CN112267743A - Non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole and preparation method thereof - Google Patents

Non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole and preparation method thereof Download PDF

Info

Publication number
CN112267743A
CN112267743A CN202011017600.0A CN202011017600A CN112267743A CN 112267743 A CN112267743 A CN 112267743A CN 202011017600 A CN202011017600 A CN 202011017600A CN 112267743 A CN112267743 A CN 112267743A
Authority
CN
China
Prior art keywords
steel pipe
stainless steel
performance concrete
electric pole
ultra
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011017600.0A
Other languages
Chinese (zh)
Inventor
易华广
王军太
王贻远
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huizhou Fuying New Material Technology Co ltd
Original Assignee
Huizhou Fuying New Material Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huizhou Fuying New Material Technology Co ltd filed Critical Huizhou Fuying New Material Technology Co ltd
Priority to CN202011017600.0A priority Critical patent/CN112267743A/en
Publication of CN112267743A publication Critical patent/CN112267743A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/12Structures made of specified materials of concrete or other stone-like material, with or without internal or external reinforcements, e.g. with metal coverings, with permanent form elements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/56Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/56Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
    • B28B21/58Steel tubes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/56Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
    • B28B21/68Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts and applying centrifugal forces
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/92Methods or apparatus for treating or reshaping
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Architecture (AREA)
  • Inorganic Chemistry (AREA)
  • Organic Chemistry (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Wood Science & Technology (AREA)
  • Civil Engineering (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Abstract

The invention relates to the technical field of electric poles, and discloses a non-prestressed stainless steel pipe-ultrahigh-performance concrete composite electric pole and a preparation method thereof. The composite hollow structure formed by centrifugally forming the stainless steel pipe and the ultrahigh-performance concrete fully plays the characteristics of good mechanical property and good corrosion resistance of the stainless steel pipe and the ultrahigh-performance concrete, improves the overall performance of the structure, is simple to form compared with the traditional composite electric pole structure, reduces circumferential reinforcing bars, has strong bearing capacity, high rigidity, good impact resistance, and can prevent collision and collapse, has stronger corrosion resistance, has better corrosion resistance to the atmosphere, water, acid, alkali, salt and various solvents with common concentrations, and solves the problems of insufficient bending moment, poor freezing resistance, poor corrosion resistance of the steel pipe pole and high manufacturing cost of the traditional concrete electric pole.

Description

Non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole and preparation method thereof
Technical Field
The invention relates to the technical field of electric poles, in particular to a non-prestressed stainless steel pipe-ultrahigh-performance concrete composite electric pole and a preparation method thereof.
Background
The development of transmission line towers in China has a history of over a hundred years, wherein the first square solid concrete electric pole produced in China in 1924 has a history of nearly 80 years.
The electric pole in the prior art is mostly of a reinforced concrete structure, has low manufacturing cost and mature construction and installation technology, and is widely applied to power transmission lines of various domestic voltage classes. However, this structure also has certain limitations: (1) the concrete is a brittle material, has low tensile strength, is easy to crack and has poor capability of resisting natural disasters; (2) the concrete has low unit density bearing capacity and large dead weight of the concrete pole, and is not beneficial to transportation and construction; (3) under natural environment, the inside reinforcing bar of concrete is perishable, shortens life. In addition, when natural disasters such as typhoon, ice disaster, flood, earthquake and the like occur, the rod-falling and line-breaking accidents often occur, the situations of power failure, communication interruption, road block and water cut are caused, and the post-disaster reconstruction work needs to be rapidly carried out. Particularly, the frequency of pole falling of the concrete pole is very high, and the operation safety of a power grid and the safety of equipment and personnel are seriously influenced.
Aiming at the current situation, a novel electric pole with good mechanical property, durability and corrosion resistance can be developed, and the problem that the application of the existing concrete annular electric pole is limited is solved.
Disclosure of Invention
In view of the above, the invention provides a non-prestressed stainless steel pipe-ultra-high performance concrete composite pole with good toughness, good mechanical properties, good durability, good impact resistance, good anti-collapse performance and good corrosion resistance and a preparation method thereof, in order to overcome at least one of the defects in the prior art; the problems of large brittleness, great self weight, poor corrosion resistance and the like of a common annular concrete pole are solved.
In order to solve the technical problems, the invention adopts the following technical scheme:
the non-prestressed stainless steel pipe-ultrahigh-performance concrete composite electric pole comprises a stainless steel pipe and an ultrahigh-performance concrete layer poured on the inner wall of the stainless steel pipe, wherein the stainless steel pipe is composed of two half pipes split along the axis, and a steel bar framework is planted in the ultrahigh-performance concrete layer.
The stainless steel pipe-ultrahigh performance concrete composite pole with the hollow outer-wrapped steel structure is manufactured by introducing the stainless steel pipe, so that the characteristics of good mechanical property and good corrosion resistance of the stainless steel pipe and the ultrahigh performance concrete are fully exerted, the overall performance of the structure is improved, the composite pole is simpler in structure forming compared with the traditional composite pole, circumferential reinforcing bars are reduced, the composite pole is strong in bearing capacity, large in rigidity, good in impact resistance, capable of preventing collision and collapse, strong in corrosion resistance, and good in corrosion resistance to atmosphere, water, acid, alkali, salt and various solvents with general concentrations, and the problems that the traditional concrete pole is insufficient in bending moment, poor in freezing resistance, poor in corrosion resistance of the steel pipe pole and high in manufacturing cost are solved.
The stainless steel pipe and the ultra-high performance concrete layer are subjected to interface combination due to inherent properties of the stainless steel pipe and the ultra-high performance concrete layer, so that the bearing capacity and bending moment of the electric pole with the stainless steel structure coated outside the concrete are poor, and the deflection deformation is large, which is also a big problem in the research process of the invention. According to the invention, the inner wall of the stainless steel pipe is provided with the plurality of shear nails extending into the ultrahigh-performance concrete layer, one ends of the shear nails are connected to the inner wall of the stainless steel pipe in a welding mode and the like, and the other ends of the shear nails extend into the ultrahigh-performance concrete layer, so that the interface bonding capacity between the stainless steel pipe and the ultrahigh-performance concrete layer is improved to a greater extent, the bearing force bending moment is greatly improved, the deflection deformation is greatly reduced, and the mechanical property of the electric pole is greatly improved. Preferably, the row spacing between the shear nails is 20-30 mm, and the length is 6-12 mm, so that the ultra-high performance concrete layer can be better combined with the stainless steel pipe, and the bearing capacity bending moment of the electric pole is further improved.
The thickness of the stainless steel pipe is 0.5-1.5 mm.
The stainless steel pipe is reserved with rows of reserved holes along the length direction, and/or the inner wall of the stainless steel pipe corresponding to the reserved holes is welded with nuts, one end of each nut is fixed on the inner wall of the stainless steel pipe corresponding to the reserved hole, and the other end of each nut extends into the ultra-high performance concrete layer corresponding to the reserved hole and can be used for fixing the ladder. Preferably, the aperture of the preformed holes is 14-20 mm, and the row spacing is 200-300 mm; and/or the inner diameter of the nut is 14-20 mm, and the length of the nut is 20-80 mm.
The thickness of the ultra-high performance concrete layer is 20-80 mm; or the distance between the steel bar framework and the inner wall of the stainless steel pipe is 10-12 mm or more than the diameter of the steel bar framework. Constitute framework of steel reinforcement includes the longitudinal reinforcement that extends along pole length direction, does not include with pole length direction vertically horizontal reinforcing bar, has both saved 30% ~ 50% arrangement of reinforcement volume, has improved the mechanical properties on super high performance concrete layer again to improve the whole mechanical properties of pole.
The ultra-high performance concrete layer comprises the following components in parts by weight: 40-70 parts of cement, 25-45 parts of admixture, 80-120 parts of fine aggregate, 8-22 parts of steel fiber and 1.8-3.6 parts of polycarboxylic acid water reducing agent.
A method for preparing the non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole comprises the following steps:
s1, preparing an electric pole mould, respectively placing two half pipes of a stainless steel pipe in an upper mould and a lower mould of the electric pole mould, closing the moulds to fix a steel reinforcement framework in the stainless steel pipe, and assembling the moulds for later use;
s2, putting all fine aggregates and steel fibers for manufacturing the ultra-high performance concrete layer into a stirrer according to the proportion, stirring for 60-120 seconds, then putting all cement and admixtures into the stirrer, stirring for 180-240 seconds, and finally putting all water reducing agents and water into the stirrer, and stirring for 360-600 seconds to obtain the ultra-high performance concrete mixture;
s3, pumping the ultra-high performance concrete mixture obtained in the step S2 into a stainless steel pipe assembled in a pole mold in the step S1, and performing centrifugal molding to obtain the composite pole with the mold;
s4, standing the composite electric pole with the mould obtained in the step S3 at room temperature for 1-2 hours, and putting the composite electric pole into a curing kiln at the temperature of 80-90 ℃ for steam curing for 8-16 hours;
and S5, demolding the composite electric pole subjected to steam curing in the step S4, and then placing the composite electric pole into a storage yard for natural curing for 7-14 days.
Preferably, the slump of the ultra-high performance concrete mixture in the step S2 is 160-240 mm, and the compressive strength is not lower than 130 MPa and the bending strength is not lower than 14 MPa after steam curing in the step S4.
Compared with the prior art, the invention has the following beneficial effects:
(1) according to the non-prestressed stainless steel pipe-ultrahigh-performance concrete composite electric pole related to the technical scheme, the outer layer is the stainless steel pipe, so that the electric pole is good in toughness, good in impact resistance and good in anti-collision collapse performance, and basically does not react with erosion components in the environment; the inner layer is made of ultra-high performance concrete, the compressive strength is not lower than 130 MPa, the bending strength is not lower than 14 MPa, the design thickness of the outer layer stainless steel pipe is reduced, and the manufacturing cost is saved.
(2) The non-prestressed stainless steel pipe-ultrahigh performance concrete composite pole structure related to the technical scheme of the invention cancels circumferential reinforcement, reduces the overall reinforcement amount by 30-50%, and can be used for manufacturing a connection rod, and the connection part can be welded; the problems of large brittleness, large self weight and inconvenient carrying of the concrete pole are effectively solved, and the manufacturing process is simple.
Drawings
Fig. 1 is a longitudinal sectional view of a non-prestressed stainless steel pipe-ultra high performance concrete composite pole.
Fig. 2 is an enlarged sectional view a-a of the non-prestressed stainless steel pipe-ultra high performance concrete composite pole shown in fig. 1.
Description of reference numerals: the steel pipe comprises a stainless steel pipe 100, a preformed hole 110, shear nails 120, an ultra-high performance concrete layer 200, nuts 210 and a steel reinforcement framework 220.
Detailed Description
The drawings are for illustration purposes only and are not to be construed as limiting the invention; for the purpose of better illustrating the embodiments, certain features of the drawings may be omitted, enlarged or reduced, and do not represent the size of an actual product; it will be understood by those skilled in the art that certain well-known structures in the drawings and descriptions thereof may be omitted; the positional relationships depicted in the drawings are for illustrative purposes only and are not to be construed as limiting the invention. The present invention will be described in further detail with reference to specific examples.
Example 1
Referring to fig. 1-2, the M-grade non-prestressed stainless steel pipe-ultrahigh performance concrete composite electric pole with a slight diameter of 190mm and a length (L) of 12M comprises a stainless steel pipe 100 and an ultrahigh performance concrete layer 200 poured on the inner wall of the stainless steel pipe 100, wherein the thickness t1 of the stainless steel pipe 100 is 0.5mm, and the thickness t2 of the ultrahigh performance concrete layer 200 is 20 mm.
The stainless steel pipe 100 is composed of two half pipes split along the axis, two rows of preformed holes 110 with the aperture of 14mm are reserved in the stainless steel pipe 100 along the length direction, the row spacing between the preformed holes 110 is 200mm, stainless steel nuts 210 with the inner diameter of 14mm and the length of 20mm are welded on the inner wall of the stainless steel pipe corresponding to the preformed holes 110, the nuts 210 which are pre-buried in the ultra-high performance concrete layer 200 in the embodiment are used for fixing the ladder stand, and the ladder stand is connected with the nuts 210 which are reserved in the ultra-high performance concrete layer 200 through connecting pieces, such as bolts, penetrating through the preformed holes 110. It can be understood that the embedded nut 210 can also be used to fix other supporting members, and the embedded nut 210 can also be made of other materials with anti-corrosion function.
In order to improve the interface bonding between the stainless steel pipe 100 and the ultra-high performance concrete layer 200, rows of shear nails 120 are arranged on the inner wall of the stainless steel pipe 100, and the row spacing between the shear nails 120 is 20mm and the length is 6 mm. It is understood that the shear pins 120 may be connected to the inner wall of the stainless steel pipe 100 by welding or the like.
The ultra-high performance concrete layer 200 comprises the following components in parts by weight: 40-70 parts of cement, 25-45 parts of admixture, 80-120 parts of fine aggregate, 8-22 parts of steel fiber and 1.8-3.6 parts of polycarboxylic acid water reducing agent. Be equipped with steel reinforcement framework 220 in ultra high performance concrete layer 200, this steel reinforcement framework 220 includes the longitudinal reinforcement that extends along pole length direction, does not include the hoop reinforcing bar parallel with the pole cross section, and the distance between longitudinal reinforcement and the 100 inner walls of stainless steel pipe is 20mm, or is greater than the bar diameter.
The preparation method of the non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole comprises the following steps:
s1, preparing an electric pole mould, respectively placing two half pipes of a stainless steel pipe in an upper mould and a lower mould of the electric pole mould, closing the moulds to fix a designed steel reinforcement framework in the stainless steel pipe, closing an upper mould of the electric pole mould, screwing down screws, and assembling the mould for later use;
s2, calculating the using amount of each raw material for manufacturing the ultra-high performance concrete layer according to the proportion, putting all fine aggregate and steel fiber into a stirrer to be stirred for 60-120 seconds, then putting all cement and admixture into the stirrer to be stirred for 180-240 seconds, and finally putting all water reducing agent and water into the stirrer to be stirred for 360-600 seconds to obtain the ultra-high performance concrete mixture with slump of 160-240 mm;
s3, pumping the ultra-high performance concrete mixture obtained in the step S2 to a stainless steel pipe assembled in the electric pole mold in the step S1, locking the electric pole mold, and carrying out centrifugal forming to obtain the composite electric pole with the mold;
s4, standing the composite electric pole with the mould obtained in the step S3 at room temperature for 1-2 hours, and putting the composite electric pole into a curing kiln at the temperature of 80-90 ℃ for steam curing for 8-16 hours, wherein the compressive strength is not lower than 130 MPa, and the bending strength is not lower than 14 MPa;
and S5, demolding the composite electric pole subjected to steam curing in the step S4, and then placing the composite electric pole into a storage yard for natural curing for 7-14 days.
It is understood that in the above preparation method, the order of steps S1 to S2 may be arbitrarily changed.
Example 2
Referring to fig. 1-2, the M-grade non-prestressed stainless steel pipe-ultrahigh performance concrete composite electric pole with the slight diameter of 190mm and the length (L) of 12M comprises a stainless steel pipe 100 and an ultrahigh performance concrete layer 200 poured on the inner wall of the stainless steel pipe 100, wherein the thickness t1 of the stainless steel pipe 100 is 1.5mm, and the thickness t2 of the ultrahigh performance concrete layer 200 is 80 mm.
The stainless steel pipe 100 is composed of two half pipes split along the axis, two rows of preformed holes 110 with the aperture of 20mm are reserved in the stainless steel pipe 100 along the length direction, the row spacing between the preformed holes 110 is 300mm, stainless steel nuts 210 with the inner diameter of 20mm and the length of 80mm are welded on the inner wall of the stainless steel pipe corresponding to the preformed holes 110, the nuts 210 which are pre-buried in the ultra-high performance concrete layer 200 in the embodiment are used for fixing the ladder stand, and the ladder stand is connected with the nuts 210 which are reserved in the ultra-high performance concrete layer 200 through connecting pieces, such as bolts, penetrating through the preformed holes 110. It can be understood that the embedded nut 210 can also be used to fix other supporting members, and the embedded nut 210 can also be made of other materials with anti-corrosion function.
In order to improve the interface bonding between the stainless steel pipe 100 and the ultra-high performance concrete layer 200, rows of shear nails 120 are arranged on the inner wall of the stainless steel pipe 100, and the row spacing between the shear nails 120 is 30mm and the length is 12 mm. It is understood that the shear pins 120 may be connected to the inner wall of the stainless steel pipe 100 by welding or the like.
The ultra-high performance concrete layer 200 comprises the following components in parts by weight: 40-70 parts of cement, 25-45 parts of admixture, 80-120 parts of fine aggregate, 8-22 parts of steel fiber and 1.8-3.6 parts of polycarboxylic acid water reducing agent. Be equipped with framework of steel reinforcement 220 in ultra high performance concrete layer 200, this framework of steel reinforcement 220 includes the longitudinal reinforcement that extends along pole length direction, does not include the hoop reinforcing bar parallel with the pole cross section, and the distance between longitudinal reinforcement and the 100 inner walls of stainless steel pipe is 12mm, or is greater than the bar diameter.
The preparation method of the non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole comprises the following steps:
s1, preparing an electric pole mould, respectively placing two half pipes of a stainless steel pipe in an upper mould and a lower mould of the electric pole mould, closing the moulds to fix a designed steel reinforcement framework in the stainless steel pipe, closing an upper mould of the electric pole mould, screwing down screws, and assembling the mould for later use;
s2, calculating the using amount of each raw material for manufacturing the ultra-high performance concrete layer according to the proportion, putting all fine aggregate and steel fiber into a stirrer to be stirred for 60-120 seconds, then putting all cement and admixture into the stirrer to be stirred for 180-240 seconds, and finally putting all water reducing agent and water into the stirrer to be stirred for 360-600 seconds to obtain the ultra-high performance concrete mixture with slump of 160-240 mm;
s3, pumping the ultra-high performance concrete mixture obtained in the step S2 to a stainless steel pipe assembled in the electric pole mold in the step S1, locking the electric pole mold, and carrying out centrifugal forming to obtain the composite electric pole with the mold;
s4, standing the composite electric pole with the mould obtained in the step S3 at room temperature for 1-2 hours, and putting the composite electric pole into a curing kiln at the temperature of 80-90 ℃ for steam curing for 8-16 hours, wherein the compressive strength is not lower than 130 MPa, and the bending strength is not lower than 14 MPa;
and S5, demolding the composite electric pole subjected to steam curing in the step S4, and then placing the composite electric pole into a storage yard for natural curing for 7-14 days.
It is understood that in the above preparation method, the order of steps S1 to S2 may be arbitrarily changed.
Example 3
Referring to fig. 1-2, the M-grade non-prestressed stainless steel pipe-ultrahigh performance concrete composite electric pole with the slight diameter of 190mm and the length (L) of 12M comprises a stainless steel pipe 100 and an ultrahigh performance concrete layer 200 poured on the inner wall of the stainless steel pipe 100, wherein the thickness t1 of the stainless steel pipe 100 is 1.0mm, and the thickness t2 of the ultrahigh performance concrete layer 200 is 50 mm.
The stainless steel pipe 100 is composed of two half pipes split along the axis, two rows of preformed holes 110 with the aperture of 17mm are reserved in the stainless steel pipe 100 along the length direction, the row spacing between the preformed holes 110 is 250mm, stainless steel nuts 210 with the inner diameter of 17mm and the length of 50mm are welded on the inner wall of the stainless steel pipe corresponding to the preformed holes 110, the nuts 210 which are pre-buried in the ultra-high performance concrete layer 200 are used for fixing the ladder stand, and the ladder stand is connected with the nuts 210 which are reserved in the ultra-high performance concrete layer 200 through connecting pieces, such as bolts, penetrating through the preformed holes 110. It can be understood that the embedded nut 210 can also be used to fix other supporting members, and the embedded nut 210 can also be made of other materials with anti-corrosion function.
In order to improve the interface bonding between the stainless steel pipe 100 and the ultra-high performance concrete layer 200, rows of shear nails 120 are arranged on the inner wall of the stainless steel pipe 100, and the row spacing between the shear nails 120 is 25mm and the length is 9 mm. It is understood that the shear pins 120 may be connected to the inner wall of the stainless steel pipe 100 by welding or the like.
The ultra-high performance concrete layer 200 comprises the following components in parts by weight: 40-70 parts of cement, 25-45 parts of admixture, 80-120 parts of fine aggregate, 8-22 parts of steel fiber and 1.8-3.6 parts of polycarboxylic acid water reducing agent. Be equipped with steel reinforcement framework 220 in ultra high performance concrete layer 200, this steel reinforcement framework 220 includes the longitudinal reinforcement that extends along pole length direction, does not include the hoop reinforcing bar parallel with the pole cross section, and the distance between longitudinal reinforcement and the 100 inner walls of stainless steel pipe is 11mm, or is greater than the bar diameter.
The preparation method of the non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole comprises the following steps:
s1, preparing an electric pole mould, respectively placing two half pipes of a stainless steel pipe in an upper mould and a lower mould of the electric pole mould, closing the moulds to fix a designed steel reinforcement framework in the stainless steel pipe, closing an upper mould of the electric pole mould, screwing down screws, and assembling the mould for later use;
s2, calculating the using amount of each raw material for manufacturing the ultra-high performance concrete layer according to the proportion, putting all fine aggregate and steel fiber into a stirrer to be stirred for 60-120 seconds, then putting all cement and admixture into the stirrer to be stirred for 180-240 seconds, and finally putting all water reducing agent and water into the stirrer to be stirred for 360-600 seconds to obtain the ultra-high performance concrete mixture with slump of 160-240 mm;
s3, pumping the ultra-high performance concrete mixture obtained in the step S2 to a stainless steel pipe assembled in the electric pole mold in the step S1, locking the electric pole mold, and carrying out centrifugal forming to obtain the composite electric pole with the mold;
s4, standing the composite electric pole with the mould obtained in the step S3 at room temperature for 1-2 hours, and putting the composite electric pole into a curing kiln at the temperature of 80-90 ℃ for steam curing for 8-16 hours, wherein the compressive strength is not lower than 130 MPa, and the bending strength is not lower than 14 MPa;
and S5, demolding the composite electric pole subjected to steam curing in the step S4, and then placing the composite electric pole into a storage yard for natural curing for 7-14 days.
It is understood that in the above preparation method, the order of steps S1 to S2 may be arbitrarily changed.
Comparative example 1
An M-grade non-prestressed ultrahigh-performance concrete pole with a small diameter of 190mm and a length of 12M and a preparation method thereof are the same as those in example 1 except that a stainless steel pipe is not arranged.
Comparative example 2
An M-grade non-prestressed concrete pole with a small diameter of 190mm and a length of 12M and a preparation method thereof are the same as those in example 1 except that a stainless steel pipe is not arranged, and the ultra-high performance concrete is changed into C50 concrete.
Comparative example 3
An M-grade non-prestressed ultrahigh-performance concrete pole with a slight diameter of 190mm and a length of 12M and a preparation method thereof are the same as those in the embodiment 1 except that no shear nails are arranged on the inner wall of a stainless steel pipe.
The performance test of the M-grade non-prestressed electric pole with the slight diameter of 190mm and the length of 12M prepared in the examples 1 to 3 and the comparative examples 1 to 3 is carried out according to GB4623-2014 annular concrete electric pole, and the test results are shown in Table 1.
TABLE 1 mechanical property test results of M-grade non-prestressed electric pole with a small diameter of 190mm and a length of 12M
Numbering Bearing capacity bending moment (more than or equal to 117kNkN.m) Crack width (less than or equal to 1.5mm) Deflection deformation (less than or equal to 1000mm)
Example 1 132.8 Is free of 400
Example 2 138.7 Is free of 389
Example 3 144.6 Is free of 375
Comparative example 1 81.9 1.8 850
Comparative example 2 58.5 1.95 495
Comparative example 3 108.5 Is free of 1035
From table 1, comparative example 1 has no stainless steel pipe, and compared with example 1, the bearing capacity bending moment is reduced more, and the crack width and deflection deformation are increased more; comparative example 2 has no stainless steel pipe, the ultra-high performance concrete is changed into C50 concrete, compared with example 1, the bearing capacity bending moment is reduced more, the crack width is increased more, and the deflection deformation is reduced slightly; comparative example 3 the stainless steel pipe has no shear nails on the inner wall, and compared with example 1, the bearing force and bending moment are reduced more, the appearance cracks are basically unchanged, and the deflection deformation is increased more. Through a large number of tests, the stainless steel tube outer cylinder is combined with the ultra-high performance concrete, so that the rigidity and the bearing force bending moment of the composite electric pole are improved, and the mechanical property of the electric pole is improved; the shear nails improve the interface bonding force of the stainless steel and the ultra-high performance concrete and improve the mechanical property of the electric pole.
It should be understood that the above-described embodiments of the present invention are merely examples for clearly illustrating the present invention, and are not intended to limit the embodiments of the present invention. Other variations and modifications will be apparent to persons skilled in the art in light of the above description. And are neither required nor exhaustive of all embodiments. Any modification, equivalent replacement, and improvement made within the spirit and principle of the present invention should be included in the protection scope of the claims of the present invention.

Claims (10)

1. The non-prestressed stainless steel pipe-ultrahigh-performance concrete composite electric pole is characterized by comprising a stainless steel pipe and an ultrahigh-performance concrete layer poured on the inner wall of the stainless steel pipe, wherein the stainless steel pipe is composed of two half pipes split along the axis, and a steel reinforcement framework is planted in the ultrahigh-performance concrete layer.
2. The non-prestressed stainless steel pipe-ultra high performance concrete composite electric pole as recited in claim 1, wherein the inner wall of said stainless steel pipe is provided with rows of shear nails.
3. The non-prestressed stainless steel pipe-ultra high performance concrete composite electric pole as claimed in claim 2, wherein the pitch of the shear nails is 20-30 mm and/or the length is 6-12 mm.
4. The non-prestressed stainless steel pipe-ultra high performance concrete composite electric pole as claimed in any one of claims 1 to 3, wherein the thickness of the stainless steel pipe is 0.5 to 1.5 mm.
5. The non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole according to any one of claims 1 to 3, wherein rows of prepared holes are prepared in the stainless steel pipe along the length direction, or nuts are welded on the inner wall of the stainless steel pipe corresponding to the prepared holes.
6. The non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole as recited in claim 5, wherein the aperture of the prepared hole is 14-20 mm, and the pitch is 200-300 mm; and/or the inner diameter of the nut is 14-20 mm, and the length of the nut is 20-80 mm.
7. The non-prestressed stainless steel pipe-ultra high performance concrete composite electric pole as claimed in any one of claims 1 to 3, wherein the thickness of the ultra high performance concrete layer is 20 to 80 mm; or the distance between the steel bar framework and the inner wall of the stainless steel pipe is 10-12 mm or more than the diameter of the steel bar framework.
8. The non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole as claimed in any one of claims 1 to 3, wherein the ultra-high performance concrete layer comprises the following components in parts by weight: 40-70 parts of cement, 25-45 parts of admixture, 80-120 parts of fine aggregate, 8-22 parts of steel fiber and 1.8-3.6 parts of polycarboxylic acid water reducing agent.
9. The preparation method of the non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole as claimed in any one of claims 2 to 8, characterized by comprising the following steps:
s1, preparing an electric pole mould, respectively placing two half pipes of a stainless steel pipe in an upper mould and a lower mould of the electric pole mould, closing the moulds to fix a steel reinforcement framework in the stainless steel pipe, and assembling the moulds for later use;
s2, putting all fine aggregates and steel fibers for manufacturing the ultra-high performance concrete layer into a stirrer according to the proportion, stirring for 60-120 seconds, then putting all cement and admixtures into the stirrer, stirring for 180-240 seconds, and finally putting all water reducing agents and water into the stirrer, and stirring for 360-600 seconds to obtain the ultra-high performance concrete mixture;
s3, pumping the ultra-high performance concrete mixture obtained in the step S2 into a stainless steel pipe assembled in a pole mold in the step S1, and performing centrifugal molding to obtain the composite pole with the mold;
s4, standing the composite electric pole with the mould obtained in the step S3 at room temperature for 1-2 hours, and putting the composite electric pole into a curing kiln at the temperature of 80-90 ℃ for steam curing for 8-16 hours;
and S5, demolding the composite electric pole subjected to steam curing in the step S4, and then placing the composite electric pole into a storage yard for natural curing for 7-14 days.
10. The method for preparing the non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole as recited in claim 9, wherein the slump of the ultra-high performance concrete mixture in the step S2 is 160-240 mm, and/or the compressive strength after steam curing in the step S4 is not lower than 130 mpa, and the flexural strength is not lower than 14 mpa.
CN202011017600.0A 2020-09-24 2020-09-24 Non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole and preparation method thereof Withdrawn CN112267743A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011017600.0A CN112267743A (en) 2020-09-24 2020-09-24 Non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011017600.0A CN112267743A (en) 2020-09-24 2020-09-24 Non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole and preparation method thereof

Publications (1)

Publication Number Publication Date
CN112267743A true CN112267743A (en) 2021-01-26

Family

ID=74349570

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011017600.0A Withdrawn CN112267743A (en) 2020-09-24 2020-09-24 Non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole and preparation method thereof

Country Status (1)

Country Link
CN (1) CN112267743A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100646751B1 (en) * 2005-06-07 2006-11-23 (주) 반도체 통신 The steel pipe for environmental-friendly electric pole with frp reinforcement material and their making method
CN102296753A (en) * 2011-06-20 2011-12-28 北京工业大学 Hollow column member with built-in high tensile steel bars and pipes for confinement of ultra high performance concrete
CN102633472A (en) * 2012-04-13 2012-08-15 江苏建华管桩有限公司 High-strength and high-durability pre-stressed concrete pile and production method thereof
CN102979180A (en) * 2012-12-27 2013-03-20 长安大学 SCS (steel-tube concrete structure) with built-in shear nails
CN203065954U (en) * 2012-12-27 2013-07-17 长安大学 SCS concrete filled steel tube structure with shearing-resistant function
CN209194322U (en) * 2018-12-18 2019-08-02 哈尔滨工业大学 A kind of corrugated steel tube-steel interlining composite pipes concrete combined component
CN111231098A (en) * 2020-03-31 2020-06-05 浙江荣林电力器材有限公司 Thin-wall centrifugal GFRP pipe ultra-high performance concrete composite electric pole and forming process thereof
CN111236296A (en) * 2019-12-18 2020-06-05 长江勘测规划设计研究有限责任公司 Offshore wind power hollow interlayer concrete filled steel tube single pile foundation structure and construction method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100646751B1 (en) * 2005-06-07 2006-11-23 (주) 반도체 통신 The steel pipe for environmental-friendly electric pole with frp reinforcement material and their making method
CN102296753A (en) * 2011-06-20 2011-12-28 北京工业大学 Hollow column member with built-in high tensile steel bars and pipes for confinement of ultra high performance concrete
CN102633472A (en) * 2012-04-13 2012-08-15 江苏建华管桩有限公司 High-strength and high-durability pre-stressed concrete pile and production method thereof
CN102979180A (en) * 2012-12-27 2013-03-20 长安大学 SCS (steel-tube concrete structure) with built-in shear nails
CN203065954U (en) * 2012-12-27 2013-07-17 长安大学 SCS concrete filled steel tube structure with shearing-resistant function
CN209194322U (en) * 2018-12-18 2019-08-02 哈尔滨工业大学 A kind of corrugated steel tube-steel interlining composite pipes concrete combined component
CN111236296A (en) * 2019-12-18 2020-06-05 长江勘测规划设计研究有限责任公司 Offshore wind power hollow interlayer concrete filled steel tube single pile foundation structure and construction method
CN111231098A (en) * 2020-03-31 2020-06-05 浙江荣林电力器材有限公司 Thin-wall centrifugal GFRP pipe ultra-high performance concrete composite electric pole and forming process thereof

Similar Documents

Publication Publication Date Title
CN202519664U (en) High tensile reinforcement reinforced prestressed UHPC (Ultra High Performance Concrete) thin-wall tubular pile component
CN112523443A (en) Ultra-high performance concrete assembled light and thin prefabricated staircase and assembling process thereof
CN213710595U (en) Glass fiber reinforced plastic pipe composite electric pole
CN112360220A (en) Non-prestressed galvanized steel pipe-ultra-high performance concrete composite electric pole and preparation method thereof
US7419543B2 (en) Metal fiber concrete
CN112302404A (en) Prestressed galvanized steel pipe-concrete composite electric pole and preparation method thereof
CN112302405A (en) Non-prestressed glass fiber reinforced plastic pipe-ultra-high performance concrete composite electric pole and preparation method thereof
CN112267743A (en) Non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole and preparation method thereof
CN112248213A (en) Prestressed stainless steel pipe-ultrahigh-performance concrete composite electric pole and preparation method thereof
CN112267747A (en) Non-prestressed stainless steel pipe-ultra-high performance concrete composite electric pole and preparation method thereof
CN112343402A (en) Prestressed galvanized steel pipe-ultrahigh-performance concrete composite electric pole and preparation method thereof
CN112267745A (en) Prestressed stainless steel pipe-ultrahigh-performance concrete composite electric pole and preparation method thereof
CN112360219A (en) Non-prestressed galvanized steel pipe-ultra-high performance concrete composite electric pole and preparation method thereof
CN112360223A (en) Prestressed galvanized steel pipe-ultrahigh-performance concrete composite electric pole and preparation method thereof
CN102071701A (en) Non-prestressed centrifugal concrete pile
CN213890532U (en) Prestress or non-prestress stainless steel pipe composite electric pole
CN214110863U (en) Stainless steel pipe composite electric pole
CN213710594U (en) Non-prestressed glass steel tube composite electric pole
CN112267746A (en) Prestressed stainless steel pipe-concrete composite electric pole and preparation method thereof
CN112282483A (en) Non-prestressed galvanized steel pipe-concrete composite electric pole and preparation method thereof
CN112297216A (en) Prestressed galvanized steel pipe-concrete composite electric pole and preparation method thereof
CN112302402A (en) Non-prestressed galvanized steel pipe-concrete composite electric pole and preparation method thereof
CN112252807A (en) Non-prestressed stainless steel tube-concrete composite electric pole and preparation method thereof
CN112282482A (en) Non-prestressed stainless steel tube-concrete composite electric pole and preparation method thereof
CN112267742A (en) Prestressed stainless steel pipe-concrete composite electric pole and preparation method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20210126