CN112279097A - Method for hoisting long shaft vertical piece of offshore oil drilling rig - Google Patents
Method for hoisting long shaft vertical piece of offshore oil drilling rig Download PDFInfo
- Publication number
- CN112279097A CN112279097A CN202011137306.3A CN202011137306A CN112279097A CN 112279097 A CN112279097 A CN 112279097A CN 202011137306 A CN202011137306 A CN 202011137306A CN 112279097 A CN112279097 A CN 112279097A
- Authority
- CN
- China
- Prior art keywords
- long shaft
- vertical
- offshore oil
- drilling machine
- oil drilling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 39
- 238000000034 method Methods 0.000 title claims abstract description 19
- 239000003208 petroleum Substances 0.000 claims abstract description 8
- 235000012431 wafers Nutrition 0.000 abstract 1
- 238000010276 construction Methods 0.000 description 5
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 230000007306 turnover Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C13/00—Other constructional features or details
- B66C13/04—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
- B66C13/08—Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for depositing loads in desired attitudes or positions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/12—Slings comprising chains, wires, ropes, or bands; Nets
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C19/00—Cranes comprising trolleys or crabs running on fixed or movable bridges or gantries
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66D—CAPSTANS; WINCHES; TACKLES, e.g. PULLEY BLOCKS; HOISTS
- B66D1/00—Rope, cable, or chain winding mechanisms; Capstans
- B66D1/60—Rope, cable, or chain winding mechanisms; Capstans adapted for special purposes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C2700/00—Cranes
- B66C2700/01—General aspects of mobile cranes, overhead travelling cranes, gantry cranes, loading bridges, cranes for building ships on slipways, cranes for foundries or cranes for public works
Abstract
The invention provides a method for hoisting a long shaft vertical sheet of an offshore oil drilling rig, which comprises the following steps: a. hanging a main hook of the portal crane on an auxiliary lifting lug of a long shaft vertical sheet of the marine petroleum drilling machine, and hanging two auxiliary hooks of the portal crane on a turning-over lifting lug of the long shaft vertical sheet of the marine petroleum drilling machine; b. synchronously lifting the vertical slice of the long shaft of the offshore oil drilling machine by the main hook and the two auxiliary hooks, turning over the vertical slice of the long shaft of the offshore oil drilling machine by the two auxiliary hooks, and lifting the vertical slice of the long shaft of the offshore oil drilling machine by the main hook for positioning; c. after the drop position adjustment meets the precision requirement, fixedly connecting the winch with the long shaft to anchor the winch in the direction vertical to the long shaft; d. the lower end of a long shaft base of the long shaft vertical piece of the offshore oil drilling machine is welded on a temporary clamping plate fixed on a horizontal plane, after temporary fixation is achieved, a lifting rope of the portal crane is removed, and the work of the vertical piece is completed. The safety risk of turning over the wafers in the hoisting process is reduced.
Description
Technical Field
The invention relates to the technical field of a transition structure of a marine oil module sliding shipment wharf front edge, in particular to a method for hoisting a long shaft vertical piece of a marine oil drilling machine.
Background
The modular drilling rig is an assembled offshore drilling rig adopting a modular structure, is usually placed on an offshore fixed platform, and mainly comprises three large modules, namely a drilling equipment system module, a drilling support system module and a bulk tank module. The drilling equipment system module mainly comprises a lower base sliding system, a slideway beam and a drilling platform surface. The long shaft of the lower sliding base system is designed to be 45 tons, and is generally a frame structure of 17m multiplied by 9m multiplied by 0.7m, and two transverse supporting shafts are arranged and mainly comprise main upright posts and supporting section steel. The lower base system is difficult to construct, mainly embodying the construction precision and the folding precision of two long shafts, wherein the folding precision is the most important. In the prior art, the long shaft vertical piece lifted by the crawler crane cannot be separated from the slideway, more resources in the slideway area are occupied, the construction cost is increased, the body is turned over by using the auxiliary lifting of the truck crane and more manpower for auxiliary pulling, and the long shaft piece can shake in the lifting process of the crawler crane, so that the long shaft can be deformed. In the walking process of the crawler crane, the preliminary preparation work such as road surface leveling, steel plate laying and the like is complex. When the group is to the operation, the group is to the adjustment of falling position, needs the manpower to carry out the guide chain cooperation, and more manpower is carried out the cooperation and is hoisted the activity duration long, and the construction is more complicated, and construction cycle generally is about 25 days, and the safety risk is great. Therefore, there is a need in the art for a method and apparatus that can shorten the assembly time of the slide, save the resources of the field, save the labor, and reduce the cost of the project.
Disclosure of Invention
Aiming at the defects in the prior art, the invention provides a method for hoisting a long shaft vertical piece of an offshore oil drilling machine.
In order to achieve the purpose, the invention is realized by the following technical scheme:
a method for hoisting a long shaft vertical sheet of an offshore oil drilling rig comprises the following steps:
a. hanging a main hook of the portal crane on an auxiliary lifting lug of a long shaft vertical sheet of the marine petroleum drilling machine, and hanging two auxiliary hooks of the portal crane on a turning-over lifting lug of the long shaft vertical sheet of the marine petroleum drilling machine;
b. synchronously lifting the vertical slice of the long shaft of the offshore oil drilling machine by the main hook and the two auxiliary hooks, turning over the vertical slice of the long shaft of the offshore oil drilling machine by the two auxiliary hooks, and lifting the vertical slice of the long shaft of the offshore oil drilling machine by the main hook for positioning;
c. after the drop position adjustment meets the precision requirement, fixedly connecting the winch with the long shaft to anchor the winch in the direction vertical to the long shaft;
d. the lower end of a long shaft base of the long shaft vertical piece of the offshore oil drilling machine is welded on a temporary clamping plate fixed on a horizontal plane, after temporary fixation is achieved, a lifting rope of the portal crane is removed, and the work of the vertical piece is completed.
The main hook adopts a high-strength sling or a steel wire rope.
The auxiliary hook adopts a high-strength hanging strip.
The vertical pieces of the long shafts of the offshore oil drilling machine are provided with two long shafts, the number of the windlasses is four, every two windlasses form a group, and each group is fixedly connected with the upper end of each long shaft.
Compared with the prior art, the invention has the beneficial effects that: the three hook heads of the portal crane are used for erecting the sheets, the three hooks are synchronously and integrally lifted, the two small hooks are synchronously turned over, the large hook assists in lifting, the single-group adjustment of the falling position is realized, fewer construction operators are required in the lifting process, the folding period is short, and the safety risk is reduced; in addition, the sling is used for replacing a traditional steel wire rope in the falling position adjustment, the falling position adjustment efficiency is high, and the accuracy is high.
Drawings
FIG. 1 is a schematic diagram of a long shaft vertical piece of an offshore oil rig during lifting and turning over.
FIG. 2 is a schematic diagram of a long shaft stand of an offshore oil rig in a landing position.
Detailed Description
The invention is further illustrated by the following examples.
The gantry crane comprises three hook heads, a main hook and two auxiliary hooks, the distance between the two auxiliary hooks is generally 12 meters, the distance between two main upright posts of a long shaft of the drilling machine module is 15-17 meters, so that the two auxiliary hooks are hung on the upright piece turning lifting lugs, and the main hook is hung on the two auxiliary lifting lugs. The main hook adopts high strength suspender or wire rope, adopts high strength suspender in this embodiment. The auxiliary hook adopts a high-strength hanging strip. Because the hanging strip has elasticity, when the auxiliary hook single hook is adjusted up and down, the assembly and the falling process can be adjusted along the axial direction of the long shaft conveniently.
The method for hoisting the long shaft vertical piece of the offshore oil drilling rig as shown in the figures 1-2 comprises the following steps:
a. hanging a main hook of the portal crane on an auxiliary lifting lug of a long shaft vertical sheet of the marine petroleum drilling machine, and hanging two auxiliary hooks of the portal crane on a turning-over lifting lug of the long shaft vertical sheet of the marine petroleum drilling machine;
b. synchronously lifting the vertical slice of the long shaft of the offshore oil drilling machine by the main hook and the two auxiliary hooks, turning over the vertical slice of the long shaft of the offshore oil drilling machine by the two auxiliary hooks, and lifting the vertical slice of the long shaft of the offshore oil drilling machine by the main hook for positioning;
c. after the drop position adjustment meets the precision requirement, fixedly connecting the winch with the long shaft to anchor the winch in the direction vertical to the long shaft; the vertical pieces of the long shafts of the offshore oil drilling machine are two long shafts, in the embodiment, the number of the windlasses is four, every two windlasses form a group, and each group is fixedly connected with the upper end of each long shaft;
d. the lower end of a lower long shaft base of the long shaft vertical piece of the offshore oil rig is welded on a temporary clamping plate fixed on a horizontal plane, after temporary fixation is achieved, a lifting rope of the portal crane is removed, and the work of the vertical piece is completed.
The long shaft vertical sheet is hoisted by the portal crane by the method, the hoisting efficiency is high, and the vertical sheet period is generally 15 days; moreover, the turnover operation does not need the participation of constructors, so that the turnover risk can be reduced; the long shaft can be built without building on two sides of the slideway, and the slideway area is not occupied; the hoisting process is stable, safe and efficient.
The above description is only for the preferred embodiment of the present invention, but the present invention is not limited to the above specific embodiments, and those skilled in the art can make various changes and modifications without departing from the inventive concept of the present invention, which falls into the protection scope of the present invention.
Claims (4)
1. A method for hoisting a long shaft vertical sheet of an offshore oil drilling rig is characterized by comprising the following steps:
a. hanging a main hook of the portal crane on an auxiliary lifting lug of a long shaft vertical sheet of the marine petroleum drilling machine, and hanging two auxiliary hooks of the portal crane on a turning-over lifting lug of the long shaft vertical sheet of the marine petroleum drilling machine;
b. synchronously lifting the vertical slice of the long shaft of the offshore oil drilling machine by the main hook and the two auxiliary hooks, turning over the vertical slice of the long shaft of the offshore oil drilling machine by the two auxiliary hooks, and lifting the vertical slice of the long shaft of the offshore oil drilling machine by the main hook for positioning;
c. after the drop position adjustment meets the precision requirement, fixedly connecting the winch with the long shaft to anchor the winch in the direction vertical to the long shaft;
d. the lower end of a lower long shaft base of the long shaft vertical piece of the offshore oil rig is welded on a temporary clamping plate fixed on a horizontal plane, after temporary fixation is achieved, a lifting rope of the portal crane is removed, and the work of the vertical piece is completed.
2. The method as claimed in claim 1, wherein the main hook is a high strength sling or wire rope.
3. The method as claimed in claim 1, wherein the auxiliary hook is a high-strength hanging strip.
4. The method as claimed in claim 1, wherein the vertical pieces of the long shaft of the offshore oil rig are two long shafts, the hoisting machines are four long shafts, each two long shafts are in a group, and each group is fixedly connected with the upper end of each long shaft.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011137306.3A CN112279097A (en) | 2020-10-22 | 2020-10-22 | Method for hoisting long shaft vertical piece of offshore oil drilling rig |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011137306.3A CN112279097A (en) | 2020-10-22 | 2020-10-22 | Method for hoisting long shaft vertical piece of offshore oil drilling rig |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112279097A true CN112279097A (en) | 2021-01-29 |
Family
ID=74423242
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011137306.3A Pending CN112279097A (en) | 2020-10-22 | 2020-10-22 | Method for hoisting long shaft vertical piece of offshore oil drilling rig |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112279097A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112875538A (en) * | 2021-01-05 | 2021-06-01 | 上海市机械施工集团有限公司 | Prefabricated assembly type overhead box girder hoisting process |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104711964A (en) * | 2015-03-24 | 2015-06-17 | 中国海洋石油总公司 | Process for keeping ocean structure in upright or inclined state |
JP2018030709A (en) * | 2016-08-26 | 2018-03-01 | 株式会社タダノ | crane |
CN108726359A (en) * | 2018-06-04 | 2018-11-02 | 中天科技集团海洋工程有限公司 | A kind of loop wheel machine turn technique |
-
2020
- 2020-10-22 CN CN202011137306.3A patent/CN112279097A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104711964A (en) * | 2015-03-24 | 2015-06-17 | 中国海洋石油总公司 | Process for keeping ocean structure in upright or inclined state |
JP2018030709A (en) * | 2016-08-26 | 2018-03-01 | 株式会社タダノ | crane |
CN108726359A (en) * | 2018-06-04 | 2018-11-02 | 中天科技集团海洋工程有限公司 | A kind of loop wheel machine turn technique |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112875538A (en) * | 2021-01-05 | 2021-06-01 | 上海市机械施工集团有限公司 | Prefabricated assembly type overhead box girder hoisting process |
CN112875538B (en) * | 2021-01-05 | 2022-05-24 | 上海市机械施工集团有限公司 | Prefabricated overhead box girder hoisting process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205387439U (en) | Mast hoisting accessory | |
CN112279097A (en) | Method for hoisting long shaft vertical piece of offshore oil drilling rig | |
CN201567160U (en) | Detachable combined high-level crane boom | |
CN210171980U (en) | Automatic material taking manipulator for NG | |
CN203486787U (en) | Integral lifting device for cabinet top of Wiggins coal gas cabinet | |
CN110640383A (en) | Container ship ligature bridge weldment work platform | |
CN107487724B (en) | Non-crane-assisted large floating crane arm support mounting device and mounting method | |
CN102062538A (en) | Method for mounting head sprocket wheel of belt sintering machine | |
CN214648855U (en) | Dredger piling bar installing system | |
CN210563326U (en) | Overhead unit type overhead sliding splicing operation platform | |
CN210214549U (en) | Auxiliary assembly for horizontal installation of tower barrel accessory | |
CN209760046U (en) | Transport support and transport device | |
CN209924462U (en) | Rail type horizontal load moving and transporting device for steel structure sliding construction | |
CN210620081U (en) | Cantilever crane device suitable for dismantling external scaffold of assembled high-rise residence | |
CN109457700B (en) | Pile top walking type pile foundation construction platform, erecting method thereof and pile foundation construction method | |
CN107700854B (en) | Steel plate wall sliding installation device and installation method for super high-rise core tube | |
CN210025766U (en) | Movable jig frame device for manufacturing box girder steel reinforcement framework | |
CN219839952U (en) | Pier body hangs rail installation operation combination formula removal lift platform device | |
CN220312209U (en) | Frame type high pile construction operation platform | |
CN217376979U (en) | New jersey guardrail horizontal type prefabrication method steel reinforcement framework integral hoisting device | |
CN213834386U (en) | Portable carrier roller changer of steel wire rope core belt conveyor | |
CN218024998U (en) | Host computer of aerial passenger device in pit overhauls uses hoisting equipment | |
CN214696949U (en) | Intelligent self-climbing discharging platform | |
CN217323086U (en) | Large-scale substation equipment lifting device under indoor special construction environment | |
CN218088599U (en) | Detachable hydraulic lifting portal frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210129 |
|