CN112252782A - Whole pin-connected panel room of polishing of operation panel room body - Google Patents
Whole pin-connected panel room of polishing of operation panel room body Download PDFInfo
- Publication number
- CN112252782A CN112252782A CN202011031850.XA CN202011031850A CN112252782A CN 112252782 A CN112252782 A CN 112252782A CN 202011031850 A CN202011031850 A CN 202011031850A CN 112252782 A CN112252782 A CN 112252782A
- Authority
- CN
- China
- Prior art keywords
- stand
- supporting framework
- grid
- wallboard
- roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H5/00—Buildings or groups of buildings for industrial or agricultural purposes
- E04H5/02—Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B24—GRINDING; POLISHING
- B24B—MACHINES, DEVICES, OR PROCESSES FOR GRINDING OR POLISHING; DRESSING OR CONDITIONING OF ABRADING SURFACES; FEEDING OF GRINDING, POLISHING, OR LAPPING AGENTS
- B24B41/00—Component parts such as frames, beds, carriages, headstocks
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2418—Details of bolting
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The invention discloses an integral assembling type grinding chamber of an operation table chamber body, and relates to a grinding chamber, which comprises an upright post and a supporting framework, wherein the upright post is made of C-shaped steel, the supporting framework is formed by bending wall plates, the upright post and the supporting framework are connected through bolts, a bottom plate, a top plate and side plates are respectively arranged at the bottom, the top and the periphery of the upright post, the top plate and the side plates are all made of the wall plates, and the bottom plate, the top plate and the side plates are respectively fixedly connected with the upright post and the supporting framework.
Description
Technical Field
The invention relates to a grinding chamber, in particular to an operating platform chamber body integral assembling type grinding chamber.
Background
The existing grinding chamber is formed by welding rectangular pipes, the workload of manufacturing and installation is large, the period is long, materials are seriously wasted, and the cost is high.
Disclosure of Invention
The invention solves the technical problem of providing the operating platform chamber body integrally-assembled grinding chamber which is simple to install, small in manufacturing and installing workload, short in manufacturing period, material-saving and low in cost.
The technical scheme adopted by the invention for solving the technical problems is as follows: the utility model provides a room is polished to whole pin-connected panel of operation panel room body, includes stand and supporting framework, the stand adopts C shaped steel, supporting framework is bent by the wallboard and forms, just stand and supporting framework pass through bolted connection, bottom plate, roof and curb plate are provided with respectively all around to bottom, top of stand, roof, bottom plate and curb plate all adopt the wallboard to make, bottom plate, roof and curb plate respectively with stand and supporting framework fixed connection, the stand adopts C shaped steel, supporting framework is bent by the wallboard and forms, roof, bottom plate and curb plate all adopt the wallboard to make, and the cost is convenient and practiced thrift in the preparation, stand and supporting framework pass through bolted connection, simple to operate, and the preparation cycle is short, the wallboard is the iron sheet.
Further, the method comprises the following steps: the utility model discloses a building support structure, including stand, grid, support skeleton, reinforcing rib, grid and support skeleton, the top of stand is located the below of roof and is provided with the grid, grid and the perpendicular setting of support skeleton, be provided with the strengthening rib between grid and the support skeleton, the strengthening rib respectively with grid and support skeleton fixed connection, the set-square is bent into by the wallboard to the strengthening rib, and the cost is just practiced thrift in the convenient preparation.
The invention has the beneficial effects that: the invention has the advantages of simple installation, small workload of manufacture and installation, short manufacture period, material saving and low cost.
Drawings
FIG. 1 is a schematic structural view of an operating floor chamber body integral assembly type grinding chamber;
labeled as: 1. a column; 2. a support framework; 3. a side plate; 4. a grid; 5. and (5) reinforcing ribs.
Detailed Description
The invention is further described with reference to the following figures and detailed description.
As shown in figure 1, the whole assembly type grinding chamber of operation panel room body, including stand 1 and supporting framework 2, stand 1 adopts C shaped steel, supporting framework 2 is bent by the wallboard and is formed, just stand 1 and supporting framework 2 pass through bolted connection, bottom plate, roof and curb plate 3 are provided with respectively all around in bottom, the top of stand 1, roof, bottom plate and curb plate 3 all adopt the wallboard to make, bottom plate, roof and curb plate 3 respectively with stand 1 and supporting framework 2 fixed connection, stand 1 adopts C shaped steel, supporting framework 2 is bent by the wallboard and forms, roof, bottom plate and curb plate 3 all adopt the wallboard to make, and the cost is convenient and practiced thrift in the preparation, stand 1 and supporting framework 2 pass through bolted connection, simple to operate, and the preparation cycle is short.
On the basis, the below that the top of stand 1 is located the roof is provided with grid 4, grid 4 and support chassis 2 set up perpendicularly, be provided with strengthening rib 5 between grid 4 and the support chassis 2, strengthening rib 5 respectively with grid 4 and 2 fixed connection of support chassis, the set-square is bent into by the wallboard to strengthening rib 5, and the cost is just practiced thrift to the convenient preparation.
The above-mentioned embodiments are intended to illustrate the objects, technical solutions and advantages of the present invention in further detail, and it should be understood that the above-mentioned embodiments are only exemplary embodiments of the present invention, and are not intended to limit the present invention, and any modifications, equivalents, improvements and the like made within the spirit and principle of the present invention should be included in the protection scope of the present invention.
Claims (2)
1. The utility model provides a room is polished to whole pin-connected panel of operation panel room body which characterized in that: including stand (1) and supporting framework (2), stand (1) adopts C shaped steel, supporting framework (2) are bent by the wallboard and are formed, just stand (1) and supporting framework (2) pass through bolted connection, bottom, top of stand (1) and be provided with bottom plate, roof and curb plate (3) all around respectively, roof, bottom plate and curb plate (3) all adopt the wallboard to make, bottom plate, roof and curb plate (3) respectively with stand (1) and supporting framework (2) fixed connection.
2. The console chamber body integral assembling type grinding chamber as claimed in claim 1, wherein: the utility model discloses a three-dimensional building support column, including stand (1), grid (4), support skeleton (2), grid (4) and support skeleton (2), be provided with strengthening rib (5) between grid (4) and the support skeleton (2), strengthening rib (5) respectively with grid (4) and support skeleton (2) fixed connection, the set-square is bent into by the wallboard in strengthening rib (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011031850.XA CN112252782A (en) | 2020-09-27 | 2020-09-27 | Whole pin-connected panel room of polishing of operation panel room body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011031850.XA CN112252782A (en) | 2020-09-27 | 2020-09-27 | Whole pin-connected panel room of polishing of operation panel room body |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112252782A true CN112252782A (en) | 2021-01-22 |
Family
ID=74234380
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011031850.XA Pending CN112252782A (en) | 2020-09-27 | 2020-09-27 | Whole pin-connected panel room of polishing of operation panel room body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112252782A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0913717A (en) * | 1995-06-28 | 1997-01-14 | Kawatetsu Kizai Kogyo Kk | Prefabricated type trunk room |
CN201405265Y (en) * | 2009-06-05 | 2010-02-17 | 陕西昕宇表面工程有限公司 | Dedusting noise reduction burnishing chamber for burnishing metal aluminum castings |
CN202131802U (en) * | 2011-07-04 | 2012-02-01 | 安徽名筑钢塔工程有限公司 | Armored machine room |
AU2011235973A1 (en) * | 2011-10-12 | 2012-08-02 | Anthony Spencer Browning | Relocatable Stable |
CN205276939U (en) * | 2016-01-06 | 2016-06-01 | 成都华泰昌隆金属制品有限公司 | Convenient tollbooth of dismantling |
CN109113372A (en) * | 2017-06-23 | 2019-01-01 | 随州市珠峰钢构工程有限公司 | A kind of steel structure colored steel pavilion |
-
2020
- 2020-09-27 CN CN202011031850.XA patent/CN112252782A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0913717A (en) * | 1995-06-28 | 1997-01-14 | Kawatetsu Kizai Kogyo Kk | Prefabricated type trunk room |
CN201405265Y (en) * | 2009-06-05 | 2010-02-17 | 陕西昕宇表面工程有限公司 | Dedusting noise reduction burnishing chamber for burnishing metal aluminum castings |
CN202131802U (en) * | 2011-07-04 | 2012-02-01 | 安徽名筑钢塔工程有限公司 | Armored machine room |
AU2011235973A1 (en) * | 2011-10-12 | 2012-08-02 | Anthony Spencer Browning | Relocatable Stable |
CN205276939U (en) * | 2016-01-06 | 2016-06-01 | 成都华泰昌隆金属制品有限公司 | Convenient tollbooth of dismantling |
CN109113372A (en) * | 2017-06-23 | 2019-01-01 | 随州市珠峰钢构工程有限公司 | A kind of steel structure colored steel pavilion |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201611662U (en) | Frameless battery panel novel installation device | |
CN108809217B (en) | Be applied to photovoltaic board on roof | |
CN212428026U (en) | Regularization support is used in hanging flower basket installation | |
CN213509665U (en) | Auxiliary device for mounting curtain wall | |
CN112252782A (en) | Whole pin-connected panel room of polishing of operation panel room body | |
CN102903776B (en) | Solar combined heat and power supply and building integrated installation bracket | |
CN211850049U (en) | Welding-free fixed corner of assembly type building | |
CN208885596U (en) | A kind of large-scale vertical pump shaft branch stake tool | |
CN201358267Y (en) | Installation rack of revolving furnace | |
CN201770452U (en) | Forklift frame | |
CN206084419U (en) | Equipment alignment translation device | |
CN201474185U (en) | Color steel plate bearing | |
CN201437611U (en) | Light-duty steel frame-plate shell structure | |
CN219508929U (en) | Curtain wall installation structure integrally designed with main body steel structure | |
CN217531226U (en) | Modular stair mould | |
CN209445614U (en) | A kind of assembled arthitecutral structure collected with solar energy-electric energy | |
CN210724638U (en) | Device convenient to solar panel roof installation | |
CN201812865U (en) | Storage battery installation rack | |
CN212750207U (en) | Stereo garage vehicle parking sign | |
CN215759559U (en) | Prefabricated frame post roof beam structure convenient to aggregate erection | |
CN202363489U (en) | Installation support system for solar cell pack | |
CN103158105A (en) | Tool for positioning metal parts of cabin cover of large-sized glass-fiber reinforced plastic wind-driven generator | |
CN203640047U (en) | Combined building support steel structure member | |
CN213927767U (en) | Instrument column for electric appliance installation | |
CN220978361U (en) | Structure of high-stability assembled house |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20210122 |
|
RJ01 | Rejection of invention patent application after publication |