CN112257139A - 基于玻璃水槽试验数据的河道数学模型桥墩概化方法 - Google Patents

基于玻璃水槽试验数据的河道数学模型桥墩概化方法 Download PDF

Info

Publication number
CN112257139A
CN112257139A CN202010941871.9A CN202010941871A CN112257139A CN 112257139 A CN112257139 A CN 112257139A CN 202010941871 A CN202010941871 A CN 202010941871A CN 112257139 A CN112257139 A CN 112257139A
Authority
CN
China
Prior art keywords
pier
generalized
model
prototype
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010941871.9A
Other languages
English (en)
Other versions
CN112257139B (zh
Inventor
付开雄
薛泷辉
柯明辉
杨首龙
何承农
高梦露
夏厚兴
胡朝阳
王新强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Provincial Investigation Design & Research Institute Of Water Conservancy And Hydropower
Original Assignee
Fujian Provincial Investigation Design & Research Institute Of Water Conservancy And Hydropower
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Provincial Investigation Design & Research Institute Of Water Conservancy And Hydropower filed Critical Fujian Provincial Investigation Design & Research Institute Of Water Conservancy And Hydropower
Priority to CN202010941871.9A priority Critical patent/CN112257139B/zh
Publication of CN112257139A publication Critical patent/CN112257139A/zh
Application granted granted Critical
Publication of CN112257139B publication Critical patent/CN112257139B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B1/00Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
    • E02B1/02Hydraulic models
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/20Design optimisation, verification or simulation
    • G06F30/28Design optimisation, verification or simulation using fluid dynamics, e.g. using Navier-Stokes equations or computational fluid dynamics [CFD]
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2111/00Details relating to CAD techniques
    • G06F2111/10Numerical modelling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2113/00Details relating to the application field
    • G06F2113/08Fluids
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F2119/00Details relating to the type or aim of the analysis or the optimisation
    • G06F2119/14Force analysis or force optimisation, e.g. static or dynamic forces
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Abstract

本发明公布了基于玻璃水槽试验数据的河道数学模型桥墩概化方法,概化桥墩试验与原型桥墩试验的水位差值在±0.01m以内,流速差值在±0.05m/s以内。通过玻璃水槽断面模型试验对原型桥墩和概化桥墩进行比较试验,得到了与原型桥墩等效阻水的概化桥墩尺寸以供数学模型使用。概化桥墩与原型桥墩各水力学参数基本相同,确保概化后桥墩阻水影响与原型一致,解决了河道数学模型桥墩概化主要根据理论计算或通过实测河道水位反推桥墩等效阻水面积,跟实际常有偏差的技术问题。

Description

基于玻璃水槽试验数据的河道数学模型桥墩概化方法
技术领域
本发明属于河道水力学技术领域,具体涉及基于玻璃水槽试验数据的河道数学模型桥墩概化方法。
背景技术
目前,我们一般采用丹麦DHI公司开发的MIKE21软件中的水动力模块进行河流下游河道桥梁群对防洪影响的累积效应研究。MIKE21在平面二维自由表面流数值模拟方面具有强大的功能,软件自带的构筑物选项可以实现简单桥墩结构的模拟,但对于包括桥墩、承台及群桩3个部分的复杂桥墩,往往需要对桥墩进行概化处理,其目的是为了简化数学模型建模,提高其运算速度。概化处理拟将桥墩承台及桩基概化为高度及长度不变、宽度缩窄的承台体型,并通过玻璃水槽试验确定概化后的承台宽度,确保概化后桥墩阻水影响与原型一致。
发明内容
(1)要解决的技术问题
河道数学模型桥墩概化主要根据理论计算或通过实测河道水位反推桥墩等效阻水面积,跟实际常有偏差。
(2)技术方案
为了解决上述技术问题,本发明提供基于玻璃水槽试验数据的河道数学模型桥墩概化方法,包括以下步骤:
1)、按照重力相似和几何相似准则,制作比尺为λL=30的桥墩正态模型,其相关比尺如下:
流速比尺:λv=λL 1/2=5.477
流量比尺:λQ=λL 5/2=4929.50
糙率比尺:λn=λL 1/6=1.7627
2)、设定玻璃水槽宽度1m,模拟原型河道宽度30m,玻璃水槽底坡为0,模拟各个桥墩的平均河底高程;
3)、玻璃水槽上游给定河道数学模型相应单宽流量,控制桥墩模型下游5m处水位为实测水位;
4)、测量桥墩模型上游5m处水位为H;
5)、制作概化桥墩模型,所述概化桥墩模型的墩身及以上体型不变,承台及以下概化成承台形状,承台长度及顶高程不变,底高程为原桩底高程,宽度b为原承台宽度B的a%;
6)、将玻璃水槽中的模型桥墩替换成概化桥墩模型,玻璃水槽水力边界条件不变,测量概化桥墩模型上游5m处水位h;
7)、调整概化桥墩模型的承台宽度,使h=H,得出a%=b/B。
而在河道数学模型中,桥墩承台及以下概化为承台体型,宽度按原承台宽度的a%,其余参数不变即可。当制作比尺为λL=30的桥墩正态模型时,设置在玻璃水槽内的原型桥墩模型和概化桥墩模型都是按照1:30的比例缩小,其试验水深也是按照1:30的比例缩小。
(3)有益效果
本发明的有益效果:通过玻璃水槽断面模型试验对原型桥墩和概化桥墩进行比较试验,得到了与原型桥墩等效阻水的概化桥墩尺寸以供数学模型使用。概化桥墩与原型桥墩各水力学参数基本相同,确保概化后桥墩阻水影响与原型一致,解决了河道数学模型桥墩概化主要根据理论计算或通过实测河道水位反推桥墩等效阻水面积,跟实际常有偏差的技术问题。
附图说明
附图用来提供对本发明专利的进一步理解,并且构成说明书的一部分,与本发明的实施例一起用于解释本发明,并不构成对本发明的限制。
图1为金山大桥原型桥墩试验;
图2为金山大桥概化桥墩试验;
图3为尤溪洲大桥原型桥墩试验;
图4为尤溪洲大桥概化桥墩试验;
图5为解放大桥原型桥墩试验;
图6为解放大桥概化桥墩试验;
图7为闽江大桥原型桥墩试验;
图8为闽江大桥概化桥墩试验;
图9为鳌峰大桥原型桥墩试验;
图10为鳌峰大桥概化桥墩试验。
具体实施方式
下面结合实施例对本发明实施例中的技术方案进行进一步清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。
实施例一
本实施例提供基于玻璃水槽试验数据的河道数学模型桥墩概化方法,通过玻璃水槽断面模型试验对金山大桥、尤溪洲大桥、解放大桥、闽江大桥、鳌峰大桥主跨原型桥墩与概化桥墩进行比较试验,寻找与原型桥墩等效阻水的概化桥墩尺寸以供数学模型试验。
本实施例各原型桥墩和概化桥墩按重力相似及几何相似准则设计,制作比尺为λL=30的正态模型。其相关比尺如下:
流速比尺:λv=λL 1/2=5.477
流量比尺:λQ=λL 5/2=4929.50
糙率比尺:λn=λL 1/6=1.7627
玻璃水槽宽度1m,模拟原型河道宽度30m,玻璃水槽底坡为0,模拟各个桥墩的平均桩底地形高程。模型各桥墩、承台均由雕刻机根据原型尺寸精准雕刻而成,承台下群桩用同等尺寸的PVC管进行模拟。PVC板材及管道糙率约为0.0081~0.0091,相当于原型糙率约0.014~0.016,与混凝土糙率相似。另外配备流量计、水位和流速自动化数据采集系统及水循环系统。
试验工况为:下泄100年一遇洪水流量Q=35600m3/s,北港分流流量约Q=6472m3/s,单宽流量约Q=20m3/sm。
试验水深为各桥墩下游150m处水位至桩底河道平均高程的高程差值,具体试验工况和边界条件如下表1-1。
Figure BDA0002673910640000041
表1-1试验工况及边界条件
1、原型桥墩与概化桥墩流态比较
在100年一遇流量Q=35600m3/s洪水作用下,各大桥原型桥墩附近会形成固有的马蹄形螺旋和尾涡螺旋,无其他明显的旋涡、回流等不良流态。概化桥墩的水流流态基本与原型相似。原型桥墩及概化桥墩附近水面及水下水流形态见图1~10。
2、原型桥墩与概化桥墩水位比较
金山大桥原型桥墩试验水位为9.108m~9.030m,概化桥墩试验水位为9.101m~9.040m,差值为-0.007~0.010;尤溪洲大桥原型桥墩试验水位为9.001m~8.877m,概化桥墩试验水位为8.991m~8.867m,差值为-0.010~-0.006;解放大桥原型桥墩试验水位为8.861m~8.823m,概化桥墩试验水位为8.852m~8.817m,差值为-0.009~-0.006;闽江大桥原型桥墩试验水位为8.199m~7.742m,概化桥墩试验水位为8.205m~7.735m,差值为-0.009~0.006;鳌峰大桥原型桥墩试验水位为7.519m~7.505m,概化桥墩试验水位为7.515m~7.495m,差值为-0.010~-0.004,具体各大桥原型桥墩与概化桥墩水位比较见表1-2。
Figure BDA0002673910640000051
表1-2原型桥墩与概化桥墩水位比较表
3、原型桥墩与概化桥墩流速比较
金山大桥原型桥墩试验流速为2.28m/s~1.57m/s,概化桥墩试验流速为2.22m/s~1.55m/s,垂向平均流速差值为0.05m/s~-0.02m/s;尤溪洲大桥原型桥墩试验流速为1.98m/s~0.64m/s,概化桥墩试验流速为1.98m/s~0.68m/s,垂向平均流速差值为0.04m/s~-0.04m/s;解放大桥原型桥墩试验流速为1.44m/s~1.12m/s,概化桥墩试验流速为1.44m/s~1.02m/s,垂向平均流速差值为0.04m/s~-0.03m/s;闽江大桥原型桥墩试验流速为1.55m/s~1.00m/s,概化桥墩试验流速为1.56m/s~0.97m/s,垂向平均流速差值为0.05m/s~-0.04m/s;鳌峰大桥原型桥墩试验流速为1.85m/s~1.00m/s,概化桥墩试验流速为1.82m/s~1.07m/s,垂向平均流速差值为0.05m/s~-0.05m/s;具体各大桥原型桥墩与概化桥墩流速比较见表1-3。
Figure BDA0002673910640000061
Figure BDA0002673910640000071
表1-3原型桥墩与概化桥墩流速比较表
注:(1)100年一遇工况,单宽流量Q=20m3/sm;(2)表中流速单位为m/s
综上,本次试验对各大桥原型桥墩和概化桥墩进行比较,确定了各桥墩的概化体型,从试验数据可以看出:概化桥墩与原型桥墩的水位差值均在±0.01m以内,流速差值均在±0.05m/s以内,可以认为概化桥墩与原型桥墩在阻水影响上具有等同效果。具体各大桥主跨概化桥墩承台宽度见表1-4。
Figure BDA0002673910640000072
表1-4各大桥主跨概化桥墩承台宽度表
以上所述实施例仅表达了本发明的优选实施方式,其描述较为具体和详细,但并不能因此而理解为对本发明专利范围的限制。应当指出的是,对于本领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干变形、改进及替代,这些都属于本发明的保护范围。因此,本发明专利的保护范围应以所附权利要求为准。

Claims (2)

1.基于玻璃水槽试验数据的河道数学模型桥墩概化方法,其特征在于,包括以下步骤:
1)、按照重力相似和几何相似准则,制作比尺为λL=30的桥墩正态模型,其相关比尺如下:
流速比尺:λv=λL 1/2=5.477
流量比尺:λQ=λL 5/2=4929.50
糙率比尺:λn=λL 1/6=1.7627
2)、设定玻璃水槽宽度1m,模拟原型河道宽度30m,玻璃水槽底坡为0,模拟各个桥墩的平均河底高程;
3)、玻璃水槽上游给定河道数学模型相应单宽流量,控制桥墩模型下游5m处水位为实测水位;
4)、测量桥墩模型上游5m处水位为H;
5)、制作概化桥墩模型,所述概化桥墩模型的墩身及以上体型不变,承台及以下概化成承台形状,承台长度及顶高程不变,底高程为原桩底高程,宽度b为原承台宽度B的a%;
6)、将玻璃水槽中的模型桥墩替换成概化桥墩模型,玻璃水槽水力边界条件不变,测量概化桥墩模型上游5m处水位h;
7)、调整概化桥墩模型的承台宽度,使h=H,得出a%=b/B。
2.根据权利要求1所述的基于玻璃水槽试验数据的河道数学模型桥墩概化方法,其特征在于,在河道数学模型中,桥墩承台及以下概化为承台体型,宽度按原承台宽度的a%,其余参数不变即可。
CN202010941871.9A 2020-09-09 2020-09-09 基于玻璃水槽试验数据的河道数学模型桥墩概化方法 Active CN112257139B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010941871.9A CN112257139B (zh) 2020-09-09 2020-09-09 基于玻璃水槽试验数据的河道数学模型桥墩概化方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010941871.9A CN112257139B (zh) 2020-09-09 2020-09-09 基于玻璃水槽试验数据的河道数学模型桥墩概化方法

Publications (2)

Publication Number Publication Date
CN112257139A true CN112257139A (zh) 2021-01-22
CN112257139B CN112257139B (zh) 2022-10-25

Family

ID=74231624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010941871.9A Active CN112257139B (zh) 2020-09-09 2020-09-09 基于玻璃水槽试验数据的河道数学模型桥墩概化方法

Country Status (1)

Country Link
CN (1) CN112257139B (zh)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006260173A (ja) * 2005-03-17 2006-09-28 Gunma Prefecture 河川システムの状態推定方法及びその状態推定装置
CN108399312A (zh) * 2018-04-16 2018-08-14 江苏省水利科学研究院 基于桥梁上下游水位差的桥墩绕流阻力等效糙率概化方法
CN108446521A (zh) * 2018-04-24 2018-08-24 江苏省水利科学研究院 一种多参数桥墩绕流阻力等效糙率经验概化方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006260173A (ja) * 2005-03-17 2006-09-28 Gunma Prefecture 河川システムの状態推定方法及びその状態推定装置
CN108399312A (zh) * 2018-04-16 2018-08-14 江苏省水利科学研究院 基于桥梁上下游水位差的桥墩绕流阻力等效糙率概化方法
CN108446521A (zh) * 2018-04-24 2018-08-24 江苏省水利科学研究院 一种多参数桥墩绕流阻力等效糙率经验概化方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
GREGORY A. DE ALMEIDA CARLOS 等: "Series compensator based on cascaded transformers coupled with three-phase bridge converters", 《2015 IEEE ENERGY CONVERSION CONGRESS AND EXPOSITION (ECCE)》 *
付开雄: "桥梁群对防洪影响的累积效应研究", 《水利科技》 *
房世龙等: "跨江大桥主桥墩局部冲刷试验研究", 《南通航运职业技术学院学报》 *

Also Published As

Publication number Publication date
CN112257139B (zh) 2022-10-25

Similar Documents

Publication Publication Date Title
Harrold et al. Agricultural hydrology as evaluated by monolith lysimeters
CN106759164B (zh) 一种感潮河段鱼道进口设计方法和鱼道进口
CN108446489A (zh) 海岸线变迁对湿地地下水影响的测量方法及其处理装置
CN114580793B (zh) 基于多源互补以及局部调控的水环境优化方法及系统
CN109271672A (zh) 一种河-湖-泵站相互影响作用下的河道水面线计算方法
CN104933268A (zh) 一种基于一维非恒定流数值模型的洪水分析方法
Kalathil et al. Control of sediment inflow into a trapezoidal intake canal using submerged vanes
CN107256312B (zh) 一种基于潮流环境下海湾纳潮变化量计算方法
CN111441306A (zh) 一种水动力提升方法及其性能测试方法
Cherry Chen et al. Behavior of storm‐induced suspension interflow in subtropical Feitsui Reservoir, Taiwan
CN112257139B (zh) 基于玻璃水槽试验数据的河道数学模型桥墩概化方法
Glovatskii et al. Hydrometric flow measurement in water management
Nasyrova et al. Use of Combined Floating Structures at Water Inlets of Pumping Stations
Djillali et al. Discharge capacity of shaft spillway with a polygonal section: a case study of Djedra dam (East Algeria)
CN103993575A (zh) 一种可科学重现稀遇潮洪流动特性的水景观设计方法
Ikramova et al. The reservoirs capacity assessment: the Tuyamuyun hydro complex in Khorezm region of Uzbekistan
Nasyrova et al. Operation of the Cascade of Pumping Stations of the Karshi Main Canal
Dabling et al. Staged and notched labyrinth weir hydraulics
CN113282997A (zh) 泥石流拦砂坝库内回淤纵比降测算方法、应用
Saki et al. A newly designed rectangular weir for flow regulation at river fork through a physical model (case studies of karkheh/hufel/nissan streams)
Wu et al. Long-term morpho-dyn amics in special type of estuary
CN203855930U (zh) 一种含漂浮植物河道的模拟系统
CN116644499B (zh) 适用于运河浪岸坡击区作用范围的确定方法及船行波模型试验装置
CN117236211B (zh) 一种强潮海岸潟湖弱流区流路多样性分时域提升方法
CN112433029B (zh) 一种滩地树木糙率的计算方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: No.158, Dongda Road, Fuzhou, Fujian 350000

Applicant after: Fujian Water Resources and Hydropower Survey, design and Research Institute Co.,Ltd.

Address before: No.158, Dongda Road, Fuzhou, Fujian 350000

Applicant before: FUJIAN PROVINCIAL INVESTIGATION DESIGN & Research Institute OF WATER CONSERVANCY AND HYDROPOWER

CB02 Change of applicant information
GR01 Patent grant
GR01 Patent grant