CN112329411A - Engineering budget accounting management and control management software - Google Patents

Engineering budget accounting management and control management software Download PDF

Info

Publication number
CN112329411A
CN112329411A CN202011246995.1A CN202011246995A CN112329411A CN 112329411 A CN112329411 A CN 112329411A CN 202011246995 A CN202011246995 A CN 202011246995A CN 112329411 A CN112329411 A CN 112329411A
Authority
CN
China
Prior art keywords
unit
data
module
output end
input end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011246995.1A
Other languages
Chinese (zh)
Other versions
CN112329411B (en
Inventor
陈贤庭
陈丽君
许治明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Futai Building Decoration Engineering Co ltd
Original Assignee
Hubei Futai Building Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Futai Building Decoration Engineering Co ltd filed Critical Hubei Futai Building Decoration Engineering Co ltd
Priority to CN202011246995.1A priority Critical patent/CN112329411B/en
Publication of CN112329411A publication Critical patent/CN112329411A/en
Application granted granted Critical
Publication of CN112329411B publication Critical patent/CN112329411B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/02Marketing; Price estimation or determination; Fundraising
    • G06Q30/0201Market modelling; Market analysis; Collecting market data
    • G06Q30/0206Price or cost determination based on market factors
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F40/00Handling natural language data
    • G06F40/10Text processing
    • G06F40/166Editing, e.g. inserting or deleting
    • G06F40/177Editing, e.g. inserting or deleting of tables; using ruled lines
    • G06F40/18Editing, e.g. inserting or deleting of tables; using ruled lines of spreadsheets

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Finance (AREA)
  • Accounting & Taxation (AREA)
  • General Physics & Mathematics (AREA)
  • Strategic Management (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Engineering & Computer Science (AREA)
  • Data Mining & Analysis (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • Computational Linguistics (AREA)
  • Audiology, Speech & Language Pathology (AREA)
  • Artificial Intelligence (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Geometry (AREA)
  • Game Theory and Decision Science (AREA)
  • Economics (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses engineering budget accounting management and control management software, which comprises a manual module, a drawing module and a list document module, wherein the manual module comprises a manual calibration unit and a manual proofreading unit, the output end of the manual calibration unit is connected with the input ends of the drawing module and the list document module, the manual proofreading unit is bidirectionally connected with the drawing module and the list document module, the data collection system also comprises a high-definition camera, the output end of the high-definition camera is connected with the input ends of the drawing module and the list document module, and the drawing module comprises an electronic drawing modeling unit, a duplicate removal unit and a feature collection unit. According to the engineering budget accounting management and control management software, the data collection system is arranged, the high-definition camera is used for collecting images, the data of drawings and list documents are collected, and required data texts are finally generated, so that the working time of budget staff is greatly reduced, and the working efficiency is improved.

Description

Engineering budget accounting management and control management software
Technical Field
The invention relates to the technical field, in particular to engineering budget accounting management and control management software.
Background
Project planning is the planning of the income and expense of a project over a period of time in the future. The method can evaluate the investment of engineering projects in a currency form and reflect the economic effect of the engineering. It is the basis for strengthening enterprise management, carrying out economic accounting, checking engineering cost and compiling construction plan; and is also the main basis for bidding engineering bid and determining engineering cost. According to national regulations: the infrastructure budget is phased with the construction program. Because the budget system foundation and the working depth of each stage are different, the budget of the basic construction project can be divided into two types, namely: firstly, approximate calculation; the second is budget. The approximate calculation has two types of feasibility research investment estimation and preliminary design approximate calculation, the budget is divided by the construction drawing design budget and the construction budget, and the basic construction project budget is a general term of the estimation, the approximate calculation and the budget.
The existing engineering budget is cost accounting which is necessary for one line before engineering implementation, and various software for realizing budget are available at present, but the software is not strong in pertinence, is mostly general computing software, needs to manually select a project, needs to manually enter information, needs to spend a large amount of time of budget staff, has no way of ensuring the accuracy rate of manual entry, and cannot avoid errors of the whole budget result caused by data errors in the entry process.
Disclosure of Invention
Aiming at the defects of the prior art, the invention provides management and control software for accounting engineering budgets, which solves the problems that various types of software for realizing budgets exist at present, but the software is not strong in pertinence, is mostly general computing software, needs to manually select items, needs to manually enter information, needs to spend a large amount of time on budgeters, has no way to guarantee the accuracy rate of manual entry, and cannot avoid errors in the whole budget result caused by data errors in the entry process.
In order to achieve the purpose, the invention is realized by the following technical scheme: the utility model provides an engineering budget accounting management and control management software, includes cost control system, record management system, data collection system and data statistics system, the data collection system includes artifical module, drawing module and manifest document module, artifical module includes artifical calibration unit and artifical proofreading unit, the output of artifical calibration unit is connected with the input of drawing module and manifest document module, artifical proofreading unit respectively with drawing module and manifest document module both way junction.
The data collection system further comprises a high-definition camera, wherein the output end of the high-definition camera is connected with the input ends of the drawing module and the list document module, the drawing module comprises an electronic drawing modeling unit, a duplication removing unit and a feature collecting unit, the output end of the duplication removing unit is connected with the input end of the electronic drawing modeling unit, the output end of the electronic drawing modeling unit is connected with the input end of the feature collecting unit, the output end of the high-definition camera is connected with the input end of the list document module, and the list document module comprises an electronic form rebuilding unit, a data comparison unit and an EXCEL electronic document generating unit.
Preferably, the data statistical system comprises a data processing module and a data detection module, the data processing module comprises an online shopping platform access port, a unit price database unit, a data association unit, a data classification unit and a calculation unit, and the output end of the data classification unit is connected with the input end of the data classification unit.
Preferably, the output end of the unit price database unit is connected with the input end of the data association unit, and the output end of the online shopping platform access port is connected with the input end of the unit price database unit.
Preferably, the output end of the unit price database unit is connected with the input end of the data association unit, the output end of the data association unit is connected with the input end of the data classification unit, and the output end of the data classification unit is connected with the input end of the calculation unit.
Preferably, the data detection module comprises a history comparison unit, a data duplication checking unit and a special data marking unit, and the output ends of the history comparison unit and the data duplication checking unit are connected with the input end of the special data marking unit.
Preferably, the record management system comprises a printer, a manual operation recording unit, an annotation insertion unit and a system history recording unit, the output ends of the data statistics system and the data collection system are connected with the input end of the record management system, and the output ends of the cost control system, the record management system, the data collection system and the data statistics system are connected with the input end of the printer.
Preferably, the cost control system includes a data distribution module, a cost variation module, and an auto-suggestion module.
Preferably, the output end of the data statistical system is respectively connected with the input ends of the data distribution module, the cost variation module and the automatic suggestion module.
Advantageous effects
The invention provides engineering budget accounting management and control management software. Compared with the prior art, the method has the following beneficial effects:
(1) the engineering budget accounting management and control management software comprises a manual module, a drawing module and a list document module in a data collection system, wherein the manual module comprises a manual calibration unit and a manual proofreading unit, the output end of the manual calibration unit is connected with the input ends of the drawing module and the list document module, the manual proofreading unit is respectively connected with the drawing module and the list document module in a bidirectional way, the data collection system also comprises a high-definition camera, the output end of the high-definition camera is connected with the input ends of the drawing module and the list document module, the drawing module comprises an electronic drawing modeling unit, a duplication removing unit and a characteristic collecting unit, the output end of the duplication removing unit is connected with the input end of the electronic drawing modeling unit, the output end of the electronic drawing modeling unit is connected with the input end of the characteristic collecting unit, and the output end of the high-definition camera, the list document module comprises an electronic form reconstruction unit, a data comparison unit and an EXCEL electronic document generation unit, and a data collection system is arranged, so that images are collected by a high-definition camera, data of drawings and list documents are collected, and required data texts are finally generated, the working time of budget staff is greatly reduced, and the working efficiency is improved.
(2) The engineering budget accounting management and control management software comprises a data processing module and a data detection module in a data statistical system, wherein the data processing module comprises an online shopping platform access port, a unit price database unit, a data association unit, a data classification unit and a calculation unit, the output end of the data classification unit is connected with the input end of the data classification unit, the output end of the unit price database unit is connected with the input end of the data association unit, the output end of the online shopping platform access port is connected with the input end of the unit price database unit, the output end of the unit price database unit is connected with the input end of the data association unit, the output end of the data association unit is connected with the input end of the data classification unit, the output end of the data classification unit is connected with the input end of the calculation unit, and automatic deep processing of data is realized by arranging the data statistical, automatic classification is associated and is calculated, and whole process need not artificial participation, uses more convenient and fast, utilizes the market price that the online shopping platform access port among the data processing module can the current required material of real-time synchronization, makes the result of calculation more accurate, more laminates the change in market.
(3) The project budget accounting management and control management software comprises a history comparison unit, a data duplication checking unit and a special data marking unit on a data detection module, wherein the output ends of the history comparison unit and the data duplication checking unit are connected with the input end of the special data marking unit, a recording management system comprises a printer, a manual operation recording unit, a comment inserting unit and a system history recording unit, the output ends of a data statistics system and a data collection system are connected with the input end of the recording management system, the output ends of the data collection system, the data statistics system and the recording management system are coupled with the printer, through the data detection module and the recording management system, calculation result errors caused by data errors can be better avoided, man-machine interaction is realized, each operation of the system can be monitored, comments are made to places with questions, and manual checking is facilitated, the accuracy of the calculation is increased.
(4) The engineering budget accounting management and control management software comprises a data distribution module, a cost change module and an automatic suggestion module in a cost control system, wherein the output end of a data statistics system is respectively connected with the input ends of the data distribution module, the cost change module and the automatic suggestion module, a data text can be converted into a data change table through the cost control system, and then a data change chart is arranged, so that a non-professional person can also observe the change trend of the output cost and occupy the main components of the cost.
Drawings
FIG. 1 is a schematic block diagram of the system of the present invention;
FIG. 2 is a schematic block diagram of a data statistics system of the present invention;
FIG. 3 is a schematic block diagram of a drawing template according to the present invention;
FIG. 4 is a functional block diagram of a manifest document module of the present invention;
FIG. 5 is a functional block diagram of a data processing module according to the present invention;
FIG. 6 is a functional block diagram of a data monitoring module according to the present invention;
FIG. 7 is a functional block diagram of a record management system according to the present invention;
FIG. 8 is a functional block diagram of a cost control system of the present invention.
In the figure: 1. a cost control system; 2. a record management system; 3. a data collection system; 4. a data statistics system; 31. a manual module; 32. drawing module; 33. a manifest document module; 311. a manual calibration unit; 312. a manual proofreading unit; 34. a high definition camera; 321. an electronic drawing modeling unit; 322. a deduplication unit; 323. a feature collection unit; 331. a spreadsheet reconstruction unit; 332. a data comparison unit; 333. an EXCEL electronic document generating unit; 41. a data processing module; 42. a data detection module; 411. an online shopping platform access port; 412. a unit price database unit; 413. a data association unit; 414. a data classification unit; 415. a calculation unit; 421. a history comparison unit; 422. a data duplication checking unit; 423. a special data flag unit; 21. a printer; 22. a manual operation recording unit; 23. an annotation insertion unit; 24. a system history recording unit; 11. a data distribution module; 12. a cost change module; 13. an auto suggest module.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-8, the present invention provides a technical solution: an engineering budget accounting management and control management software comprises a cost control system 1, a recording management system 2, a data collection system 3 and a data statistics system 4, wherein the data collection system 3 comprises a manual module 31, a drawing module 32 and a list document module 33, the manual module 31 comprises a manual calibration unit 311 and a manual proofreading unit 312, the output end of the manual calibration unit 311 is connected with the input ends of the drawing module 32 and the list document module 33, the manual proofreading unit 312 is respectively connected with the drawing module 32 and the list document module 33 in a bidirectional mode, the data collection system 3 further comprises a high-definition camera 34, the output end of the high-definition camera 34 is connected with the input ends of the drawing module 32 and the list document module 33, the drawing module 32 comprises an electronic drawing modeling unit 321, a deduplication unit 322 and a characteristic collection unit 323, the output end of the deduplication unit 322 is connected with the input end of the electronic drawing modeling unit 321, the output end of the electronic drawing modeling unit 321 is connected with the input end of the characteristic collection unit 323, the output end of the high-definition camera 34 is connected with the input end of the list document module 33, the list document module 33 comprises an electronic form reconstruction unit 331, a data comparison unit 332 and an EXCEL electronic document generation unit 333, the high-definition camera 34 is used for collecting images by the data collection system 3, the data of drawings and list documents are collected, and finally required data texts are generated, the working time of budgeters is greatly reduced, the working efficiency is increased, the data statistical system 4 comprises a data processing module 41 and a data detection module 42, the data processing module 41 comprises an online shopping platform access port 411, a unit price database unit 412, a data association unit 413, a data classification unit 414 and a calculation unit 415, the output end of the data classification unit 414 is connected with the input end of the data classification unit 414, the output end of the unit price database unit 412 is connected with the input end of the data association unit 413, the output end of the online shopping platform access port 411 is connected with the input end of the unit price database unit 412, the output end of the unit price database unit 412 is connected with the input end of the data association unit 413, the output end of the data association unit 413 is connected with the input end of the data classification unit 414, the output end of the data classification unit 414 is connected with the input end of the calculation unit 415, through the arrangement of the data statistics system 4, the automatic deep processing of data is realized, the automatic classification association and calculation are realized, the whole process does not need manual participation, the use is more convenient and rapid, the market price of the existing required materials can be synchronized in real time by utilizing the online shopping platform access port 411 in the data processing module 41, the calculation result is more accurate, the market change is more suitable for, and the data detection module 42, The data record management system comprises a data record unit 422 and a special data mark unit 423, the output ends of a history comparison unit 421 and the data record unit 422 are connected with the input end of the special data mark unit 423, the record management system 2 comprises a printer 21, a manual operation record unit 22, an annotation insertion unit 23 and a system history record unit 24, the output ends of a data statistics system 4 and a data collection system 3 are connected with the input end of the record management system 2, the output ends of the data collection system 3, the data statistics system 4 and the record management system 2 are coupled with the printer 21, through a data detection module 42 and the record management system 2, calculation result errors caused by data errors can be better avoided, man-machine interaction is realized, each operation of the system can be monitored, annotation can be made to a problematic place, manual checking is convenient, calculation accuracy is improved, the cost control system 1 comprises a data distribution module 11, The output end of the data statistical system 4 is respectively connected with the input ends of the data distribution module 11, the cost change module 12 and the automatic suggestion module 13, the data text can be converted into a data change table through the cost control system 1, and then a data change chart is arranged, so that a non-professional person can also observe the change trend of the output cost and the main components of the occupied cost.
And those not described in detail in this specification are well within the skill of those in the art.
When the online shopping platform is used, the high-definition camera 34 collects image information and transmits the image information to the list document module 33 and the drawing module 32, the electronic drawing modeling unit 321 in the drawing module 32 establishes a data model, the duplication eliminating unit 322 eliminates duplication, the feature collecting unit 323 extracts required data, the electronic form rebuilding unit 331 in the list document module 33 establishes a data model, the data comparing unit 332 compares the data in the manual calibration unit 311, the EXCEL electronic document generating unit 333 generates an easily-viewed EXCEL form, the online shopping platform access port 411 inquires real-time prices, the prices are recorded in the unit price database unit 412, the data associating unit 413 associates the unit price and the quantity of the article, the data classifying unit 414 classifies all the costs, and the calculating unit 415 counts all the costs.
After the calculated data is obtained, the data distribution module 11 makes the data into a digital model convenient for observing distribution again, the cost change module 12 compares the previous cases to establish a change digital model, and the automatic suggestion module 13 evaluates the budget to obtain an intuitive data change conclusion.
In use, the printer 21 in the record management system 2 prints all the data collection system 3, the data statistics system 4 and the record management system 2, and the manual operation recording unit 22 can manually change error data or update data and annotate fuzzy or questionable data by using the annotation insertion unit 23, and the system history recording unit 24 can store data records and manual operation records, and the history can be compared with a new budget.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (8)

1. The utility model provides an engineering budget accounting management and control management software, includes cost control system (1), record management system (2), data collection system (3) and data statistics system (4), its characterized in that: the data collection system (3) comprises an artificial module (31), a drawing module (32) and a list document module (33), wherein the artificial module (31) comprises an artificial calibration unit (311) and an artificial proofreading unit (312), the output end of the artificial calibration unit (311) is connected with the input ends of the drawing module (32) and the list document module (33), and the artificial proofreading unit (312) is respectively connected with the drawing module (32) and the list document module (33) in a bidirectional mode;
the data collection system (3) further comprises a high-definition camera (34), the output end of the high-definition camera (34) is connected with the input ends of the drawing module (32) and the list document module (33), the drawing module (32) comprises an electronic drawing modeling unit (321), a duplication removing unit (322) and a feature collecting unit (323), the output end of the duplication removing unit (322) is connected with the input end of the electronic drawing modeling unit (321), the output end of the electronic drawing modeling unit (321) is connected with the input end of the feature collecting unit (323), the output end of the high-definition camera (34) is connected with the input end of the list document module (33), and the list document module (33) comprises an electronic form reconstruction unit (331), a data comparison unit (332) and an EXCEL electronic document generation unit (333).
2. The engineering budget accounting management and control software according to claim 1, wherein: the data statistical system (4) comprises a data processing module (41) and a data detection module (42), the data processing module (41) comprises an online shopping platform access port (411), a unit price database unit (412), a data association unit (413), a data classification unit (414) and a calculation unit (415), and the output end of the data classification unit (414) is connected with the input end of the data classification unit (414).
3. The engineering budget accounting management and control software according to claim 2, wherein: the output end of the unit price database unit (412) is connected with the input end of the data association unit (413), and the output end of the online shopping platform access port (411) is connected with the input end of the unit price database unit (412).
4. The engineering budget accounting management and control software according to claim 3, wherein: the output end of the unit price database unit (412) is connected with the input end of the data association unit (413), the output end of the data association unit (413) is connected with the input end of the data classification unit (414), and the output end of the data classification unit (414) is connected with the input end of the calculation unit (415).
5. The engineering budget accounting management and control software according to claim 2, wherein: the data detection module (42) comprises a history comparison unit (421), a data duplication checking unit (422) and a special data marking unit (423), and the output ends of the history comparison unit (421) and the data duplication checking unit (422) are connected with the input end of the special data marking unit (423).
6. The engineering budget accounting management and control software according to claim 1, wherein: the record management system (2) comprises a printer (21), a manual operation recording unit (22), an annotation inserting unit (23) and a system history recording unit (24), the output ends of the data statistics system (4) and the data collection system (3) are connected with the input end of the record management system (2), and the output ends of the data collection system (3), the data statistics system (4) and the record management system (2) are coupled with the printer (21).
7. The engineering budget accounting management and control software according to claim 1, wherein: the cost control system (1) comprises a data distribution module (11), a cost change module (12) and an automatic suggestion module (13).
8. The engineering budget accounting management and control software according to claim 7, wherein: and the output end of the data statistical system (4) is respectively connected with the input ends of the data distribution module (11), the cost change module (12) and the automatic suggestion module (13).
CN202011246995.1A 2020-11-10 2020-11-10 Engineering budget accounting management and control management software Active CN112329411B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011246995.1A CN112329411B (en) 2020-11-10 2020-11-10 Engineering budget accounting management and control management software

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011246995.1A CN112329411B (en) 2020-11-10 2020-11-10 Engineering budget accounting management and control management software

Publications (2)

Publication Number Publication Date
CN112329411A true CN112329411A (en) 2021-02-05
CN112329411B CN112329411B (en) 2024-06-18

Family

ID=74318147

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011246995.1A Active CN112329411B (en) 2020-11-10 2020-11-10 Engineering budget accounting management and control management software

Country Status (1)

Country Link
CN (1) CN112329411B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101882225A (en) * 2009-12-29 2010-11-10 北京中科辅龙计算机技术股份有限公司 Engineering drawing material information extraction method based on template
CN102646144A (en) * 2012-03-16 2012-08-22 江西省电力公司 ObjectARX-based standardized intelligent design method for rural power network engineering
CN102880868A (en) * 2012-08-06 2013-01-16 上海中和软件有限公司 Engineering drawing vector conversion and primitive semantic extraction method
CN105975562A (en) * 2016-05-03 2016-09-28 水木智博(北京)网络信息科技有限公司 Method and apparatus for automatically generating budget table of engineering drawing
CN111626029A (en) * 2020-05-30 2020-09-04 阶梯项目咨询有限公司 Budget method and device for project consultation, electronic equipment and computer-readable storage medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101882225A (en) * 2009-12-29 2010-11-10 北京中科辅龙计算机技术股份有限公司 Engineering drawing material information extraction method based on template
CN102646144A (en) * 2012-03-16 2012-08-22 江西省电力公司 ObjectARX-based standardized intelligent design method for rural power network engineering
CN102880868A (en) * 2012-08-06 2013-01-16 上海中和软件有限公司 Engineering drawing vector conversion and primitive semantic extraction method
CN105975562A (en) * 2016-05-03 2016-09-28 水木智博(北京)网络信息科技有限公司 Method and apparatus for automatically generating budget table of engineering drawing
CN111626029A (en) * 2020-05-30 2020-09-04 阶梯项目咨询有限公司 Budget method and device for project consultation, electronic equipment and computer-readable storage medium

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘潇;邵定宏;: "工程图纸文本智能输入的研究与应用", 化工自动化及仪表, no. 06, 10 June 2012 (2012-06-10) *

Also Published As

Publication number Publication date
CN112329411B (en) 2024-06-18

Similar Documents

Publication Publication Date Title
CN110659273A (en) Data abnormity monitoring and repairing method of distributed big data acquisition platform
CN111178680B (en) Wind power plant engineering quality overall process management system, method and equipment
CN113011959A (en) Seven-expense intelligent auditing system and use method thereof
CN113190501A (en) Method for forming and filing electronic file for quality testing of water conservancy and hydropower engineering
CN112102443A (en) Marking system and marking method suitable for substation equipment inspection image
CN109242431B (en) Enterprise management method and system based on data system
Macdonald et al. A comparison of computer support systems for software inspection
CN115269874A (en) Intelligent contract examination method based on natural language understanding
CN115221380A (en) Method, system and platform for managing urban construction files in batches
CN114548650A (en) Power grid asset life cycle cost analysis method and system
CN112329411A (en) Engineering budget accounting management and control management software
CN111160681A (en) Method, device and storage medium for evaluating user income level based on user income and expenditure data
CN115456413A (en) Method, device and equipment for matching personnel with posts and storage medium
CN115907280A (en) User electricity utilization abnormity identification method based on electricity utilization characteristics
CN110597899B (en) Project expense management method and system
CN114003774A (en) A big data information collection system of electric power for wisdom city
CN112505604A (en) Measurement standard field evaluation process monitoring system
CN116562653B (en) Distributed energy station area line loss monitoring method and system
Grazianova et al. HBIM: The digital transformation of cultural and existing heritage
Guo et al. Financial Data Intelligent Analysis System Based on Big Data
CN114912846B (en) Comprehensive energy customer value mining energy efficiency evaluation method and device for online learning
CN117708186A (en) Intelligent adjustment and optimization method for application system
CN117194493A (en) Medical equipment purchase demonstration data management method, system and storage medium
CN116860894A (en) Configuration and processing method and device based on energy data warehouse and related medium thereof
Minggao et al. Research on the Application of LLM in Power Finance Middle Platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant