for detecting or protecting against malicious traffic by monitoring network traffic
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L63/00Network architectures or network communication protocols for network security
    • H04L63/14Network architectures or network communication protocols for network security for detecting or protecting against malicious traffic
    • H04L63/1441Countermeasures against malicious traffic
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02DCLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
    • Y02D10/00Energy efficient computing, e.g. low power processors, power management or thermal management

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Security & Cryptography (AREA)
  • General Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Software Systems (AREA)
  • Computer Hardware Design (AREA)
  • Computing Systems (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Information Transfer Between Computers (AREA)

Abstract

The invention provides a project resource comprehensive management system, a project resource comprehensive management method, a project resource comprehensive management terminal and a storage medium, wherein the project resource comprehensive management system comprises a pre-estimation distribution unit, a pre-estimation distribution unit and a resource management unit, wherein the pre-estimation distribution unit is used for acquiring the space configuration of a server and obtaining a distribution mode by combining the resource requirements of various projects; an allocation execution unit for executing specific allocation of resources of each item; the dynamic adjustment unit is used for regularly checking the service condition of the server space in the resource operation process and dynamically adjusting resource allocation according to the service condition; and the operation evaluation unit is used for evaluating the application condition of the system according to the user activity rate, the function utilization rate and the access amount index data of the system at the terminal. The invention creates a resource pre-estimation function and realizes automatic calculation of resource allocation; monitoring the resource use condition to realize dynamic adjustment of server resources; and checking the use condition of the terminal process, evaluating the actual application condition of the system and improving the usability of the system.

Description

Project resource comprehensive management system, method, terminal and storage medium
Technical Field
The invention belongs to the technical field of big data, and particularly relates to a project resource comprehensive management system, a project resource comprehensive management method, a project resource comprehensive management terminal and a storage medium.
Background
When managing numerous projects, enterprises mostly adopt system software for specially managing the projects, all work data related to the projects are effectively managed, and online management becomes the mainstream trend.
In the existing project resource allocation scheme, the current informatization resource allocation is based on the requirements mainly provided for each project, and a reasonable and effective resource allocation mode is not established; after the resources are allocated, a resource operation evaluation system is lacked, the condition of surplus or shortage of resources is not analyzed after the allocation, and the reasonable allocation and the dynamic adjustment of the resources cannot be supported; the number of processes in the system execution is large, a large number of idle processes exist, and the resources and the operation and maintenance cost are occupied; and project resources are easy to be destroyed by a botnet, so that the safety of data is damaged.
Disclosure of Invention
In view of the above-mentioned deficiencies of the prior art, the present invention provides a project resource integrated management system, method, terminal and storage medium to solve the above-mentioned technical problems.
In a first aspect, the present invention provides a project resource integrated management system, including:
the pre-estimation distribution unit is used for acquiring the space configuration of the server and obtaining a distribution mode by combining the resource requirements of all items;
an allocation execution unit for executing specific allocation of resources of each item;
the dynamic adjustment unit is used for regularly checking the service condition of the server space in the resource operation process and dynamically adjusting resource allocation according to the service condition;
and the operation evaluation unit is used for evaluating the application condition of the system according to the user activity rate, the function utilization rate and the access amount index data of the system at the terminal.
Further, the system further comprises:
the process cleaning unit is used for monitoring and cleaning the idle process of the terminal;
further, the system further comprises:
and the resource cleaning unit is used for deleting the resources stored by the server according to the operation executed by the terminal user.
Further, the system further comprises:
and the botnet cleaning unit is used for cleaning the botnet between the terminal and the server.
In a second aspect, the present invention provides a project resource integrated management method, including:
acquiring server space configuration and combining resource requirements of various items to obtain a distribution mode;
executing specific allocation of resources of each item according to the allocation mode;
checking the space use condition of the server regularly, and dynamically adjusting resource allocation according to the use condition;
and collecting user operation data in real time, and calculating application indexes reflecting the use conditions of the users.
Further, the method further comprises:
and monitoring the terminal process of the system, and cleaning the process with the idle time exceeding the idle threshold value specified by the user.
Further, the method further comprises:
installing a network security package, wherein a botnet characteristic model is arranged in the network security package;
monitoring a network, and screening a botnet matched with the characteristic model by a pool;
the botnet is cleaned and the network security package is upgraded.
Further, the method further comprises:
acquiring a cleaning instruction and a target resource to be deleted by a terminal;
after target resources on the server are inquired, a deletion prompt is displayed at the terminal;
and deleting the resource according to the selection operation executed by the user.
In a third aspect, a terminal is provided, including:
a processor, a memory, wherein,
the memory is used for storing a computer program which,
the processor is configured to call and run the computer program from the memory, so that the terminal performs the method of the terminal described above.
In a fourth aspect, a computer-readable storage medium is provided, having stored therein instructions, which when run on a computer, cause the computer to perform the method of the above aspects.
The beneficial effect of the invention is that,
the project resource comprehensive management system, the project resource comprehensive management method, the project resource comprehensive management terminal and the project resource comprehensive management storage medium establish a resource pre-estimation function through a big data analysis technology, realize automatic calculation of resource allocation and reasonably distribute resources by combining project requirements; checking whether the phenomenon of resource excess or resource deficiency exists at the resource period, and realizing dynamic adjustment of server resources; checking the use condition of the terminal process in the running process, timely cleaning the idle process and improving the terminal processing speed; by establishing big data analysis of the system user activity rate, the function utilization rate and the system access amount index, the actual application condition of the system is evaluated, a basis is provided for system maintenance, and the availability of the system is improved.
In addition, the invention has reliable design principle, simple structure and very wide application prospect.
Drawings
In order to more clearly illustrate the embodiments or technical solutions in the prior art of the present invention, the drawings used in the description of the embodiments or prior art will be briefly described below, and it is obvious for those skilled in the art that other drawings can be obtained based on these drawings without creative efforts.
FIG. 1 is a schematic flow diagram of a system of one embodiment of the invention.
FIG. 2 is a schematic block diagram of a method of one embodiment of the present invention.
Fig. 3 is a schematic structural diagram of a terminal according to an embodiment of the present invention.
Detailed Description
In order to make those skilled in the art better understand the technical solution of the present invention, the technical solution in the embodiment of the present invention will be clearly and completely described below with reference to the drawings in the embodiment of the present invention, and it is obvious that the described embodiment is only a part of the embodiment of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
It should be noted that the embodiments and features of the embodiments may be combined with each other without conflict.
The present invention will be described in detail below with reference to the embodiments with reference to the attached drawings.
As shown in fig. 1, an embodiment of the present invention provides a project resource integrated management system 100, including:
the pre-estimation allocation unit 110 is configured to obtain server space configuration and obtain an allocation mode according to resource requirements of various items;
an allocation performing unit 120 for performing specific allocation of resources for each item;
a dynamic adjustment unit 130, configured to periodically check a service condition of a server space during resource operation, and dynamically adjust resource allocation according to the service condition; the method is favorable for self-cleaning under the condition that the server resource space is insufficient, and the sufficient space of the server is ensured.
And the operation evaluation unit 140 is configured to evaluate an application condition of the system according to the user activity rate, the function utilization rate, and the access amount index data of the system at the terminal. The user activity rate, the function utilization rate and the access amount are all the basis for evaluating the service condition of the system, and the display condition of the function module can be adjusted at the terminal according to the basis.
Optionally, as an embodiment of the present invention, the system further includes:
and the process cleaning unit is used for monitoring and cleaning the idle process of the terminal, and is favorable for ensuring the execution of the terminal.
Optionally, as an embodiment of the present invention, the system further includes:
and the resource cleaning unit is used for deleting the resources stored by the server according to the operation executed by the terminal user. And if the data is required to be deleted after a certain project is terminated, inputting project resources required to be deleted from the terminal by the user, and deleting the corresponding data by the server.
Optionally, as an embodiment of the present invention, the system further includes:
and the botnet cleaning unit is used for cleaning the botnet between the terminal and the server. The method is beneficial to maintaining the network stability of the system, thereby ensuring the safety of project data.
As shown in fig. 2, an embodiment of the present application provides a project resource integrated management method, including:
step 210, obtaining server space configuration and obtaining a distribution mode by combining resource requirements of various items;
step 220, executing specific allocation of resources of each item according to the allocation mode;
step 230, checking the service condition of the server space periodically, and dynamically adjusting resource allocation according to the service condition;
and 240, acquiring user operation data in real time, and calculating an application index reflecting the use condition of the user.
Optionally, as an embodiment of the present application, the method further includes:
and monitoring the terminal process of the system, and cleaning the process with the idle time exceeding the idle threshold value specified by the user.
Optionally, as an embodiment of the present application, the method further includes:
installing a network security package, wherein a botnet characteristic model is arranged in the network security package;
monitoring a network, and screening a botnet matched with the characteristic model by a pool;
the botnet is cleaned and the network security package is upgraded.
Optionally, as an embodiment of the present application, the method further includes:
acquiring a cleaning instruction and a target resource to be deleted by a terminal;
after target resources on the server are inquired, a deletion prompt is displayed at the terminal;
and deleting the resource according to the selection operation executed by the user.
Fig. 3 is a schematic structural diagram of a terminal system 300 according to an embodiment of the present invention, where the terminal system 300 may be used to execute the method replacement according to the embodiment of the present invention.
The terminal system 300 may include: a processor 310, a memory 320, and a communication unit 330. The components communicate via one or more buses, and those skilled in the art will appreciate that the architecture of the server shown in the figures is not intended to be limiting, and that it may be a bus architecture, a star architecture, a combination of more or fewer components than shown, or a different arrangement of components.
The memory 320 may be used for storing instructions executed by the processor 310, and the memory 320 may be implemented by any type of volatile or non-volatile storage terminal or combination thereof, such as Static Random Access Memory (SRAM), electrically erasable programmable read-only memory (EEPROM), erasable programmable read-only memory (EPROM), programmable read-only memory (PROM), read-only memory (ROM), magnetic memory, flash memory, magnetic disk or optical disk. The executable instructions in memory 320, when executed by processor 310, enable terminal 300 to perform some or all of the steps in the method embodiments described below.
The processor 310 is a control center of the storage terminal, connects various parts of the entire electronic terminal using various interfaces and lines, and performs various functions of the electronic terminal and/or processes data by operating or executing software programs and/or modules stored in the memory 320 and calling data stored in the memory. The processor may be composed of an Integrated Circuit (IC), for example, a single packaged IC, or a plurality of packaged ICs connected with the same or different functions. For example, the processor 310 may include only a Central Processing Unit (CPU). In the embodiment of the present invention, the CPU may be a single operation core, or may include multiple operation cores.
A communication unit 330, configured to establish a communication channel so that the storage terminal can communicate with other terminals. And receiving user data sent by other terminals or sending the user data to other terminals.
The present invention also provides a computer storage medium, wherein the computer storage medium may store a program, and the program may include some or all of the steps in the embodiments provided by the present invention when executed. The storage medium may be a magnetic disk, an optical disk, a read-only memory (ROM) or a Random Access Memory (RAM).
Therefore, the invention creates the resource pre-estimation function and carries out the dynamic adjustment of the resource in the resource operation process; the service condition of the terminal process is checked in the running process, the actual application condition of the system is evaluated by establishing big data analysis of the system user activity rate, the function utilization rate and the system access amount index, a basis is provided for system maintenance, and the availability of the system is improved.
Those skilled in the art will readily appreciate that the techniques of the embodiments of the present invention may be implemented as software plus a required general purpose hardware platform. Based on such understanding, the technical solutions in the embodiments of the present invention may be embodied in the form of a software product, where the computer software product is stored in a storage medium, such as a usb disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and the like, and the storage medium can store program codes, and includes instructions for enabling a computer terminal (which may be a personal computer, a server, or a second terminal, a network terminal, and the like) to perform all or part of the steps of the method in the embodiments of the present invention.
The same and similar parts in the various embodiments in this specification may be referred to each other. Especially, for the terminal embodiment, since it is basically similar to the method embodiment, the description is relatively simple, and the relevant points can be referred to the description in the method embodiment.
In the embodiments provided by the present invention, it should be understood that the disclosed system, system and method can be implemented in other ways. For example, the above-described system embodiments are merely illustrative, and for example, the division of the units is only one logical functional division, and other divisions may be realized in practice, for example, a plurality of units or components may be combined or integrated into another system, or some features may be omitted, or not executed. In addition, the shown or discussed mutual coupling or direct coupling or communication connection may be an indirect coupling or communication connection through some interfaces, systems or units, and may be in an electrical, mechanical or other form.
The units described as separate parts may or may not be physically separate, and parts displayed as units may or may not be physical units, may be located in one place, or may be distributed on a plurality of network units. Some or all of the units can be selected according to actual needs to achieve the purpose of the solution of the embodiment.
In addition, functional units in the embodiments of the present invention may be integrated into one processing unit, or each unit may exist alone physically, or two or more units are integrated into one unit.
Although the present invention has been described in detail by referring to the drawings in connection with the preferred embodiments, the present invention is not limited thereto. Various equivalent modifications or substitutions can be made on the embodiments of the present invention by those skilled in the art without departing from the spirit and scope of the present invention, and these modifications or substitutions are within the scope of the present invention/any person skilled in the art can easily conceive of the changes or substitutions within the technical scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (4)

1. A system for integrated management of project resources, comprising:
the pre-estimation distribution unit is used for acquiring the space configuration of the server and obtaining a distribution mode by combining the resource requirements of all items;
an allocation execution unit for executing specific allocation of resources of each item;
the dynamic adjustment unit is used for regularly checking the service condition of the server space in the resource operation process and dynamically adjusting resource allocation according to the service condition;
the operation evaluation unit is used for evaluating the application condition of the system according to the user activity rate, the function utilization rate and the access amount index data of the system at the terminal;
the dynamic adjusting unit is also used for self-cleaning under the condition that the server resource space is insufficient, so that the sufficient server space is ensured;
the system further comprises:
the process cleaning unit is used for monitoring and cleaning the idle process of the terminal;
the system further comprises:
the resource cleaning unit is used for deleting the resources stored by the server according to the operation executed by the terminal user;
the system further comprises:
the botnet cleaning unit is used for cleaning the botnet between the terminal and the server;
the system is configured for: monitoring a terminal process of a system, and cleaning a process with idle time exceeding an idle threshold value specified by a user;
the system is further configured for:
installing a network security package, wherein a botnet characteristic model is arranged in the network security package;
monitoring a network, and screening a botnet matched with the characteristic model by a pool;
cleaning a botnet and upgrading a network security package;
the system is further configured for:
acquiring a cleaning instruction and a target resource to be deleted by a terminal;
after target resources on the server are inquired, a deletion prompt is displayed at the terminal;
and deleting the resource according to the selection operation executed by the user.
2. A project resource integrated management method is characterized by comprising the following steps:
acquiring server space configuration and combining resource requirements of various items to obtain a distribution mode;
executing specific allocation of resources of each item according to the allocation mode;
checking the space use condition of the server regularly, and dynamically adjusting resource allocation according to the use condition;
collecting user operation data in real time, and calculating application indexes reflecting user use conditions;
the method further comprises the following steps: under the condition that the server resource space is insufficient, self-cleaning is carried out, and the sufficient server space is ensured;
the method further comprises the following steps:
monitoring a terminal process of a system, and cleaning a process with idle time exceeding an idle threshold value specified by a user;
the method further comprises the following steps:
installing a network security package, wherein a botnet characteristic model is arranged in the network security package;
monitoring a network, and screening a botnet matched with the characteristic model by a pool;
cleaning up a botnet and upgrading a network security package;
the method further comprises the following steps:
acquiring a cleaning instruction and a target resource to be deleted by a terminal;
after target resources on the server are inquired, a deletion prompt is displayed at the terminal;
and deleting the resource according to the selection operation executed by the user.
3. A project resource integrated management apparatus comprising:
a processor; and
a memory for storing computer program instructions;
wherein, when the computer program instructions are loaded and executed by the processor, the processor performs the method of claim 2.
4. A computer-readable storage medium, in which a computer program is stored which, when being executed by a processor, carries out the method of claim 2.
CN202011148265.8A 2020-10-23 2020-10-23 Project resource comprehensive management system, method, terminal and storage medium Active CN112363826B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011148265.8A CN112363826B (en) 2020-10-23 2020-10-23 Project resource comprehensive management system, method, terminal and storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011148265.8A CN112363826B (en) 2020-10-23 2020-10-23 Project resource comprehensive management system, method, terminal and storage medium

Publications (2)

Publication Number Publication Date
CN112363826A CN112363826A (en) 2021-02-12
CN112363826B true CN112363826B (en) 2023-03-14

Family

ID=74511944

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011148265.8A Active CN112363826B (en) 2020-10-23 2020-10-23 Project resource comprehensive management system, method, terminal and storage medium

Country Status (1)

Country Link
CN (1) CN112363826B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114707948A (en) * 2022-03-04 2022-07-05 广东省国土资源测绘院 Management method, device and storage medium for large surveying and mapping production project

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101488098A (en) * 2009-02-13 2009-07-22 华中科技大学 Multi-core computing resource management system based on virtual computing technology
CN105099826A (en) * 2015-08-19 2015-11-25 腾讯科技(深圳)有限公司 Network service operation status monitoring method and device
CN107408032A (en) * 2015-03-26 2017-11-28 英特尔公司 PRBS pseudo-random bit sequence in interconnection
CN110399213A (en) * 2019-05-21 2019-11-01 腾讯科技(深圳)有限公司 Determine method, apparatus, electronic equipment and the medium of the resource requirement of application program
CN110622129A (en) * 2016-12-21 2019-12-27 奥恩全球运营有限公司,新加坡分公司 Method, system, and portal for accelerating aspects of data analysis application development and deployment using software containers
CN111491006A (en) * 2020-03-03 2020-08-04 天津大学 Load-aware cloud computing resource elastic distribution system and method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101488098A (en) * 2009-02-13 2009-07-22 华中科技大学 Multi-core computing resource management system based on virtual computing technology
CN107408032A (en) * 2015-03-26 2017-11-28 英特尔公司 PRBS pseudo-random bit sequence in interconnection
CN105099826A (en) * 2015-08-19 2015-11-25 腾讯科技(深圳)有限公司 Network service operation status monitoring method and device
CN110622129A (en) * 2016-12-21 2019-12-27 奥恩全球运营有限公司,新加坡分公司 Method, system, and portal for accelerating aspects of data analysis application development and deployment using software containers
CN110399213A (en) * 2019-05-21 2019-11-01 腾讯科技(深圳)有限公司 Determine method, apparatus, electronic equipment and the medium of the resource requirement of application program
CN111491006A (en) * 2020-03-03 2020-08-04 天津大学 Load-aware cloud computing resource elastic distribution system and method

Also Published As

Publication number Publication date
CN112363826A (en) 2021-02-12

Similar Documents

Publication Publication Date Title
CN112272203B (en) Cluster service node selection method, system, terminal and storage medium
US9483288B2 (en) Method and system for running a virtual appliance
US9037505B2 (en) Mechanisms for executing a process in a cloud computing environment
US9154366B1 (en) Server maintenance modeling in cloud computing
US20150058844A1 (en) Virtual computing resource orchestration
US8880676B1 (en) Resource planning for computing
CN103399781B (en) Cloud Server and virtual machine management method thereof
CN112698952A (en) Unified management method and device for computing resources, computer equipment and storage medium
CN111181774A (en) High-availability method, system, terminal and storage medium for MapReduce task
CN113835874A (en) Deep learning service scheduling method, system, terminal and storage medium
CN109873714A (en) Cloud computing node configures update method and terminal device
CN111857861B (en) Jenkins task management method, system, terminal and storage medium
CN112363826B (en) Project resource comprehensive management system, method, terminal and storage medium
CN112306784A (en) Test method, test device, electronic equipment and test system
CN110569154B (en) Chip interface function testing method, system, terminal and storage medium
CN111475251A (en) Cluster container scheduling method, system, terminal and storage medium
CN110347546B (en) Dynamic adjustment method, device, medium and electronic equipment for monitoring task
CN107277143A (en) A kind of resource matched management method and device
CN109257256A (en) Apparatus monitoring method, device, computer equipment and storage medium
CN110471769A (en) A kind of method for managing resource and device of virtual machine
Mithani et al. Improving resource allocation in multi-tier cloud systems
CN105718297A (en) Virtual machine establishing system and method
CN111124854A (en) Method, system, terminal and storage medium for distributing smoking test cases
CN108874923A (en) Virtual objects distribution method, server and computer readable storage medium
CN111858528B (en) BMC log collection and management method, system, terminal and storage medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant