CN112273908A CN202011104120.8A CN202011104120A CN112273908A CN 112273908 A CN112273908 A CN 112273908A CN 202011104120 A CN202011104120 A CN 202011104120A CN 112273908 A CN112273908 A CN 112273908A
Authority
CN
China
Prior art keywords
frame
outer frame
positioning
display device
progress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011104120.8A
Other languages
Chinese (zh)
Inventor
冯聪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202011104120.8A priority Critical patent/CN112273908A/en
Publication of CN112273908A publication Critical patent/CN112273908A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47BTABLES; DESKS; OFFICE FURNITURE; CABINETS; DRAWERS; GENERAL DETAILS OF FURNITURE
    • A47B97/00Furniture or accessories for furniture, not provided for in other groups of this subclass
    • A47B97/02Devices for holding or supporting maps, drawings, or the like, including means for preventing rolling-up
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F21LIGHTING
    • F21VFUNCTIONAL FEATURES OR DETAILS OF LIGHTING DEVICES OR SYSTEMS THEREOF; STRUCTURAL COMBINATIONS OF LIGHTING DEVICES WITH OTHER ARTICLES, NOT OTHERWISE PROVIDED FOR
    • F21V33/00Structural combinations of lighting devices with other articles, not otherwise provided for
    • F21V33/0004Personal or domestic articles
    • F21V33/0012Furniture
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47BTABLES; DESKS; OFFICE FURNITURE; CABINETS; DRAWERS; GENERAL DETAILS OF FURNITURE
    • A47B2220/00General furniture construction, e.g. fittings
    • A47B2220/0075Lighting
    • A47B2220/0077Lighting for furniture, e.g. cupboards and racks

Landscapes

  • Health & Medical Sciences (AREA)
  • Public Health (AREA)
  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses an engineering progress display device for building engineering management and a using method thereof, wherein the engineering progress display device for building engineering management comprises a first outer frame and a second outer frame, the front walls of the first outer frame and the second outer frame are installed through hinges, support sleeves are installed at the front and back of the bottoms of the first outer frame and the second outer frame, support legs are inserted into the support sleeves, positioning rods are fixedly installed at the top ends of the support sleeves, the positioning rods are conveniently inserted into positioning grooves formed in the front and back of the bottoms of the first outer frame and the second outer frame, the installation is convenient, the support legs are movably inserted into the support sleeves, the support legs can conveniently move in the positions inside of the support sleeves, and the heights of the first outer frame and the second outer frame can be positioned and adjusted through the matching of pin holes and pins.

Description

Project progress display device for building project management and use method thereof
Technical Field
The invention relates to the technical field of constructional engineering, in particular to an engineering progress display device for constructional engineering management and a using method thereof.
Background
Building engineering: the method comprises urban and rural planning, architecture, architectural structure design, architectural electrical design, water supply and drainage design, heating ventilation air conditioner design, landscape garden design, urban gas design, architectural decoration design, municipal road and bridge design, geotechnical engineering, architectural engineering geological survey, architectural engineering measurement, architectural protection design, architectural chemical design, architectural construction, architectural decoration construction, water supply and drainage construction, architectural electrical construction, heating ventilation and air conditioner construction, municipal road and bridge construction, urban gas construction, landscape garden construction, architectural electromechanical equipment installation, architectural engineering management, architectural engineering detection, architectural engineering cost, building materials and other professional directions.
At present, when construction engineering is constructed, construction drawings need to be used, construction can be conducted on designated positions of a construction site better through the construction drawings, a construction progress display board can be generally and fixedly installed on the construction site, the construction drawings are attached to the display board, the current display board is single in structure, the drawing is inconvenient to disassemble and assemble, meanwhile, the display board is inconvenient to disassemble and assemble, transportation is complicated, when light is dark, indication contents on the drawing cannot be well seen, the positions needing to be constructed cannot be located and indicated, and the use is inconvenient.
Disclosure of Invention
Technical problem to be solved
Aiming at the defects of the prior art, the invention provides an engineering progress display device for building engineering management and a using method thereof, which have the advantages of convenience in storage, positioning adjustment on height, reinforcement stability, convenience in disassembly and assembly, construction progress positioning indication and the like, and the problems of convenience in storage, positioning adjustment on height, reinforcement stability, convenience in disassembly and assembly, construction progress positioning indication and the like are solved.
(II) technical scheme
In order to achieve the purposes of convenient storage, positioning adjustment of height, stability reinforcement, convenient disassembly and assembly and construction progress positioning indication, the invention provides the following technical scheme: an engineering progress display device for building engineering management comprises a first outer frame and a second outer frame, wherein the front walls of the first outer frame and the second outer frame are installed through hinges, supporting sleeves are installed at the front and back of the bottoms of the first outer frame and the second outer frame, supporting legs are inserted into the supporting sleeves, pin holes are formed in the front walls of the supporting sleeves and the front walls of the supporting legs, positioning sleeves are fixedly installed at the relative positions of the supporting sleeves, lower reinforcing plates and upper reinforcing plates are placed on the inner sides of the supporting sleeves and hinged to each other, positioning columns are fixedly installed at the two ends of the bottoms of the lower reinforcing plates and the upper reinforcing plates and inserted into the positioning sleeves, lamp tubes are fixedly installed at the relative positions inside the left side of the first outer frame and the right side of the second outer frame, and wires are fixedly installed in the left wall of the first outer frame and the right wall of the second outer frame, the conducting wires are fixedly connected with the lamp tubes, the first outer frame and the second outer frame are internally provided with placing grooves, and the inside of the placing groove is fixedly provided with a magnetic plate, the inside of the placing groove is provided with an engineering progress drawing, and the project progress drawing is attached on the magnetic plate, the periphery of the project progress drawing is pressed with magnets, and the magnet is adsorbed on the magnetic plate, the engineering progress drawing is adsorbed with a progress indication mark, the front walls of the first outer frame and the second outer frame are inserted with fixed frames, and the interior of the fixed frame is fixedly provided with toughened glass, the upper part and the lower part of the first outer frame and the second outer frame are provided with limiting plates, and a limiting rod is fixedly arranged on two sides of one side face of the limiting plate relative to the first outer frame and the second outer frame, the limiting rod is sequentially inserted into the first outer frame, the second outer frame and the fixed frame, and a pull ring is fixedly arranged on one side face of the limiting plate far away from the first outer frame and the second outer frame.
Preferably, the bottom of first frame and second frame has seted up the constant head tank, support sleeve's top fixed mounting has the locating lever, the locating lever is pegged graft in the constant head tank, and locating lever and constant head tank are regular hexagon structure.
Preferably, the pin holes formed in the front wall of the support leg are linearly arranged, the number of the pin holes is not less than six, and pins are inserted into the pin holes.
Preferably, the number and the position of the supporting sleeve are four, the positioning sleeves are arranged in a staggered mode in pairs, and the positioning columns are matched with the positioning sleeves.
Preferably, a power plug is fixedly installed at one end of the wire, which is far away from the first outer frame and the second outer frame, the power plug is electrically connected with an external power supply, and the magnetic plate and the magnet are opposite in polarity.
Preferably, the progress indication mark comprises a magnetic indicator, the magnetic indicator is pressed on the engineering progress drawing, the magnetic indicator is adsorbed on the magnetic plate, a fixed column is fixedly mounted at the top of the magnetic indicator, and a pull disc is fixedly mounted at one end, far away from the magnetic indicator, of the fixed column.
Preferably, the first outer frame, the second outer frame and the fixed frame are provided with limiting holes at relative positions, the limiting holes in the first outer frame and the second outer frame are of through hole structures, the limiting rods are inserted in the limiting holes, and the bottom of the supporting leg is fixedly provided with the supporting disc.
Preferably, mounting grooves are formed in the front walls of the first outer frame and the second outer frame from top to bottom, the hinge is connected in the mounting grooves through screws and threads, the front walls of the fixed frame and the first outer frame and the second outer frame are located on the same horizontal plane, and pull grooves which are arranged oppositely are formed in two sides of the front wall of the fixed frame.
Preferably, the lower reinforcing plate and the upper reinforcing plate have the same specification, magnets are fixedly mounted inside the front walls of the first outer frame and the second outer frame at opposite positions, the magnets are a group of magnets with opposite polarities, and a square-shaped pull ring is fixedly mounted at the front opposite position of the tops of the first outer frame and the second outer frame.
The invention also provides a use method of the project progress display device for building project management, which comprises the following steps:
the first step is as follows: the first outer frame and the second outer frame are opened, so that the front walls of the first outer frame and the second outer frame are positioned on the same horizontal plane, and the limiting rods are inserted into limiting holes formed in the relative positions of the first outer frame and the second outer frame, so that the positions of the first outer frame and the second outer frame can be limited and fixed;
the second step is that: the support leg is moved in the support sleeve, the pin is inserted into the pin hole, the position of the support leg can be limited and fixed, the positioning rod is inserted into positioning grooves formed in the front and back of the bottoms of the first outer frame and the second outer frame, the first outer frame and the second outer frame can be positioned and supported, the lower reinforcing plate and the upper reinforcing plate are opened, and the positioning column is inserted into the positioning sleeve;
the third step: draw out the gag lever post from the inside spacing hole of seting up of first frame and second frame, place the inside of standing groove with the engineering progress drawing, with the magnet pressfitting around the engineering progress drawing, the engineering progress drawing adsorbs on the magnetic sheet this moment, remove the assigned position of engineering progress drawing progress with the magnetism index mark, the magnetism index mark adsorbs on the magnetic sheet this moment, inside the place ahead of first frame and second frame is pegged graft to toughened glass, first frame is pegged graft to the gag lever post this moment, in the spacing hole that second frame and fixed frame relative position were seted up, peg graft on external power with the plug on the wire can.
The fourth step: follow first frame with the gag lever post, pull out in the spacing hole that second frame and fixed frame relative position seted up, offer some kerfs through the fixed frame antetheca of pulling and can follow the inside of first frame and second frame with fixed frame, pull out in the constant head tank that the bottom of this moment was offered the locating lever from first frame and second frame, overlap first frame and second frame upset together, the inside fixed mounting's of first frame and second frame antetheca relative position magnet adsorbs together this moment, can carry first frame and second frame, pull out the reference column from the position sleeve, can carry support sleeve and supporting leg.
Advantageous effects
Compared with the prior art, the invention provides an engineering progress display device for building engineering management and a using method thereof, and the engineering progress display device has the following beneficial effects:
1. there is the locating lever at support sleeve's top fixed mounting, be convenient for peg graft the locating lever in seting up some constant head tanks around first frame and second frame bottom, it is comparatively convenient to install, it has the supporting leg to peg graft in support sleeve's inside activity, the supporting leg of being convenient for carries out the position removal in support sleeve's inside, cooperation through pinhole and pin, can highly advance line location to adjust first frame and second frame, opposite face fixed mounting at support sleeve has the position sleeve, be convenient for peg graft the reference column in the position sleeve, cooperation through gusset plate and last gusset plate down, can consolidate the stability when support sleeve and supporting leg use.
2. Hinge is installed through the screw in first frame and the inside relative position of second frame antetheca, be convenient for fold first frame and second frame and accomodate, it is comparatively convenient to carry, it has the gag lever post to peg graft from top to bottom at first frame and second frame, be convenient for carry on spacing fixedly to the position of first frame and second frame through the gag lever post, consolidate the stability of first frame and second frame use, there is magnet at the inside fixed mounting of the antetheca relative position of first frame and second frame, be convenient for under the effect of magnet, can fold together first frame and the better folding of second frame, top relative position fixed mounting at first frame and second frame has back font pull ring, be convenient for through the pull ring, can be with the better transport of first frame and second frame.
3. The standing groove has been seted up in the inside of first frame and second frame, be convenient for place engineering progress drawing in the standing groove, there is the magnetic sheet at the inside fixed mounting of standing groove, it can be spacing with engineering progress drawing in the standing groove to be convenient for pass through magnet, the dismouting is comparatively convenient, pressfitting has the magnetism index mark on engineering progress drawing, be convenient for can carry out the location indication to the engineering progress through the magnetism index mark, be convenient for constructor better knows the construction progress, there is the rolling disc through fixed column fixed mounting at the top of magnetism index mark, be convenient for through the cooperation of fixed column and rolling disc, better carry out the position with the magnetism index mark and remove.
4. Inserting fixed frame in the antetheca of first frame and second frame, be convenient for peg graft in fixed frame through the gag lever post, can carry out spacing fixed to fixed frame and toughened glass's position, toughened glass can protect engineering progress drawing this moment, there is the fluorescent tube at the inside fixed mounting in the both sides of first frame and second frame, be convenient for through wire and external power supply cooperation, the fluorescent tube lights this moment, can shine engineering progress drawing, make the better construction progress on the observation engineering progress drawing of constructor.
Drawings
FIG. 1 is a schematic view of the overall structure of the present invention;
FIG. 2 is a schematic view of the support sleeve structure of the present invention;
FIG. 3 is a schematic structural view of a lower reinforcing plate and an upper reinforcing plate according to the present invention;
FIG. 4 is a cross-sectional view of a first frame structure according to the present invention;
FIG. 5 is a schematic view of a first outer frame structure according to the present invention;
FIG. 6 is a schematic diagram of a structure of a progress indicator according to the present invention;
fig. 7 is a sectional view of the first frame, the second frame, the limiting plate and the fixing frame according to the present invention.
In the figure: 1-a first outer frame, 2-a second outer frame, 3-a support sleeve, 4-a positioning rod, 5-a support leg, 6-a pin hole, 7-a positioning sleeve, 8-a lower reinforcing plate, 9-an upper reinforcing plate, 10-a positioning column, 11-a lamp tube, 12-a lead, 13-a placement groove, 14-a magnetic plate, 15-an engineering progress drawing, 16-a magnet, 17-a progress indicator, 18-a magnetic indicator, 19-a fixing column, 20-a pull disc, 21-a fixing frame, 22-toughened glass, 23-a limiting plate, 24-a limiting rod and 25-a pull ring.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Referring to fig. 1-7, the present invention provides the following technical solutions: an engineering progress display device for building engineering management comprises a first outer frame 1 and a second outer frame 2, wherein magnets are fixedly arranged inside the front walls of the first outer frame 1 and the second outer frame 2 at opposite positions, the magnets are a group of magnets with opposite polarities, the first outer frame 1 and the second outer frame 2 can be folded better under the action of the magnets, a reversed-square-shaped pull ring is fixedly arranged at the front opposite position of the top of the first outer frame 1 and the top of the second outer frame 2, the first outer frame 1 and the second outer frame 2 can be better transported through the pull ring, mounting grooves are formed in the upper portion and the lower portion of the front walls of the first outer frame 1 and the second outer frame 2, hinges are connected in the mounting grooves through screws and threads, the first outer frame 1 and the second outer frame 2 can be conveniently folded and stored, the carrying is convenient, positioning grooves are formed in the bottoms of the first outer frame 1 and the second outer frame 2, and the front walls of the first outer frame 1 and the second outer frame 2, the front and back of the bottoms of the first outer frame 1 and the second outer frame 2 are provided with support sleeves 3, the number of the support sleeves 3 is four, the top of the support sleeve 3 is fixedly provided with a positioning rod 4, the positioning rod 4 is convenient to be inserted into positioning grooves formed in the front and back of the bottoms of the first outer frame 1 and the second outer frame 2, the installation is convenient, the positioning rod 4 is inserted into the positioning groove, the positioning rod 4 and the positioning groove are both in a regular hexagon structure, the support leg 5 is inserted into the support sleeve 3, the support leg 5 can conveniently move in position in the support sleeve 3, the heights of the first outer frame 1 and the second outer frame 2 can be positioned and adjusted through the matching of a pin hole 6 and a pin, the bottom of the support leg 5 is fixedly provided with a support plate, the front walls of the support sleeves 3 and the support legs 5 are both provided with pin, the number of the pin holes 6 is not less than six, pins are inserted into the pin holes 6, the relative positions of the support sleeve 3 are fixedly provided with positioning sleeves 7, so that the positioning columns 10 are conveniently inserted into the positioning sleeves 7, the stability of the support sleeve 3 and the support leg 5 in use can be reinforced through the matching of a lower reinforcing plate 8 and an upper reinforcing plate 9, the positioning sleeves 7 are arranged in a staggered mode in pairs, the lower reinforcing plate 8 and the upper reinforcing plate 9 are placed on the inner side of the support sleeve 3, the lower reinforcing plate 8 is hinged with the upper reinforcing plate 9, the specifications of the lower reinforcing plate 8 and the upper reinforcing plate 9 are the same, the two ends of the bottom of the lower reinforcing plate 8 and the upper reinforcing plate 9 are fixedly provided with positioning columns 10, the positioning columns 10 are inserted into the positioning sleeves 7, the positioning columns 10 are matched with the positioning sleeves 7, the lamp tubes 11 are fixedly arranged at the relative positions inside the left side of the first outer frame 1 and the right side of the second outer, at the moment, the lamp tube 11 is lighted, so that a constructor can better observe the construction progress on the engineering progress drawing 15, the left wall of the first outer frame 1 and the right wall of the second outer frame 2 are fixedly provided with the lead 12, the lead 12 is fixedly connected with the lamp tube 11, one end of the lead 12, far away from the first outer frame 1 and the second outer frame 2, is fixedly provided with a power plug, the power plug is electrically connected with an external power supply, the first outer frame 1 and the second outer frame 2 are internally provided with the placing groove 13, the engineering progress drawing 15 is conveniently placed in the placing groove 13, the magnetic plate 14 is fixedly arranged in the placing groove 13, the engineering progress drawing 15 can be conveniently limited in the placing groove 13 through the magnet 16, the disassembly and assembly are convenient, the engineering progress drawing 15 is placed in the placing groove 13, the engineering progress drawing 15 is attached to the magnetic plate 14, and the magnet 16 is pressed around the engineering progress drawing 15, the magnet 16 is adsorbed on the magnetic plate 14, the magnetic plate 14 and the magnet 16 have opposite polarities, the engineering progress drawing 15 is adsorbed with a progress indicator 17, the progress indicator 17 comprises a magnetic indicator 18, the engineering progress drawing 15 is pressed with the magnetic indicator 18, and the magnetic indicator 18 is adsorbed on the magnetic plate 14, so that the engineering progress can be positioned and indicated through the magnetic indicator 18, a constructor can know the construction progress better, a fixing column 19 is fixedly installed at the top of the magnetic indicator 18, a pull disc 20 is fixedly installed at one end of the fixing column 19 far away from the magnetic indicator 18, so that the magnetic indicator 18 can be moved through the matching of the fixing column 19 and the pull disc 20, a fixing frame 21 is inserted in the front walls of the first outer frame 1 and the second outer frame 2, the fixing frame 21 is inserted in the fixing frame 21 through a limiting rod 24, and the positions of the fixing frame 21 and the toughened glass 22 can be limited and fixed, at the moment, the tempered glass 22 can protect the engineering progress drawing 15, the front wall of the fixing frame 21 and the front walls of the first outer frame 1 and the second outer frame 2 are positioned on the same horizontal plane, pull grooves which are oppositely arranged are formed in two sides of the front wall of the fixing frame 21, limiting holes are formed in the relative positions of the first outer frame 1, the second outer frame 2 and the fixing frame 21, the limiting holes in the first outer frame 1 and the second outer frame 2 are of through hole structures, the tempered glass 22 is fixedly arranged in the fixing frame 21, limiting plates 23 are arranged above and below the first outer frame 1 and the second outer frame 2, limiting rods 24 are fixedly arranged on two sides of one side face of each limiting plate 23, which is opposite to the first outer frame 1 and the second outer frame 2, the positions of the first outer frame 1 and the second outer frame 2 are conveniently limited and fixed through the limiting rods 24, the stability of the first outer frame 1 and the second outer frame, the limiting rod 24 is sequentially inserted into the first outer frame 1, the second outer frame 2 and the fixing frame 21, and a pull ring 25 is fixedly mounted on one side face, far away from the first outer frame 1 and the second outer frame 2, of the limiting plate 23.
A use method of an engineering progress display device for building engineering management comprises the following steps:
the first step is as follows: the first outer frame 1 and the second outer frame 2 are opened, so that the front walls of the first outer frame 1 and the second outer frame 2 are positioned on the same horizontal plane, and the limiting rod 24 is inserted into a limiting hole formed in the relative position of the first outer frame 1 and the second outer frame 2, so that the positions of the first outer frame 1 and the second outer frame 2 can be limited and fixed;
the second step is that: the position of the support leg 5 is moved in the support sleeve 3, the pin is inserted into the pin hole 6, the position of the support leg 5 can be limited and fixed, the positioning rod 4 is inserted into positioning grooves formed in the front and back of the bottoms of the first outer frame 1 and the second outer frame 2, the first outer frame 1 and the second outer frame 2 can be positioned and supported, the lower reinforcing plate 8 and the upper reinforcing plate 9 are opened, and the positioning column 10 is inserted into the positioning sleeve 7;
the third step: draw out gag lever post 24 from first frame 1 and the inside spacing hole of seting up of second frame 2, place the inside of standing groove 13 with engineering progress drawing 15, 16 pressfittings of magnet are around engineering progress drawing 15, engineering progress drawing 15 adsorbs on magnetic sheet 14 this moment, remove the assigned position of engineering progress drawing 15 progress with magnetism indicator 18, magnetism indicator 18 adsorbs on magnetic sheet 14 this moment, peg graft inside the place ahead of first frame 1 and second frame 2 with toughened glass 22, peg graft first frame 1 with gag lever post 24 this moment, second frame 2 and fixed frame 21 relative position set up some spacing holes in this moment, peg graft on external power supply with the plug on the wire 12 can.
The fourth step: draw out gag lever post 24 from first frame 1, second frame 2 and the relative position of fixed frame 21 offer some spacing holes, offer some kerfs through the fixed frame 21 antetheca of pulling and can take out fixed frame 21 from the inside of first frame 1 and second frame 2, draw out locating lever 4 from the constant head tank that has been offered to the bottom of first frame 1 and second frame 2 this moment, overlap together first frame 1 and the upset of second frame 2, the inside fixed mounting's of first frame 1 and the 2 antetheca of second frame magnet absorption together this moment, can carry first frame 1 and second frame 2, draw out reference column 10 from position sleeve 7, can carry supporting sleeve 3 and supporting leg 5.
It is to be noted that, in the present invention, relational terms such as first and second, and the like are used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (10)

1. The utility model provides an engineering progress display device for building engineering management, includes first frame (1) and second frame (2), its characterized in that: the lamp tube fixing device is characterized in that front walls of the first outer frame (1) and the second outer frame (2) are installed through hinges, supporting sleeves (3) are installed at the front and back of the bottoms of the first outer frame (1) and the second outer frame (2), supporting legs (5) are inserted into the supporting sleeves (3), pin holes (6) are formed in the front walls of the supporting sleeves (3) and the front walls of the supporting legs (5), positioning sleeves (7) are fixedly installed at the relative positions of the supporting sleeves (3), lower reinforcing plates (8) and upper reinforcing plates (9) are placed on the inner sides of the supporting sleeves (3), the lower reinforcing plates (8) are hinged to the upper reinforcing plates (9), positioning columns (10) are fixedly installed at two ends of the bottoms of the lower reinforcing plates (8) and the upper reinforcing plates (9), the positioning columns (10) are inserted into the positioning sleeves (7), lamp tubes (11) are fixedly installed at the relative positions inside the left side of the first outer frame (1) and the right side of the second outer, the lamp tube comprises a first outer frame (1), a second outer frame (2), a lamp tube (11), a guide wire (12), a placing groove (13), a magnetic plate (14), an engineering progress drawing (15), a progress indication mark (17), fixing frames (21), toughened glass (22), a fixing frame (21), a lamp tube (12), a lamp tube (11), a placing groove (13), a magnet plate (14), a progress drawing (15), a progress indication mark (17), a fixing frame (21), a toughened glass (22), a toughened glass (2), a lamp tube and a lamp tube (12), limiting plate (23) have been placed from top to bottom of first frame (1) and second frame (2), and a side both sides fixed mounting of limiting plate (23) relative first frame (1) and second frame (2) has gag lever post (24), gag lever post (24) are pegged graft in proper order in first frame (1), second frame (2) and fixed frame (21), a side fixed mounting that first frame (1) and second frame (2) were kept away from in limiting plate (23) has pull ring (25).
2. The project progress display device for building project management according to claim 1, characterized in that: the bottom of first frame (1) and second frame (2) has seted up the constant head tank, the top fixed mounting of support sleeve (3) has locating lever (4), locating lever (4) are pegged graft in the constant head tank, and locating lever (4) and constant head tank are regular hexagon structure.
3. The project progress display device for building project management according to claim 1, characterized in that: the pin holes (6) formed in the front wall of the supporting leg (5) are linearly arranged, the number of the pin holes (6) is not less than six, and pins are inserted into the pin holes (6).
4. The project progress display device for building project management according to claim 1, characterized in that: the number and the position of the supporting sleeve (3) are four, the positioning sleeves (7) are arranged in a staggered mode in pairs, and the positioning columns (10) are matched with the positioning sleeves (7).
5. The project progress display device for building project management according to claim 1, characterized in that: one end of the wire (12) far away from the first outer frame (1) and the second outer frame (2) is fixedly provided with a power plug, the power plug is electrically connected with an external power supply, and the magnetic plate (14) and the magnet (16) are opposite in polarity.
6. The project progress display device for building project management according to claim 1, characterized in that: progress indication mark (17) include magnetic indicator (18), pressfitting has magnetic indicator (18) on engineering progress drawing (15), and magnetic indicator (18) adsorb on magnetic sheet (14), the top fixed mounting of magnetic indicator (18) has fixed column (19), and fixed column (19) keep away from the one end fixed mounting of magnetic indicator (18) and have reel (20).
7. The project progress display device for building project management according to claim 1, characterized in that: spacing holes have been seted up to first frame (1), second frame (2) and fixed frame (21) relative position, and spacing hole on first frame (1) and second frame (2) is through-hole structure, gag lever post (24) are pegged graft in spacing hole, the bottom fixed mounting of supporting leg (5) has the supporting disk.
8. The project progress display device for building project management according to claim 1, characterized in that: the mounting groove has been seted up from top to bottom to the antetheca of first frame (1) and second frame (2), and the hinge passes through screw threaded connection in the mounting groove, the antetheca of fixed frame (21) and first frame (1) and second frame (2) is located same horizontal plane, the kerve of relative setting is seted up to the antetheca both sides of fixed frame (21).
9. The project progress display device for building project management according to claim 1, characterized in that: the lower reinforcing plate (8) and the upper reinforcing plate (9) are identical in specification, magnets are fixedly mounted inside front walls of the first outer frame (1) and the second outer frame (2) in opposite positions and are a group of magnets with opposite polarities, and a square-shaped pull ring is fixedly mounted in the front of the top of the first outer frame (1) and the top of the second outer frame (2) in opposite positions.
10. A method for using an engineering progress display device for building engineering management is characterized by comprising the following steps: the method comprises the following steps:
the first step is as follows: the first outer frame (1) and the second outer frame (2) are opened, so that the front walls of the first outer frame (1) and the second outer frame (2) are positioned on the same horizontal plane, and the limiting rod (24) is inserted into a limiting hole formed in the relative position of the first outer frame (1) and the second outer frame (2), so that the positions of the first outer frame (1) and the second outer frame (2) can be limited and fixed;
the second step is that: the position of the supporting leg (5) is moved in the supporting sleeve (3), the pin is inserted into the pin hole (6), the position of the supporting leg (5) can be limited and fixed, the positioning rod (4) is inserted into positioning grooves formed in the front and back of the bottoms of the first outer frame (1) and the second outer frame (2), the first outer frame (1) and the second outer frame (2) can be positioned and supported, the lower reinforcing plate (8) and the upper reinforcing plate (9) are opened, and the positioning column (10) is inserted into the positioning sleeve (7);
the third step: draw out gag lever post (24) from first frame (1) and the inside spacing hole of seting up of second frame (2), place the inside of standing groove (13) with engineering progress drawing (15), with magnet (16) pressfitting around engineering progress drawing (15), engineering progress drawing (15) adsorb on magnetic sheet (14) this moment, remove magnetic indicator (18) to the assigned position of engineering progress drawing (15) progress, magnetic indicator (18) adsorb on magnetic sheet (14) this moment, inside the place ahead of first frame (1) and second frame (2) is pegged graft to toughened glass (22), peg graft first frame (1) this moment, in the spacing hole that second frame (2) and fixed frame (21) relative position were seted up, peg graft on wire (12) on the external power source can.
The fourth step: the limiting rod (24) is pulled out from limiting holes arranged at the opposite positions of the first outer frame (1), the second outer frame (2) and the fixed frame (21), the fixing frame (21) can be taken out from the inside of the first outer frame (1) and the second outer frame (2) by pulling the pull groove arranged on the front wall of the fixing frame (21), at the moment, the positioning rod (4) is pulled out from the positioning groove arranged on the bottom of the first outer frame (1) and the second outer frame (2), the first outer frame (1) and the second outer frame (2) are overturned and overlapped together, at the moment, the magnets fixedly arranged inside the front walls of the first outer frame (1) and the second outer frame (2) are adsorbed together, the first outer frame (1) and the second outer frame (2) can be transported, and the support sleeve (3) and the support leg (5) can be transported by pulling the positioning column (10) out of the positioning sleeve (7).
CN202011104120.8A 2020-10-15 2020-10-15 Project progress display device for building project management and use method thereof Pending CN112273908A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011104120.8A CN112273908A (en) 2020-10-15 2020-10-15 Project progress display device for building project management and use method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011104120.8A CN112273908A (en) 2020-10-15 2020-10-15 Project progress display device for building project management and use method thereof

Publications (1)

Publication Number Publication Date
CN112273908A true CN112273908A (en) 2021-01-29

Family

ID=74496601

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011104120.8A Pending CN112273908A (en) 2020-10-15 2020-10-15 Project progress display device for building project management and use method thereof

Country Status (1)

Country Link
CN (1) CN112273908A (en)

Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090040711A1 (en) * 2007-08-10 2009-02-12 Hon Hai Precision Industry Co., Ltd. Drive bracket assembly
CN106724065A (en) * 2017-01-22 2017-05-31 恽启嘉 A kind of Multifunctional rack
CN108538165A (en) * 2018-06-01 2018-09-14 广西科技大学鹿山学院 A kind of solar energy practice-training teaching plate
CN209028979U (en) * 2018-12-24 2019-06-25 山西传媒学院 A kind of dismountable billboard of advertisement marketing
CN209252259U (en) * 2018-11-02 2019-08-16 江西太升实业有限公司 A kind of process photo frame internal pictures convenient changing device
CN209674828U (en) * 2019-04-22 2019-11-22 苏州攻城狮科技有限公司 Promotional plate is used in a kind of popularization of commercial matters information
CN209947161U (en) * 2019-02-25 2020-01-14 邵阳学院 Think political affairs and use high efficiency teaching board
CN209993317U (en) * 2019-07-23 2020-01-24 南京林业大学 A bulletin board for building engineering management
CN210006432U (en) * 2019-05-06 2020-01-31 王淑芝 Progress management display device that kind of building engineering construction used
CN210122865U (en) * 2019-03-25 2020-03-03 浙江广成装饰工程有限公司 Intelligent door and window convenient to disassemble and assemble
CN210124460U (en) * 2019-03-21 2020-03-06 李婷 Drawing display device for civil engineering
CN211062344U (en) * 2019-11-27 2020-07-21 辽宁有色地质地理信息研究院有限公司 Map marking device for mapping geographic information
CN211124914U (en) * 2019-12-23 2020-07-28 辽宁生态工程职业学院 Tourism management information show propaganda device
CN211130146U (en) * 2019-09-10 2020-07-31 吉红 Folding multifunctional drawing frame for architectural design
CN211245457U (en) * 2019-11-24 2020-08-14 江苏经贸职业技术学院 Etiquette gesture contrast trainer
CN211591991U (en) * 2020-01-09 2020-09-29 南阳理工学院 Teaching board of giving lessons for education and teaching

Patent Citations (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20090040711A1 (en) * 2007-08-10 2009-02-12 Hon Hai Precision Industry Co., Ltd. Drive bracket assembly
CN106724065A (en) * 2017-01-22 2017-05-31 恽启嘉 A kind of Multifunctional rack
CN108538165A (en) * 2018-06-01 2018-09-14 广西科技大学鹿山学院 A kind of solar energy practice-training teaching plate
CN209252259U (en) * 2018-11-02 2019-08-16 江西太升实业有限公司 A kind of process photo frame internal pictures convenient changing device
CN209028979U (en) * 2018-12-24 2019-06-25 山西传媒学院 A kind of dismountable billboard of advertisement marketing
CN209947161U (en) * 2019-02-25 2020-01-14 邵阳学院 Think political affairs and use high efficiency teaching board
CN210124460U (en) * 2019-03-21 2020-03-06 李婷 Drawing display device for civil engineering
CN210122865U (en) * 2019-03-25 2020-03-03 浙江广成装饰工程有限公司 Intelligent door and window convenient to disassemble and assemble
CN209674828U (en) * 2019-04-22 2019-11-22 苏州攻城狮科技有限公司 Promotional plate is used in a kind of popularization of commercial matters information
CN210006432U (en) * 2019-05-06 2020-01-31 王淑芝 Progress management display device that kind of building engineering construction used
CN209993317U (en) * 2019-07-23 2020-01-24 南京林业大学 A bulletin board for building engineering management
CN211130146U (en) * 2019-09-10 2020-07-31 吉红 Folding multifunctional drawing frame for architectural design
CN211245457U (en) * 2019-11-24 2020-08-14 江苏经贸职业技术学院 Etiquette gesture contrast trainer
CN211062344U (en) * 2019-11-27 2020-07-21 辽宁有色地质地理信息研究院有限公司 Map marking device for mapping geographic information
CN211124914U (en) * 2019-12-23 2020-07-28 辽宁生态工程职业学院 Tourism management information show propaganda device
CN211591991U (en) * 2020-01-09 2020-09-29 南阳理工学院 Teaching board of giving lessons for education and teaching

Similar Documents

Publication Publication Date Title
CN112273908A (en) Project progress display device for building project management and use method thereof
CN208215162U (en) A kind of support in steel pipe with laser positioning
CN105372394B (en) A kind of ultraviolet degradation experimental provision
CN214834924U (en) Pipe truss assembly jig frame
CN201328587Y (en) Truss
CN207181724U (en) A kind of dismountable blinds box bracket
CN210067618U (en) Road construction road sealing plate convenient to dismantle
CN207974615U (en) A kind of construction site isolating device
CN210378334U (en) Publicity column is used in municipal administration
CN207776522U (en) A kind of Multifunctional mobile combination classroom
CN112535354A (en) Traditional chinese medicine storage cabinet
CN217208725U (en) Supporting device for outdoor transformer box
CN205330211U (en) Portable optics darkroom
CN216202296U (en) Liquid crystal splicing screen with high connection stability
CN205216899U (en) Physics electricity experiment cupboard
CN216664493U (en) Assembled equipment room
CN208589200U (en) One kind showing instructional device for geology
CN205009832U (en) Outdoor teaching device
CN110836040A (en) Dustproof device for building engineering convenient to dismouting
CN213087542U (en) Combined assembled gallery
CN221043826U (en) Spliced wood-plastic material landscape box
CN108387071A (en) A kind of ventilative drying storage device for Shui nationality handwoven cloth
CN209099658U (en) A kind of eaves splicing construction
CN217859535U (en) A simulation welding set that is used for welding of LNG film type under-deck film piece to train
CN217840433U (en) Fixing device of assembled shear force wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20210129

RJ01 Rejection of invention patent application after publication