CN112252502A - Steel construction office building convenient to installation drain pipe - Google Patents

Steel construction office building convenient to installation drain pipe Download PDF

Info

Publication number
CN112252502A
CN112252502A CN202010870189.5A CN202010870189A CN112252502A CN 112252502 A CN112252502 A CN 112252502A CN 202010870189 A CN202010870189 A CN 202010870189A CN 112252502 A CN112252502 A CN 112252502A
Authority
CN
China
Prior art keywords
sliding
drain pipe
office building
support
assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202010870189.5A
Other languages
Chinese (zh)
Inventor
杨恩祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Jinqidian Industrial Co ltd
Original Assignee
Fujian Jinqidian Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Jinqidian Industrial Co ltd filed Critical Fujian Jinqidian Industrial Co ltd
Priority to CN202010870189.5A priority Critical patent/CN112252502A/en
Publication of CN112252502A publication Critical patent/CN112252502A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/024Structures with steel columns and beams
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/02Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs
    • E04B7/022Roofs; Roof construction with regard to insulation with plane sloping surfaces, e.g. saddle roofs consisting of a plurality of parallel similar trusses or portal frames
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04DROOF COVERINGS; SKY-LIGHTS; GUTTERS; ROOF-WORKING TOOLS
    • E04D3/00Roof covering by making use of flat or curved slabs or stiff sheets
    • E04D3/35Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation
    • E04D3/351Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation at least one of the layers being composed of insulating material, e.g. fibre or foam material
    • E04D3/354Roofing slabs or stiff sheets comprising two or more layers, e.g. for insulation at least one of the layers being composed of insulating material, e.g. fibre or foam material more than one of the layers being composed of insulating material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/021Bearing, supporting or connecting constructions specially adapted for such buildings
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L3/00Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets
    • F16L3/08Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing
    • F16L3/10Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing
    • F16L3/1091Supports for pipes, cables or protective tubing, e.g. hangers, holders, clamps, cleats, clips, brackets substantially surrounding the pipe, cable or protective tubing divided, i.e. with two or more members engaging the pipe, cable or protective tubing with two members, the two members being fixed to each other with fastening members on each side
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2406Connection nodes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2421Socket type connectors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2439Adjustable connections, e.g. using elongated slots or threaded adjustment elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B2001/2484Details of floor panels or slabs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Building Environments (AREA)
  • Floor Finish (AREA)

Abstract

The invention discloses a steel structure office building convenient for installing a drain pipe, which comprises a plurality of upright posts with rectangular sections, a beam assembly fixedly connected to two adjacent upright posts and a floor slab assembly arranged on the beam assembly; the steel structure office building further comprises a drain pipe installation device, wherein the drain pipe installation device comprises an installation plate, a fixed support, two sliding supports and a fixed assembly for fixing the drain pipe; the fixed assembly is fixedly arranged on the fixed support and the sliding support; due to the fact that the adjusting device can be adjusted up and down, the sliding support can avoid the connecting position of the drain pipe between the drain pipes, and therefore the drain pipe can be better fixed.

Description

Steel construction office building convenient to installation drain pipe
The patent application of the invention is a divisional application of Chinese patent application No. 201910220388.9, the application No. of the original application is 201910220388.9, the application date is 2019, 03 and 22, and the invention is named as a steel structure office building with good damping effect.
Technical Field
The invention relates to the field of steel structure buildings, in particular to a steel structure office building convenient for installing a drain pipe.
Background
With the development of modern society, more and more buildings are built by adopting steel structures, in particular to a plurality of large-scale factory buildings and office buildings. Because the area volume is huge, and the span is great, will use a lot of stands and crossbeams in the construction, form the frame construction of office building through stand and crossbeam interconnect. Because personnel are intensive in the office building, can shake the floor when personnel walk around, can cause the interference to personnel's normal work, influence work efficiency.
In view of the above, the applicant has made an intensive study on the above-mentioned defects in the prior art, and has made this invention.
Disclosure of Invention
The invention mainly aims to provide a steel structure office building convenient for installing a drainage pipe, which has the characteristic of convenience in installing a drainage structure.
In order to achieve the above purpose, the solution of the invention is:
a steel structure office building convenient for installing a drain pipe comprises a plurality of upright posts with rectangular sections, a beam assembly fixedly connected to two adjacent upright posts and a floor slab assembly arranged on the beam assembly;
the beam assembly comprises a connecting plate and fixing seats which are fixedly arranged on two adjacent stand columns respectively, inserting grooves are formed in the fixing seats, and two ends of the connecting plate are inserted in the two inserting grooves with opposite openings respectively; the upper surface of the connecting plate is provided with a damping cushion pad;
the floor slab assembly comprises a floor slab main body and a damping device, wherein the damping device comprises a base, a sliding seat vertically and slidably arranged on the base and a first damping elastic body arranged between the base and the sliding seat; the base of the damping device is fixedly arranged on the upper surface of the fixed base, four corners of the floor slab main body are provided with limiting grooves, and the floor slab main body is arranged on the sliding seat of the damping device through the limiting grooves; the lower surface of the floor slab main body is in contact with the shock-absorbing cushion pad.
Further, the first damping elastic body is an arched elastic steel plate; the bottom of the arched elastic steel plate is arranged on the base, the top of the arched elastic steel plate is abutted against the sliding seat, an arc portion is formed at the position where the arched elastic steel plate is contacted with the base, and lubricating grease is arranged between the arc portion and the base.
Further, a bearing floor, a sound insulation pad arranged below the bearing floor and a second damping elastomer arranged around the sound insulation pad are arranged on the floor main body; the second damping elastic body is arranged between the bearing floor and the floor slab main body.
Further, the second damping elastic body is a damping rubber pad.
Furthermore, a locking block positioned at the lower part of the connecting plate is arranged in the insertion groove, the upper surface of the locking block is abutted against the lower surface of the connecting plate, a first wedge-shaped surface is formed on the locking block, and a second wedge-shaped surface used for abutting against the first wedge-shaped surface is formed in the insertion groove; the fixed seat is provided with an air hole communicated with the inserting groove; the locking device comprises a fixing seat and is characterized in that a locking lug plate is formed at one end, far away from the insertion groove, of the locking block, a lug plate through hole is formed in the locking lug plate and is arranged along the length direction of the connecting plate, a threaded sleeve is fixedly arranged on the fixing seat, and a locking bolt is connected between the lug plate through hole and the threaded sleeve.
Further, the steel structure office building also comprises a roof assembly; the roof assembly comprises a roof beam, a supporting structure, a connecting structure and a roof panel; the roof cross beam is arranged at the top of the upright post, a first roof steel column is fixedly arranged in the middle of the upper surface of the roof cross beam, and second roof steel columns are fixedly arranged on the upper surfaces of two sides of the roof cross beam; the top parts of the first roof steel column and the second roof steel column on two sides of the roof beam are connected with the supporting structure through first bolts; two ends of the connecting structure are respectively connected to the adjacent supporting structures through second bolts; and the supporting structure and the connecting structure are provided with roof panels.
Further, the support structure comprises a first connecting seat, a first supporting rod, a rectangular bracket and a second connecting seat; the first connecting seat and the second connecting seat are fixedly connected to the tops of the first roof steel column and the second roof steel column through first bolts respectively; the rectangular support is connected to the first connecting seat in a welding mode, and two ends of the first supporting rod are connected to the second connecting seat and the rectangular support in a welding mode respectively;
the connecting structure comprises a second supporting rod and U-shaped connecting seats respectively welded to two ends of the second supporting rod, and the U-shaped connecting seats are fixedly connected with the rectangular support through second bolts.
Further, the roof panel comprises a lower cover plate, an upper cover plate, a heat-insulating layer and dry fillers; the insulating layer is made of glass wool; the dry filler is calcium chloride particles; two heat-insulating layers are arranged between the upper cover plate and the lower cover plate, and a drying filler is arranged between the two heat-insulating layers; the upper surface of the upper cover plate is provided with a waterproof coating, and the waterproof coating is composed of polymer cement-based waterproof paint.
Furthermore, the steel structure office building also comprises a drain pipe installation device, wherein the drain pipe installation device comprises an installation plate, a fixed support, two sliding supports and a fixed assembly for fixing a drain pipe; the fixed assembly is fixedly arranged on the fixed support and the sliding support; the mounting plate is fixedly arranged on the upright post through a third bolt, sliding grooves are symmetrically formed in the mounting plate, and a fixing support is arranged on the mounting plate between the two sliding grooves; the guide groove has been seted up on the inside wall of sliding tray, sliding support slides and sets up in the sliding tray, install the guide block on sliding support's the side, the guide block slides and sets up slide setting is in the guide groove.
Further, a distance adjusting assembly is arranged on the fixing assembly, the fixing support and/or the sliding support, and comprises a guide seat and a sliding rod which is arranged in the guide seat and can slide along the axial direction of the guide seat; the guide seat is fixedly arranged on the fixed support or the sliding support, and the fixing assembly is fixedly arranged at one end of the sliding rod, which is far away from the guide seat; a threaded hole is formed in the side wall of the guide seat, and a fixing screw is arranged on the threaded hole; the outer side wall of the sliding rod is provided with a plurality of adjusting counter bores, and the front part of the fixing screw is arranged in one of the adjusting counter bores.
After the structure is adopted, the damping device is arranged on the fixing seat, the lower surface of the floor slab main body is connected with the damping cushion pad, the four corners of the floor slab main body need to bear larger supporting force than the side edges, the damping device arranged on the limiting grooves at the four corners of the floor slab main body is used for damping, and the better damping effect is achieved through the auxiliary damping effect of the damping cushion pad arranged on the connecting plate.
The sliding seat on the damping device can slide in the vertical direction, so that the first damping elastic body deforms. The floor main body avoids the fixing seat, and in the whole damping process, the floor main body cannot be in direct contact with the fixing seat. The upper surface of the first shock absorption elastic body is in abutting contact with the floor slab main body, and when the floor slab main body vibrates, the shock absorption cushion can absorb the energy of the vibration, so that the influence of the vibration on personnel is reduced.
Drawings
Fig. 1 is a schematic structural view of a column and a floor slab assembly of a steel structure office building, which is convenient for installing a drain pipe.
Fig. 2 is a schematic structural view of a column and beam assembly.
Fig. 3 is a schematic cross-sectional view of a floor slab assembly.
Fig. 4 is an enlarged schematic view of the structure at a in fig. 3.
Figure 5 is an exploded schematic view of the floor slab body and the damping means.
Fig. 6 is a schematic structural view of the fixing base.
FIG. 7 is a schematic view of another angle of the column and beam assembly.
Fig. 8 is a schematic structural view of the locking block.
Fig. 9 is a schematic view of the roof assembly.
Fig. 10 is a schematic top view of a roof assembly.
Fig. 11 is a schematic structural view of the support structure.
Fig. 12 is a schematic structural view of the connection structure.
Fig. 13 is a schematic sectional structure view of the roof panel.
FIG. 14 is a side view of the drain mounting apparatus.
Fig. 15 is a front view of the drain mounting apparatus.
Fig. 16 is a schematic top view of the drain pipe installation device.
Fig. 17 is a schematic sectional view of the pitch adjustment assembly.
Fig. 18 is an exploded view of the guide block installation.
In the figure: a column 1; a beam assembly 2; a connecting plate 21; a shock-absorbing cushion 211; a fixed seat 22; a plugging groove 221; a second wedge-facet 222; an air vent 223; a threaded sleeve 224; a locking block 23; first wedge-facet 231; a locking lug 232; an ear plate through hole 233; a locking bolt 234; a strike pad 235;
a floor slab assembly 3; a floor slab main body 31; a limit recess 311; a load floor 312; a sound insulating mat 313; a second shock-absorbing elastic body 314; a damper 32; a base 321; a slide base 322; an arched elastic steel plate 323; a circular arc portion 324;
the roof cross member 41; a first roof steel column 411; a second roof steel column 412; a support structure 42; a first connecting seat 421; the first support rod 422; a rectangular bracket 423; a second connecting seat 424; a first bolt 425;
a connecting structure 43; a second support bar 431; a U-shaped connecting seat 432; a second bolt 433;
a roof panel 44; a lower cover plate 441; an upper cover plate 442; an insulating layer 443; a dry filler 444; a water-resistant coating 445; an auxiliary steel plate 45;
a drain pipe installation device 5; a mounting plate 51; a slide groove 511; a guide groove 512; a third bolt 513; a fixed support 52; a slide support 53; a guide block 531; a fixed component 54; a clamp 541; a rubber ring 542; a spacing adjustment assembly 55; a guide base 551; a slide bar 552; threaded holes 553; set screws 554; the counterbore 555 is adjusted.
Detailed Description
In order to further explain the technical solution of the present invention, the present invention is explained in detail by the following specific examples.
As shown in fig. 1 to 18, the steel structure office building convenient for installing a drain pipe according to the present invention includes a plurality of columns 1 with rectangular cross sections, a beam assembly 2 fixedly connected to two adjacent columns 1, and a floor assembly 3 disposed on the beam assembly 2. The beam assembly 2 comprises a connecting plate 21 and fixing seats 22 fixedly arranged on two adjacent upright posts 1 respectively, an insertion groove 221 is formed on each fixing seat 22, and two ends of the connecting plate 21 are inserted into the insertion grooves 221 with opposite openings respectively; the upper surface of the connecting plate 21 is provided with a shock-absorbing cushion 211.
The floor slab assembly 3 comprises a floor slab main body 31 and a damping device 32, wherein the damping device 32 comprises a base 321, a sliding seat 322 vertically and slidably arranged on the base 321, and a first damping elastic body arranged between the base 321 and the sliding seat 322; the base 321 of the damping device 32 is fixedly arranged on the upper surface of the fixed seat 22, the four corners of the floor slab main body 31 are provided with limiting grooves 311, and the floor slab main body 31 is arranged on the sliding seat 322 of the damping device 32 through the limiting grooves 311; the lower surface of the floor slab body 31 is in contact with the shock-absorbing and cushioning pad 211.
Thus, according to the steel structure office building convenient for installing the drain pipe, the damping device 32 is arranged on the fixed seat 22, the lower surface of the floor slab main body 31 is connected with the damping cushion 211, and as the four corners of the floor slab main body 31 need to bear larger supporting force than the side edges, the damping device 32 arranged on the limiting grooves 311 at the four corners of the floor slab main body 31 is used for damping, and then the auxiliary damping effect of the damping cushion 211 arranged on the connecting plate 21 is achieved.
The sliding seat 322 of the damping device 32 can slide in the vertical direction, so that the first damping elastomer is deformed. Floor main part 31 avoids fixing base 22, at whole shock attenuation in-process, floor main part 31 can not with fixing base 22 direct emergence contact. The upper surface of the first shock absorption elastic body is in abutting contact with the floor slab main body 31, and when the floor slab main body 31 vibrates, the shock absorption cushion 211 can absorb the energy of the vibration, so that the influence of the vibration on people is reduced.
Preferably, the first shock absorbing elastic body is an arched elastic steel plate 323; the bottom of the arched elastic steel plate 323 is arranged on the base 321, the top of the arched elastic steel plate 323 abuts against the sliding seat 322, an arc portion 324 is formed at the position where the arched elastic steel plate 323 contacts with the base 321, and lubricating grease is arranged between the arc portion 324 and the base 321. The top of the arched elastic steel plate 323 abuts against the sliding seat 322, and when the sliding seat 322 moves downwards, the arched elastic steel plate 323 can deform, so that the amplitude of vibration is reduced. The contact part of the arched elastic steel plate 323 and the base 321 is processed into an arc part 324 by arc treatment and added with grease, so as to reduce the influence of friction noise. Furthermore, the surface of the arched elastic steel plate 323 is covered with a rubber layer (not shown), which can protect the arched elastic steel plate 323.
Preferably, a load floor 312, a sound insulation pad 313 arranged below the load floor 312, and a second shock-absorbing elastic body 314 arranged around the sound insulation pad 313 are mounted on the floor main body 31; the second shock-absorbing elastic body 314 is disposed between the load floor 312 and the floor slab body 31. Further, the second shock absorbing elastic body 314 is a shock absorbing rubber pad. The sound absorption to the footstep sound is realized through the soundproof cotton arranged below the bearing floor 312, and the vibration is further reduced by the damping effect of the second damping elastic body 314. Preferably, the second shock absorbing elastic body 314 may also be a foam plastic block.
Preferably, a locking block 23 located at the lower portion of the connecting plate 21 is further disposed in the insertion groove 221, an upper surface of the locking block 23 abuts against a lower surface of the connecting plate 21, a first wedge-shaped surface 231 is formed on the locking block 23, and a second wedge-shaped surface 222 for abutting against the first wedge-shaped surface 231 is formed in the insertion groove 221; the fixed seat 22 is provided with an air hole 223 communicated with the insertion groove 221; a locking lug plate 232 is formed at one end of the locking block 23 away from the insertion groove 221, a lug plate through hole 233 arranged along the length direction of the connecting plate 21 is formed on the locking lug plate 232, a threaded sleeve 224 is fixedly arranged on the fixing seat 22, and a locking bolt 234 is connected between the lug plate through hole 233 and the threaded sleeve 224. The locking block 23 is plugged into the insertion groove 221, the first wedge-shaped surface 231 and the second wedge-shaped surface 222 on the locking block 23 abut against each other, the locking bolt 234 passes through the lug plate through hole 233 and is in threaded connection with the threaded sleeve 224, and after the rotation is stopped along with the rotation of the locking bolt 234, the connecting plate 21 is firmly fixed in the insertion groove 221, so that the risk of falling out of the insertion groove 221 is avoided; the air holes 223 play a role in balancing internal and external air pressure, so that the locking block 23 cannot be inserted and pulled out due to the air pressure. Furthermore, a knocking pad 235 is disposed on a side of the locking lug 232 away from the insertion groove 221, so that the locking block 23 is not easily damaged by a hammer when the locking block 23 is inserted into the insertion groove 221.
Preferably, the steel structure office building further comprises a roof assembly; the roof assembly comprises roof beams 41, support structures 42, connecting structures 43 and roof panels 44; the roof beam 41 is arranged at the top of the upright post 1, a first roof steel column 411 is fixedly arranged in the middle of the upper surface of the roof beam 41, and second roof steel columns 412 are fixedly arranged on the upper surfaces of two sides of the roof beam 41; the top of the first roof steel column 411 and the second roof steel column 412 on both sides of the roof cross beam 41 are connected with the supporting structure 42 through a first bolt 425; the two ends of the connecting structure 43 are respectively connected to the adjacent supporting structures 42 through second bolts 433; a roof panel 44 is arranged on the support structure 42 and the connecting structure 43. Because the components are mutually matched for assembly, the assembly efficiency is greatly improved.
Preferably, the support structure 42 comprises a first connection seat 421, a first support rod 422, a rectangular bracket 423 and a second connection seat 424; the first connecting seat 421 and the second connecting seat 424 are fixedly connected to the tops of the first roof steel column 411 and the second roof steel column 412 respectively through a first bolt 425; the rectangular bracket 423 is welded to the first connecting seat 421, and two ends of the first supporting rod 422 are welded to the second connecting seat 424 and the rectangular bracket 423, respectively;
the connecting structure 43 includes a second supporting rod 431 and u-shaped connecting seats 432 welded to two ends of the second supporting rod 431, respectively, and the u-shaped connecting seats 432 are fixedly connected to the rectangular support 423 through second bolts 433. Two sets of U font connecting seat 432 are provided with on each, and every group has 2 confession the mounting hole that second bolt 433 passed, through eight sets of second bolt 433 and nut cooperation, will second bracing piece 431 with rectangle support 423 connects, and the steadiness is better.
Preferably, an auxiliary steel plate 45 is connected between the first support rod 422 and the roof cross beam 41. The auxiliary steel plate 45 provides better stability of the roof assembly.
Preferably, the roof panel 44 includes a lower cover plate 441, an upper cover plate 442, an insulation layer 443, and a dry filler 444; the insulating layer 443 is made of glass wool; the dry filler is calcium chloride particles; two insulating layers 443 are arranged between the upper cover plate 442 and the lower cover plate 441, and a drying filler 444 is arranged between the two insulating layers; the upper surface of the upper cover plate 442 is provided with a waterproof coating 445, and the waterproof coating 445 is composed of a polymer cement-based waterproof coating. The heat-insulating layer 443 can play a good heat-insulating role so as to reduce heat loss indoors in winter. The dry filler 444 can prevent indoor moisture, meanwhile, the upper surface of the roof panel 44 is coated with the waterproof coating 445, and the waterproof coating 445 is composed of polymer cement-based waterproof paint, so that a good waterproof effect can be achieved.
Preferably, the steel structure office building further comprises a drain pipe installation device 5, wherein the drain pipe installation device 5 comprises an installation plate 51, a fixed support 52, two sliding supports 53 and a fixing assembly 54 for fixing a drain pipe; the fixed assembly 54 is fixedly arranged on the fixed support 52 and the sliding support 53; the mounting plate 51 is fixedly arranged on the upright post 1 through a third bolt 513, sliding grooves 511 are symmetrically formed in the mounting plate 51, and a fixed support 52 is arranged on the mounting plate 51 between the two sliding grooves 511; a guide groove 512 is formed in the inner side wall of the sliding groove 511, the sliding support 53 is arranged in the sliding groove 511 in a sliding manner, a guide block 531 is arranged on the side surface of the sliding support 53, and the guide block 531 is arranged in the guide groove 512 in a sliding manner. The drain pipe mounting device 5 adopts an assembled design, so that the integral mounting and dismounting are facilitated, and the mounting efficiency of the drain pipe mounting device 5 is improved. The sliding support 53 can adjust the position of the pipeline and support the pipeline in an auxiliary manner. Due to the fact that the upper and lower adjustment is achieved, the sliding support 53 can avoid the connecting portion of the drain pipe and the drain pipe, and therefore the drain pipe can be better fixed. Further, the fixing component 54 is a clamp 541 which holds the drain pipe tightly; a rubber ring 542 is arranged in the clamp 541.
Preferably, the fixed assembly 54 and the fixed support 52 and/or the sliding support 53 are provided with a spacing adjustment assembly 55, and the spacing adjustment assembly 55 comprises a guide seat 551 and a sliding rod 552 which is arranged in the guide seat 551 and can slide along the axial direction of the guide seat 551; the guide seat 551 is fixedly arranged on the fixed support 52 or the sliding support 53, and the fixed assembly 54 is fixedly arranged at one end of the sliding rod 552 far away from the guide seat 551; a threaded hole 553 is formed in the side wall of the guide seat 551, and a fixing screw 554 is arranged on the threaded hole 553; the outer side wall of the slide rod 552 is formed with a plurality of adjustment counterbores 555, and the front portion of the set screw 554 is disposed in one of the adjustment counterbores 555. Because the existence of interval adjustment subassembly 55, can adjust the distance between drain pipe and the office building according to the particular case of drain pipe to better installation drain pipe.
The above embodiments and drawings are not intended to limit the form and style of the present invention, and any suitable changes or modifications thereof by those skilled in the art should be considered as not departing from the scope of the present invention.

Claims (7)

1. A steel structure office building convenient for installing a drain pipe is characterized by comprising a plurality of upright posts with rectangular sections, a beam assembly fixedly connected to two adjacent upright posts and a floor slab assembly arranged on the beam assembly;
the steel structure office building further comprises a drain pipe installation device, wherein the drain pipe installation device comprises an installation plate, a fixed support, two sliding supports and a fixed assembly for fixing the drain pipe; the fixed assembly is fixedly arranged on the fixed support and the sliding support; the mounting plate is fixedly arranged on the upright post through a third bolt, sliding grooves are symmetrically formed in the mounting plate, and a fixing support is arranged on the mounting plate between the two sliding grooves; the guide groove has been seted up on the inside wall of sliding tray, sliding support slides and sets up in the sliding tray, install the guide block on sliding support's the side, the guide block slides and sets up slide setting is in the guide groove.
2. The steel structure office building convenient for installing the drainage pipe as claimed in claim 1, wherein the beam assembly comprises a connecting plate and fixing seats fixedly arranged on two adjacent upright columns respectively, wherein the fixing seats are formed with inserting grooves, and two ends of the connecting plate are inserted into the two inserting grooves with opposite openings respectively; and a damping cushion pad is arranged on the upper surface of the connecting plate.
3. The steel structure office building convenient for installing the drain pipe as claimed in claim 2, wherein the floor assembly comprises a floor main body and a damping device, the damping device comprises a base, a sliding seat vertically and slidably arranged on the base, and a first damping elastic body arranged between the base and the sliding seat; the base of the damping device is fixedly arranged on the upper surface of the fixed base, four corners of the floor slab main body are provided with limiting grooves, and the floor slab main body is arranged on the sliding seat of the damping device through the limiting grooves; the lower surface of the floor slab main body is in contact with the shock absorption and buffer cushion;
4. a steel structure office building convenient for installing a drainage pipe as claimed in claim 3, wherein the first shock-absorbing elastic body is an arched elastic steel plate; the bottom of the arched elastic steel plate is arranged on the base, the top of the arched elastic steel plate is abutted against the sliding seat, an arc portion is formed at the position where the arched elastic steel plate is contacted with the base, and lubricating grease is arranged between the arc portion and the base.
5. The steel structure office building convenient for installing the drainage pipe as claimed in claim 3, wherein a bearing floor, a sound insulation pad arranged below the bearing floor and a second shock absorption elastic body arranged around the sound insulation pad are installed on the floor main body; the second damping elastic body is arranged between the bearing floor and the floor slab main body.
6. A steel structure office building convenient for installing a drainage pipe according to claim 1, wherein the fixing component and the fixing support and/or the sliding support are provided with spacing adjusting components, and the spacing adjusting components comprise a guide seat and a sliding rod which is arranged in the guide seat and can slide along the axial direction of the guide seat; the guide seat is fixedly arranged on the fixed support or the sliding support, and the fixing assembly is fixedly arranged at one end of the sliding rod, which is far away from the guide seat; a threaded hole is formed in the side wall of the guide seat, and a fixing screw is arranged on the threaded hole; the outer side wall of the sliding rod is provided with a plurality of adjusting counter bores, and the front part of the fixing screw is arranged in one of the adjusting counter bores.
7. A steel structure office building for facilitating the installation of a drain pipe according to claim 1, wherein the fixing member is a clip for clasping the drain pipe; and a rubber ring is arranged in the clamp.
CN202010870189.5A 2019-03-22 2019-03-22 Steel construction office building convenient to installation drain pipe Withdrawn CN112252502A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010870189.5A CN112252502A (en) 2019-03-22 2019-03-22 Steel construction office building convenient to installation drain pipe

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910220388.9A CN110295684B (en) 2019-03-22 2019-03-22 Shock attenuation steel construction office building
CN202010870189.5A CN112252502A (en) 2019-03-22 2019-03-22 Steel construction office building convenient to installation drain pipe

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
CN201910220388.9A Division CN110295684B (en) 2019-03-22 2019-03-22 Shock attenuation steel construction office building

Publications (1)

Publication Number Publication Date
CN112252502A true CN112252502A (en) 2021-01-22

Family

ID=68026435

Family Applications (4)

Application Number Title Priority Date Filing Date
CN202010870187.6A Withdrawn CN112252501A (en) 2019-03-22 2019-03-22 Floor absorbing steel structure office building
CN202010870189.5A Withdrawn CN112252502A (en) 2019-03-22 2019-03-22 Steel construction office building convenient to installation drain pipe
CN202010870194.6A Withdrawn CN112252503A (en) 2019-03-22 2019-03-22 Steel construction office building that assembly efficiency is high
CN201910220388.9A Active CN110295684B (en) 2019-03-22 2019-03-22 Shock attenuation steel construction office building

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN202010870187.6A Withdrawn CN112252501A (en) 2019-03-22 2019-03-22 Floor absorbing steel structure office building

Family Applications After (2)

Application Number Title Priority Date Filing Date
CN202010870194.6A Withdrawn CN112252503A (en) 2019-03-22 2019-03-22 Steel construction office building that assembly efficiency is high
CN201910220388.9A Active CN110295684B (en) 2019-03-22 2019-03-22 Shock attenuation steel construction office building

Country Status (1)

Country Link
CN (4) CN112252501A (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114837485A (en) * 2022-05-26 2022-08-02 山东金宇杭萧装配建筑有限公司 Floor for shock attenuation shaped steel structure house

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104594501A (en) * 2013-11-01 2015-05-06 江苏海恒建材机械有限公司 Shock absorption steel structural building
CN204919567U (en) * 2015-09-01 2015-12-30 上海宝冶集团有限公司 Shoring of trench stand shock attenuation construction equipment
CN206109973U (en) * 2016-10-26 2017-04-19 浙江钢泰钢结构工程有限公司 Steel structure damping support
KR101972916B1 (en) * 2016-12-22 2019-04-26 영산대학교 산학협력단 Connection System of Progressive Collapse-Resistant Steel Moment Beam-Column using Damper
CN107217739B (en) * 2017-03-21 2022-09-13 江苏城乡建设职业学院 Frame structure for floor vibration isolation and mounting method thereof
CN106894522A (en) * 2017-04-24 2017-06-27 江苏跃发建设工程有限公司 A kind of antidetonation attachment structure for steel house

Also Published As

Publication number Publication date
CN112252501A (en) 2021-01-22
CN110295684A (en) 2019-10-01
CN110295684B (en) 2021-05-11
CN112252503A (en) 2021-01-22

Similar Documents

Publication Publication Date Title
KR101372087B1 (en) Strengthen method for steel frame structure using seismic control device
CN214574887U (en) Novel assembled shear wall structure power consumption device
CN110295684B (en) Shock attenuation steel construction office building
JP5043461B2 (en) Floor structure
CN211472848U (en) Steel construction of high anti-seismic performance
CN212063331U (en) Anti-seismic bridge
CN210890395U (en) Anti-seismic support is stabilized to high strength
CN214090455U (en) Shock attenuation building structure
CN113235844B (en) Shock-absorbing structure of house building
CN115478711A (en) Steel structure supporting upright post and steel structure house
CN212427720U (en) Arc roof system with electromechanical vibration/noise reduction function
CN217153296U (en) Vibration reduction limiting support for pipeline
CN215566549U (en) Roof water pump shock attenuation foundation device
CN220954071U (en) Double-layer sound insulation curtain wall
CN219887272U (en) Curtain wall supporting structure
CN216743135U (en) Air pipe anti-seismic support
CN221095554U (en) Anti-cracking heat-insulation floor slab
CN215371972U (en) Construction equipment mounting support frame
CN220167215U (en) Connection structure between adjacent buildings
CN112523416A (en) Ceiling shock absorber
CN218818659U (en) Water pipeline fixing support
CN219327215U (en) Sound insulation decorative curtain wall
CN218990544U (en) Shock attenuation mounting structure of assembled wall
CN218374414U (en) Novel building damping support
KR102355239B1 (en) Corner Ceiling Finishes

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20210122