CN112195295A - Method for cutting coal gas of blast furnace and coal gas recovery device thereof - Google Patents

Method for cutting coal gas of blast furnace and coal gas recovery device thereof Download PDF

Info

Publication number
CN112195295A
CN112195295A CN201911237402.2A CN201911237402A CN112195295A CN 112195295 A CN112195295 A CN 112195295A CN 201911237402 A CN201911237402 A CN 201911237402A CN 112195295 A CN112195295 A CN 112195295A
Authority
CN
China
Prior art keywords
gas
valve
recovery device
blast furnace
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201911237402.2A
Other languages
Chinese (zh)
Inventor
郭喜明
张佳兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fuxin Dacheng Technology Co ltd
Original Assignee
Fuxin Dacheng Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuxin Dacheng Technology Co ltd filed Critical Fuxin Dacheng Technology Co ltd
Publication of CN112195295A publication Critical patent/CN112195295A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B5/00Making pig-iron in the blast furnace
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/002Evacuating and treating of exhaust gases
    • CCHEMISTRY; METALLURGY
    • C21METALLURGY OF IRON
    • C21BMANUFACTURE OF IRON OR STEEL
    • C21B7/00Blast furnaces
    • C21B7/002Evacuating and treating of exhaust gases
    • C21B7/005Bleeder valves or slides

Abstract

A method for cutting coal gas of a blast furnace and a coal gas recovery device thereof are invented for solving the technical defect that the prior blast furnace discharges raw gas to the outside of the furnace to the air during the damping down process. The device comprises the existing system equipment and facilities and is characterized in that gas recovery devices are arranged at two ends of the existing clean gas grid-connected valve in parallel, and each gas recovery device comprises a recovered gas pipeline, a stop valve, a check valve and an air extractor. By adopting the following steps: (1) the air supply quantity is reduced, and the pressure of the top gas is reduced; (2) opening the gas recovery device, closing the net valve for purifying gas and recovering the gas; (3) adjusting the pressure regulating valve group until the pressure regulating valve group is fully opened; (4) stopping air supply when the pressure of the top gas is reduced to micro positive pressure; (5) stopping the gas recovery device, closing the gas blocking valve, and opening the blast furnace crude gas blow-off valve; (6) turning the hot blast stove to a damping-down state; thus, the coal gas cutting process is completed. During the period, the blowing down gas of the blast furnace is completely recovered. Thereby thoroughly solving the problems of energy waste, potential safety hazard, air pollution and the like in the existing damping down process.

Description

Method for cutting coal gas of blast furnace and coal gas recovery device thereof
The technical field is as follows:
the invention belongs to the technical field of blast furnace damping down, and particularly relates to a coal gas cutting method and a coal gas recovery device in a blast furnace damping down process.
Background art:
the coal gas cutting method used in the damping down of the blast furnace at present comprises the following steps: the crude gas is discharged to the outside of the furnace to the air by opening the furnace top bleeding valve, then the gas blocking valve is closed to block the gas passage of the system, and then the air valve is opened to bleed air and stop air supply. This method is used up to now, and has obvious defects which are not solved: one is that a large amount of coal gas discharged from the top of the blast furnace during the damping down process has potential safety hazard and seriously pollutes the environment due to dust, high temperature, toxicity, flammability and explosiveness; secondly, because coal gas is also an energy source, the coal gas is lost in vain during the damping down process, and energy waste is caused. For this reason, chinese patent CN204022855U discloses "a dust-settling device for blast furnace emission", which uses a whole set of equipment to spray liquid above the furnace top through a spray head, and uses the liquid water mist sprayed from the spray head to remove dust from the emitted coal gas. However, although the device can solve the problem of dust removal of the diffused gas, the problems of gas evacuation and safety are still not solved, and the problem of waste of part of energy is also not solved.
The invention content is as follows:
the technical problem to be solved by the invention is as follows: the method can solve the problems of emptying and safety of the raw gas in the damping down process of the blast furnace, and can completely recycle the coal gas diffused at the top of the blast furnace in the damping down process; not only ensures the process of cutting the coal gas to be safe, reliable, sanitary and environment-friendly, but also can recycle the coal gas. The device adopted by the device has the advantages of simple structure, easy manufacture and installation, convenient operation and the like.
The technical scheme of the invention is as follows:
a blast furnace coal gas cutting method utilizes the existing system equipment facilities, comprises an air supply system, a coal gas dust removal system, a net gas combining valve and a coal gas pipe network, and is characterized in that: the method is characterized in that raw gas is not discharged to the outside of the blast furnace to the air in the coal gas cutting process, a gas recovery device is arranged at two ends of a net gas combining valve 14 in parallel, and the method is realized by adopting the following steps:
(1) the air supply amount is reduced through an air supply system, and the pressure of the furnace top raw gas is gradually reduced;
(2) opening a valve of the gas recovery device, closing a net combining valve of the clean gas, and enabling the gas recovery device to be put into operation, so that the clean gas flows to a gas pipe network through the device;
(3) when the air supply quantity is reduced to a set value, the pressure regulating valve bank is regulated to reduce the pressure of the furnace top raw gas until the pressure regulating valve bank is fully opened;
(4) continuing to reduce the air supply amount until the air valve is fully opened, and stopping air supply when the pressure of the furnace top is reduced to micro positive pressure;
(5) firstly, stopping a valve of the gas recovery device, then closing a gas blocking valve, and opening a blast furnace raw gas blow-off valve;
(6) and (5) converting the state of the hot blast stove group into a damping-down state, and cutting the coal gas.
A gas recovery device for blast furnace coal gas cutting for implementing the method comprises a net gas combining valve and a gas pipe network, and is characterized in that: the two ends of the net valve for net gas mixing are connected in parallel with a gas recovery device, and the gas recovery device comprises a gas recovery pipeline, a stop valve, a check valve and an air extraction device.
The air extractor is an ejector which is connected with a flow regulating valve and a high-pressure gas cut-off valve through a high-pressure gas pipeline; or the so-called air extraction device is an air extractor.
Compared with the prior art, the invention has the following advantages:
1. according to the method for cutting the coal gas, the coal gas recovery device is connected in parallel to the net valve of the clean coal gas, and reasonable operation steps are adopted, so that the method for cutting the coal gas which is used all the time is improved, the current situation that the raw gas is required to be discharged to the air in the existing coal gas cutting process is thoroughly changed, the problem that the raw gas is diffused in the blast furnace damping-down process is solved, potential safety hazards are eliminated, and environmental pollution and energy waste are avoided.
2. The gas recovery device provided by the invention can recover all the gas in the blast furnace gas system in the process of cutting the gas into the gas pipe network, so that the technical effect of not discharging the raw gas to the outside of the furnace to the air in the process of cutting the gas is achieved, the problems of environmental pollution and potential safety hazard are solved thoroughly, and the energy in the aspect is recovered and saved.
3. The ejector or the air extractor of the air extractor can adaptively recover the coal gas according to different working conditions in the production process, so the air extractor has strong practicability and wide popularity.
4. The invention utilizes the equipment facilities of the original system, and the newly added gas recovery device has the characteristics of simple structure, easy implementation, convenient operation, convenient maintenance and management and the like, thereby not only completely ensuring the recovery of the gas in the gas cutting process, but also having the advantages of small investment, quick effect, obvious economic benefit and social benefit and the like, and being beneficial to large-area popularization and application.
Description of the drawings:
FIG. 1 is a schematic structural diagram of the working system and the gas recovery device of the present invention.
The specific implementation mode is as follows:
the present invention will be described in detail with reference to the accompanying drawings.
A blast furnace coal gas cutting method, which utilizes the existing system equipment facilities, as shown in fig. 1, the equipment facilities comprise: the system comprises a cold air pipeline 1, an air release valve 2, a hot air furnace group 3, a hot air pipeline 4, a blast furnace 5, a raw gas pipeline 6, a blast furnace raw gas release valve 7, a gas blocking valve 8, a gravity dust collector 9, a semi-clean gas pipeline 10, a bag-type dust collector 11, a clean gas pipeline 12, a pressure regulating valve group 13, a gas grid valve 14 and a gas pipe network 15. The method is characterized in that: the blast furnace does not discharge raw gas to the outside of the furnace in the process of cutting the gas. In order to achieve the purpose, the invention is provided with a gas recovery device in parallel at two ends of the purified gas grid valve 14.
The gas recovery device comprises a gas recovery pipe 16, a stop valve 17, a check valve 18 and an air extraction device. The air-extracting means here can be used in two ways, one being an ejector 19 as shown in fig. 1, and a high-pressure gas pipe 22 connected thereto and a high-pressure gas shut-off valve 21, a flow regulating valve 20; the other way is to adopt a common air extractor; the former is given by the figure. The front end of the gas recovery device consisting of a recovered gas pipe 16, a stop valve 17, a check valve 18 and an injector 19 is connected to a clean gas pipeline between a gas merging net valve 14 and a pressure regulating valve group 13, and the rear end of the gas recovery device is connected to a gas pipe network 15, so that a gas suction passage is formed for gas recovery.
With the coal gas recovery device, the whole coal gas cutting process can be completed through the following steps:
(1) the air supply amount is reduced through the operation of an air supply system, so that the pressure of the furnace top crude gas is gradually reduced;
(2) then, opening a valve 17 of the gas recovery device, and closing a net combining valve 14 of the clean gas to enable the gas recovery device to be operated, wherein the clean gas flows to a gas pipe network 15 under the pumping action of an ejector 19 or an air extractor;
(3) when the air supply amount is reduced to a set value, the pressure regulating valve group 13 is adjusted to further reduce the pressure of the furnace top raw gas until the pressure regulating valve group 13 is fully opened;
(4) continuing to reduce the air supply amount until the air valve 2 is fully opened, and stopping air supply when the pressure of the furnace top is reduced to micro positive pressure;
(5) firstly, stopping the valve 17 of the gas recovery device, then closing the gas blocking valve 8, and opening the blast furnace raw gas blow-off valve 7;
(6) and (5) converting the state of the hot blast stove group 3 into a damping-down state, and finishing the coal gas cutting.
And finishing the coal gas cutting implementation method.
Supplementary explanation:
1. when the blast furnace is supplied with air, the air release valve 2 is in a closed state, namely, the air is not released to the atmosphere, the hot blast furnace group 3 is in an air supply state, the blast furnace raw gas release valve 7 is in a closed state, the gas blocking valve 8 and the gas merging net valve 14 are in an open state, and the gas recovery device cut-off valve 17 is in a closed state.
2. In the process of recovering the coal gas, a coal gas recovery device cut-off valve 17 is opened, and a high-pressure gas cut-off valve 21 of an ejector 19 or an air extractor starting device is opened, so that the coal gas recovery device is put into use; closing the gas merging net valve 14, and allowing the gas to flow to a gas pipe network 15 through the recovery device; the suction of the ejector 19 is regulated by a flow regulating valve 20 on a high-pressure gas pipeline 22; or the suction force of the air extractor is adjusted by the suction force adjusting device of the air extractor. And the check valve 18 arranged on the gas recovery pipe 16 is used for preventing the gas of the gas pipe network 15 from flowing backwards.
3. The invention realizes the blast furnace damping down by a coal gas cutting method, and realizes the coal gas cutting process by a coal gas recovery device without discharging the raw gas to the outside of the furnace to the air.
In a word, the method and the device can safely realize the whole purification and recovery of the coal gas diffused at the top of the blast furnace in the damping-down process of the blast furnace by the prior cloth bag dust removal system.
The invention can be widely used in the technical fields of blast furnace damping down and coal gas dust removal and recovery.

Claims (4)

1. A blast furnace coal gas cutting method utilizes the existing system equipment facilities, comprises an air supply system, a coal gas dust removal system, a net gas combining valve and a coal gas pipe network, and is characterized in that: the method is characterized in that raw gas is not discharged to the outside of the blast furnace to the air in the coal gas cutting process, a coal gas recovery device is arranged at two ends of a net gas combining valve (14) in parallel, and the method is realized by adopting the following steps:
(1) the air supply amount is reduced through an air supply system, and the pressure of the furnace top raw gas is gradually reduced;
(2) opening a valve (17) of the gas recovery device, closing a net combining valve (14) of the clean gas, and enabling the gas recovery device to be operated to enable the clean gas to flow to a gas pipe net (15) through the device;
(3) when the air supply quantity is reduced to a set value, the pressure regulating valve bank (13) is adjusted to reduce the pressure of the furnace top raw gas until the pressure regulating valve bank (13) is fully opened;
(4) continuing to reduce the air supply amount until the air valve (2) is fully opened, and stopping air supply when the pressure of the furnace top is reduced to micro positive pressure;
(5) firstly, stopping a valve (17) of the gas recovery device, then closing a gas blocking valve (8), and opening a blast furnace raw gas blow-off valve (7);
(6) and (5) converting the state of the hot blast stove group (3) into a damping-down state, and finishing the coal gas cutting.
2. A gas recovery device for blast furnace coal gas cutting comprises a net valve (14) and a gas pipe net (15), and is characterized in that: two ends of the net valve (14) for net gas purification are connected in parallel with a gas recovery device, and the gas recovery device comprises a gas recovery pipeline (16), a stop valve (17), a check valve (18) and an air extraction device.
3. The gas recycling device for blast furnace cutting gas as claimed in claim 2, wherein: the air extraction device is an ejector (19), and the ejector (19) is connected with a flow regulating valve (20) and a high-pressure gas cut-off valve (21) through a high-pressure gas pipeline (22).
4. The gas recycling device for blast furnace cutting gas as claimed in claim 2, wherein: the so-called air extraction device is an air extractor.
CN201911237402.2A 2019-07-07 2019-11-26 Method for cutting coal gas of blast furnace and coal gas recovery device thereof Pending CN112195295A (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201910633997 2019-07-07
CN2019106339977 2019-07-07

Publications (1)

Publication Number Publication Date
CN112195295A true CN112195295A (en) 2021-01-08

Family

ID=74004755

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201911237402.2A Pending CN112195295A (en) 2019-07-07 2019-11-26 Method for cutting coal gas of blast furnace and coal gas recovery device thereof

Country Status (1)

Country Link
CN (1) CN112195295A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020034238A (en) * 2000-10-31 2002-05-09 이구택 Pressure control device of Blast Furnace Hot Stove
CN102337364A (en) * 2011-07-20 2012-02-01 中冶南方工程技术有限公司 Device for recovering coal gas in equalizing and relieving process of furnace top of blast furnace
CN205062095U (en) * 2015-10-29 2016-03-02 中冶华天南京工程技术有限公司 Blast furnace furnace roof material jar diffuses gas purifying, recovery system
CN107201417A (en) * 2017-07-18 2017-09-26 沈阳红杉科技有限公司 A kind of full retracting device of blast furnace roof feed pot pressure-equalizing and discharging coal gas and recovery method
CN206721237U (en) * 2017-03-07 2017-12-08 北京凯德恒源科技发展有限公司 Blast furnace roof based on gas fan presses the full recovery system of coal gas
CN211665118U (en) * 2019-11-26 2020-10-13 阜新达诚科技有限公司 Gas recycling device for blast furnace cutting gas

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020034238A (en) * 2000-10-31 2002-05-09 이구택 Pressure control device of Blast Furnace Hot Stove
CN102337364A (en) * 2011-07-20 2012-02-01 中冶南方工程技术有限公司 Device for recovering coal gas in equalizing and relieving process of furnace top of blast furnace
CN205062095U (en) * 2015-10-29 2016-03-02 中冶华天南京工程技术有限公司 Blast furnace furnace roof material jar diffuses gas purifying, recovery system
CN206721237U (en) * 2017-03-07 2017-12-08 北京凯德恒源科技发展有限公司 Blast furnace roof based on gas fan presses the full recovery system of coal gas
CN107201417A (en) * 2017-07-18 2017-09-26 沈阳红杉科技有限公司 A kind of full retracting device of blast furnace roof feed pot pressure-equalizing and discharging coal gas and recovery method
CN211665118U (en) * 2019-11-26 2020-10-13 阜新达诚科技有限公司 Gas recycling device for blast furnace cutting gas

Similar Documents

Publication Publication Date Title
CN110016530B (en) Blast furnace gas full-dry purification system and process flow thereof
CN102864257A (en) Pressure-equalizing and bleeding method for injecting furnace roof tank coal gas by using high-pressure gas
CN102337364A (en) Device for recovering coal gas in equalizing and relieving process of furnace top of blast furnace
CN205062095U (en) Blast furnace furnace roof material jar diffuses gas purifying, recovery system
CN211665118U (en) Gas recycling device for blast furnace cutting gas
CN111187867B (en) Integrated recovery process for diffused raw gas
CN110004258B (en) Device for recycling blast furnace top pressure equalizing and diffusing gas
CN211199256U (en) Blast furnace damping device for safely recovering furnace top gas
CN102031321A (en) Method and device for recovering pressure-equalized coal gas at top of blast furnace
CN110317911B (en) Method for quickly introducing coal gas after blast furnace overhaul and mid-term delivery
CN109234482B (en) Full recovery system for coal gas diffused by blast furnace top charging bucket and safety maintenance method thereof
CN104372129A (en) Device and process used for back flushing, deashing and pneumatic ash conveying by utilizing waste flue gas of hot blast heater
CN214612583U (en) Integrated recovery device for diffused raw coke oven gas
CN219363678U (en) Blast furnace damping-down and re-blowing coal gas recycling, purifying and diffusing system
CN112195295A (en) Method for cutting coal gas of blast furnace and coal gas recovery device thereof
CN109234481B (en) Method and system for fully recovering coal gas diffused by blast furnace top charging bucket
CN102864260A (en) Pressure-equalizing bleeding device for ejecting furnace-top tank gas by high pressure gas
CN201981222U (en) Recovery device for gas exhausted from top of blast furnace
CN206502787U (en) A kind of removing tar dirt system of coke-stove gas
CN201762347U (en) Pulverized coal recovery device for blast furnace coal injection pipeline filter
CN210103990U (en) Device for recovering pressure-equalizing diffused gas at top of blast furnace
CN102504871A (en) Isolating device for blown gas reclaiming valve
CN211546587U (en) Blast furnace damping down coal gas recovery system
CN220432862U (en) Blast furnace damping down and diffusing gas cascade injection recovery device
CN216864211U (en) Blast furnace damping down coal gas recovery system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20210108

WD01 Invention patent application deemed withdrawn after publication