CN112344757A - Power plant condenser evacuation prevent ponding device - Google Patents

Power plant condenser evacuation prevent ponding device Download PDF

Info

Publication number
CN112344757A
CN112344757A CN202011362516.2A CN202011362516A CN112344757A CN 112344757 A CN112344757 A CN 112344757A CN 202011362516 A CN202011362516 A CN 202011362516A CN 112344757 A CN112344757 A CN 112344757A
Authority
CN
China
Prior art keywords
evacuation
inlet
power plant
pipeline
valve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011362516.2A
Other languages
Chinese (zh)
Inventor
郑超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Energy Environmental Engineering Co Ltd
Guilin Shenneng Environmental Protection Co Ltd
Shanxian Shenzhen Energy Environment Co Ltd
Shenzhen Energy Environment Eastern Co Ltd
Wuhan Shenneng Environmental Protection Xingou Waste Power Generation Co Ltd
Chaozhou Shenneng Environmental Protection Co Ltd
Shenzhen Energy and Urban Environmental Services Co Ltd
Original Assignee
Shenzhen Energy Environmental Engineering Co Ltd
Guilin Shenneng Environmental Protection Co Ltd
Shanxian Shenzhen Energy Environment Co Ltd
Shenzhen Energy Environment Eastern Co Ltd
Wuhan Shenneng Environmental Protection Xingou Waste Power Generation Co Ltd
Chaozhou Shenneng Environmental Protection Co Ltd
Shenzhen Energy and Urban Environmental Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Energy Environmental Engineering Co Ltd, Guilin Shenneng Environmental Protection Co Ltd, Shanxian Shenzhen Energy Environment Co Ltd, Shenzhen Energy Environment Eastern Co Ltd, Wuhan Shenneng Environmental Protection Xingou Waste Power Generation Co Ltd, Chaozhou Shenneng Environmental Protection Co Ltd, Shenzhen Energy and Urban Environmental Services Co Ltd filed Critical Shenzhen Energy Environmental Engineering Co Ltd
Priority to CN202011362516.2A priority Critical patent/CN112344757A/en
Publication of CN112344757A publication Critical patent/CN112344757A/en
Priority to PCT/CN2021/106134 priority patent/WO2022110831A1/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28BSTEAM OR VAPOUR CONDENSERS
    • F28B9/00Auxiliary systems, arrangements, or devices
    • F28B9/10Auxiliary systems, arrangements, or devices for extracting, cooling, and removing non-condensable gases
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Jet Pumps And Other Pumps (AREA)

Abstract

The utility model provides a power plant's condenser evacuation prevent ponding device, including the female pipe of evacuation and right the female pipe of evacuation carries out two sets of independent evacuation systems of evacuation, and in the normal operating process, one of them set of evacuation system uses, and another set is then spare. Because the communicated drain pipeline is arranged behind the inlet manual isolation valves of the two sets of vacuum pumping systems and in front of the inlet absolute pressure gauge, the communicated drain pipeline is also provided with a valve. Set up behind the intercommunication drain line, reserve evacuation system entry section ponding can be siphoned away by using evacuation system to can not make reserve pump pipe section ponding because of the continuous condensation of the noncondensable gas in the pipeline, thoroughly solve entry section ponding problem, ensure the normal operating of power plant.

Description

Power plant condenser evacuation prevent ponding device
Technical Field
The invention relates to a power plant condenser vacuumizing system, in particular to a water accumulation preventing device for vacuumizing of a power plant condenser.
Background
At present, in a condenser vacuum pumping system of a power plant, a water ring vacuum pump is selected to pump the system, generally two water ring vacuum pumps are used and prepared, and a main pipe system is adopted. The two water ring vacuum pumps are arranged below the main pipe so as to pump out condensed water generated by non-condensable gas pumped from the condenser in the main pipe. The running water ring vacuum pump can discharge non-condensed gas and water to the steam-water separation tank, the gas is discharged, and the condensed water overflows. In the standby state, because the pneumatic butterfly valve at the inlet of the water pump is in a closed state, water can be accumulated in a section of pipeline from the pneumatic butterfly valve at the inlet of the standby water ring vacuum pump to the main pipe (the condensed water generated by the gas in the main pipe is accumulated).
This results in: 1. when the standby pump is started, the starting power is high due to a large amount of accumulated water at the inlet section, pump tripping can be caused, and the blades of the water pump can be seriously damaged; 2. for system reasons, the backup pump is jointly started when an absolute pressure gauge reaches a certain pressure before a backup pump inlet starts a butterfly valve. But because the pipeline is accumulated with water, the pipeline has a certain height. The height is typically 60-80CM, so the absolute pressure gauge pressure is consequently 6-8KPa higher, which results in the absolute pressure gauge pressure varying with the level of the condensate at the inlet. If the joint starting condition of the absolute pressure gauge is set unreasonably, the standby pump can be started frequently, the service life of the water pump is influenced on the one hand, and the normal operation of a condenser vacuum pumping system is influenced simultaneously.
Disclosure of Invention
In order to solve the technical problem, the invention provides a water accumulation prevention device for vacuumizing a condenser of a power plant, which comprises a vacuumizing main pipe and two independent vacuumizing systems for vacuumizing the vacuumizing main pipe. Set up behind the intercommunication drain line, reserve evacuation system entry section ponding can be siphoned away by using evacuation system to can not make reserve pump pipe section ponding because of the continuous condensation of the noncondensable gas in the pipeline, thoroughly solve entry section ponding problem, ensure the normal operating of power plant.
The technical scheme adopted by the invention for solving the technical problem is as follows: the utility model provides a power plant's condenser evacuation prevent ponding device, including the female pipe of evacuation and right the female pipe of evacuation carries out two sets of independent evacuation systems of evacuation, evacuation system includes respectively: the pipeline connected with the vacuumizing main pipe is also sequentially provided with an inlet manual isolating valve, an inlet absolute pressure gauge, an inlet pneumatic butterfly valve, an inlet check valve and a vacuum pump according to the direction of air flow; the inlet of the differential pressure transmitter is connected to the inlet of the inlet pneumatic butterfly valve, and the outlet of the differential pressure transmitter is connected to the outlet of the inlet check valve;
the device is characterized in that a communicated drain pipeline is arranged behind the inlet manual isolation valves of the two sets of vacuum pumping systems and in front of the inlet absolute pressure gauge, and a valve is further arranged on the communicated drain pipeline.
Preferably, the vacuum pump is a water ring vacuum pump.
The invention has the beneficial effects that: the invention provides a water accumulation prevention device for vacuumizing a condenser of a power plant, which comprises a vacuumizing main pipe and two independent vacuumizing systems for vacuumizing the vacuumizing main pipe. Set up behind the intercommunication drain line, reserve evacuation system entry section ponding can be siphoned away by using evacuation system to can not make reserve pump pipe section ponding because of the continuous condensation of the noncondensable gas in the pipeline, thoroughly solve entry section ponding problem. The problems of the prior art can be effectively solved. Ensuring the normal operation of the power plant.
Drawings
Fig. 1 is a schematic diagram of a setup arrangement of one embodiment of the prior art.
Fig. 2 is a schematic diagram of the arrangement of the apparatus according to the first embodiment of the present invention.
In the figure, the position of the upper end of the main shaft,
a is in a vacuum-pumping system, B is a standby vacuum-pumping system,
A1. the inlet is provided with a manual isolating valve,
A2. a communicated drain pipeline, A21 and A21 valves are additionally arranged,
A3. an inlet absolute pressure gauge is arranged on the inlet of the pressure gauge,
A4. an inlet pneumatic butterfly valve is arranged on the shell,
A5. an inlet check valve is arranged on the outer side of the shell,
A6. a vacuum pump is arranged on the vacuum pump,
A7. a differential pressure transmitter is arranged on the base plate,
A8. and (5) vacuumizing the main pipe.
Detailed Description
Fig. 1 is a schematic diagram of a setup arrangement of one embodiment of the prior art. The drawing shows that in the prior art, the water accumulation prevention device for vacuumizing the condenser of the power plant comprises a vacuumizing main pipe A8 and two independent vacuumizing systems A and B for vacuumizing the vacuumizing main pipe, wherein A is an in-use vacuumizing system, and B is a standby vacuumizing system.
The vacuum-pumping systems A and B are connected to the vacuum-pumping main pipe A8 to pump vacuum, and the vacuum-pumping system A comprises: the pipeline connected with the vacuumizing main pipe A8 is also sequentially provided with an inlet manual isolating valve A1, an inlet absolute pressure gauge A3, an inlet pneumatic butterfly valve A4, an inlet check valve A5 and a vacuum pump A6 according to the direction of air flow; a pressure difference transmitter A7 is further arranged, the inlet of the pressure difference transmitter A7 is connected to the inlet of the inlet pneumatic butterfly valve A4, and the outlet of the pressure difference transmitter A7 is connected to the outlet of the inlet check valve A5. In this example, vacuum pump a6 is a water ring vacuum pump. The configuration of the vacuum-pumping system B is the same as that of the vacuum-pumping system A.
In the prior art, two independent vacuum pumping systems a and B are both arranged below a vacuum pumping main pipe A8 so as to pump away condensed water generated by non-condensable gas pumped from a condenser in the vacuum pumping main pipe A8. Vacuum system B under the standby state is because of water pump entry pneumatic butterfly valve is closed state, so reserve water ring vacuum pump entry pneumatic butterfly valve preceding to this section pipeline of female pipe can ponding (the condensate accumulation that the gas in the female pipe produced), because of at normal operating condition, water ring vacuum pump entry section is the negative pressure, can't discharge the intraductal condensate through conventional method. When the standby pump is started, the starting power is high due to a large amount of accumulated water at the inlet section, pump tripping can be caused, and the blades of the water pump are seriously damaged; resulting in frequent restart of the backup pump. And hidden troubles are brought to the safe operation of the whole system.
Fig. 2 is a schematic diagram of the arrangement of the apparatus according to the first embodiment of the present invention. In contrast to the prior art, in this example, a communicating drain line a2 is provided after the inlet manual isolation valve a1 and before the inlet absolute pressure gauge A3 of the two vacuum pumping systems a and B, and valves a21 and a22 are also provided on the communicating drain line a2.
Set up behind the intercommunication drain line A2, reserve evacuation system B entry section ponding can be siphoned away by using evacuation system A to can not make reserve pump pipe section ponding because of the continuous condensation of the incondensable gas in the pipeline, thoroughly solve entry section ponding problem, ensure the normal operating of power plant.

Claims (2)

1. The utility model provides a power plant's condenser evacuation prevent ponding device, including the female pipe of evacuation and right the female pipe of evacuation carries out two sets of independent evacuation systems of evacuation, evacuation system includes respectively: the pipeline connected with the vacuumizing main pipe is also sequentially provided with an inlet manual isolating valve, an inlet absolute pressure gauge, an inlet pneumatic butterfly valve, an inlet check valve and a vacuum pump according to the direction of air flow; the inlet of the differential pressure transmitter is connected to the inlet of the inlet pneumatic butterfly valve, and the outlet of the differential pressure transmitter is connected to the outlet of the inlet check valve;
the device is characterized in that a communicated drain pipeline is arranged behind the inlet manual isolation valves of the two sets of vacuum pumping systems and in front of the inlet absolute pressure gauge, and a valve is further arranged on the communicated drain pipeline.
2. The device of claim 1, wherein the vacuum pump is a water ring vacuum pump.
CN202011362516.2A 2020-11-28 2020-11-28 Power plant condenser evacuation prevent ponding device Pending CN112344757A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202011362516.2A CN112344757A (en) 2020-11-28 2020-11-28 Power plant condenser evacuation prevent ponding device
PCT/CN2021/106134 WO2022110831A1 (en) 2020-11-28 2021-07-14 Water accumulation prevention device for evacuating power plant condenser

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011362516.2A CN112344757A (en) 2020-11-28 2020-11-28 Power plant condenser evacuation prevent ponding device

Publications (1)

Publication Number Publication Date
CN112344757A true CN112344757A (en) 2021-02-09

Family

ID=74366080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011362516.2A Pending CN112344757A (en) 2020-11-28 2020-11-28 Power plant condenser evacuation prevent ponding device

Country Status (2)

Country Link
CN (1) CN112344757A (en)
WO (1) WO2022110831A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113833630A (en) * 2021-09-29 2021-12-24 潮州深能环保有限公司 Pipeline system of vacuum pump unit of waste incineration power plant
WO2022110831A1 (en) * 2020-11-28 2022-06-02 桂林市深能环保有限公司 Water accumulation prevention device for evacuating power plant condenser

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013181466A (en) * 2012-03-01 2013-09-12 Jfe Steel Corp Condenser vacuum control device and condenser vacuum control method
CN105091622A (en) * 2015-09-14 2015-11-25 湖南创元铝业有限公司 Vacuumizing system for condenser of thermal power generation set
CN206556456U (en) * 2017-01-09 2017-10-13 华电莱州发电有限公司 A kind of evacuation system for steam condenser for transforming vacuum pump inlet pipe
CN206670399U (en) * 2017-04-21 2017-11-24 河北冀研能源科学技术研究院有限公司 Newly-built condenser of power plant vacuumizes operation maintenance system
CN107560451A (en) * 2017-10-17 2018-01-09 武汉艾德沃泵阀有限公司 A kind of energy-saving type vacuum device
CN107830742A (en) * 2017-12-04 2018-03-23 武汉艾德沃泵阀有限公司 A kind of system complete equipment that vacuum is kept for steam-condenser of thermal power plants
CN209943095U (en) * 2019-05-20 2020-01-14 武汉艾德沃泵阀有限公司 Energy-saving cone vacuum pump unit
CN214120833U (en) * 2020-11-28 2021-09-03 桂林市深能环保有限公司 Power plant condenser evacuation prevent ponding device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1925234B2 (en) * 1969-05-17 1973-08-16 GEA Luftkuhlergesellschaft Happel GmbH & Co KG, 4630 Bochum INJECTION CONDENSATION SYSTEM WITH RECOOLING OF THE INJECTION WATER VIA AIR-COOLED COOLING ELEMENTS
CN205825746U (en) * 2016-05-31 2016-12-21 廖倩 A kind of plant condenser pumped vacuum systems
CN207945993U (en) * 2017-12-01 2018-10-09 华润电力湖南有限公司 A kind of condenser vacuum-pumping pipeline system
CN112344757A (en) * 2020-11-28 2021-02-09 桂林市深能环保有限公司 Power plant condenser evacuation prevent ponding device

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2013181466A (en) * 2012-03-01 2013-09-12 Jfe Steel Corp Condenser vacuum control device and condenser vacuum control method
CN105091622A (en) * 2015-09-14 2015-11-25 湖南创元铝业有限公司 Vacuumizing system for condenser of thermal power generation set
CN206556456U (en) * 2017-01-09 2017-10-13 华电莱州发电有限公司 A kind of evacuation system for steam condenser for transforming vacuum pump inlet pipe
CN206670399U (en) * 2017-04-21 2017-11-24 河北冀研能源科学技术研究院有限公司 Newly-built condenser of power plant vacuumizes operation maintenance system
CN107560451A (en) * 2017-10-17 2018-01-09 武汉艾德沃泵阀有限公司 A kind of energy-saving type vacuum device
CN107830742A (en) * 2017-12-04 2018-03-23 武汉艾德沃泵阀有限公司 A kind of system complete equipment that vacuum is kept for steam-condenser of thermal power plants
CN209943095U (en) * 2019-05-20 2020-01-14 武汉艾德沃泵阀有限公司 Energy-saving cone vacuum pump unit
CN214120833U (en) * 2020-11-28 2021-09-03 桂林市深能环保有限公司 Power plant condenser evacuation prevent ponding device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022110831A1 (en) * 2020-11-28 2022-06-02 桂林市深能环保有限公司 Water accumulation prevention device for evacuating power plant condenser
CN113833630A (en) * 2021-09-29 2021-12-24 潮州深能环保有限公司 Pipeline system of vacuum pump unit of waste incineration power plant

Also Published As

Publication number Publication date
WO2022110831A1 (en) 2022-06-02

Similar Documents

Publication Publication Date Title
CN112344757A (en) Power plant condenser evacuation prevent ponding device
CN214120833U (en) Power plant condenser evacuation prevent ponding device
CN106838622A (en) A kind of flare gas recovery system
CN207145024U (en) Steam turbine condensate delivery device
CN213176049U (en) Automatic oil supply device for oil injection screw air compressor during starting
CN201802626U (en) Oil supply system of screw compressor
CN209860050U (en) Acid adding equipment for storage battery and vacuumizing device thereof
CN217842003U (en) Screw pump unit for solvent recovery
CN209054969U (en) A kind of condenser parallel connection vacuum evacuation device
CN207647786U (en) A kind of vacuum pollutant discharging device
CN208330762U (en) A kind of vacuum water diversion system of convenient assembling
CN114635762B (en) Emergency shutdown system of negative pressure steam inlet condensing steam turbine
CN105065069A (en) Condensed water extracting device of turbine generator set
CN201730646U (en) Main air ejector of steam turbine generator unit
CN206503705U (en) A kind of pump test vaccum drainage means
CN211703510U (en) Concentrated gas-liquid separation transformation device for papermaking method reconstituted tobacco
CN115111157A (en) Screw pump unit for solvent recovery
CN210512709U (en) Condensate recovery system for steam leakage of steam turbine shaft seal
CN219262457U (en) Shaft seal heating system
CN215058170U (en) Take evacuation system of two sets of lobe pumps
CN216198845U (en) Recycle device of liquid ammonia that separation compressor entrance gas ammonia carried
CN217795031U (en) Polyvinyl chloride resin cyclone separation device
CN218077773U (en) Negative pressure tower top material recycling equipment
CN213450742U (en) Water gauge detects vacuum pumping system
CN216079765U (en) Measures for preventing backup pump from being out of normal operation due to failure of condensate pump negative pressure system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 541000 Shankou domestic waste sanitary landfill, Shuikou village, Lingui Town, Lingui District, Guilin City, Guangxi Zhuang Autonomous Region

Applicant after: Guilin Shenneng environmental protection Co.,Ltd.

Applicant after: Chaozhou Shenneng environmental protection Co.,Ltd.

Applicant after: Shenzhen Energy and environmental protection Co.,Ltd.

Applicant after: Shenzhen Shenneng environmental protection East Co.,Ltd.

Applicant after: Shenzhen Shenneng Environmental Protection City Environmental Service Co.,Ltd.

Applicant after: WUHAN SHENNENG ENVIRONMENTAL PROTECTION NEW DITCH WASTE POWER GENERATION Co.,Ltd.

Applicant after: Shanxian Shenneng environmental protection Co.,Ltd.

Address before: 541000 Shankou domestic waste sanitary landfill, Shuikou village, Lingui Town, Lingui District, Guilin City, Guangxi Zhuang Autonomous Region

Applicant before: Guilin Shenneng environmental protection Co.,Ltd.

Applicant before: Chaozhou Shenneng environmental protection Co.,Ltd.

Applicant before: SHENZHEN ENERGY ENVIRONMENTAL ENGINEERING Co.,Ltd.

Applicant before: Shenzhen Shenneng environmental protection East Co.,Ltd.

Applicant before: Shenzhen Shenneng Environmental Protection City Environmental Service Co.,Ltd.

Applicant before: WUHAN SHENNENG ENVIRONMENTAL PROTECTION NEW DITCH WASTE POWER GENERATION Co.,Ltd.

Applicant before: Shanxian Shenneng environmental protection Co.,Ltd.

CB02 Change of applicant information