CN112258138B - Construction site safety management informatization system - Google Patents
Construction site safety management informatization system Download PDFInfo
- Publication number
- CN112258138B CN112258138B CN202010941102.9A CN202010941102A CN112258138B CN 112258138 B CN112258138 B CN 112258138B CN 202010941102 A CN202010941102 A CN 202010941102A CN 112258138 B CN112258138 B CN 112258138B
- Authority
- CN
- China
- Prior art keywords
- site
- module
- safety
- integral
- construction site
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 95
- 230000006399 behavior Effects 0.000 claims abstract description 82
- 238000009826 distribution Methods 0.000 claims abstract description 55
- 238000003860 storage Methods 0.000 claims description 5
- 238000007689 inspection Methods 0.000 claims description 3
- 230000001360 synchronised effect Effects 0.000 claims description 3
- 238000003032 molecular docking Methods 0.000 claims description 2
- 238000007726 management method Methods 0.000 abstract description 54
- 230000000694 effects Effects 0.000 abstract description 4
- 238000007405 data analysis Methods 0.000 abstract description 3
- 238000013523 data management Methods 0.000 abstract description 3
- 230000005284 excitation Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 7
- 238000011161 development Methods 0.000 description 4
- 238000000338 in vitro Methods 0.000 description 4
- 238000004519 manufacturing process Methods 0.000 description 4
- 230000008901 benefit Effects 0.000 description 3
- 238000009435 building construction Methods 0.000 description 2
- 230000001737 promoting effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 210000001503 joint Anatomy 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000002085 persistent effect Effects 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 230000004083 survival effect Effects 0.000 description 1
- 230000009897 systematic effect Effects 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/08—Construction
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Economics (AREA)
- General Physics & Mathematics (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Theoretical Computer Science (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Data Mining & Analysis (AREA)
- Primary Health Care (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a construction site safety management informatization system, which solves the problem of cost by adopting the form of an electronic card through the mutual coordination among a server, a login module, an integral distribution module, an integral acquisition module, an integral exchange module, a showing module and a browsing module; the system comprises a point distribution module, a point acquisition module and a point exchange module, wherein the point distribution module, the point acquisition module and the point exchange module are matched without manual exchange and statistics, so that workload of staff is reduced, the problem of personnel statistics errors is avoided, a top-in-the-air module and a browsing module are further arranged, site constructors, site management staff and company leaders can browse and watch site safety behaviors at any time, the management staff and company management layer use a big data platform to conduct data management and analysis, the landing of post-level application tools is truly realized, the working efficiency and effect of projects are obviously improved, and a safety management atmosphere with participation of all staff and forward excitation is created.
Description
Technical Field
The invention relates to construction site safety, in particular to a construction site safety management informatization system, and belongs to the field of management informatization systems.
Background
Building construction safety is a basic stone in the building construction industry and is a precondition for various works of construction enterprises. The enterprise staff should firmly establish the idea of 'safe first, foredefense as the main and comprehensive treatment'. The method has the advantages that various relations are straightened, the safety of people is truly achieved, the people are safe in all times, the matters are safe in all matters, all violation phenomena are avoided, and the method plays a positive role in promoting the safety production of enterprises. Safety production is a persistent topic in the process of human survival and development. With the progress of society and the development of economy, the safety problem is receiving more attention and importance from the whole society. The production process has the advantages of ensuring the safety of life and property of people, realizing the premise and guarantee of sustainable development of national economy of China, improving the quality of life of people, promoting the stability of society and creating a harmonious society.
In the social production activities of enterprises, particularly the construction industry, the safety is an image, the safety is development, the safety is a requirement, the safety is a benefit concept, and the method is widely accepted and is more highly valued by construction enterprises.
The traditional safety management behavior is mainly punished, a plurality of enterprises adopt a form of 'point card' to carry out safety management, the point card is used for exchanging rewards, labor staff are stimulated to carry out site safety maintenance together, but verification and distribution of the card are only supervised by staff of a project department, the safety management work efficiency is low, and the labor cost cannot be saved.
In order to solve the technical problems, the invention provides the following technical scheme.
Disclosure of Invention
The invention aims to provide a construction site safety management informatization system which is used for solving the problems that the prior art cannot solve the problems that a worker sends a card in a form and has low efficiency, a card is easy to dirty and fold, paper card is high in cost, and a worker exchange way is complex, wherein the problems of long distance of exchange points (office areas), complicated exchange process and great workload of the manager are mainly reflected in the exchange of the manager, and the cost is solved by adopting the form of an electronic card through the mutual coordination among a server, a login module, an integral distribution module, an integral acquisition module, an integral exchange module, a showing module and a browsing module; the system comprises a point distribution module, a point acquisition module and a point exchange module, wherein the point distribution module, the point acquisition module and the point exchange module are matched without manual exchange and statistics, so that workload of staff is reduced, the problem of personnel statistics errors is avoided, a top-in-the-air module and a browsing module are further arranged, site constructors, site management staff and company leaders can browse and watch site safety behaviors at any time, the management staff and company management layer use a big data platform to conduct data management and analysis, the landing of post-level application tools is truly realized, the working efficiency and effect of projects are obviously improved, and a safety management atmosphere with participation of all staff and forward excitation is created.
The technical problems to be solved by the invention are as follows:
1. the efficiency is low for worker card issuing formalization (card making, card number registering, card issuing and worker combination), and the card is easy to dirty and fold, and the paper card has high cost;
2. the way of the worker exchange is complicated, the way is mainly reflected in that the exchange points (office areas) are far away, the exchange is not carried out by the manager, and the exchange process is complicated (signing and photographing);
3. the manager has extremely high workload (card issuing standing accounts, exchange standing accounts, numerous photo collection and export, various signature procedures, exchange material purchase, preservation and registration and the like).
The aim of the invention can be achieved by the following technical scheme:
a construction site safety management informatization system comprises a server, a login module, an integral distribution module, an integral acquisition module, an integral exchange module, a saturation module and a browsing module;
the integral distribution module is used for carrying out integral distribution by field management personnel, and the specific distribution steps are as follows:
step one: the site manager enters the integral distribution module through inputting an account number and a password;
step two: the field manager sends the type of the safety behavior of the construction field to an integral distribution module, and the integral distribution module numbers the type of the safety behavior of the construction field and marks the type as i;
step three: the site manager gives the score to the safety behavior of the construction site, and sends the score of the safety behavior of the construction site to an integral distribution module, and the integral distribution module matches the score with the corresponding safety behavior of the construction site and stores the score of the safety behavior of the construction site in a sending server;
step four: the site manager adds new construction site safety behaviors according to site construction safety requirements, directly sends the scores to the integral distribution module, and sends the scores of the new construction site safety behaviors to the server for storage;
the integral acquisition module is used for carrying out integral acquisition by site constructors, and the specific acquisition steps are as follows:
s1, a site constructor enters an integral acquisition module through inputting an account number and a password;
s2, shooting the safety behavior of the construction site by a site constructor through a mobile phone, and sending the safety behavior of the construction site and a short text description to an integral acquisition module;
s3, the integral acquisition module performs construction site safety behavior matching according to integral distribution of the integral distribution module, and the corresponding integral is sent to an integral card of a site constructor;
s4, for the construction site safety behavior, the construction site safety behavior is outside the type of the construction site safety behavior set by site management personnel, the site management personnel is automatically searched for manual integral allocation, and the corresponding type of the construction site safety behavior is increased;
the point exchange module is used for the on-site constructors to exchange the points for the living goods and the food, and the specific exchange mode is as follows: and the site constructor selects commodities beside the exchange cabinet, performs code scanning exchange on the exchange cabinet through the point card, and deducts corresponding points in the point card.
Preferably, the login module is used for inputting an account number and a password by site constructors, site management personnel and company leaders to log in the system, and the account number and the password are automatically generated by synchronous docking of a construction site safety management informatization system and a project labor service system.
Preferably, after the company leader inputs an account number and a password to log in the system, security observation times and observation time are set, and site management personnel are reminded to conduct site security inspection at fixed time.
Preferably, the top in-the-air module is used for carrying out top in-the-air on-site constructors with top in-the-air ranking, the top in-the-air module gathers the point conditions of the on-site constructors and carries out the top in-the-air ranking each month, the top in-the-air module is provided with a top in-the-field constructor point list, and the top in-the-air module carries out independent display and top in-the-air on groups with top in-the-air ranking.
Preferably, the browsing module is used for logging in and browsing the safety behavior of the construction site by site constructors, site management personnel and company leaders, and the specific browsing steps are as follows:
step one: site constructors, site management personnel and company leaders input account numbers and passwords to log in the browsing module;
step two: the site constructor, site manager and company leader input keywords to search the safety behavior of the construction site;
step three: the browsing module searches the safety behaviors of the construction site according to the keywords, and arranges and displays the safety behaviors of the construction site related to the keywords on a browsing homepage;
step four: site constructors, site management personnel and company leaders click on the site safety behaviors to read the site safety behaviors.
Preferably, the project labor system is used for labor dispatch of field construction personnel.
Compared with the prior art, the invention has the beneficial effects that:
1. a construction site safety management informatization system integrates the traditional safety management behaviors mainly punished to the same platform to perform unified and systematic management, encourages the participation of all personnel in the safety management, solves the defect that the current safety management is only supervised by personnel in a project department, reduces the safety risk, greatly improves the working efficiency of the safety management, ensures the safety and saves the labor cost.
2. A construction site safety management informatization system enables labor staff and safety observers to acquire safety information at any time, enables management staff and a company management layer to use a large data platform to conduct data management and analysis, truly realizes the landing of post-level application tools, enables the working efficiency and effect of projects to be obviously improved, and creates a safety management atmosphere with participation of all staff and forward excitation.
3. A construction site safety management informatization system reduces site safety risks, gradually builds an integrity system large database of workers, and provides references for personnel selection of follow-up projects and subcontracting units of a company.
4. The information system for safety management of construction sites changes the safety behavior into guidance, penalty into rewards, passive safety into active safety, improves the safety consciousness of first-line operators and is a brand-new safety management mode.
Drawings
In order to more clearly illustrate the embodiments of the invention or the technical solutions in the prior art, the drawings that are required in the embodiments or the description of the prior art will be briefly described, it being obvious that the drawings in the following description are only some embodiments of the invention, and that other drawings may be obtained according to these drawings without inventive effort for a person skilled in the art.
Fig. 1 is a functional block diagram of the present invention.
Detailed Description
The technical solutions of the present invention will be clearly and completely described in connection with the embodiments, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. All other embodiments, which can be made by those skilled in the art based on the embodiments of the invention without making any inventive effort, are intended to be within the scope of the invention.
Referring to fig. 1, a construction site safety management informatization system includes a server, a login module, an integral distribution module, an integral acquisition module, an integral exchange module, a saturation module and a browsing module;
the integral distribution module is used for carrying out integral distribution by field management personnel, and the specific distribution steps are as follows:
step one: the site manager enters the integral distribution module through inputting an account number and a password;
step two: the field manager sends the type of the safety behavior of the construction field to an integral distribution module, and the integral distribution module numbers the type of the safety behavior of the construction field and marks the type as i;
step three: the site manager gives the score to the safety behavior of the construction site, and sends the score of the safety behavior of the construction site to an integral distribution module, and the integral distribution module matches the score with the corresponding safety behavior of the construction site and stores the score of the safety behavior of the construction site in a sending server;
step four: the site manager adds new construction site safety behaviors according to site construction safety requirements, directly sends the scores to the integral distribution module, and sends the scores of the new construction site safety behaviors to the server for storage;
the integral acquisition module is used for carrying out integral acquisition by site constructors, and the specific acquisition steps are as follows:
s1, a site constructor enters an integral acquisition module through inputting an account number and a password;
s2, shooting the safety behavior of the construction site by a site constructor through a mobile phone, and sending the safety behavior of the construction site and a short text description to an integral acquisition module;
s3, the integral acquisition module performs construction site safety behavior matching according to integral distribution of the integral distribution module, and the corresponding integral is sent to an integral card of a site constructor;
s4, for the construction site safety behavior, the construction site safety behavior is outside the type of the construction site safety behavior set by site management personnel, the site management personnel is automatically searched for manual integral allocation, and the corresponding type of the construction site safety behavior is increased;
the point exchange module is used for the on-site constructors to exchange the points for the living goods and the food, and the specific exchange mode is as follows: and the site constructor selects commodities beside the exchange cabinet, performs code scanning exchange on the exchange cabinet through the point card, and deducts corresponding points in the point card.
The login module is used for inputting an account number and a password to login the system by site constructors, site management personnel and company leaders, and the account number and the password are automatically generated by synchronous butt joint of a construction site safety management informatization system and a project labor service system.
After the company leads to input an account number and a password to log in the system, setting safety observation times and observation time, and reminding site management personnel of carrying out site safety inspection at fixed time.
The in-vitro module is used for carrying out in-vitro on the on-site constructors with the top ranking of the points, summarizing the point conditions of the on-site constructors and carrying out the point ranking each month, setting an on-site constructor point list on the in-vitro module, and carrying out independent display and in-vitro on groups with the top ranking of the points.
The system also comprises a browsing module, wherein the browsing module is used for logging in and browsing the safety behavior of the construction site by site constructors, site management personnel and company leaders, and the specific browsing steps are as follows:
step one: site constructors, site management personnel and company leaders input account numbers and passwords to log in the browsing module;
step two: the site constructor, site manager and company leader input keywords to search the safety behavior of the construction site;
step three: the browsing module searches the safety behaviors of the construction site according to the keywords, and arranges and displays the safety behaviors of the construction site related to the keywords on a browsing homepage;
step four: site constructors, site management personnel and company leaders click on the site safety behaviors to read the site safety behaviors.
The project labor service system is used for labor service dispatch of site constructors.
The working principle of the invention is as follows: a construction site safety management informatization system comprises a server, a login module, an integral distribution module, an integral acquisition module, an integral exchange module, a saturation module and a browsing module; the point distribution module is used for performing point distribution by field management personnel, and the field management personnel enter the point distribution module through an input account number and a password; the field manager sends the type of the safety behavior of the construction field to an integral distribution module, and the integral distribution module numbers the type of the safety behavior of the construction field and marks the type as i; the site manager gives the score to the safety behavior of the construction site, and sends the score of the safety behavior of the construction site to an integral distribution module, and the integral distribution module matches the score with the corresponding safety behavior of the construction site and stores the score of the safety behavior of the construction site in a sending server; the site manager adds new construction site safety behaviors according to site construction safety requirements, directly sends the scores to the integral distribution module, and sends the scores of the new construction site safety behaviors to the server for storage;
the integral acquisition module is used for carrying out integral acquisition by site constructors, and the site constructors enter the integral acquisition module through an input account number and a password; the field constructor shoots the safety behavior of the construction field through a mobile phone and sends the safety behavior of the construction field and a short text description to the integral acquisition module; the integral acquisition module performs construction site safety behavior matching according to integral distribution of the integral distribution module, and the corresponding integral is sent to an integral card of site constructors; for the construction site safety behavior outside the type of the construction site safety behavior set by site management personnel, the site management personnel is automatically searched for manual integral allocation, and the corresponding type of the construction site safety behavior is increased; the system also comprises a point exchange module, wherein the point exchange module is used for carrying out point exchange on living goods and food by site constructors, and the specific exchange mode is as follows: and the site constructor selects commodities beside the exchange cabinet, performs code scanning exchange on the exchange cabinet through the point card, and deducts corresponding points in the point card.
The preferred embodiments of the invention disclosed above are intended only to assist in the explanation of the invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise form disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and the practical application, to thereby enable others skilled in the art to best understand and utilize the invention. The invention is limited only by the claims and the full scope and equivalents thereof.
Claims (5)
1. The construction site safety management informatization system is characterized by comprising a server, a login module, an integral distribution module, an integral acquisition module, an integral exchange module, a saturation module and a browsing module;
the integral distribution module is used for carrying out integral distribution by field management personnel, and the specific distribution steps are as follows:
step one: the site manager enters the integral distribution module through inputting an account number and a password;
step two: the field manager sends the type of the safety behavior of the construction field to an integral distribution module, and the integral distribution module numbers the type of the safety behavior of the construction field and marks the type as i;
step three: the site manager gives the score to the safety behavior of the construction site, and sends the score of the safety behavior of the construction site to an integral distribution module, the integral distribution module matches the score with the corresponding safety behavior of the construction site, and a server for sending the score distribution condition of the safety behavior of the construction site is used for storage;
step four: the site manager adds new construction site safety behaviors according to site construction safety requirements, directly sends the scores to the integral distribution module, and sends the scores of the new construction site safety behaviors to the server for storage;
the integral acquisition module is used for carrying out integral acquisition by site constructors, and the specific acquisition steps are as follows:
s1, a site constructor enters an integral acquisition module through inputting an account number and a password;
s2, shooting the safety behavior of the construction site by a site constructor through a mobile phone, and sending the safety behavior of the construction site and a short text description to an integral acquisition module;
s3, the integral acquisition module performs construction site safety behavior matching according to integral distribution of the integral distribution module, and the corresponding integral is sent to an integral card of a site constructor;
s4, for the construction site safety behavior, the construction site safety behavior is outside the type of the construction site safety behavior set by site management personnel, the site management personnel is automatically searched for manual integral allocation, and the corresponding type of the construction site safety behavior is increased;
the point exchange module is used for the on-site constructors to exchange the points for the living goods and the food, and the specific exchange mode is as follows: and the site constructor selects commodities beside the exchange cabinet, performs code scanning exchange on the exchange cabinet through the point card, and deducts corresponding points in the point card.
2. The job site safety management information system of claim 1, further comprising a login module for a job site constructor, a job site manager, and a corporate leader to enter an account number and a password to log into the system, the account number and the password being automatically generated by the job site safety management information system in synchronized docking with the project labor system.
3. The system of claim 1, wherein the security observation times and the observation time are set after the company leads to input account numbers and passwords to log in the system, and the site manager is reminded of site security inspection at regular time.
4. The system of claim 1, further comprising a top-in module for top-in to top-in the field constructors with top-in scores, wherein the top-in module summarizes the top-in scores of the field constructors and top-in scores each month, sets a top-in-the-field constructor top-in-scores list in the top-in module, and displays and top-in-the-scores groups with top-in-scores separately.
5. The system of claim 1, further comprising a browsing module, wherein the browsing module is configured to log in and browse the safe behavior of the construction site by site constructors, site manager and company leaders, and the specific browsing steps are as follows:
step one: site constructors, site management personnel and company leaders input account numbers and passwords to log in the browsing module;
step two: the site constructor, site manager and company leader input keywords to search the safety behavior of the construction site;
step three: the browsing module searches the safety behaviors of the construction site according to the keywords, and arranges and displays the safety behaviors of the construction site related to the keywords on a browsing homepage;
step four: site constructors, site management personnel and company leaders click on the site safety behaviors to read the site safety behaviors.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010941102.9A CN112258138B (en) | 2020-09-09 | 2020-09-09 | Construction site safety management informatization system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202010941102.9A CN112258138B (en) | 2020-09-09 | 2020-09-09 | Construction site safety management informatization system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112258138A CN112258138A (en) | 2021-01-22 |
CN112258138B true CN112258138B (en) | 2023-06-27 |
Family
ID=74231564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202010941102.9A Active CN112258138B (en) | 2020-09-09 | 2020-09-09 | Construction site safety management informatization system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112258138B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113570408B (en) * | 2021-07-16 | 2024-02-13 | 晋江易库物联网科技有限公司 | Integral type rural management system and management method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102314642A (en) * | 2011-08-12 | 2012-01-11 | 华电国际电力股份有限公司山东分公司 | Management system for safe production behavior of operating personnel |
CN106447195A (en) * | 2016-09-28 | 2017-02-22 | 国网浙江省电力公司湖州供电公司 | Safety bearing capacity analysis method based on employee integral and outsourcing team evaluation |
CN111062551A (en) * | 2018-10-17 | 2020-04-24 | 中电建生态环境集团有限公司 | Safety factor evaluation method and device for construction site and server |
-
2020
- 2020-09-09 CN CN202010941102.9A patent/CN112258138B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102314642A (en) * | 2011-08-12 | 2012-01-11 | 华电国际电力股份有限公司山东分公司 | Management system for safe production behavior of operating personnel |
CN106447195A (en) * | 2016-09-28 | 2017-02-22 | 国网浙江省电力公司湖州供电公司 | Safety bearing capacity analysis method based on employee integral and outsourcing team evaluation |
CN111062551A (en) * | 2018-10-17 | 2020-04-24 | 中电建生态环境集团有限公司 | Safety factor evaluation method and device for construction site and server |
Also Published As
Publication number | Publication date |
---|---|
CN112258138A (en) | 2021-01-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100468246C (en) | Real time monitoring system for production processes and monitoring method | |
CN1501296A (en) | Project executive personnel management system and method of the same | |
CN104361445A (en) | Real-time labor management system and management method | |
CN113283683A (en) | Post qualification management method and system | |
CN111160789A (en) | Intelligent whole-person safety production responsibility management system | |
CN112258138B (en) | Construction site safety management informatization system | |
CN104573885A (en) | Auditing service working platform based on Internet cloud computing service function | |
CN114677044A (en) | Management system and method for intelligent building supervision engineering project | |
Salehi et al. | A study of the effect of information technology on internal auditing: Some Iranian evidence | |
CN203415004U (en) | Intelligent all-purpose government administration card terminal for labor employment | |
CN114677117A (en) | Building engineering management system and device | |
Xue et al. | Developing a unified framework for data sharing in the smart construction using text analysis | |
Gong et al. | Blockchain-based e-tendering evaluation framework | |
CN117113358A (en) | Digital exhibition trusted service platform and method based on blockchain technology | |
Wu | Intelligent communication management terminal in the construction of human resource management mode | |
CN111292064A (en) | New medicine research and development platform of Internet of things | |
Xie et al. | Practice of EVA‐Based Balanced Scorecard in the Construction of Performance Evaluation System | |
Wang | Impact of information technology on accounting | |
Su et al. | Innovation of Enterprise Cost Management Under Internet Plus Era | |
CN112330170B (en) | Power transmission and transformation engineering quality common fault prevention and control platform based on AR technology | |
Zhang et al. | Research on Effective Management and Control team System of Power Grid Based on Internet Technology | |
Fernando et al. | Public Value and Level of e-Government in Sri Lanka: Problems and Prospects | |
CN111985908A (en) | Shared cloud office platform | |
CN116307421A (en) | Autonomous driving type overall improvement management system | |
Zhang | Design and Implementation of Enterprise Resource Planning Management System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |