CN112332457B - 一种配电综合监测数据的边云协同处理方法 - Google Patents
一种配电综合监测数据的边云协同处理方法 Download PDFInfo
- Publication number
- CN112332457B CN112332457B CN202011089636.XA CN202011089636A CN112332457B CN 112332457 B CN112332457 B CN 112332457B CN 202011089636 A CN202011089636 A CN 202011089636A CN 112332457 B CN112332457 B CN 112332457B
- Authority
- CN
- China
- Prior art keywords
- power
- distribution network
- power distribution
- equipment
- intermittent
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 17
- 238000003672 processing method Methods 0.000 title claims abstract description 13
- 238000010248 power generation Methods 0.000 claims abstract description 22
- 238000004146 energy storage Methods 0.000 claims abstract description 8
- 238000000034 method Methods 0.000 claims description 15
- 238000004458 analytical method Methods 0.000 abstract description 6
- 238000012545 processing Methods 0.000 abstract description 6
- 238000007726 management method Methods 0.000 description 17
- 230000005611 electricity Effects 0.000 description 13
- 238000005457 optimization Methods 0.000 description 5
- 230000008569 process Effects 0.000 description 5
- 238000004364 calculation method Methods 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 230000009133 cooperative interaction Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008520 organization Effects 0.000 description 2
- 230000002159 abnormal effect Effects 0.000 description 1
- 238000009825 accumulation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000006731 degradation reaction Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000004870 electrical engineering Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 238000007499 fusion processing Methods 0.000 description 1
- 238000007654 immersion Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000008447 perception Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/46—Controlling of the sharing of output between the generators, converters, or transformers
- H02J3/466—Scheduling the operation of the generators, e.g. connecting or disconnecting generators to meet a given demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/004—Generation forecast, e.g. methods or systems for forecasting future energy generation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
Claims (6)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011089636.XA CN112332457B (zh) | 2020-10-13 | 2020-10-13 | 一种配电综合监测数据的边云协同处理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011089636.XA CN112332457B (zh) | 2020-10-13 | 2020-10-13 | 一种配电综合监测数据的边云协同处理方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112332457A CN112332457A (zh) | 2021-02-05 |
CN112332457B true CN112332457B (zh) | 2022-05-17 |
Family
ID=74314851
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011089636.XA Active CN112332457B (zh) | 2020-10-13 | 2020-10-13 | 一种配电综合监测数据的边云协同处理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112332457B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113285475A (zh) * | 2021-06-21 | 2021-08-20 | 海南绿色能源与环境工程技术研究院 | 一种基于边云协同计算的多储能联合优化主动调控方法 |
CN114928166B (zh) * | 2022-05-20 | 2023-02-24 | 广州市水电设备安装有限公司 | 一种医疗设备配电监测管理系统 |
CN114726659B (zh) * | 2022-06-08 | 2022-08-16 | 天津市普迅电力信息技术有限公司 | 一种用于边缘网关的节能控制系统及其方法 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102694391B (zh) * | 2012-05-31 | 2014-09-03 | 国电南瑞科技股份有限公司 | 风光储联合发电系统日前优化调度方法 |
CN103066620B (zh) * | 2012-12-24 | 2014-10-22 | 中国电力科学研究院 | 间歇能源并网下的自动发电控制模型的设计方法 |
CN104616121B (zh) * | 2015-02-28 | 2016-12-28 | 南京飞腾电子科技有限公司 | 一种区域能量综合协调管控系统 |
CN111654067A (zh) * | 2020-06-11 | 2020-09-11 | 国网江苏省电力有限公司扬州供电分公司 | 输配协同的配电系统调度新型控制方法及装置 |
-
2020
- 2020-10-13 CN CN202011089636.XA patent/CN112332457B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN112332457A (zh) | 2021-02-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Liu et al. | Energy consumption and emission mitigation prediction based on data center traffic and PUE for global data centers | |
CN112332457B (zh) | 一种配电综合监测数据的边云协同处理方法 | |
Huber et al. | Integration of wind and solar power in Europe: Assessment of flexibility requirements | |
US9218035B2 (en) | Renewable energy control systems and methods | |
US20160109916A1 (en) | Method and apparatus for sustainable scale-out datacenters | |
Begum et al. | A comparative study on improving the performance of solar power plants through IOT and predictive data analytics | |
KR102544181B1 (ko) | 디지털 트윈 기반의 분산 자원 및 전력 계통 운영 계획 시스템 및 운영 계획 방법 | |
KR102063383B1 (ko) | 분산 자원 통합 관리 시스템 및 방법 | |
Wu et al. | Improving data center energy efficiency using a cyber-physical systems approach: integration of building information modeling and wireless sensor networks | |
CN108958054A (zh) | 一种融入模型预测的开源型智慧家庭能源管理系统 | |
CN116961061B (zh) | 一种储能设备的控制方法、装置及电子设备 | |
CN105375502B (zh) | 一种光伏电量的实时控制方法及系统 | |
CN118095707A (zh) | 一种基于互联网的充电站智能监控管理系统及方法 | |
CN105550788A (zh) | 一种微电网智能化数据处理及分析方法 | |
CN105470972B (zh) | 一种基于太阳能供电接口实现的智能家居用电管理系统 | |
KR101775269B1 (ko) | 분산전원 통합 거래 관리 시스템 및 발전량 할당 방법 | |
Liu et al. | Towards an adaptive multi-power-source datacenter | |
CN117200413A (zh) | 一种基于户外电源太阳能板的多电源协同充电控制方法 | |
WO2020125984A1 (en) | System and method for power outage prediction | |
Adnan et al. | Workload shaping to mitigate variability in renewable power use by data centers | |
CA3192998A1 (en) | System for monitoring under-performance of solar power plant | |
Hamdaoui et al. | A cyber-physical power distribution management system for smart buildings | |
Yamzaki et al. | Data processing framework with analytic infrastructure for future smart grid | |
Kumar et al. | Real-time implementation of an IoT-based intelligent source allocation system using machine learning technique in a commercial building | |
CN118748409B (zh) | 基于无线传感器网络的电力系统数据采集分析方法和系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Lu Yujun Inventor after: Cao Jiajia Inventor after: Gao Mingliang Inventor after: Shan Hua Inventor after: Li Cheng Inventor after: Wang Fuliang Inventor after: Chen Hao Inventor after: Ge Yonggao Inventor after: Wang Jiangbin Inventor after: Wang Ning Inventor after: Ning Yan Inventor before: Lu Yujun Inventor before: Cao Jiajia Inventor before: Gao Mingliang Inventor before: Shan Hua Inventor before: Li Cheng Inventor before: Wang Fuliang Inventor before: Chen Hao Inventor before: Ge Yonggao Inventor before: Wang Jiangbin Inventor before: Wang Ning Inventor before: Ning Yan |
|
CB03 | Change of inventor or designer information |