CN112292494A - Binding apparatus for scaffold operation pedal - Google Patents

Binding apparatus for scaffold operation pedal Download PDF

Info

Publication number
CN112292494A
CN112292494A CN201980036985.4A CN201980036985A CN112292494A CN 112292494 A CN112292494 A CN 112292494A CN 201980036985 A CN201980036985 A CN 201980036985A CN 112292494 A CN112292494 A CN 112292494A
Authority
CN
China
Prior art keywords
pressing
hook
bracket
scaffold
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201980036985.4A
Other languages
Chinese (zh)
Inventor
李英泫
殷钟爱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Publication of CN112292494A publication Critical patent/CN112292494A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G7/00Connections between parts of the scaffold
    • E04G7/02Connections between parts of the scaffold with separate coupling elements
    • E04G7/28Clips or connections for securing boards
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/08Scaffold boards or planks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mutual Connection Of Rods And Tubes (AREA)
  • Ladders (AREA)

Abstract

The invention relates to a binding device of scaffold operation pedal, further concretely, the binding device structurally comprises: in order to construct the operation pedal on the scaffold tube or the bracket, one side of the operation pedal is tied on the scaffold tube or the bracket, and the upper end part of the operation pedal is wrapped by the compressed compressing hook clamp; the other side of the operation pedal is tied on the scaffold tube or the bracket and is combined with the pressing hook clamp so that the operation pedal is fixed on the scaffold tube or the bracket. Therefore, when the operation pedal is constructed on the scaffold tube or the bracket, the structure is simplified, the assembly and the disassembly are easy, and the operation time can be shortened.

Description

Binding apparatus for scaffold operation pedal
Technical Field
The present invention relates to a binding apparatus for scaffold operation steps, which is required to secure a scaffold tube or a scaffold to a work space on a construction site or to secure a scaffold to a scaffold tube or a scaffold.
Background
In various construction sites such as construction and ship building, where there is a risk of falling or falling, it is common to provide a work foot board (foot board) for safe passage and construction of workers and the like.
In the conventional operation pedal, an operation pedal made of a quadrangular plate is transversely arranged on a horizontally fixed bracket for construction.
However, the conventional work foot plate is not practical because it is constructed by binding the front and rear ends of the foot plate to the scaffolding pipe or the scaffold with a binding tool such as a wire, and the binding tool is bound one by an operator for the construction of the binding tool, so that the dismantling work is complicated, and the connecting tool used once cannot be used again.
And the front and rear ends are arranged between the front and rear operation pedals through the annular clamping device, so that a space is generated and potential safety hazards exist.
According to korean patent office laid-open publication No. 10-2005-0120607, there is disclosed a technique of fixing a safety pedal by inserting U-bolts into binding holes formed at both sides of the pedal at a predetermined interval and fixing the safety pedal to a scaffold tube or a bracket.
However, in the conventional technology, in order to fix the safety step, the U-bolt is tied to the scaffold tube or the bracket at the lower part side and then fixed by the nut at the upper part after being hooked, so that there is a problem that the construction and the disassembly work are complicated and the time required is long.
Prior art documents
Patent document
(patent document 0001) KR (A)10-2005-0120607 (20051222)
Disclosure of Invention
Technical problem
Accordingly, the present invention has been made to solve the above-mentioned problems occurring in the prior art, and an object of the present invention is to provide a binding apparatus for scaffold operation foot plates, which has a simple structure of a clip for binding the operation foot plates to scaffold tubes or brackets to be fixed, and is convenient to assemble and disassemble, thereby greatly improving operability and safety.
Technical scheme
In order to solve the above-mentioned problems of the present invention, the present invention preferably comprises: one side of the operation pedal is tied on the scaffold tube or the bracket, and the upper end part of the operation pedal is wrapped by the compressed compressing hook clamp; the other side of the operation pedal is tied on the scaffold tube or the bracket and is combined with the pressing hook clamp so that the operation pedal is fixed on the scaffold tube or the bracket.
Preferably, the compression hook clip comprises: a lower hook part for loading the scaffold tube or the bracket into the inner part during bundling; a bracket extending to an upper portion of the lower hook; the upper part of the bracket is bent and extended towards the other side in a perpendicular way, and the upper end part of the operation pedal is pressed and wrapped by the pressing fixing frame. The bracket and the pressing fixing frame are formed into one or a pair separated by a preset length according to the shape of the scaffold tube or the bracket.
Preferably, the coupling hook clip comprises: a lower hook part for loading the scaffold tube or the bracket into the inner part during bundling; a bracket extending to an upper portion of the lower hook; and a hook ring which is bent to enable the tail end of the compression fixing frame to be combined with the upper end of the bracket. The bracket and the hook ring are formed into one or a pair separated by a preset length according to the shape of the scaffold tube or the bracket, and the hook ring is provided with a hook groove which is bent downwards into an arc shape or an angle shape at the upper end part of the bracket and is used for hooking and combining the pressing fixing frame.
Preferably, the pressing hook clip is formed such that the end of the pressing holder is formed as an anti-falling ridge for preventing falling off when the hook ring of the coupling hook clip is coupled, the anti-falling ridge being formed such that the end of the pressing holder is upwardly protruded in an arc shape or an angular shape.
Preferably, the method further comprises the following steps: when more than one operation pedal is extended and connected to the side, the operation pedals on two sides are bundled by a pressing hook clamp and a combination hook clamp, a connection pressing hook clamp is added at the middle position between the operation pedals to form a first pressing hook clamp and a second pressing hook clamp, and a connection fixing piece is used for mutually connecting the first pressing frame and the second pressing frame of the first pressing hook clamp and the second pressing hook clamp. The structure of connecting the stationary blade includes: a fixing clamp which is arranged in front of and behind the pressing part tightly attached to the operation pedal and enables the first pressing fixing frame to be inserted; a pressing wing part extending to the outer side of the fixing clamp and entering the lower part of the second pressing fixing frame to fix the connecting fixing piece on the operation pedal; a striking part vertically bent at one side of the pressing part for detaching with a striking device.
Advantageous effects
The binding device for the scaffold operation pedal has the advantages that the binding device for fixing the operation pedal on the scaffold pipe or the bracket has simple structure, so that the manufacturing cost and the construction cost are relatively economic;
the operation pedal is firmly fixed on the scaffold tube or the bracket, so that the scaffold tube or the bracket is stable, the assembly and the disassembly are easy, the time required by construction is reduced, and the stability and the operability are outstanding;
the scaffold operation pedal is convenient to connect and detach, so that the time required by construction is shortened.
Drawings
Fig. 1 is a perspective view illustrating a strapping apparatus of scaffold work footrests of the present invention;
fig. 2 is a perspective view illustrating a construction state of the strapping device of the scaffold work footrests of the present invention;
fig. 3 is a side view illustrating a construction state of the banding device of the scaffold operation footrests of the present invention;
fig. 4 is a side view illustrating another construction state of the scaffold operation foot-plate binding apparatus of the present invention;
fig. 5 is a front view illustrating a modified embodiment of a tension part in the scaffold work foot board binder structure of the present invention;
fig. 6 to 7 are perspective views illustrating a modified embodiment of the scaffold work foot strapping device of the present invention;
fig. 8 is a perspective view illustrating still another construction state of the scaffold work step bander of the present invention.
Description of the main symbols in the drawings
1: an operating pedal; 2: a scaffold tube or frame;
10: compressing the hook clamp; 10 a: a first compression hook clamp; 10 b: a second compression hook clamp;
11: a lower hook portion; 12: a support;
13: compressing the fixing frame; 13 a: a first compression mount; 13 b: a second pressing and fixing frame; 14: anti-falling ridges;
20: combining a hook clamp;
21: a lower hook portion; 22: a support; 23: a shackle; 23 a: a hook groove;
30: a tension section;
40: connecting a fixing sheet;
41: a pressing part; 42: fixing the clamp; 43: pressing the pressing part; 44: a striking part.
Detailed Description
The present invention is characterized by comprising: one side of the operation pedal 1 is tied on the scaffold tube or the bracket 2, and the upper end part of the operation pedal 1 is wrapped by the compressed compressing hook clamp 10; the other side of the working footrest 1 is tied to the footrest tube or the bracket 2, and is coupled to the pressing hook clip 10 to fix the working footrest 1 to the coupling hook clip 20 on the footrest tube or the bracket 2. The pressing hook clip 10 includes: a lower hook part 11 for mounting the scaffold tube or the bracket 2 inside when connecting; a bracket 12 extending to an upper portion of the lower hook 11; a pressing fixing frame 13 which is bent and extended to the other side at the upper part of the bracket 12 and presses and wraps the upper end part of the operation pedal 1. The holder 12 and the pressing holder 13 are formed in one or a pair of a predetermined length apart from each other according to the shape of the scaffold tube or the holder 2.
Various embodiments of the present invention are described below with reference to specific embodiments illustrated in the figures. The differences between the embodiments are not mutually exclusive, and a specific shape, structure and characteristic described in one embodiment is realized in another embodiment without departing from the spirit and scope of the technical solutions of the embodiments of the present invention.
The position or arrangement of the individual components of the various embodiments of the present invention may be changed, similar reference symbols in the drawings may represent the same or similar functions in various aspects, and the specific forms such as the length, the area, the thickness, etc. may be exaggerated for convenience of description.
The directions and positions of the drawing are described based on an XYZ orthogonal coordinate system, and the upper, lower, left, and right sides are aligned with an XY coordinate system, and the front, rear, left, and right sides are arranged to be aligned with a YZ coordinate system. In the drawings of the embodiments, the units, modules, portions and components of the lower member, which are not described, include general lower members having respective predetermined functions, and are not limited to the lower members shown in the drawings. Components that are shown but are generally omitted from illustration are included in various embodiments.
The terms used are those whose attributes conform to the meaning of a general dictionary for chinese characters, korean languages or english languages or terms used in the field, except specifically defined terms. "including, constituting, or provided" means that another member is also included, "fixed and constrained" means that the movement and the movement are restricted, "and" rotation and hinge "means that a part or all of the object can rotate and move.
Fig. 1 is a perspective view illustrating a scaffold work foot board binding apparatus of the present invention.
The invention relates to a binding device of scaffold operation pedal, comprising: a pressing hook clamp 10 that is bound to the scaffold tube or the bracket 2 on one side of the work footrest 1 to press and wrap the upper end of the work footrest 1, and a coupling hook clamp 20 that is bound to the scaffold tube or the bracket 2 on the other side of the work footrest 1 to couple the pressing hook clamp 10 and fix the work footrest 1 to the scaffold tube or the bracket 2.
The lower part of the pressing hook clamp 10 is provided with a scaffold tube or a lower hook part 11 in which the bracket 2 is arranged, the upper part of the lower hook part 11 is formed by extending a pair of brackets 12 separated by a preset length, the upper end of the bracket 12 is provided with a pair of pressing fixing frames 13 which are bent and extended perpendicularly to the other side direction to wrap the upper end part of the operation pedal 1, and the tail ends of the pressing fixing frames 13 are provided with anti-falling sills 14.
The anti-falling threshold 14 is formed by protruding upwards at the tail end of the pressing fixed frame 13 to form an arc shape or an angle shape.
The lower part of the combination hook clamp 20 is provided with a lower hook part 21 for the scaffold tube or the bracket 2 to be arranged inside, the upper part of the lower hook part 21 extends a pair of brackets 22 separated by a preset length, and the upper end of the bracket 22 is provided with a hook ring 23 for combining the tail end of the pressing fixing frame 13.
The hook ring 23 is bent downward to form an arc or an angle at the upper end of the bracket 22 to form a hook groove 23a, so that the pressing fixing frame 13 is hooked and tied.
The shapes of the lower hook portions 11, 21 and the brackets 12, 22 of the pressing hook clip 10 and the coupling hook clip 20 as described above are formed in the same structure.
The brackets 12, 22 constituting the pressing hook clip 10 and the coupling hook clip 20 may further include a tension part 30 that exerts a telescopic force and an elastic restoring force to maintain the binding and detachment and a firm pressing fixing state.
The tension portions 30 are provided on the brackets 12, 22, respectively, and are formed to protrude in a manner curved to face each other in an outward direction on the pair of brackets 12, 22.
The assembly jig for scaffold operation steps according to the present invention configured as described above can make the operation of steps on scaffold tubes or brackets very easy and simple.
Fig. 2 is a perspective view illustrating a construction state of the scaffold operation step tying device of the present invention, which is simply assembled at a place where an operation step 1 and a scaffold tube or a bracket 2 cross, and further fixes the operation step 1 to the scaffold tube or the bracket 2.
That is, the pressing hook clamp 10 is attached to one side of the scaffold tube or the bracket 2 of the working footrest 1, and the coupling hook clamp 20 is attached to the other side of the scaffold tube or the bracket 2 of the working footrest 1 opposite to the one side, and is further coupled to the pressing hook clamp 10.
In this case, the pressing hook clamp 10 is configured such that a scaffold tube or a bracket 2 located at a lower portion of one side of the working footrest 1 is fitted into the inside when the lower hook 11 is assembled, the bracket 12 is closely attached to one side surface of the working footrest 1, and the upper end portion of the working footrest 1 is passed through by the pressing fixing frame 2 bent toward the other side on the bracket 12.
The coupling hook clip 20 is assembled by fitting the lower hook 21 into the inside of the scaffold tube or the bracket 2 located at the lower part of the other side of the working footrest 1, closely attaching the bracket 22 to the other side of the working footrest 1, and tying the hook ring 23 bent at the upper part of the bracket 22 to the end of the pressing bracket 13.
At this time, the hook ring 23 is positioned inside the anti-drop sill 14 of the press fixing frame 13, thereby realizing a firm binding structure and preventing accidents such as dropping or loose connection of the hook ring 23 from the press fixing frame 13.
The tension portion 30 integrally bent and bent with the brackets 12 and 22 exerts a predetermined elastic action and a stretching force during the connection process, so that the worker can easily bundle and remove the hook ring 23 of the lower hook portion 21 with the press fixing frame 13 of the press hook clip 10. In the bound state, the tension portion 30 exerts an elastic restoring force, so that the compression-fixed state becomes firm.
As described above, in the binding apparatus of the present invention, as shown in fig. 3 to 4, a plurality of pressing hook clips 10 and coupling hook clips 20 are provided at each of positions crossing the scaffold tube or the bracket 2 along the length direction of the working footrest 1, so that the fixing state becomes firm.
In addition, the tension portion 30 is constructed such that the tension portion 30 can be arranged one above the other when the working steps 1 are overlapped according to fig. 5, and the expansion force and the elastic restoring force can be more easily exerted.
The coupling device for scaffold operation footrests according to the present invention is configured such that the pressing hook clamp 10 and the coupling hook clamp 20 can be deformed according to the shape of the scaffold tube or the bracket 2.
That is, according to fig. 6, if the scaffolding tube or the bracket 2 is formed in a quadrangular frame or a triangular frame shape, the shape of the lower hook portions 11, 21 may be changed to a quadrangular or triangular shape in order to conform to this.
In particular, if the scaffolding tube or support 2 is shaped as shown in figure 7, the scaffolding tube or support may be shaped as
Figure BDA0002809745690000061
Or a straight frame, the pressing hook clamp 10 is formed by bending a bracket 12 toward the upper end of the lower hook 11, the pressing holder 13 is formed by bending the bracket 12, the coupling hook clamp 20 is formed by bending a bracket 22 and the upper end of the lower hook 21, and the hook ring 23 is formed by bending the bracket 22.
Fig. 8 is a perspective view illustrating still another construction state of the scaffold operation step bander of the present invention, which can be constructed by extending the operation steps in a lateral direction, and to this end, further includes a connection fixing piece 40 for fixing the compression fixing frame of the compression hook clip 10 to a middle point of the operation step 1.
The connecting and fixing piece 40 is a fixing clamp 42 which is provided with a pressing fixing frame 13 at the front and the rear of a pressing part 41 closely attached to the operation pedal 1 and is inserted and fixed, the other pressing fixing frame 13 is pressed outside the fixing clamp 42 to form a pressing wing part 43 which fixes the connecting and fixing piece 40 on the operation pedal 1, and a striking part 44 which is struck by a striking device and facilitates the disassembly is vertically bent and formed at one side of the pressing part 41.
In the state of use of the connecting and fixing pieces 40 as described above, when one or more working steps 1 are extended and connected to the side, the working steps 1 on both sides are connected to each other by the pressing hook clamp 10 and the structure hook clamp 20, and the binding and pressing hook clamp 10 is added at the middle point between the working steps 1 to form the first and second pressing hook clamps 10a, 10b, and the connecting and fixing pieces 40 are bound and fixed at the portions where the first and second pressing fixing frames 13a, 13b of the first and second pressing hook clamps 10a, 10b are in contact with each other.
At this time, the outer pressing wing portion 43 of the fixing clip 42 is fitted into the lower portion of the second pressing bracket 13b of the second pressing hook clip 10b in a state where the first pressing bracket 13a of the first pressing hook clip 10a is inserted into the fixing clip 42 of the fixing connection piece 40, and the second pressing bracket 13b is coupled and fixed by the coupling hook clip 20 in a state where the first pressing hook clip is coupled by the fixing connection piece 40.
The above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: it is possible to modify the technical solutions described in the foregoing embodiments by adding, changing, deleting, or adding members, and the like, without departing from the scope of the technical solutions described in the embodiments of the present invention.
Industrial applications
The binding apparatus for scaffold operation pedals according to the present invention has a simple structure for fixing the operation pedals to scaffold tubes or brackets, and is economical in manufacturing cost and construction cost, capable of firmly fixing the operation pedals to the scaffold tubes or brackets to realize stability, easy to assemble and disassemble, capable of shortening the time required for construction, excellent in stability and operability, and capable of shortening the time required for construction by facilitating the binding and disassembling of the scaffold operation pedals, thereby having high industrial workability.

Claims (4)

1. A binding device of scaffold operation pedal is characterized in that,
the structure includes: one side of the operation pedal (1) is tied on the scaffold tube or the bracket (2), and the upper end part of the operation pedal (1) is wrapped by the compressed compressing hook clamp (10); a combination hook clamp (20) which is bound on the scaffold tube or the bracket (2) at the other side of the operation pedal (1) and is combined with the pressing hook clamp (10) to fix the operation pedal (1) on the scaffold tube or the bracket (2);
the compression hook clamp (10) comprises: a lower hook part (11) for loading the scaffold tube or the bracket (2) inside during binding; a bracket (12) extending to the upper part of the lower hook part (11); a pressing fixing frame (13) which is bent and extended from the upper part of the bracket (12) to the other side in a perpendicular way and presses and wraps the upper end part of the operation pedal (1);
the support (12) and the pressing fixing frame (13) are formed into one or a pair separated by a preset length according to the shape of the scaffold tube or the support (2).
2. The scaffold work foot plate binding apparatus according to claim 1,
the coupling hook clip (20) includes: a lower hook part (21) for loading the scaffold tube or the bracket (2) inside during binding; a bracket (22) extending to the upper part of the lower hook part (21); a hook ring (23) which is bent to enable the tail end of the pressing fixing frame (13) to be combined with the upper end of the bracket (22); the bracket (22) and the hook ring (23) are formed into one or a pair separated by a predetermined length according to the shape of the scaffold tube or the bracket (2), and the hook ring (23) is provided with a hook groove (23a) which is bent downwards into an arc shape or an angle shape at the upper end part of the bracket (22) and hooks and combines the pressing fixing frame (13).
3. The scaffold work foot plate binding apparatus according to claim 2,
the pressing hook clamp (10) is characterized in that the tail end of the pressing fixed frame (13) forms an anti-falling threshold (14) which is used for preventing falling when a hook ring (23) of the combined hook clamp (20) is combined, and the anti-falling threshold (14) is formed by upwards protruding into an arc shape or an angular shape at the tail end of the pressing fixed frame (13).
4. The scaffold work foot plate binding apparatus according to claim 1,
further comprising: when more than one operation pedal (1) is extended and connected to the side, the operation pedals (1) at two sides are bundled by a pressing hook clamp (10) and a combination hook clamp (20), and the bundling pressing hook clamp (10) is added at the middle position between the operation pedals (1) to form a first pressing hook clamp (10 a) and a second pressing hook clamp (10 b), and a connecting fixing piece (40) is used for bundling the first pressing frame (13 a) and the second pressing frame (13 b) of the first pressing hook clamp (10 a) and the second pressing hook clamp (10 b) mutually;
the structure of the connection fixing piece (40) comprises: a fixing clamp (42) which is arranged in front of and behind a pressing part (41) tightly attached to the operation pedal (1) and enables the first pressing fixing frame (13) to be inserted; a pressing wing part (43) extending towards the outer side of the fixing clamp (42) and entering the lower part of the second pressing and fixing frame (13) to fix the connecting and fixing sheet (40) on the operation pedal (1); a striking part (44) vertically bent and formed at one side of the pressing part (41) for detaching with a striking device.
CN201980036985.4A 2018-04-26 2019-04-19 Binding apparatus for scaffold operation pedal Pending CN112292494A (en)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
KR1020180048721A KR101919609B1 (en) 2018-04-26 2018-04-26 Rail fastening device of work plate of scaffolding
KR10-2018-0048721 2018-04-26
PCT/KR2019/004794 WO2019208981A1 (en) 2018-04-26 2019-04-19 Coupling device of scaffolding working platform

Publications (1)

Publication Number Publication Date
CN112292494A true CN112292494A (en) 2021-01-29

Family

ID=64561856

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201980036985.4A Pending CN112292494A (en) 2018-04-26 2019-04-19 Binding apparatus for scaffold operation pedal

Country Status (3)

Country Link
KR (1) KR101919609B1 (en)
CN (1) CN112292494A (en)
WO (1) WO2019208981A1 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61110748U (en) * 1984-12-25 1986-07-14
JPH08226228A (en) * 1995-02-20 1996-09-03 Takashi Hashiguchi Scaffolding board fixing device
JPH08260713A (en) * 1995-03-20 1996-10-08 Tomio Nishikawa Fastener for curing net
JPH0988335A (en) * 1995-09-22 1997-03-31 Teruo Ogata Scaffolding board binding device in prefabricated scaffolding in construction site
KR20080005217U (en) * 2007-05-04 2008-11-07 김종호 U-bolt type falsework fastener
CN203188601U (en) * 2013-05-06 2013-09-11 中铁二十四局集团安徽工程有限公司 Anti-upwarp clamp for scaffold board
KR20150133164A (en) * 2015-11-09 2015-11-27 주식회사백상 Platform Clamp

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS61110748U (en) * 1984-12-25 1986-07-14
JPH08226228A (en) * 1995-02-20 1996-09-03 Takashi Hashiguchi Scaffolding board fixing device
JPH08260713A (en) * 1995-03-20 1996-10-08 Tomio Nishikawa Fastener for curing net
JPH0988335A (en) * 1995-09-22 1997-03-31 Teruo Ogata Scaffolding board binding device in prefabricated scaffolding in construction site
KR20080005217U (en) * 2007-05-04 2008-11-07 김종호 U-bolt type falsework fastener
CN203188601U (en) * 2013-05-06 2013-09-11 中铁二十四局集团安徽工程有限公司 Anti-upwarp clamp for scaffold board
KR20150133164A (en) * 2015-11-09 2015-11-27 주식회사백상 Platform Clamp

Also Published As

Publication number Publication date
WO2019208981A1 (en) 2019-10-31
KR101919609B1 (en) 2018-11-19

Similar Documents

Publication Publication Date Title
JP6237581B2 (en) Wire harness and method of manufacturing wire harness
CN112292494A (en) Binding apparatus for scaffold operation pedal
EP2754901A2 (en) Trampoline frame pipe connector for interconnecting two frame pipe parts of a trampoline
KR20190007882A (en) Diagonally fix for system support
US11013279B2 (en) Fastener for wig and wig using the same
CN218040534U (en) Bracket arm bracket fixture
JP6148965B2 (en) Wiring and piping material holder
CN207107368U (en) Pipeline mount cable-tie
CN115489281A (en) Brace rod structure
KR101477565B1 (en) band clamp for pole pipe
DK175063B1 (en) Fixture for connection of scaffolding planks, couples together crossways two L-shaped profiles positioned with backs towards each other, and comprises first and second J-shape flanges
CN215600959U (en) High-voltage cable combination binding device
JP2018115714A (en) Lateral slippage prevention structure for wiring/piping material, lateral slippage prevention tool, lateral slippage prevention device and lateral slippage prevention method
KR101706788B1 (en) Apparatus for connecting with insulator
KR200390879Y1 (en) A fixing device for fittings of flexible tube
JP6486854B2 (en) Connection terminal box auxiliary clamp
CN215846714U (en) Sleeve clamp
JP2007231626A (en) Supporting fitting for reinforcing bar, supporting method, and assembly method for reinforcing bar
CN218863814U (en) Supporting device
US6347774B1 (en) Clip for fixing a part on a bar and document feeder comprising at least one such clip
GB2527600B (en) Fastener
JP3428399B2 (en) Concrete formwork coupler
CN216305150U (en) Quick connector for reinforcing steel bars
KR102576161B1 (en) Formwork clamp
CN209114605U (en) A kind of twisting resistance steel member

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20230224

AD01 Patent right deemed abandoned