CN112253247B - Gas pressure rapid measuring device and measuring method - Google Patents

Gas pressure rapid measuring device and measuring method Download PDF

Info

Publication number
CN112253247B
CN112253247B CN202010874258.XA CN202010874258A CN112253247B CN 112253247 B CN112253247 B CN 112253247B CN 202010874258 A CN202010874258 A CN 202010874258A CN 112253247 B CN112253247 B CN 112253247B
Authority
CN
China
Prior art keywords
pressure
gas
gas injection
pipe
liquid
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202010874258.XA
Other languages
Chinese (zh)
Other versions
CN112253247A (en
Inventor
王春光
李铁良
王耀锋
李艳增
张东旭
黄鹤
苏伟伟
许幸福
薛伟超
刘春刚
李�杰
郭怀广
马金魁
程元祥
薛彦平
闫比男
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Research Institute Co Ltd of CCTEG
Original Assignee
Shenyang Research Institute Co Ltd of CCTEG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Research Institute Co Ltd of CCTEG filed Critical Shenyang Research Institute Co Ltd of CCTEG
Priority to CN202010874258.XA priority Critical patent/CN112253247B/en
Publication of CN112253247A publication Critical patent/CN112253247A/en
Application granted granted Critical
Publication of CN112253247B publication Critical patent/CN112253247B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Measuring Fluid Pressure (AREA)

Abstract

本发明涉及煤层瓦斯压力测定技术领域,瓦斯压力快速测定装置,包括至少四个封孔胶囊、注气装置、注气管、测压管和控制装置,其中封孔胶囊在钻孔内间隔设置,形成由煤层到钻孔孔口方向依次设置的第二封孔段、注气空间和第一封孔段,测压管第一端穿过封孔胶囊和煤层延伸至测压气室,测压管第二端封闭或者安装压力表,注气管第一端敞开并设置在注气空间,注气装置连接注气管第二端,注气管上设有注气开关,所述测压管和注气管上分别设有第一压力传感器和第二压力传感器,所述控制装置与第一压力传感器、第二压力传感器以及注气开关分别信号连接,本测定装置适用于井下煤层瓦斯压力快速测定。本发明还提出瓦斯压力快速测定方法。

Figure 202010874258

The invention relates to the technical field of coal seam gas pressure measurement. A gas pressure rapid measurement device comprises at least four sealing capsules, a gas injection device, a gas injection pipe, a pressure measuring pipe and a control device. The second hole sealing section, the gas injection space and the first hole sealing section are arranged in sequence from the coal seam to the borehole orifice. The first end of the pressure measuring tube extends through the sealing capsule and the coal seam to the pressure measuring gas chamber. Both ends are closed or a pressure gauge is installed, the first end of the gas injection pipe is open and set in the gas injection space, the gas injection device is connected to the second end of the gas injection pipe, the gas injection pipe is provided with a gas injection switch, the pressure measuring pipe and the gas injection pipe are respectively A first pressure sensor and a second pressure sensor are provided, and the control device is respectively signal-connected with the first pressure sensor, the second pressure sensor and the gas injection switch. The invention also proposes a rapid gas pressure determination method.

Figure 202010874258

Description

Gas pressure rapid measuring device and measuring method
Technical Field
The invention relates to the technical field of coal seam gas pressure measurement, in particular to a rapid gas pressure measurement device and a rapid gas pressure measurement method.
Background
The coal bed gas pressure is one of important parameters for gas occurrence, is an important basis for the work of coal and gas outburst identification, regional prediction, outburst elimination effect inspection and the like, and is of great importance for accurately and quickly determining the coal bed gas pressure. Researchers at home and abroad make extensive and intensive researches on rapid measurement of gas pressure. The method for measuring the coal bed gas pressure by the direct method at present is divided into two main categories: one is passive pressure measurement, and the other is active pressure measurement. The passive pressure measurement method is a pressure measurement method which depends on gradual recovery of gas generated by a coal seam after hole sealing, and the measurement period of the method is long, generally about one month. The active pressure measurement method is characterized in that gas with preset pressure is injected after pressure measurement, the gas loss amount lost in drilling construction is compensated, generally, the gas is injected once, the gas loss amount and the gas injection amount are unknown, the compensation is uncertain, and the test time of the method is reduced compared with that of active pressure measurement, but generally about 15 days are needed.
The coal bed gas pressure measured by coal bed drilling and broken rock stratum is influenced by the environment of the drilling hole, and the measured value is small. The method is mainly characterized in that broken rings are arranged on the periphery of the hole wall of a drilled hole and cannot be plugged during hole sealing, so that gas in a pressure measuring gas chamber is leaked out from cracks of the broken rings on the periphery of the hole wall of the drilled hole.
Therefore, the gas pressure measuring period and the leakage problem of the broken ring of the drill hole restrict the accurate and rapid measurement of the gas pressure of the coal bed. The rapid and accurate measurement of the coal bed gas pressure becomes an urgent problem to be solved.
Disclosure of Invention
The invention aims to provide a device and a method for quickly measuring underground coal seam gas pressure, which aim to overcome the defects and shortcomings of the prior art, are suitable for quickly measuring the underground coal seam gas pressure and solve the problems of long gas pressure measuring period and gas leakage of a broken ring of a drill hole.
In the first technical scheme, the gas pressure rapid measuring device is used for measuring the gas pressure of an underground coal seam, a borehole is arranged on the underground construction surface in the direction of the coal seam, a pressure measuring gas chamber is arranged on the back surface of the coal seam, the gas pressure rapid measuring device comprises at least four hole sealing capsules, a gas injection device, a gas injection pipe, a pressure measuring pipe and a control device, wherein the hole sealing capsules are arranged in the borehole at intervals, a second hole sealing section, a gas injection space and a first hole sealing section which are sequentially arranged from the coal seam to the direction of a drill hole orifice are formed between every two adjacent hole sealing capsules, the first end of the pressure measuring pipe penetrates through the hole sealing capsules and the coal seam and extends to the pressure measuring gas chamber, the second end of the pressure measuring pipe is sealed or provided with a pressure gauge, the first end of the pressure measuring pipe is open and arranged in the gas injection space, the gas injection device is connected with the second end of the gas injection pipe, the gas injection pipe is provided with a gas injection switch, and the pressure measuring pipe are respectively provided with a first pressure sensor and a second pressure sensor, the control device is in signal connection with the first pressure sensor, the second pressure sensor and the gas injection switch respectively, and the control device is used for receiving the gas pressure data in the pipe monitored by the first pressure sensor and the second pressure sensor and switching the on-off state of the gas injection switch.
In the first technical scheme, preferably, the drill hole is a through-layer drill hole, and the first hole sealing capsule close to the coal seam in the drill hole is positioned on the floor of the coal seam.
In the first technical solution, preferably, the drilled hole is a bedding drilled hole, and the length ratio of the second hole sealing section, the pressure measuring air chamber and the first hole sealing section is 3: 2: 20.
In a first technical scheme, as preferred, gas pressure short-term test device still has notes liquid pipe and priming device, the priming device with annotate the liquid union coupling, it includes four free liquid outlets and two pressure liquid outlets, four to annotate the liquid pipe free liquid outlet respectively with the inside intercommunication of hole sealing capsule, two the pressure liquid outlet sets up respectively at first hole sealing section and second hole sealing section, the priming device is through annotating the liquid pipe to the inside hole sealing liquid of carrying of hole sealing capsule and annotate the intraductal pressure of liquid and reach first hole sealing section and the hole sealing liquid of second hole sealing section injection after predetermineeing pressure.
In a second technical scheme, the method for rapidly measuring the gas pressure comprises the steps of using the gas pressure rapid measuring device as described in the first technical scheme to construct a drill hole with a corresponding aperture at a preset position by using a drilling machine, after the drill hole construction is finished, putting a pressure measuring pipe and a hole sealing capsule into a specified position in the drill hole, after the hole sealing capsule seals the drill hole, opening a control device to monitor the coal bed gas pressure P1 in the pressure measuring pipe and the gas pressure P2 in a gas injection space, and calculating the difference value delta P between the two; when the delta P is greater than or equal to the preset value of 0.1MPa, the control device sends a signal to the gas injection switch to open the gas injection switch, and gas in the gas injection device is injected into the gas injection space through the gas injection switch; and when the delta P is less than the preset value of 0.1MPa, the control device sends a signal to the gas injection switch to close the gas injection switch, the gas injection device stops injecting gas into the gas injection space until the delta P is equal to the preset value of 0.1MPa and does not change any more or changes less than 0.015MPa within 3 days, and the measured pressure P1 is the coal bed gas pressure.
The invention has the beneficial effects that:
1. compared with the traditional method for passively compensating and testing the gas pressure of the coal bed, the method disclosed by the invention can be used for rapidly and accurately testing the gas pressure of the coal bed.
2. The segmented hole sealing utilizes a pressure progressive compensation principle, not only can the leakage of coal seam gas through a broken ring of a drill hole and cracks around the drill hole be reduced, but also the gas is continuously supplied to a gas injection space by utilizing program control in the coal seam gas pressure recovery process, the method of gradually approaching the coal seam gas pressure is realized, and the coal seam gas pressure is quickly recovered to the original coal seam gas pressure.
3. Gas injection compensation adopts the mode of successive approximation, though adopt initiative pressure measurement, but gas injection pressure is less than the certain numerical value of recovery pressure all the time, is recovering in fact fast because drilling construction influences release gas pressure, does not influence the final pressure measurement accuracy in coal seam.
4. The adoption of the program control mode can facilitate the operation and reduce the response time of manual operation.
Drawings
FIG. 1 is a schematic view of the overall structure of the gas pressure rapid measurement device according to the present invention.
The reference numerals include:
1-a gas injection device, 2-a gas injection switch, 3-a control device, 4-a gas injection pipe, 5-a drill hole, 6-a hole sealing capsule, 7-a liquid injection pipe, 8-a pressure measuring pipe, 9-a hole sealing liquid, 10-a coal bed, 11-a first hole sealing section, 12-a gas injection space, 13-a second hole sealing section, 14-a pressure measuring gas chamber, 15-a first pressure sensor, 16-a second pressure sensor and 17-a liquid injection device.
Detailed Description
The present invention is described in detail below with reference to the attached drawings.
Example 1
As shown in fig. 1, the gas pressure rapid measurement apparatus in this embodiment is used for measuring gas pressure of a coal seam 10 in a well, and a borehole 5 is formed in a direction facing the coal seam 10 in the well, and a pressure measurement chamber 14 is formed in a back surface of the coal seam, and the gas pressure rapid measurement apparatus includes at least four hole sealing capsules 6, a gas injection apparatus 1, a gas injection pipe 4, a pressure measurement pipe 8 and a control apparatus 3, wherein the hole sealing capsules 6 are arranged at intervals in the borehole 5, a second hole sealing section 13, a gas injection space 12 and a first hole sealing section 11 are formed between two adjacent hole sealing capsules 6 and sequentially arranged in a direction from the coal seam 10 to the borehole 5, a first end of the pressure measurement pipe 8 passes through the hole sealing capsules 6 and the coal seam 10 and extends to the pressure measurement chamber 14, a second end of the pressure measurement pipe 8 is sealed or is provided with a pressure gauge, a first end of the gas injection pipe 4 is open and arranged in the gas injection space 12, the gas injection apparatus 1 is connected to a second end of the gas injection pipe 4, be equipped with gas injection switch 2 on the gas injection pipe 4, be equipped with first pressure sensor 15 and second pressure sensor 16 on pressure-measuring pipe 8 and the gas injection pipe 4 respectively, controlling means 3 and first pressure sensor 15, second pressure sensor 16 and gas injection switch 2 are signal connection respectively, and this controlling means 3 is used for receiving the intraductal atmospheric pressure data that first pressure sensor 15, second pressure sensor 16 monitored and switches the on-off state of gas injection switch 2.
The drill hole 5 is a through-layer drill hole, and the first hole sealing capsule 6 close to the coal seam 10 in the drill hole 5 is positioned on the bottom plate of the coal seam 10.
The drill hole 5 is a bedding drill hole, and the length ratio of the second hole sealing section 13, the pressure measuring air chamber 14 and the first hole sealing section 11 is 3: 2: 20.
Gas pressure spot test device still has notes liquid pipe 7 and priming device 17, priming device 17 with annotate liquid pipe 7 and be connected, annotate liquid pipe 7 and include four free liquid outlets and two pressure liquid outlets, four free liquid outlets respectively with the inside intercommunication of hole sealing capsule 6, two pressure liquid outlets set up respectively at first hole sealing section 11 and second hole sealing section 13, priming device 17 pours into hole sealing liquid 9 into to the inside hole sealing liquid 9 of carrying of hole sealing capsule 6 and after annotating liquid pipe 7 internal pressure and reaching preset pressure into first hole sealing section 11 and second hole sealing section 13 into hole sealing liquid 9 through annotating liquid pipe 7.
The gas injection device 1 is used for providing a compensation gas source for the gas injection space 12, the gas injection switch 2 is used for controlling the gas injection device 1 to open and close the gas source for the gas injection space 12, the control device 3 is used for monitoring the pressure measuring pipe 8, namely the pressure P1 of the coal seam 10 gas in the pressure measuring gas chamber 14 and the pressure P2 of the gas in the gas injection space 12, calculating the difference value delta P between the two values P1-P2, and simultaneously opening and closing the gas injection switch 2 to inject gas into the gas injection space 12. The gas injection pipe 4 is a passage for transporting gas in the gas injection apparatus 1 to the gas injection space 12. The borehole 5 is a space for pressure measurement, hole sealing, gas injection, and the like. The hole sealing capsule 6 is used for dividing the drill hole 5 into different spaces and sealing the drill hole 5 to prevent gas from leaking to the outer space. The liquid injection pipe 7 is a passage for injecting the sealing liquid 9 into the sealing capsule 6. The pressure measuring pipe 8 is a passage for gas in the pressure measuring gas chamber 14 to be conducted to the outside of the drill hole 5 for testing; the hole sealing liquid 9 is a medium for filling the hole sealing capsules 6 to ensure that the capsules can fully seal the drill holes 5 to prevent air leakage; the coal seam 10 is the primary source of gas; the first hole sealing section 11 is used for sealing the drill hole 5 and preventing gas in a pressure measuring gas chamber 14 and a coal seam 10 in the drill hole 5 from leaking to the outside of the drill hole 5; the gas injection space 12 is used for creating a compensation gas source, one is for compensating the pressure relief gas amount in the construction process of the drill hole 5, and the other is for preventing the gas from leaking out of the drill hole 5 from the coal seam 10 and the pressure measurement gas chamber 14 in the broken circle of the drill hole 5 around the second hole sealing section 13, so that the accuracy of measuring the gas pressure of the coal seam 10 is influenced. The second hole sealing section 13 is a first sealing line for preventing the gas in the pressure measuring gas chamber 14 from leaking outwards; the manometric cell 14 is a space for creating gas accumulation in the coal seam 10 and reaching the original gas pressure of the coal seam 10.
Example 2
The gas pressure rapid measurement apparatus in example 1 was used as the gas pressure rapid measurement method.
A drill hole 5 of a corresponding bore diameter is made at a predetermined position by means of a drilling machine, the drill hole 5 being made through the coal seam 10 or along the coal seam 10. After the construction of the drill hole 5 is finished, the pressure measuring pipe 8, the hole sealing capsule 6 and the liquid injection pipe 7 are placed at the appointed position in the drill hole 5, and the hole sealing liquid 9 is injected into the capsule and the appointed space of the drill hole 5 by the liquid injection pipe 7 to seal the drill hole 5. The hole sealing capsules 6 are divided into 4, and the drilled holes 5 are divided into a pressure measuring air chamber 14, a second hole sealing section 13, an air injection space 12 and a first hole sealing section 11 from inside to outside. After hole sealing, the opening control device 3 monitors the coal seam 10 gas pressure P1 in the pressure measuring pipe 8 and the gas pressure P2 in the gas injection space 12, and calculates the difference value delta P between the two, when the delta P is larger than or equal to a preset value (0.1MPa), the control device 3 sends a signal to the gas injection switch 2 to open the gas injection switch, the gas in the gas injection device 1 is injected into the gas injection space 12 through the gas injection switch 2, when the delta P is smaller than the preset value (0.1MPa), the control device 3 sends a signal to the gas injection switch 2 to close the gas injection switch, and the gas injection device 1 stops injecting gas into the gas injection space 12. And repeatedly injecting gas until the delta P is equal to the preset value (0.1MPa) and does not change or the change is less than 0.015MPa within 3 days, wherein the measured pressure P1 is the coal seam 10 gas pressure.
The foregoing is only a preferred embodiment of the present invention, and many variations in the detailed description and the application range can be made by those skilled in the art without departing from the spirit of the present invention, and all changes that fall within the protective scope of the invention are therefore considered to be within the scope of the invention.

Claims (4)

1.瓦斯压力快速测定方法,其特征在于:该方法使用瓦斯压力快速测定装置,所述瓦斯压力快速测定装置用于测定井下煤层瓦斯压力,且井下施工面向煤层方向开设钻孔,煤层背面开设测压气室,所述瓦斯压力快速测定装置包括至少四个封孔胶囊、注气装置、注气管、测压管和控制装置,其中封孔胶囊在钻孔内间隔设置,在相邻的两个封孔胶囊之间形成由煤层到钻孔孔口方向依次设置的第二封孔段、注气空间和第一封孔段,所述测压管第一端穿过封孔胶囊和煤层延伸至测压气室,测压管第二端封闭或者安装压力表,所述注气管第一端敞开并设置在注气空间,注气装置连接注气管第二端,注气管上设有注气开关,所述测压管和注气管上分别设有第一压力传感器和第二压力传感器,所述控制装置与第一压力传感器、第二压力传感器以及注气开关分别信号连接,该控制装置用于接收第一压力传感器、第二压力传感器监测到的管内气压数据并切换注气开关的开闭状态;1. the method for measuring gas pressure rapidly, it is characterized in that: the method uses a rapid measuring device for gas pressure, and the rapid measuring device for gas pressure is used to measure the gas pressure of underground coal seam, and the underground construction faces the direction of the coal seam and sets up a borehole, and the back of the coal seam sets up a measuring device. The gas pressure chamber, the gas pressure rapid measuring device comprises at least four sealing capsules, a gas injection device, a gas injection pipe, a pressure measuring pipe and a control device, wherein the sealing capsules are arranged at intervals in the drilled holes, and two adjacent sealing capsules are arranged at intervals. A second hole sealing section, a gas injection space and a first hole sealing section are formed in sequence from the coal seam to the borehole orifice between the hole capsules, and the first end of the pressure measuring tube extends through the hole sealing capsule and the coal seam to the measurement The pressure chamber, the second end of the pressure measuring pipe is closed or a pressure gauge is installed, the first end of the gas injection pipe is open and set in the gas injection space, the gas injection device is connected to the second end of the gas injection pipe, and the gas injection pipe is provided with a gas injection switch, so The pressure measuring pipe and the gas injection pipe are respectively provided with a first pressure sensor and a second pressure sensor, the control device is respectively connected with the first pressure sensor, the second pressure sensor and the gas injection switch, and the control device is used to receive the first pressure sensor, the second pressure sensor and the gas injection switch. The air pressure data in the pipe monitored by a pressure sensor and the second pressure sensor and switch the on-off state of the gas injection switch; 所述瓦斯压力快速测定方法包括:在预定位置利用钻机施工相应孔径的钻孔,钻孔施工完毕,将测压管、封孔胶囊、放入钻孔中指定的位置,通过封孔胶囊对钻孔封堵后,打开控制装置监测测压管中煤层瓦斯压力P1和注气空间中气体压力P2,并计算两者之间的差值△P;当△P大于或等于预设值0.1MPa时,控制装置发出信号给注气开关使其打开,注气装置中的气体通过注气开关注入注气空间中;当△P小于预设值0.1MPa时,控制装置发出信号给注气开关使其关闭,注气装置停止向注气空间中注气,直至△P等于预设值0.1MPa不再发生变化或者3天内变化小于0.015MPa为止,所测的压力P1即为煤层瓦斯压力。The method for rapid gas pressure determination includes: using a drilling rig to construct a borehole with a corresponding aperture at a predetermined position, after the borehole construction is completed, placing the pressure measuring tube and the sealing capsule into the designated position in the drilling hole, and aligning the drilled holes through the sealing capsule. After the hole is blocked, open the control device to monitor the coal seam gas pressure P1 in the pressure measuring tube and the gas pressure P2 in the gas injection space, and calculate the difference ΔP between the two; when ΔP is greater than or equal to the preset value 0.1MPa , the control device sends a signal to the gas injection switch to turn it on, and the gas in the gas injection device is injected into the gas injection space through the gas injection switch; when the △P is less than the preset value of 0.1MPa, the control device sends a signal to the gas injection switch to make it Closed, the gas injection device stops gas injection into the gas injection space, until ΔP equals to the preset value of 0.1MPa and does not change or changes less than 0.015MPa within 3 days, the measured pressure P1 is the coal seam gas pressure. 2.根据权利要求1所述的瓦斯压力快速测定方法,其特征在于:所述钻孔为穿层钻孔,所述钻孔内靠近煤层的首个封孔胶囊位于煤层底板。2 . The method for rapid gas pressure measurement according to claim 1 , wherein the borehole is a through-layer borehole, and the first sealing capsule near the coal seam in the borehole is located on the coal seam floor. 3 . 3.根据权利要求1所述的瓦斯压力快速测定方法,其特征在于:所述钻孔为顺层钻孔,所述第二封孔段、测压气室和第一封孔段的长度比为3:2:20。3. gas pressure quick measuring method according to claim 1, is characterized in that: described drilling is drilled along layer, and the length ratio of described second hole sealing section, pressure measuring air chamber and first hole sealing section is 3: 2:20. 4.根据权利要求1所述的瓦斯压力快速测定方法,其特征在于:所述瓦斯压力快速测定装置还具有注液管和注液装置,所述注液装置与注液管连接,所述注液管包括四个自由出液口和两个压力出液口,四个所述自由出液口分别与封孔胶囊内部连通,两个所述压力出液口分别设置在第一封孔段和第二封孔段,所述注液装置通过注液管向封孔胶囊内部输送封孔液并在注液管内压力达到预设压力后向第一封孔段和第二封孔段注入封孔液。4. The gas pressure rapid measuring method according to claim 1, characterized in that: the gas pressure rapid measuring device also has a liquid injection pipe and a liquid injection device, the liquid injection device is connected with the liquid injection pipe, and the liquid injection pipe is connected to the liquid injection pipe. The liquid pipe includes four free liquid outlets and two pressure liquid outlets, the four free liquid outlets are respectively communicated with the inside of the sealing capsule, and the two pressure liquid outlets are respectively arranged in the first sealing section and the sealing capsule. In the second sealing section, the liquid injection device transports the sealing liquid to the inside of the sealing capsule through the liquid injection pipe, and injects the sealing liquid into the first sealing section and the second sealing section after the pressure in the liquid injection pipe reaches the preset pressure liquid.
CN202010874258.XA 2020-08-26 2020-08-26 Gas pressure rapid measuring device and measuring method Active CN112253247B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010874258.XA CN112253247B (en) 2020-08-26 2020-08-26 Gas pressure rapid measuring device and measuring method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010874258.XA CN112253247B (en) 2020-08-26 2020-08-26 Gas pressure rapid measuring device and measuring method

Publications (2)

Publication Number Publication Date
CN112253247A CN112253247A (en) 2021-01-22
CN112253247B true CN112253247B (en) 2021-10-22

Family

ID=74224048

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010874258.XA Active CN112253247B (en) 2020-08-26 2020-08-26 Gas pressure rapid measuring device and measuring method

Country Status (1)

Country Link
CN (1) CN112253247B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216940B (en) * 2021-04-27 2022-04-15 中国平煤神马能源化工集团有限责任公司 Multi-point rock stratum pore pressure testing method and system
CN115962012B (en) * 2022-11-06 2026-01-23 中国建筑第七工程局有限公司 Application method of device for monitoring front stability of gas tunnel excavation face
CN115929284B (en) * 2023-01-14 2024-08-30 华北科技学院(中国煤矿安全技术培训中心) Prediction method for rising trend of gas pressure of pressure measuring drill hole

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614650A (en) * 2008-06-24 2009-12-30 郑州市光力科技发展有限公司 Device for taking and measuring gas in negative-pressure pipelines
CN102877833A (en) * 2012-06-19 2013-01-16 淮南矿业(集团)有限责任公司 Compensated pressure measurement drilling gas-water separation drainage device
CN102889958A (en) * 2012-10-30 2013-01-23 山西潞安矿业(集团)有限责任公司 Coal bed gas pressure direct measurement device and pressure measurement method thereof
CN203572821U (en) * 2013-11-15 2014-04-30 郑州光力科技股份有限公司 Methane gas concentration measurement device with pressure compensation function
CN108397187A (en) * 2018-03-17 2018-08-14 河南理工大学 Optical Fiber Sensing Array formula acquisition system for coal-bed gas dynamic pressure measurement
CN109187266A (en) * 2018-09-14 2019-01-11 中煤科工集团重庆研究院有限公司 Model Experiment System and Method for Gas Loss Compensation for Direct Determination of Gas Content
CN109469474A (en) * 2018-12-05 2019-03-15 中国矿业大学(北京) Apparatus and method for simultaneous determination of gas pressure in multiple coal seams based on downhole drilling
CN109973082A (en) * 2019-04-18 2019-07-05 中国矿业大学(北京) Device and method for simultaneously measuring multi-coal seam gas pressure based on upward drilling
CN110080717A (en) * 2019-06-17 2019-08-02 中国矿业大学 A kind of gas pressure measurement method of horizontal drilling rapid hole sealing
CN111456721A (en) * 2020-04-16 2020-07-28 西安科技大学 Device and method for measuring gas pressure of multistage air bag rapid hole sealing

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101614650A (en) * 2008-06-24 2009-12-30 郑州市光力科技发展有限公司 Device for taking and measuring gas in negative-pressure pipelines
CN102877833A (en) * 2012-06-19 2013-01-16 淮南矿业(集团)有限责任公司 Compensated pressure measurement drilling gas-water separation drainage device
CN102889958A (en) * 2012-10-30 2013-01-23 山西潞安矿业(集团)有限责任公司 Coal bed gas pressure direct measurement device and pressure measurement method thereof
CN203572821U (en) * 2013-11-15 2014-04-30 郑州光力科技股份有限公司 Methane gas concentration measurement device with pressure compensation function
CN108397187A (en) * 2018-03-17 2018-08-14 河南理工大学 Optical Fiber Sensing Array formula acquisition system for coal-bed gas dynamic pressure measurement
CN109187266A (en) * 2018-09-14 2019-01-11 中煤科工集团重庆研究院有限公司 Model Experiment System and Method for Gas Loss Compensation for Direct Determination of Gas Content
CN109469474A (en) * 2018-12-05 2019-03-15 中国矿业大学(北京) Apparatus and method for simultaneous determination of gas pressure in multiple coal seams based on downhole drilling
CN109973082A (en) * 2019-04-18 2019-07-05 中国矿业大学(北京) Device and method for simultaneously measuring multi-coal seam gas pressure based on upward drilling
CN110080717A (en) * 2019-06-17 2019-08-02 中国矿业大学 A kind of gas pressure measurement method of horizontal drilling rapid hole sealing
CN111456721A (en) * 2020-04-16 2020-07-28 西安科技大学 Device and method for measuring gas pressure of multistage air bag rapid hole sealing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《主动式瓦斯压力测定技术特点及数据分析》;陈鹏等;《能源技术与管理》;20130430;第1节 *

Also Published As

Publication number Publication date
CN112253247A (en) 2021-01-22

Similar Documents

Publication Publication Date Title
CN112253247B (en) Gas pressure rapid measuring device and measuring method
CN105372410B (en) Double-end sealing leak detection combined geometry
CN105403930B (en) Country rock Mining failure scope sectionalization test system
CN209875145U (en) Oil gas well cement sheath sealing integrity testing arrangement
CN105547721A (en) Double-end blocking and leakage detection integrated observation method
CN110778308B (en) Drilling-while-drilling gas flow testing device and method
CN105422078A (en) Segmented testing method for surrounding rock mining destruction range
CN104729969B (en) Surrouding rock stress level of disruption test device
CN105067494A (en) Permeability testing method and device based on radial percolation experiment
CN111335837B (en) Pressure-maintaining coring inner barrel for coal rock
CN103016007B (en) Electronically controlled single-loop water-plugging overburden strata fracture detection method and probing machine
CN107829723A (en) Rock body quality of mine Mining failure scope integral type detecting devices and detection method
CN114575828A (en) Remote deep hole coal seam gas pressure measuring device and using method
CN117232746A (en) Gas sealing detection device for salt cavern hydrogen storage that facilitates detection of gas-liquid interface depth
CN205176296U (en) Destruction scope sectionalization test system is adopted to country rock
CN108303222A (en) Seal test apparatus and seal test method
CN115929286B (en) Drilling casing sealing detection system and sealing detection method
CN110987754B (en) In-situ measurement method for coal seam permeability
CN114002417A (en) A test device for expansion and contraction of oil well cement sheath under bottom hole conditions
CN111175208A (en) Drilling fluid mud cake permeability evaluation device and method
CN107642354B (en) Method for measuring length of drill hole after drill rod exits from drill hole
CN210714663U (en) Device for testing gas flow while drilling
CN202937264U (en) Electronically controlled single-loop water plugging and overburden rock fracture detector
CN215830491U (en) High-pressure airtight simulation device of underground packing system
CN105569623A (en) Combined wellhead testing device for injection well and combined wellhead testing method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 113122 No.11 Binhe Road, Shenfu demonstration area, Fushun City, Liaoning Province

Applicant after: Shenyang Research Institute Co.,Ltd.

Address before: 113122 No. 11 Binhe Road, Fushun Economic Development Zone, Fushun City, Liaoning Province

Applicant before: CCTEG (China Coal Technology and Engineering Group Corp.)

GR01 Patent grant
GR01 Patent grant