CN112270555B - Distribution network dispatching instruction ticket safety checking system and method - Google Patents

Distribution network dispatching instruction ticket safety checking system and method Download PDF

Info

Publication number
CN112270555B
CN112270555B CN202011273291.3A CN202011273291A CN112270555B CN 112270555 B CN112270555 B CN 112270555B CN 202011273291 A CN202011273291 A CN 202011273291A CN 112270555 B CN112270555 B CN 112270555B
Authority
CN
China
Prior art keywords
ticket
instruction
checking
module
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202011273291.3A
Other languages
Chinese (zh)
Other versions
CN112270555A (en
Inventor
杨晨曦
海迪
张瑞颖
王品
王勇
欧钰瞧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Power Grid Co Ltd
Original Assignee
Yunnan Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yunnan Power Grid Co Ltd filed Critical Yunnan Power Grid Co Ltd
Priority to CN202011273291.3A priority Critical patent/CN112270555B/en
Publication of CN112270555A publication Critical patent/CN112270555A/en
Application granted granted Critical
Publication of CN112270555B publication Critical patent/CN112270555B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q30/00Commerce
    • G06Q30/018Certifying business or products
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Human Resources & Organizations (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Development Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Public Health (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Accounting & Taxation (AREA)
  • Finance (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

The invention relates to a distribution network dispatching instruction ticket safety checking system and a distribution network dispatching instruction ticket safety checking method, and belongs to the technical field of electric power system dispatching operation. The system comprises a collecting device, an instruction ticket classifying module, a keyword identifying module, a power failure operation ticket checking module, a power restoration operation ticket checking module, a fault log/abnormal defect recording list checking module, a power restoration control module and the like. After the distribution network scheduling instruction ticket safety checking system is formally on line, the manpower resource waste is reduced, the manpower resource benefit maximization is achieved, and the problem of shortage of the distribution network manpower resources is solved to a certain extent. And secondly, the safety measure arrangement is changed from the traditional manual input manual check process into an automatic intelligent check process, so that the scheduling operation efficiency, the power supply reliability and the safety are improved.

Description

Distribution network dispatching instruction ticket safety checking system and method
Technical Field
The invention belongs to the technical field of power system dispatching operation, and particularly relates to a distribution network dispatching instruction ticket security checking system and a distribution network dispatching instruction ticket security checking method.
Background
Since the OMS network order is implemented, the safety measures in the planning work all depend on-site work application, mode audit, and order issuing operation after the dispatcher initiates an operation order. And the fault defect is realized on site by an operator, and a dispatcher issues an order after having three inspections of safety measures. In the process, a large amount of manual repeated operation exists, a large amount of manual checking time is needed, and safety risks are formed when the human resources are insufficient.
When the dispatching desk issues the instruction ticket and records the instruction, no safety measure logic check is generated, the safety measures in the power outage and restoration process are only recorded manually, and the risk of mistakenly recording and misoperation exists to cause power transmission with a ground wire. Therefore, how to overcome the defects of the prior art is a problem to be solved urgently in the technical field of the scheduling operation of the power system at present.
Disclosure of Invention
The invention aims to solve the defects of the prior art and provides a system and a method for safety check of a distribution network dispatching instruction ticket.
In order to achieve the purpose, the technical scheme adopted by the invention is as follows:
a distribution network dispatching instruction ticket safety checking system comprises:
the acquisition device is used for acquiring a maintenance request form and a distribution network scheduling instruction ticket submitted on site; the instruction ticket comprises a power failure operation ticket, a power restoration operation ticket and a fault log/abnormal defect record sheet;
the instruction ticket classification module is connected with the acquisition device, is pre-stored with each instruction ticket template, and classifies the acquired instruction tickets according to the instruction ticket templates; the types of the instruction tickets are power failure operation, power restoration operation, fault log/abnormal defect record;
the keyword identification module is respectively connected with the acquisition device and the instruction ticket classification module and is used for identifying whether keywords exist in the instruction ticket according to the classification of the instruction ticket; the system is also used for identifying keywords in the maintenance application form;
the power failure operation ticket checking module is connected with the keyword recognition module and used for checking the power failure operation ticket according to the content recognized by the keyword recognition module, and when N tasks with primary equipment dismantling safety measures are recognized in the maintenance application form and the corresponding N tasks with the primary equipment dismantling safety measures are also recognized in the power failure operation ticket, the power failure operation ticket checking is passed;
the power restoration operation ticket checking module is connected with the keyword recognition module and used for checking the power restoration operation ticket according to the content recognized by the keyword recognition module, and when N tasks with primary equipment safety measures for dismantling are recognized in the power failure operation ticket corresponding to the power restoration operation ticket and the corresponding N tasks with primary equipment safety measures for recovery are also recognized in the power restoration operation ticket, the power restoration operation ticket is checked to pass;
the fault log/abnormal defect record list checking module is connected with the keyword recognition module and is used for checking if a task for dismantling the primary equipment safety measure in a record group in the fault log/abnormal defect record list is matched with a task for recovering the primary equipment safety measure;
and the power recovery control module is respectively connected with the power recovery operation ticket checking module and the fault log/abnormal defect record list checking module and is used for performing power recovery control and recovering power supply after the power recovery operation ticket checking module and the fault log/abnormal defect record list checking module pass checking.
Further, preferably, in the instruction ticket classifying module, similarity matching is performed between the collected instruction tickets and all instruction ticket templates by using a difference hash algorithm, and the class of the template with the highest similarity is taken as the class of the collected instruction tickets.
Further, it is preferable that the keyword included in the task of removing the safety measure of the primary equipment includes switching from hot standby or cold standby to overhaul, closing the grounding switch or installing the grounding wire.
Further, it is preferable that the keyword included in the task of recovering the safety measure of the primary equipment includes switching from maintenance to hot standby or cold standby, pulling the grounding switch open, or removing the installed grounding wire.
Further, preferably, the system further comprises an alarm module, wherein the alarm module is connected with the power failure operation ticket checking module, the power restoration operation ticket checking module and the fault log/abnormal defect record list checking module, and when the checking fails, an alarm is given to remind a checking worker.
The invention also provides a distribution network dispatching instruction ticket security checking method, and the distribution network dispatching instruction ticket security checking system comprises the following steps:
step (1), when needing to be overhauled or having faults and defects, having finished the power cut, and after dismantling the safety measures of primary equipment, collecting an overhaul application form and a distribution network dispatching instruction ticket submitted on site, and classifying the collected instruction tickets;
step (2), if the collected instruction ticket is a power failure operation ticket, carrying out keyword identification on an overhaul application form and the power failure operation ticket, and when N tasks for dismantling the primary equipment safety measure are carried out in the overhaul application form and the corresponding N tasks for dismantling the primary equipment safety measure are also identified in the power failure operation ticket, checking the power failure operation ticket;
step (3), if the collected instruction ticket is a power restoration operation ticket, carrying out keyword identification on the power restoration operation ticket and a power failure operation ticket corresponding to the power restoration operation ticket, and when N tasks with primary equipment safety measures for dismantling are identified in the power failure operation ticket and the corresponding N tasks with primary equipment safety measures for restoring are also identified in the power restoration operation ticket, checking the power restoration operation ticket;
step (4), if the collected instruction ticket is a fault log/abnormal defect record list, identifying that a task for dismantling the safety measures of the primary equipment in a record group in the fault log/abnormal defect record list is matched with a task for recovering the safety measures of the primary equipment, and checking to pass;
step (5), after the check of the power restoration operation ticket is passed, if no fault log/abnormal defect record list exists at the power supply part to be restored, restoring the safety measures of the primary equipment and restoring the power supply;
and after the check of the power recovery operation order is passed, if a fault log/abnormal defect record list exists at the power supply part to be recovered and the check is passed, recovering the safety measures of primary equipment and recovering the power supply.
Further, preferably, if the power failure operation ticket, the power restoration operation ticket, and the fault log/abnormal defect record list do not pass the verification, the information that the verification does not pass is returned to the distribution network scheduling system, and the distribution network scheduling system is revised again.
In the invention, if the task of dismantling the primary equipment safety measure and the task of recovering the primary equipment safety measure have the notes which are not executed, the task is ignored during checking.
When the invention searches and identifies the keyword, the continuity of the keyword is not required, that is, the keyword is a character, and other contents can be contained in the middle of the character, that is, the keyword can be disassembled, for example, the XX outdoor switch stations 01a7, 01B7 and 01C7 grounding switches are closed, and the combination is also used for detecting the keyword "closing grounding switches".
Compared with the prior art, the invention has the beneficial effects that:
after the distribution network scheduling instruction ticket safety checking system is formally on line, the human resource waste is reduced, the human resource benefit maximization is achieved, and the problem of shortage of the human resources of the distribution network is solved to a certain extent. And secondly, the safety measure arrangement is changed from the traditional manual input manual check into an automatic intelligent check process, so that the scheduling operation efficiency, the power supply reliability and the safety are improved.
The operator spends 5 minutes of working time to fill and inspect safety measure logic according to each operation ticket and fault log/abnormal defect, and after a safety logic checking function is adopted, the labor time of each production professional can be saved by 3 minutes, and the labor cost of a dispatching side is calculated according to 300/day, and the number of working days is 251 days. The labor cost of the operation and maintenance side is calculated by 300/day for 3 persons at a time. The labor cost (dispatching side) is saved by 0.05 × 300 × 251 × 3765 yuan, and the labor cost (operation and maintenance side) is saved by 0.05 × 300 × 251 × 3 × 11295 yuan.
Drawings
FIG. 1 is a schematic structural diagram of a distribution network dispatching instruction ticket security checking system according to the present invention; 101, a collecting device; 102. an instruction ticket classification module; 103. a keyword recognition module; 104. a power failure operation ticket checking module; 105. a check module of the complex electricity operation ticket; 106. a fault log/abnormal defect record list checking module; 107. a complex control module; 108. an alarm module; wherein the arrow direction is a number or signal trend.
Detailed Description
The present invention will be described in further detail with reference to examples.
It will be appreciated by those skilled in the art that the following examples are illustrative of the invention only and should not be taken as limiting the scope of the invention. The examples do not specify particular techniques or conditions, and are performed according to the techniques or conditions described in the literature in the art or according to the product specifications. The materials or equipment used are not indicated by manufacturers, and all are conventional products available by purchase.
A distribution network dispatching instruction ticket safety checking system comprises:
the acquisition device 101 is used for acquiring a maintenance request form and a distribution network scheduling instruction ticket submitted on site; the instruction ticket comprises a power failure operation ticket, a power restoration operation ticket and a fault log/abnormal defect record sheet;
the instruction ticket classifying module 102 is connected with the acquisition device 101, is pre-stored with each instruction ticket template, and classifies the acquired instruction tickets according to the instruction ticket templates; the types of the instruction ticket are power failure operation, power restoration operation and fault log/abnormal defect record;
the keyword identification module 103 is respectively connected with the acquisition device 101 and the instruction ticket classification module 102, and is used for identifying whether keywords exist in the instruction ticket according to the classification of the instruction ticket; the system is also used for identifying keywords in the maintenance application form;
the power failure operation ticket checking module 104 is connected with the keyword identification module 103 and is used for checking the power failure operation ticket according to the content identified by the keyword identification module 103, and when N tasks with primary equipment safety measures to be dismantled are identified in the maintenance application form and the corresponding N tasks with the primary equipment safety measures to be dismantled are also identified in the power failure operation ticket, the power failure operation ticket checking is passed;
the power restoration operation ticket checking module 105 is connected with the keyword recognition module 103 and is used for checking the power restoration operation tickets according to the contents recognized by the keyword recognition module 103, and when N tasks with primary equipment safety measures for dismantling are recognized in the power failure operation tickets corresponding to the power restoration operation tickets, and meanwhile, N tasks with primary equipment safety measures for restoring are also recognized in the power restoration operation tickets, the power restoration operation tickets pass checking;
a fault log/abnormal defect record list checking module 106, connected to the keyword recognition module 103, for passing the checking when the task of removing the primary device safety measure in the record group in the fault log/abnormal defect record list matches the task of recovering the primary device safety measure;
and the power recovery control module 107 is respectively connected with the power recovery operation ticket checking module 105 and the fault log/abnormal defect record list checking module 106, and is used for performing power recovery control and recovering power supply after the power recovery operation ticket checking module 105 and the fault log/abnormal defect record list checking module 106 check.
Preferably, in the instruction ticket classifying module 102, the similarity matching is performed between the collected instruction tickets and all instruction ticket templates by using a difference hash algorithm, and the class of the template with the highest similarity is taken as the class of the collected instruction tickets.
Preferably, the keywords included in the task of removing the safety measures of the primary equipment include switching from hot standby or cold standby to maintenance, closing a grounding switch or installing a grounding wire.
Preferably, the keywords included in the task of recovering the safety measures of the primary equipment include switching from service to hot standby or cold standby, pulling the grounding switch open or removing the installed grounding wire.
Preferably, the system further comprises an alarm module 108, wherein the alarm module 108 is connected with the power failure operation ticket checking module 104, the power restoration operation ticket checking module 105 and the fault log/abnormal defect record list checking module 106, and when the checking fails, an alarm is given to remind a checking worker, and preferably, the sound and light alarm can be given.
The distribution network dispatching instruction ticket safety checking method adopts the distribution network dispatching instruction ticket safety checking system and comprises the following steps:
step (1), when needing to be overhauled or having faults and defects, having finished the power cut, and after dismantling the safety measures of primary equipment, collecting an overhaul application form and a distribution network dispatching instruction ticket submitted on site, and classifying the collected instruction tickets;
step (2), if the collected instruction ticket is a power failure operation ticket, carrying out keyword identification on an overhaul application form and the power failure operation ticket, and when N tasks for dismantling the primary equipment safety measure are carried out in the overhaul application form and the corresponding N tasks for dismantling the primary equipment safety measure are also identified in the power failure operation ticket, checking the power failure operation ticket;
step (3), if the collected instruction ticket is a power restoration operation ticket, carrying out keyword identification on the power restoration operation ticket and a power failure operation ticket corresponding to the power restoration operation ticket, and checking the power restoration operation ticket to pass when N tasks with primary equipment safety measures for dismantling are identified in the power failure operation ticket and N corresponding tasks with primary equipment safety measures for restoring are also identified in the power restoration operation ticket;
step (4), if the collected instruction ticket is a fault log/abnormal defect record list, identifying that a task for dismantling the primary equipment safety measure in a record group in the fault log/abnormal defect record list is matched with a task for recovering the primary equipment safety measure, and checking to pass;
step (5), after the check of the power restoration operation ticket is passed, if no fault log/abnormal defect record list exists at the power supply part to be restored, restoring the safety measures of the primary equipment and restoring the power supply;
and after the check of the power recovery operation order passes, if a fault log/abnormal defect record list exists at the power supply part to be recovered and the check also passes, recovering the safety measures of the primary equipment and recovering the power supply.
Preferably, if the power failure operation ticket, the power restoration operation ticket and the fault log/abnormal defect record list fail to be checked, returning the information that the check fails to pass to the distribution network scheduling system, and modifying the distribution network scheduling system again.
Application example 1
Planning work:
in the planned power failure work of a pole section from a 10kV converter II loop #071 tower to a #144 pole section of a 35kV converter transformer substation, acquiring the primary equipment state requirement in an overhaul application form submitted in the field as follows:
1. the breaker of the 35kV converter substation 10kV converter substation II loop #071 tower G01 is at a tripping position, and the G011 disconnecting switch is at a pulling-open position;
2. the breaker of the 35kV converter substation 10kV converter II circuit #081 tower A01 is at the opening position, the A012 disconnecting switch is at the opening position (connected with the 35kV converter substation 10kV street line #004.65 pole);
3. the 35kV converter substation 10kV converter II loop #071 tower G01 breaker #082 pole overhead line side converter overhaul;
4. the 35kV converter substation 10kV converter II-loop # 144-pole G01 breaker is at a tripping position, and the G011 disconnecting switch is at a pulling-off position;
5. the 35kV converter substation 10kV converter substation II-loop # 144-pole G011 disconnecting switch #143 pole overhead line side converter overhaul;
6. a 10kV converter II loop #84.55.45.6 pole A01 breaker of a 35kV converter transformer substation is at an opening position, and an A011 disconnecting switch is at an opening position (communicated with a 35kV nine-dragon converter 10kV civil authority line # 222.65.1.2);
7. a 10kV converter II-loop # 84.55.45.6-pole A011 disconnecting switch # 84.55.45.5-pole overhead line side-turning overhaul of a 35kV converter transformer substation;
8. the 10kV converter II loop #128.79.8.16.1 lever 011 breaker of the 35kV converter transformer substation is in a brake separating position, and the 0116 disconnecting switch is in a pulling-open position;
9. a 10kV converter II-loop #128.79.8.16.1 rod 012 breaker of a 35kV converter transformer substation is at a tripping position, and a 0126 disconnecting switch is at a pulling-open position;
10. 10kV changes dragon II of dragon converting station to return #128.79.8.16.1 pole 0116 isolator #128.79.8.1 pole overhead line side-turn overhaul.
Meanwhile, the power failure operation ticket is collected, and the task of primary equipment safety measures is identified, as shown in table 1.
TABLE 1
Figure BDA0002778346090000061
Figure BDA0002778346090000071
The identification result shows that 4 tasks for dismantling the primary equipment safety measures are carried out in the maintenance request form, and meanwhile, the corresponding 4 tasks for dismantling the primary equipment safety measures are also identified in the power failure operation ticket, and the power failure operation ticket is checked to pass;
the reply operation ticket is then collected and its task of recovering the primary equipment safety measures is identified, as in table 2.
TABLE 2
Figure BDA0002778346090000072
And the recognition result shows that 4 tasks with primary equipment safety measures for dismantling are recognized in the power failure operation ticket, the corresponding 4 tasks with primary equipment safety measures for restoring are also recognized in the power restoration operation ticket, the power restoration operation ticket is checked to pass, and then power restoration is carried out.
Application example 2
Troubleshooting:
14: 55-fleshyingming: the C-phase lead line of the 10kV Yanglin line #138.4 of the 110kV Yanglin transformer substation is blown, the rear section of the 10kV Yanglin line #134 pole is called by a 10kV development area V to be supplied, and the #134 pole to #149 pole section is applied to overhaul and process faults.
The system collects the maintenance request form submitted on site, and identifies 1 task with the primary equipment safety removal measure in the maintenance request form, and the result is shown in table 3.
TABLE 3
Figure BDA0002778346090000073
Meanwhile, collecting the power failure operation tickets, identifying the tasks of the primary equipment safety measures of the power failure operation tickets, identifying 2 corresponding tasks with the primary equipment safety measures to be removed in the power failure operation tickets, and giving an alarm if the power failure operation tickets fail to be checked in a table 4;
TABLE 4
Figure BDA0002778346090000081
And if the verification fails, entering a manual modification stage, manually confirming that the table 4 is the task for dismantling the primary equipment safety measures as required, and carrying out the task for dismantling the primary equipment safety measures according to the table 2.
The reply operation ticket is then collected and its task of recovering the primary equipment safety measures is identified, as in table 5.
TABLE 5
Figure BDA0002778346090000082
And the identification result shows that 2 tasks with primary equipment safety measures for dismantling are identified in the power failure operation ticket, and the corresponding 2 tasks with primary equipment safety measures for restoring are also identified in the power restoration operation ticket, the power restoration operation ticket is checked to pass, and then power restoration is carried out.
The foregoing shows and describes the general principles, principal features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the embodiments described above, which are described in the specification and illustrated only to illustrate the principle of the present invention, but that various changes and modifications may be made therein without departing from the spirit and scope of the present invention, which fall within the scope of the invention as claimed. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a join in marriage net dispatch instruction ticket security check system which characterized in that includes:
the acquisition device (101) is used for acquiring a maintenance request form and a distribution network scheduling instruction ticket submitted on site; the instruction ticket comprises a power failure operation ticket, a power restoration operation ticket and a fault log/abnormal defect record list;
the instruction ticket classifying module (102) is connected with the acquisition device (101), is pre-stored with each instruction ticket template, and classifies the acquired instruction tickets according to the instruction ticket templates; the types of the instruction tickets are power failure operation, power restoration operation, fault log/abnormal defect record;
the keyword identification module (103) is respectively connected with the acquisition device (101) and the instruction ticket classification module (102) and is used for identifying whether keywords exist in the instruction ticket according to the classification of the instruction ticket; the system is also used for identifying keywords in the maintenance application form;
the power failure operation ticket checking module (104) is connected with the keyword recognition module (103) and is used for checking the power failure operation ticket according to the content recognized by the keyword recognition module (103), and when N tasks with primary equipment safety measures to be dismantled are recognized in the maintenance application form and the corresponding N tasks with the primary equipment safety measures to be dismantled are also recognized in the power failure operation ticket, the power failure operation ticket checking is passed;
the power restoration operation ticket checking module (105) is connected with the keyword recognition module (103) and is used for checking the power restoration operation ticket according to the content recognized by the keyword recognition module (103), and when N tasks with primary equipment safety measures for dismantling are recognized in the power failure operation ticket corresponding to the power restoration operation ticket, and simultaneously, N tasks with primary equipment safety measures for restoring are recognized in the power restoration operation ticket, the power restoration operation ticket is checked to pass;
a fault log/abnormal defect record list checking module (106) which is connected with the keyword recognition module (103) and is used for checking when the task of dismantling the primary equipment safety measure in the record group in the fault log/abnormal defect record list is matched with the task of recovering the primary equipment safety measure;
and the power recovery control module (107) is respectively connected with the power recovery operation ticket checking module (105) and the fault log/abnormal defect record list checking module (106) and is used for performing power recovery control and recovering power supply after the power recovery operation ticket checking module (105) and the fault log/abnormal defect record list checking module (106) check.
2. The distribution network scheduling instruction ticket security check system according to claim 1, wherein in the instruction ticket classification module (102), similarity matching is performed between the collected instruction tickets and all instruction ticket templates by using a difference hash algorithm, and the class of the template with the highest similarity is taken as the class of the collected instruction tickets.
3. The distribution network dispatching instruction ticket security check system of claim 1, wherein the keyword included in the task of removing the primary equipment security measure comprises switching from hot standby or cold standby to overhaul, switching on a grounding switch or installing a grounding wire.
4. The system of claim 1, wherein the key included in the task of recovering the primary equipment safety measure comprises switching from service to hot or cold standby, pulling a grounding switch open, or removing a grounding wire.
5. The distribution network scheduling instruction ticket security checking system according to claim 1, further comprising an alarm module (108), wherein the alarm module (108) is connected with the power failure operation ticket checking module (104), the power restoration operation ticket checking module (105) and the fault log/abnormal defect record list checking module (106), and alarms when the checking fails.
6. A distribution network dispatching instruction ticket security check method adopts the distribution network dispatching instruction ticket security check system of any one of claims 1-5, and is characterized by comprising the following steps:
step (1), when needing to be overhauled or having faults and defects, having finished the power cut, and after dismantling the safety measures of primary equipment, collecting an overhaul application form and a distribution network dispatching instruction ticket submitted on site, and classifying the collected instruction tickets;
step (2), if the collected instruction ticket is a power failure operation ticket, carrying out keyword identification on an overhaul application form and the power failure operation ticket, and when N tasks with primary equipment safety measure dismantling are identified in the overhaul application form and the corresponding N tasks with the primary equipment safety measure dismantling are also identified in the power failure operation ticket, checking the power failure operation ticket;
step (3), if the collected instruction ticket is a power restoration operation ticket, carrying out keyword identification on the power restoration operation ticket and a power failure operation ticket corresponding to the power restoration operation ticket, and when N tasks with primary equipment safety measures for dismantling are identified in the power failure operation ticket and the corresponding N tasks with primary equipment safety measures for restoring are also identified in the power restoration operation ticket, checking the power restoration operation ticket;
step (4), if the collected instruction ticket is a fault log/abnormal defect record list, identifying that a task for dismantling the primary equipment safety measure in a record group in the fault log/abnormal defect record list is matched with a task for recovering the primary equipment safety measure, and checking to pass;
step (5), after the check of the power restoration operation ticket is passed, if no fault log/abnormal defect record list exists at the power supply part to be restored, restoring the safety measures of the primary equipment and restoring the power supply;
and after the check of the power recovery operation order passes, if a fault log/abnormal defect record list exists at the power supply part to be recovered and the check also passes, recovering the safety measures of the primary equipment and recovering the power supply.
7. The distribution network scheduling instruction ticket security checking method of claim 6, wherein if the power failure operation ticket, the power restoration operation ticket, the fault log/abnormal defect record list are not checked to pass, the information that the check does not pass is returned to the distribution network scheduling system, and the distribution network scheduling system is modified again.
CN202011273291.3A 2020-11-13 2020-11-13 Distribution network dispatching instruction ticket safety checking system and method Active CN112270555B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011273291.3A CN112270555B (en) 2020-11-13 2020-11-13 Distribution network dispatching instruction ticket safety checking system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011273291.3A CN112270555B (en) 2020-11-13 2020-11-13 Distribution network dispatching instruction ticket safety checking system and method

Publications (2)

Publication Number Publication Date
CN112270555A CN112270555A (en) 2021-01-26
CN112270555B true CN112270555B (en) 2022-08-19

Family

ID=74339058

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011273291.3A Active CN112270555B (en) 2020-11-13 2020-11-13 Distribution network dispatching instruction ticket safety checking system and method

Country Status (1)

Country Link
CN (1) CN112270555B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114139941A (en) * 2021-11-30 2022-03-04 广东电网有限责任公司 Distribution network scheduling operation command ticket checking method and device, electronic equipment and medium
CN115017270B (en) * 2022-08-08 2023-01-03 广东电网有限责任公司佛山供电局 Machine room distribution and control method and system based on work ticket identification

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102931727A (en) * 2012-10-22 2013-02-13 广东电网公司电力科学研究院 Topological anti-error check method of power dispatching master station type integrated intelligent anti-error system
CN103593809A (en) * 2013-12-03 2014-02-19 国家电网公司 Intelligent operation-ticket semanteme verification method of automatic power dispatching system
JP2016009401A (en) * 2014-06-25 2016-01-18 勇一 情野 Service provider dispatch system
CN108021552A (en) * 2017-11-09 2018-05-11 国网浙江省电力公司电力科学研究院 A kind of power system operation ticket method for extracting content and system
CN111680975A (en) * 2020-06-01 2020-09-18 广东电网有限责任公司 Operation ticket auditing method, device, equipment and medium

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102931727A (en) * 2012-10-22 2013-02-13 广东电网公司电力科学研究院 Topological anti-error check method of power dispatching master station type integrated intelligent anti-error system
CN103593809A (en) * 2013-12-03 2014-02-19 国家电网公司 Intelligent operation-ticket semanteme verification method of automatic power dispatching system
JP2016009401A (en) * 2014-06-25 2016-01-18 勇一 情野 Service provider dispatch system
CN108021552A (en) * 2017-11-09 2018-05-11 国网浙江省电力公司电力科学研究院 A kind of power system operation ticket method for extracting content and system
CN111680975A (en) * 2020-06-01 2020-09-18 广东电网有限责任公司 Operation ticket auditing method, device, equipment and medium

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
全网防误调度操作票系统的设计与实现;郝祎;《中国优秀硕士学位论文全文数据库-信息科技辑》;20130815(第8期);I138-318 *
浙江电网操作票管理系统的开发与实施;郭锋;《中国优秀硕士学位论文全文数据库-工程科技Ⅱ辑》;20130715(第7期);C042-905 *

Also Published As

Publication number Publication date
CN112270555A (en) 2021-01-26

Similar Documents

Publication Publication Date Title
CN108847968B (en) Monitoring accident and abnormal event identification and multidimensional analysis method
CN104459474B (en) Intelligent distribution network fault recognition method
CN107846011B (en) Power distribution network fault recovery method based on main and distribution network cooperative control
CN109347202B (en) Typical operation identification and multidimensional analysis method for monitoring equipment
CN112270555B (en) Distribution network dispatching instruction ticket safety checking system and method
CN110674282B (en) Expert knowledge rule base-based one-key sequential control operation order intelligent simulation method
CN104463712A (en) Intelligent distribution network fault information statistical analysis system
CN107666148A (en) Line fault analysis method based on distribution transforming power cut signal
CN111768076A (en) Monitoring alarm signal clustering method taking power grid event as center
CN113268590A (en) Power grid equipment running state evaluation method based on equipment portrait and integrated learning
CN110867958A (en) Automatic fault identification and alarm method for electric power system
CN112906389B (en) Fault trip discrimination method based on multi-dimensional data analysis
CN110704700B (en) One-key sequence control equipment state intelligent simulation method based on expert knowledge rule base
CN111708817A (en) Intelligent disposal method for transformer substation monitoring information
CN114221436B (en) Intelligent alarm method and system based on distribution network operation management system
CN115587635A (en) Transformer area line loss analysis method and system based on neutral point deviation judgment
CN114626440A (en) Monitoring signal objectification analysis method and device
CN106022950B (en) Power distribution network secondary equipment type identification method and system
CN113783298A (en) Secondary equipment anti-error method based on regulation cloud
CN113097981A (en) Method for judging missing of monitoring alarm signal of transformer substation
CN114498910A (en) One-key sequential control system with anti-error function and control method
Mao et al. Research on active emergency repair technology of distribution network based on large power data
Yunguang et al. Research on secondary circuit identification technology and condition-based maintenance mode of intelligent substation
CN110852606A (en) Production early report data object analysis method based on regulation cloud
CN114742431A (en) Power grid event identification method based on regulation and control management rules and rule base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant