CN112268044A - Connector of steel pull rod - Google Patents

Connector of steel pull rod Download PDF

Info

Publication number
CN112268044A
CN112268044A CN202011097550.1A CN202011097550A CN112268044A CN 112268044 A CN112268044 A CN 112268044A CN 202011097550 A CN202011097550 A CN 202011097550A CN 112268044 A CN112268044 A CN 112268044A
Authority
CN
China
Prior art keywords
pull rod
steel
connecting piece
connector
nut
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011097550.1A
Other languages
Chinese (zh)
Inventor
钟传明
吴铁成
叶峰
赵安
袁扣峰
孙川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Waigaoqiao Shipbuilding Co Ltd
Original Assignee
Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Waigaoqiao Shipbuilding Co Ltd filed Critical Shanghai Waigaoqiao Shipbuilding Co Ltd
Priority to CN202011097550.1A priority Critical patent/CN112268044A/en
Publication of CN112268044A publication Critical patent/CN112268044A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16BDEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES; JOINTS OR JOINTING
    • F16B7/00Connections of rods or tubes, e.g. of non-circular section, mutually, including resilient connections
    • F16B7/06Turnbuckles

Abstract

The invention discloses a connector of a steel pull rod, which is used for connecting a first steel pull rod and a second steel pull rod and comprises a first connecting piece, a second connecting piece, a first nut, a second nut and at least one connecting part; the first nut is in threaded connection with the first steel pull rod, and the second nut is in threaded connection with the second steel pull rod; the first connecting piece is sleeved on the first steel pull rod, and the second connecting piece is sleeved on the second steel pull rod; the first connecting piece and the second connecting piece are fixedly connected through the connecting part, so that the first connecting piece and the first nut are mutually limited, and the second connecting piece and the second nut are mutually limited. The connector of the steel pull rod has the advantages of convenient tensioning construction, high efficiency and low labor intensity, and simultaneously reduces potential safety hazard during construction and potential quality hazard caused by easy damage to steel pull rod threads.

Description

Connector of steel pull rod
Technical Field
The invention relates to the technical field of connectors, in particular to a connector of a steel pull rod.
Background
The connector of the steel pull rod for the ship is very important in the ship repairing and manufacturing process, and the current connector of the steel pull rod is generally realized by adopting a sleeve structure with internal threads.
In practice, as shown in figure 1, connecting the first steel tie rod 10 and the second steel tie rod 20 requires rotating the sleeve 1. Due to the ground at the lower parts of the first steel pull rod 10 and the second steel pull rod 20, the sleeve 1 can only rotate 180 degrees above the ground, and a tensioning tool (the tensioning tool can drive the sleeve 1 to rotate, not shown in the figure) needs to be rotated during construction operation, so that the construction is very inconvenient, the construction efficiency is low, and the labor intensity is high; meanwhile, a jack playing a tensioning role in the rotary tensioning process needs to be decompressed, so that potential safety hazards exist; when the steel rail is stressed, the end 2 of the steel rail and the thread of the sleeve 1 generate an engaging force, so that the thread of each steel pull rod and the thread of the sleeve 1 are easily damaged, the tensioning difficulty is increased, and potential quality hazards are easily caused.
Disclosure of Invention
The invention aims to overcome the defects that in the prior art, a connector of a steel pull rod for a ship is low in construction efficiency and high in labor intensity, potential safety hazards exist during construction, threads are easy to damage, and further potential quality hazards are caused.
The invention solves the technical problems through the following technical scheme:
the invention provides a connector of a steel pull rod, which is used for connecting a first steel pull rod and a second steel pull rod and comprises a first connecting piece, a second connecting piece, a first nut, a second nut and at least one connecting part;
the first nut is in threaded connection with the first steel pull rod, and the second nut is in threaded connection with the second steel pull rod;
the first connecting piece is sleeved on the first steel pull rod, and the second connecting piece is sleeved on the second steel pull rod;
the first connecting piece and the second connecting piece are fixedly connected through the connecting part, so that the first connecting piece and the first nut are mutually limited, and the second connecting piece and the second nut are mutually limited.
In this scheme, the first connecting piece and the first nut are mutually limited so as to bear force on the first connecting piece and the first nut, and the second connecting piece and the second nut are mutually limited so as to bear force on the second connecting piece and the second nut.
Preferably, the first connecting piece is abutted with the first nut; the second connecting piece is abutted to the second nut.
Adopt the mode of butt to realize spacingly in this scheme.
Preferably, the first nut is in threaded connection with one end of the first steel pull rod; and the second nut is in threaded connection with one end part of the second steel pull rod.
Preferably, the material of the first connecting piece and the second connecting piece is metal.
In this scheme, first connecting piece and second connecting piece adopt metal material, can have sufficient intensity, and the volume is also less.
Preferably, the number of the connecting parts is two, namely a first connecting part and a second connecting part; the first connecting part and the second connecting part are symmetrically arranged between the first connecting piece and the second connecting piece.
In this scheme, connecting portion include two, are first connecting portion and second connecting portion respectively, can with first connecting piece with the second connecting piece forms including having the structure of stronger holding power.
Preferably, the first and second connectors are manufactured by casting.
Preferably, the first connecting piece and the second connecting piece are symmetrically arranged on two opposite sides of the connecting part, and the hole for sleeving the first steel pull rod on the first connecting piece is aligned with the hole for sleeving the second steel pull rod on the second connecting piece.
In this scheme, be used for cup jointing on the first connecting piece the hole of first steel pull rod with be used for cup jointing on the second connecting piece the hole of second steel pull rod aligns for the center and makes two steel pull rod centrobaric after connecting more balanced, and the structure is more firm. Preferably, the first connecting piece, the second connecting piece, the first connecting part and the second connecting part are fixedly connected by welding;
or the like, or, alternatively,
the first connecting piece, the second connecting piece, the first connecting portion and the second connecting portion are integrally cast into a rectangular structure.
In this scheme, the rectangle mechanism that welding or integrative casting formed is more stable, and can bear great power.
Preferably, the distance between the end of the first steel pull rod connected with the first nut and the end of the second steel pull rod connected with the second nut is not less than 10 cm.
In the scheme, the minimum distance of 10 cm considers the expansion and contraction of the steel pull rod.
Preferably, the material of the first connecting piece and the second connecting piece is structural steel.
The positive progress effects of the invention are as follows: the connecting piece of the connector provided by the invention is in threaded connection with the steel pull rod through the nut, the two connecting pieces are fixedly connected through the connecting part, the limiting of the connecting piece and the corresponding nut is realized, the direct stress of the thread of the steel pull rod is avoided, the efficiency of the connector construction of the steel pull rod is improved, the labor intensity is reduced, the safety during the construction is also improved, and meanwhile, the damage to the thread of the steel pull rod is also prevented, so that the construction quality is ensured.
Drawings
Fig. 1 is a schematic view of a steel tie rod and a sleeve in the prior art.
Fig. 2 is a schematic connection diagram of a steel pull rod and a connector of the steel pull rod according to a preferred embodiment of the invention.
Fig. 3 is a front cross-sectional view of a connector of a steel drawbar in accordance with a preferred embodiment of the present invention.
Fig. 4 is a right side view of a connector of a steel drawbar in accordance with a preferred embodiment of the present invention.
Fig. 5 is a top view of a connector for a steel drawbar in accordance with a preferred embodiment of the present invention.
Detailed Description
The present invention is further illustrated by the following preferred embodiments, but is not intended to be limited thereby.
Referring to fig. 2 to 5, the present embodiment provides a connector for connecting a first steel tension rod 10 and a second steel tension rod 20. The connector includes a first connector 11, a second connector 21, a first nut 13, a second nut 23, a first connecting portion 12, and a second connecting portion 22. The first connecting piece 11 is sleeved on the first steel pull rod 10, and the second connecting piece 21 is sleeved on the second steel pull rod 20. The first connecting piece 11 and the second connecting piece 21 are symmetrically arranged at two opposite sides of the first connecting part 12 and the second connecting part 22, and the first connecting part 12 and the second connecting part 22 are symmetrically arranged between the first connecting piece 11 and the second connecting piece 21. The hole 14 for sleeving the first steel pull rod 10 on the first connecting piece 11 is aligned with the hole 24 for sleeving the second steel pull rod 20 on the second connecting piece 21; one side of the first connecting piece 11 and the second connecting piece 21 in the same direction is fixedly connected with the first connecting part 12 in a welding mode, and the other side of the first connecting piece 11 and the second connecting piece 21 in the same direction is fixedly connected with the second connecting part 22 in a welding mode. In other alternative implementations, the first connecting member 11, the first connecting portion 12, the second connecting member 21 and the second connecting portion 22 may also be integrally cast into a rectangular structure.
In this embodiment, the first connecting member 11 and the second connecting member 21 are manufactured by casting.
In this embodiment, the material of the first connecting member 11 and the second connecting member 21 is structural steel.
In the present embodiment, the holes 14 and 24 of the first and second connecting members 11 and 21 are circular, but other shapes, such as regular polygon, may be adopted in alternative embodiments.
In this embodiment, the first nut 13 is in threaded connection with one end of the first steel tie rod 10, and the second nut 23 is in threaded connection with one end of the second steel tie rod 20. The first connecting piece 11 and the second connecting piece 21 are fixedly connected through the connecting portion, so that the first connecting piece 11 and the first nut 13 are mutually limited and the second connecting piece 21 and the second nut 23 are mutually limited. The distance between the end of the first steel pull rod 10 connected with the first nut 13 and the end of the second steel pull rod 20 connected with the second nut 23 is not less than 10 cm.
In this embodiment, when the connector of the steel tie bar is used to connect the steel tie bar, the specific operation flow thereof is as follows:
1. the first steel pull rod 10 penetrates through a hole 14 of the first connecting piece 11, a first nut 13 is in threaded connection with the first steel pull rod 10 inside the rectangular structure, and the first nut 13 is rotated to abut against the inner wall of the rectangular structure of the first connecting piece 11; the second steel tie rod 20 is passed through the hole 24 of the second connector 21, the second nut 23 is screwed on the second steel tie rod 20 inside the rectangular structure, and the second nut 23 is rotated to abut against the second connector 21 on the inner wall of the rectangular structure.
2. By the tension construction, the end of the first steel tie rod 10 and the end of the second steel tie rod 20 are brought close to each other, the first nut 13 is rotated to be again brought into contact with the inner wall of the rectangular structure of the first connector 11, and the second nut 23 is rotated to be again brought into contact with the inner wall of the rectangular structure of the second connector 21.
3. And if the distance between the end of the first steel pull rod 10 and the end of the second steel pull rod 20 does not meet the construction requirement or is more than 10 cm, repeating the step 2 until the distance between the end of the first steel pull rod 10 and the end of the second steel pull rod 20 meets the construction requirement or is equal to 10 cm.
The connecting piece of the connector that this embodiment provided passes through nut and steel pull rod threaded connection, through two connecting pieces of connecting portion rigid coupling and realize the connecting piece and correspond the spacing of nut, avoids the direct atress of screw thread of steel pull rod for the efficiency of the connector construction of steel pull rod improves and has reduced intensity of labour, has also promoted the security during construction, also can prevent to damage steel pull rod screw and then ensures construction quality simultaneously.
While specific embodiments of the invention have been described above, it will be appreciated by those skilled in the art that this is by way of example only, and that the scope of the invention is defined by the appended claims. Various changes and modifications to these embodiments may be made by those skilled in the art without departing from the spirit and scope of the invention, and these changes and modifications are within the scope of the invention.

Claims (10)

1. A connector of a steel pull rod is used for connecting a first steel pull rod and a second steel pull rod and is characterized in that the connector comprises a first connecting piece, a second connecting piece, a first nut, a second nut and at least one connecting part;
the first nut is in threaded connection with the first steel pull rod, and the second nut is in threaded connection with the second steel pull rod;
the first connecting piece is sleeved on the first steel pull rod, and the second connecting piece is sleeved on the second steel pull rod;
the first connecting piece and the second connecting piece are fixedly connected through the connecting part, so that the first connecting piece and the first nut are mutually limited, and the second connecting piece and the second nut are mutually limited.
2. The connector of steel tie rod of claim 1, wherein the first connector and the first nut abut; the second connecting piece is abutted to the second nut.
3. The connector of steel tie rod according to claim 1, wherein the first nut is threadedly connected to one end of the first steel tie rod; and the second nut is in threaded connection with one end part of the second steel pull rod.
4. The connector of a steel drawbar according to claim 1, wherein the material of the first connector and the second connector is metal.
5. The connector of a steel drawbar according to claim 1, wherein the number of the connection parts is two, a first connection part and a second connection part; the first connecting part and the second connecting part are symmetrically arranged between the first connecting piece and the second connecting piece.
6. The connector of a steel drawbar according to claim 1, wherein the first connector and the second connector are manufactured by casting.
7. The connector of the steel pull rod according to claim 1, wherein the first connecting member and the second connecting member are symmetrically arranged on two opposite sides of the connecting portion, and the hole of the first connecting member for sleeving the first steel pull rod and the hole of the second connecting member for sleeving the second steel pull rod are aligned in the center.
8. The connector of a steel tension rod according to claim 5, wherein the fastening means of the first connecting member, the second connecting member, the first connecting portion and the second connecting portion includes welding;
or the like, or, alternatively,
the first connecting piece, the second connecting piece, the first connecting portion and the second connecting portion are integrally cast into a rectangular structure.
9. The steel tie connector of claim 1, wherein the distance between the end of the first steel tie connected to the first nut and the end of the second steel tie connected to the second nut is not less than 10 cm.
10. The connector of a steel drawbar according to claim 4, wherein the material of the first connector and the second connector is structural steel.
CN202011097550.1A 2020-10-14 2020-10-14 Connector of steel pull rod Pending CN112268044A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011097550.1A CN112268044A (en) 2020-10-14 2020-10-14 Connector of steel pull rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011097550.1A CN112268044A (en) 2020-10-14 2020-10-14 Connector of steel pull rod

Publications (1)

Publication Number Publication Date
CN112268044A true CN112268044A (en) 2021-01-26

Family

ID=74337982

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011097550.1A Pending CN112268044A (en) 2020-10-14 2020-10-14 Connector of steel pull rod

Country Status (1)

Country Link
CN (1) CN112268044A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE874197A (en) * 1979-02-15 1979-05-29 Penen Jozef PROCEDURE FOR MAKING A SLEEVE JOINT BETWEEN REINFORCEMENT BARS AND ANALOG BARS AND KEY USED HEREIN
JPH10140670A (en) * 1996-11-07 1998-05-26 Sumitomo Constr Co Ltd Reinforcement connecting structure between precast concrete blocks and method thereof
WO1999028570A1 (en) * 1997-11-28 1999-06-10 Max Bögl Bauunternehmung GmbH & Co. KG Connector piece
CN101333826A (en) * 2007-06-28 2008-12-31 深圳赤晓组合房屋有限公司 Flower basket bolt member, flower basket bolt and assembly method
CN105155781A (en) * 2015-09-09 2015-12-16 北京建筑大学 Reinforced connecting structure and method between precast reinforced concrete components
CN207017540U (en) * 2017-07-24 2018-02-16 长沙远大住宅工业阜阳有限公司 The universal steel bar connecting joints of double sleeves being directly socketed
CN210216926U (en) * 2019-05-29 2020-03-31 广东联城住工装备信息科技有限公司 Node steel bar connecting device and node connecting structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE874197A (en) * 1979-02-15 1979-05-29 Penen Jozef PROCEDURE FOR MAKING A SLEEVE JOINT BETWEEN REINFORCEMENT BARS AND ANALOG BARS AND KEY USED HEREIN
JPH10140670A (en) * 1996-11-07 1998-05-26 Sumitomo Constr Co Ltd Reinforcement connecting structure between precast concrete blocks and method thereof
WO1999028570A1 (en) * 1997-11-28 1999-06-10 Max Bögl Bauunternehmung GmbH & Co. KG Connector piece
EP1034344A1 (en) * 1997-11-28 2000-09-13 Max Bögl Bauunternehmung GmbH & Co. KG Connector piece
CN101333826A (en) * 2007-06-28 2008-12-31 深圳赤晓组合房屋有限公司 Flower basket bolt member, flower basket bolt and assembly method
CN105155781A (en) * 2015-09-09 2015-12-16 北京建筑大学 Reinforced connecting structure and method between precast reinforced concrete components
CN207017540U (en) * 2017-07-24 2018-02-16 长沙远大住宅工业阜阳有限公司 The universal steel bar connecting joints of double sleeves being directly socketed
CN210216926U (en) * 2019-05-29 2020-03-31 广东联城住工装备信息科技有限公司 Node steel bar connecting device and node connecting structure

Similar Documents

Publication Publication Date Title
CN202380713U (en) Connecting structure of scaffold and scaffold adopting same
CN208189812U (en) A kind of cable intermediate joint
CN107558720A (en) A kind of vertical rod fixture and scaffold
CN201687192U (en) Scaffold
CN112268044A (en) Connector of steel pull rod
CN207749816U (en) A kind of upright bar fixing piece
CN201779108U (en) T-shaped connector for pipe connection
CN204098358U (en) Grout sleeve bar connecting assembly
CN212020638U (en) Device for quickly assembling double-end stud
CN113770286A (en) Steel bar connecting joint and steel bar connecting process
CN212641953U (en) Connecting node device for steel bars of stiff steel columns on two sides and middle concrete beam
CN1274930C (en) Double tile reinforced bar connecting sleeve
CN202034692U (en) Insulating rod
CN201346750Y (en) Detachable tong head
CN213806533U (en) Connecting assembly for scaffold
CN219770148U (en) Adjustable stay bar device in sail
CN219994089U (en) Quick connector for constant diameter cement electric pole
CN105402222A (en) Anti-loosening connecting mechanism of metal bar
CN206928668U (en) A kind of sleeve pipe erector
CN105583324B (en) A kind of steel wire bending apparatus
CN216263250U (en) Steel bar connecting joint
JP5380745B2 (en) Formwork separator
KR20140054691A (en) Coupling apparatus of threaded reinforcing bar
CN212991023U (en) Fuse-link contact connecting piece
CN213449736U (en) Connecting base

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20210126