CN112227656A - Interior decoration construction process - Google Patents

Interior decoration construction process Download PDF

Info

Publication number
CN112227656A
CN112227656A CN202011012117.3A CN202011012117A CN112227656A CN 112227656 A CN112227656 A CN 112227656A CN 202011012117 A CN202011012117 A CN 202011012117A CN 112227656 A CN112227656 A CN 112227656A
Authority
CN
China
Prior art keywords
decoration
construction
region division
modules
indoor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011012117.3A
Other languages
Chinese (zh)
Inventor
单炳泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Dianshuo Decoration Engineering Co ltd
Original Assignee
Chongqing Dianshuo Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Dianshuo Decoration Engineering Co ltd filed Critical Chongqing Dianshuo Decoration Engineering Co ltd
Priority to CN202011012117.3A priority Critical patent/CN112227656A/en
Publication of CN112227656A publication Critical patent/CN112227656A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention provides an indoor decoration construction process, which comprises the following steps: the method comprises the steps of firstly, carrying out region division on an indoor decoration environment, obtaining each decoration region division module, and issuing a construction drawing of each module; secondly, setting a construction progress sequence according to the decoration region division modules, setting a time schedule for each decoration region division module, and limiting the construction time of each decoration region division module; thirdly, finishing the construction of each decoration area division module according to a schedule; fourthly, finishing the indoor decoration. The invention utilizes the online platform to monitor the time progress of the indoor decoration process, divides each decoration area according to the indoor environment, sets the specific construction schedule of decoration of each area, sets time for each construction environment, and monitors online to improve the decoration efficiency.

Description

Interior decoration construction process
Technical Field
The invention relates to the technical field of decoration industry, in particular to an interior decoration construction process.
Background
At present, in the decoration industry, common indoor and outdoor decoration design is realized by directly carrying out field measurement and setting a decoration scheme, materials are piled and transported to a field for construction, and the decoration process flow has no fluent and ready planned automatic distribution process, so that the decoration efficiency is low, the progress is delayed, the process is disordered, and the construction environment of the field is disturbed.
Disclosure of Invention
In order to solve the defects of the prior art, the invention provides an interior decoration construction process.
The technical scheme provided by the invention is as follows: the technical scheme provided by the invention is as follows: an interior decoration construction process comprises the following steps:
the method comprises the steps of firstly, obtaining user information, and recommending designers and design scheme previews based on user intentions;
secondly, performing online interactive butt joint, and determining a preliminary signing protocol and measurement parameters offline after finishing the online interactive butt joint;
thirdly, determining a design scheme, a final contract signing protocol and a budget provision scheme;
fourthly, issuing a construction effect picture and signing a construction contract; assist in providing property procedures;
fifthly, completion supervision;
and sixthly, payment is carried out by stages.
Further, the method also comprises the following steps:
the method comprises the steps of firstly, carrying out region division on an indoor decoration environment, obtaining each decoration region division module, and issuing a construction drawing of each module;
secondly, setting a construction progress sequence according to the decoration region division modules, setting a time schedule for each decoration region division module, and limiting the construction time of each decoration region division module;
thirdly, finishing the construction of each decoration area division module according to a schedule;
fourthly, finishing the indoor decoration.
Furthermore, the interior decoration environment is divided into regions, and the decoration region division modules include but are not limited to a wall decoration module, a ground decoration module, a ceiling module, a hydropower installation module, a power distribution facility module, a kitchen and toilet facility module, a waterproof engineering module, an interior hard decoration module, an interior soft decoration module and an interior sanitation removal module.
Further, the construction time limitation is performed on each decoration region division module, specifically:
and issuing a decoration construction project book to each decoration region division module, refining each decoration region division module, wherein the construction project book comprises each construction link, and setting an upper limit and a lower limit of construction time for each construction link.
Furthermore, the indoor decoration environment is divided into regions to obtain each decoration region division module, each decoration region division module is issued with a decoration construction project book, and the upper limit and the lower limit of construction time are set for each construction link, which are all set through an online platform, so that the progress of each project is monitored online in real time.
The beneficial technical effects of the invention are as follows: the invention utilizes the online platform to monitor the time progress of the indoor decoration process, divides each decoration area according to the indoor environment, sets the specific construction schedule of decoration of each area, sets time for each construction environment, and monitors online to improve the decoration efficiency.
Drawings
FIG. 1 is a schematic flow chart of the present invention.
Detailed Description
The invention is further described with reference to the following figures and specific embodiments.
In the description of the present invention, the relative terms "upper", "lower", "left", "right", "inner", "outer", etc. indicate positions based on the orientations shown in the drawings for convenience of description, and the components are not necessarily required to have the orientations and configurations, and thus, should not be construed as limiting the present invention.
Example 1
The technical scheme provided by the invention is as follows: an interior decoration construction process comprises the following steps:
the method comprises the steps of firstly, obtaining user information, and recommending designers and design scheme previews based on user intentions;
secondly, performing online interactive butt joint, and determining a preliminary signing protocol and measurement parameters offline after finishing the online interactive butt joint;
thirdly, determining a design scheme, a final contract signing protocol and a budget provision scheme;
fourthly, issuing a construction effect picture and signing a construction contract; assist in providing property procedures;
fifthly, completion supervision;
and sixthly, payment is carried out by stages.
On the service details:
the method comprises the following steps:
first, early-stage service: consult with designer-designer's consult-designer's home-quantity-designer's effect picture-communicate with customer to decide scheme-designer's construction picture-customer's examination-contract
II, medium-term service: the two parties of the engineering delivery end A and the engineering delivery end B go to a decoration company for design and construction, quality inspection and field arrival, construction of construction teams, designers, quality inspection and field arrival inspection clearance, a company customer service department asks for customer opinions in construction, and the designers accompany customers to the building material market to purchase the first party for providing reference opinions of main materials. Meanwhile, the method solves the problems of changing, consulting and drawing out of tradition and the like in construction, namely completion design, construction and quality inspection on the spot and completion procedures of a client, and continuous service provision of a designer, and provides consultation and reference opinions for later-stage furniture preparation and the like of a house finished by the client.
Third, end service: the company customer service department regularly asks for customer opinions in the warranty period, problems occur and warranty is carried out in time, and after the warranty period expires, if a customer has a maintenance task, the decoration company timely gives maintenance cost only.
The method mainly comprises the following plate design and construction blocks:
family type analysis
Functional layout
Style positioning
Capital planning
Budget of drawing
Soft assembly decoration
Household shopping
Matching of main material products
Therein, 1 asks the owner about the details of the finish, wherein there are roughly these problems, the area size of the owner's house, second hand or new house, changing water and electricity, full or half pack, several people's use, style requirements, etc., more detailed problems, etc.
And 2, giving a home measuring room to the owner according to the initial communication with the owner by appointing time with the owner (the measured contents mainly comprise 1, the area related to the decoration process, the size and the position of each functional area, a window and a wall, and 2, the main sizes, such as a sewer pipe, a vent, a decorative wall, a bearing wall, a beam and the like are determined), wherein a designer, a salesman and the owner are required to cooperate, and the initial room measuring room not only can know the house condition of the owner, but also can further communicate with the owner and know the detailed requirements of the owner.
And 3, drawing a CAD plan design drawing of the house of the owner after the designer measures the house, and then checking the design details from the owner to the company, and adjusting according to the specific requirements of the owner. If the owner is satisfied with the design fixed money, the owner can modify the design fixed money according to the requirement of the owner and start the next step.
4, the start work is divided into three parts of early stage, middle stage and completion acceptance. The early stage is hydroelectric power and a terrace, the middle stage is a suspended ceiling, a tile, a main material and the like, and the completion acceptance check is a special acceptance check for comprehensively checking the decoration quality of the house. And then the product is accepted and signed by the owner and the tail money is settled.
Specifically, the method comprises the following steps:
consultation
In the early stage of decoration or when decoration is selected, a service person of a decoration company can introduce company conditions, company scale and the like for you to answer some questions and recommend the most appropriate designer for you according to the decoration requirements of you.
Design communication
The designer carefully knows the basic situation of your room and your design requirements and communicates with you sufficiently to provide some design ideas you agree with.
After the communication between the volume room agreement and the designer is finished, if the user feels satisfied, the volume room agreement is signed and the designer appoints time to get to the door volume room.
Measuring room
On-site measurement, on-the-spot communication with the customer, and collection of design data.
After a measuring room protocol is signed, a designer can go to a measuring room by himself at appointed time, measure the accurate size of the room, and record the field measurement result and the requirement of the user on the space structure in detail.
After the design scheme measuring room is determined to be finished, the designer can communicate with the user deeply again to know the related requirements and determine the design scheme according to the requirements. The design and budget are determined in response to customer requests to improve the solution.
After the design agreement is signed and satisfied with the designer and the design plan, the designer represents the company to sign the design agreement with the designer.
Go out construction drawing
After the design agreement is signed, a designer can generate a final construction drawing; the construction drawing is the basis for carrying out engineering budget and is also the important basis for later construction personnel to carry out engineering construction;
eighthly, engineering budget
A designer performs engineering budget to provide decoration quotation according to the construction drawing;
nine, sign construction contract
After the construction drawing and the quotation are approved, a designer can sign a construction contract with the company on behalf of the company; signing a project construction contract and using all drawings;
assisting clients in transacting property procedures;
starting construction, wherein a designer supervises design implementation and provides design change service according to the requirements of a client;
providing an as built drawing after construction;
delivering a first-term payment of the project;
when a construction contract is signed, a user needs to pay the first-stage money of a project to a company, and then the company arranges to start working; start-up
After signing a contract and paying first-term money, a project manager of a company arranges a worker leader and a construction team to start construction, and a designer can carry out construction settlement on workers according to drawings from the current working day to the site;
water and electricity material and water and electricity acceptance and second-phase payment
When the hydropower material enters a field and after the hydropower construction is finished, the engineering department can firstly go to a construction site to patrol and help you to get closed. The project manager then takes you to the site to check out, ensuring that every detail is not problematic. After the water and electricity are checked and accepted, a user needs to pay for the project money of the second period;
carpentry material and acceptance of carpentry, and payment in three phases
When the woodworking materials enter a field and after the woodworking construction is finished, the project department can go to a construction site to patrol and check the upper and close the wall. The project manager can take you to the site for acceptance, and at the same time, you need to pay the project money in the third period;
paint material and paint construction acceptance
When the paint material enters the field and after the paint construction is finished, the engineering department manager goes to a construction site to patrol and check the upper and you are closed; the project manager can take the project manager to the site to check and accept;
acceptance of completion and payment at the end
After completion of the project, the designer, the foreman, the proctor and the project manager can take the person to the site for completion acceptance. After the acceptance is qualified, you need to pay the final payment;
engineering warranty
After you pay the end-term money, the company will issue a warranty bill to you, typically a concealed project warranty for 5 years and a surface project warranty for 2 years.
The invention utilizes the online platform to monitor the time progress of the indoor decoration process, divides each decoration area according to the indoor environment, sets the specific construction schedule of decoration of each area, sets time for each construction environment, and monitors online to improve the decoration efficiency.
As shown in the attached figure 1, the scheme also comprises the following design and construction scheme:
according to the scheme, on-line indoor decoration schedule monitoring construction is carried out on the basis of an on-line platform, each indoor area is divided, construction links are specifically set, construction progress time of each environment is set on line, construction progress of each link is supervised on line, and construction efficiency is improved.
The method comprises the steps of firstly, carrying out region division on an indoor decoration environment, obtaining each decoration region division module, and issuing a construction drawing of each module;
secondly, setting a construction progress sequence according to the decoration region division modules, setting a time schedule for each decoration region division module, and limiting the construction time of each decoration region division module;
thirdly, finishing the construction of each decoration area division module according to a schedule;
fourthly, finishing the indoor decoration.
Furthermore, the interior decoration environment is divided into regions, and the decoration region division modules include but are not limited to a wall decoration module, a ground decoration module, a ceiling module, a hydropower installation module, a power distribution facility module, a kitchen and toilet facility module, a waterproof engineering module, an interior hard decoration module, an interior soft decoration module and an interior sanitation removal module.
Further, the construction time limitation is performed on each decoration region division module, specifically:
and issuing a decoration construction project book to each decoration region division module, refining each decoration region division module, wherein the construction project book comprises each construction link, and setting an upper limit and a lower limit of construction time for each construction link.
Furthermore, the indoor decoration environment is divided into regions to obtain each decoration region division module, each decoration region division module is issued with a decoration construction project book, and the upper limit and the lower limit of construction time are set for each construction link, which are all set through an online platform, so that the progress of each project is monitored online in real time.
The foregoing is a preferred embodiment of the present invention, and it should be understood that those skilled in the art can derive the related technical solutions through logic analysis, reasoning or experiment based on the concepts of the present invention without creative efforts, and therefore, the related technical solutions should be within the protection scope of the present claims.

Claims (5)

1. An interior decoration construction process is characterized in that: the method comprises the following steps:
the method comprises the steps of firstly, obtaining user information, and recommending designers and design scheme previews based on user intentions;
secondly, performing online interactive butt joint, and determining a preliminary signing protocol and measurement parameters offline after finishing the online interactive butt joint;
thirdly, determining a design scheme, a final contract signing protocol and a budget provision scheme;
fourthly, issuing a construction effect picture and signing a construction contract; assist in providing property procedures;
fifthly, completion supervision;
and sixthly, payment is carried out by stages.
2. The interior decoration construction process according to claim 1, wherein: also comprises the following steps:
the method comprises the steps of firstly, carrying out region division on an indoor decoration environment, obtaining each decoration region division module, and issuing a construction drawing of each module;
secondly, setting a construction progress sequence according to the decoration region division modules, setting a time schedule for each decoration region division module, and limiting the construction time of each decoration region division module;
thirdly, finishing the construction of each decoration area division module according to a schedule;
fourthly, finishing the indoor decoration.
3. The interior decoration construction process according to claim 1, wherein: the indoor decoration environment is divided into regions, and the decoration region division modules comprise but are not limited to wall decoration modules, ground decoration modules, ceiling modules, hydropower installation modules, power distribution facility modules, kitchen and toilet facility modules, waterproof engineering modules, indoor hard decoration modules, indoor soft decoration modules and indoor sanitation clearing modules.
4. The interior decoration construction process according to claim 2, wherein: the construction time limitation is carried out on each decoration region division module, and the construction time limitation method specifically comprises the following steps:
and issuing a decoration construction project book to each decoration region division module, refining each decoration region division module, wherein the construction project book comprises each construction link, and setting an upper limit and a lower limit of construction time for each construction link.
5. The interior decoration construction process according to claim 3, wherein: the method comprises the steps of carrying out region division on an indoor decoration environment to obtain each decoration region division module, issuing a decoration construction project book to each decoration region division module, setting upper and lower limits of construction time for each construction link, setting through an online platform, and monitoring the progress of each project in real time on line.
CN202011012117.3A 2020-09-23 2020-09-23 Interior decoration construction process Pending CN112227656A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011012117.3A CN112227656A (en) 2020-09-23 2020-09-23 Interior decoration construction process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011012117.3A CN112227656A (en) 2020-09-23 2020-09-23 Interior decoration construction process

Publications (1)

Publication Number Publication Date
CN112227656A true CN112227656A (en) 2021-01-15

Family

ID=74107846

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011012117.3A Pending CN112227656A (en) 2020-09-23 2020-09-23 Interior decoration construction process

Country Status (1)

Country Link
CN (1) CN112227656A (en)

Similar Documents

Publication Publication Date Title
Teng et al. Analysis of stakeholder relationships in the industry chain of industrialized building in China
US11004160B2 (en) Systems and methods for advanced energy network
CN109345339B (en) Vertical industrial chain integrated transaction service system in power industry
US6922701B1 (en) Generating cad independent interactive physical description remodeling, building construction plan database profile
US20180114154A1 (en) O2O Business Model For Marketing Services
Du et al. Multi-agent simulation for managing design changes in prefabricated construction projects
US20150161695A1 (en) Systems and methods for normalizing and comparatively displaying disparate service offerings
Lin et al. Offsite construction in the Australian low-rise residential buildings application levels and procurement options
Yang et al. Assessment of automation and integration technology's impacts on project stakeholder success
CN113689179A (en) Informationized internet platform for improving operation efficiency of home industry
CN112227656A (en) Interior decoration construction process
KR20220069702A (en) Electricity bidding transaction method and electricity transaction control system
Gohardani et al. Turning building renovation measures into energy saving opportunities
TW200304603A (en) Asset managing apparatus, asset managing method, trust/leasing method for asset management
KR100642605B1 (en) Method of Building Simulation and Construction Management Using Internet
KR20210148833A (en) Personal direct construction service provision system
Perdomo-Rivera A framework for a decision support model for supply chain management in the construction industry
Karthi et al. Blockchain Empowered Solar Energy Trading: A Decentralized Grid Integration Revolution
Russell et al. Objective functions for optimal building design
US8650104B2 (en) Rough order of magnitude narrative system
Kacchba et al. Strategies to reduce costs in the planning of house building projects with government financing for low-income populations
USHER PROJECT MANAGEMENT PLAN FOR THE CONSTRUCTION OF A NEW BUNGALOW RESIDENCE AT PARCEL 3972 GREEN ESTATE, LORD’S BANK, BELIZE
FAN Symbiotic system and benchmarking research of prefabricated construction chain based on symbiosis theory
KR20210114621A (en) Design system of building
Oleynik et al. Aspects of Heuristic Method of Forming and Assessing the Plan of Contractor Works

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20210115

WD01 Invention patent application deemed withdrawn after publication