CN112145072A - 一种智能钻井方法 - Google Patents
一种智能钻井方法 Download PDFInfo
- Publication number
- CN112145072A CN112145072A CN202011022451.7A CN202011022451A CN112145072A CN 112145072 A CN112145072 A CN 112145072A CN 202011022451 A CN202011022451 A CN 202011022451A CN 112145072 A CN112145072 A CN 112145072A
- Authority
- CN
- China
- Prior art keywords
- drill bit
- drilling
- mechanical arm
- iron roughneck
- drill
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 41
- 238000000034 method Methods 0.000 title claims abstract description 26
- 239000000463 material Substances 0.000 claims abstract description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 30
- 229910052742 iron Inorganic materials 0.000 claims description 15
- 238000001514 detection method Methods 0.000 claims description 3
- 238000006073 displacement reaction Methods 0.000 claims description 3
- 239000004576 sand Substances 0.000 claims description 3
- 230000002159 abnormal effect Effects 0.000 abstract description 3
- 230000001502 supplementing effect Effects 0.000 description 6
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000032683 aging Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000018109 developmental process Effects 0.000 description 1
- 206010016256 fatigue Diseases 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Earth Drilling (AREA)
- Processing Of Stones Or Stones Resemblance Materials (AREA)
- Drilling And Boring (AREA)
Abstract
本发明公开了一种智能钻井方法,包括以下步骤:S1,设计井身结构:Φ444.5mm钻头*1115m+311.2*3225m+215.9*5900m;S2,根据S1设计的数据,准备好上述材料后,钻井工艺工序实现自动操作至完井。本发明只需要一个人输入程序和维护,效率高而且节约劳动力,自动化程度高,可以离线操作或者远程控制,无人则安,人员技能要求高,人员数量需求少,参数异常时及时报警处理。
Description
技术领域
本发明涉及页岩气勘探开发领域,特别涉及一种智能钻井方法。
背景技术
当前传统石油钻井工艺,是根据设计,安排操作人员一步步人工去完成每一项工艺工序,人员操作一方面会有失误,疲惫,每步工序的链接等一系列不连续性,钻井时效非常低下,制约了石油天然气的开采效率,另一方面存在安全隐患,可能发生安全隐患。
发明内容
针对上述缺陷,本发明提供一种智能钻井方法,该方法只需要一个人输入程序和维护,效率高而且节约劳动力,自动化程度高,可以离线操作或者远程控制,无人则安,人员技能要求高,人员数量需求少,参数异常时及时报警处理。
技术方案是:一种智能钻井方法,包括以下步骤:
S1,设计井身结构:Φ444.5mm钻头*1115m+311.2*3225m+215.9*5900m,第一步钻头通过机械臂、传感器选择444.5mm钻头放进钻头盒,设计第一趟钻钻具组合为:钻头+双母+9″钻铤,实际机械臂通过传感器抓一柱9″钻铤放至顶驱吊卡,吊卡关闭,机械臂松开,顶驱上提至预定位置,机械臂再抓双母至钻台面的对扣器上,下放钻铤对扣,铁钻工移至钻具位置引扣上扣至最佳扭矩,铁钻工离开至原位。双母与钻头引扣、铁钻工移至钻具位置上扣至最佳扭矩,铁钻工离开至原位。顶驱下移、旋扣、上扣至设定扭矩,上提钻具,钻头盒移开至安全位置。移开转盘补芯,下放钻头,钻头通过转盘面后,转盘补芯(钻头的大小能通过转盘补芯时取消该步骤,直接下放钻具)执行探底操作步骤,开泵、观察悬重,悬重持续增加视为到底,上提2米,转速30转下放到底,钻进1-2米后,排量和转速加之钻进时参数,钻进工序、循环举砂工序、接立柱工序都模块自动化。
本发明的有益效果:
本发明只需要一个人输入程序和维护,效率高而且节约劳动力,自动化程度高,可以离线操作或者远程控制,无人则安,人员技能要求高,人员数量需求少,参数异常时及时报警处理。
具体实施方式
下面将结合实施例对本发明作进一步说明。
实施例1
一种智能钻井方法,包括以下步骤:
S1,设计井身结构:Φ444.5mm钻头*1115m+311.2*3225m+215.9*5900m,第一步钻头通过机械臂、传感器选择444.5mm钻头放进钻头盒,设计第一趟钻钻具组合为:钻头+双母+9″钻铤,实际机械臂通过传感器抓一柱9″钻铤放至顶驱吊卡,吊卡关闭,机械臂松开,顶驱上提至预定位置,机械臂再抓双母至钻台面的对扣器上,下放钻铤对扣,铁钻工移至钻具位置引扣上扣至最佳扭矩,铁钻工离开至原位。双母与钻头引扣、铁钻工移至钻具位置上扣至最佳扭矩,铁钻工离开至原位。顶驱下移、旋扣、上扣至设定扭矩,上提钻具,钻头盒移开至安全位置。移开转盘补芯,下放钻头,钻头通过转盘面后,转盘补芯(钻头的大小能通过转盘补芯时取消该步骤,直接下放钻具)执行探底操作步骤,开泵、观察悬重,悬重持续增加视为到底,上提2米,转速30转下放到底,钻进1-2米后,排量和转速加之钻进时参数,钻进工序、循环举砂工序、接立柱工序都模块自动化。
S2,根据S1设计的数据,准备好上述材料后(比如钻头设计需要Φ444.5mm,双母需要730*630,钻铤需要9″防止钻台,通过钻台传感器和机械臂、顶驱、绞车配合实现自动组合钻具下钻、探底、钻进),钻井工艺工序实现自动操作至完井。
以上所述仅为本发明的优选实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (1)
1.一种智能钻井方法,包括以下步骤:S1,设计井身结构:Φ444.5mm钻头*1115m+311.2*3225m+215.9*5900m,第一步钻头通过机械臂、传感器选择444.5mm钻头放进钻头盒,设计第一趟钻钻具组合为:钻头+双母+9″钻铤,实际机械臂通过传感器抓一柱9″钻铤放至顶驱吊卡,吊卡关闭,机械臂松开,顶驱上提至预定位置,机械臂再抓双母至钻台面的对扣器上,下放钻铤对扣,铁钻工移至钻具位置引扣上扣至最佳扭矩,铁钻工离开至原位。双母与钻头引扣、铁钻工移至钻具位置上扣至最佳扭矩,铁钻工离开至原位。顶驱下移、旋扣、上扣至设定扭矩,上提钻具,钻头盒移开至安全位置。移开转盘补芯,下放钻头,钻头通过转盘面后,转盘补芯执行探底操作步骤,开泵、观察悬重,悬重持续增加视为到底,上提2米,转速30转下放到底,钻进1-2米后,排量和转速加之钻进时参数,钻进工序、循环举砂工序、接立柱工序都模块自动化;S2,根据S1设计的数据,准备好上述材料后,钻井工艺工序实现自动操作至完井。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011022451.7A CN112145072A (zh) | 2020-09-25 | 2020-09-25 | 一种智能钻井方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011022451.7A CN112145072A (zh) | 2020-09-25 | 2020-09-25 | 一种智能钻井方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112145072A true CN112145072A (zh) | 2020-12-29 |
Family
ID=73898037
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011022451.7A Pending CN112145072A (zh) | 2020-09-25 | 2020-09-25 | 一种智能钻井方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112145072A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113112639A (zh) * | 2021-05-20 | 2021-07-13 | 宏华油气工程技术服务有限公司 | 一种适用于石油钻井的参数记录系统及其方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101737003A (zh) * | 2008-11-15 | 2010-06-16 | 王来朋 | 一种液压步履式大口径龙门桩机 |
CN105672874A (zh) * | 2016-02-05 | 2016-06-15 | 四川宏华石油设备有限公司 | 一种自动化钻机 |
WO2019173840A1 (en) * | 2018-03-09 | 2019-09-12 | Schlumberger Technology Corporation | Integrated well construction system operations |
-
2020
- 2020-09-25 CN CN202011022451.7A patent/CN112145072A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101737003A (zh) * | 2008-11-15 | 2010-06-16 | 王来朋 | 一种液压步履式大口径龙门桩机 |
CN105672874A (zh) * | 2016-02-05 | 2016-06-15 | 四川宏华石油设备有限公司 | 一种自动化钻机 |
WO2019173840A1 (en) * | 2018-03-09 | 2019-09-12 | Schlumberger Technology Corporation | Integrated well construction system operations |
Non-Patent Citations (2)
Title |
---|
朱云祖: "《国外油气新科技丛书自动化钻井技术译文集》", 31 May 1993, 石油工业出版社 * |
王登文: "《油田生产安全技术》", 31 May 2003, 中国石化出版社 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113112639A (zh) * | 2021-05-20 | 2021-07-13 | 宏华油气工程技术服务有限公司 | 一种适用于石油钻井的参数记录系统及其方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2947694C (en) | Interlock system and method for drilling rig | |
AU2010218497B2 (en) | Method for withdrawal and insertion of a drill pipe string in a borehole and also a device for use when practising the method | |
US10697257B2 (en) | Interlock system and method for a drilling rig | |
CN202131976U (zh) | 全液压齿轮齿条钻机 | |
US20120000671A1 (en) | Method for Withdrawal and Insertion of a Drill Pipe String in a Borehole and Also a Device for Use When Practising the Method | |
US8960324B2 (en) | Top drive with automatic anti-rotation safety control | |
CN111911097A (zh) | 一种油田大修井作业自动化操作系统及操作方法 | |
CN110454100A (zh) | 一种钻修井超级单根作业工业机器人装置和方法 | |
CN112145072A (zh) | 一种智能钻井方法 | |
CN106481290A (zh) | 一种油田修井作业自动化设备 | |
US20130133899A1 (en) | Top drive with automatic positioning system | |
CN102505920B (zh) | 双卷扬液压升降钻塔 | |
CN103132983A (zh) | 石油钻机自动送钻控制系统 | |
CN210317200U (zh) | 油田修井用小修作业设备 | |
CN210564414U (zh) | 一种钻修井超级单根作业工业机器人装置 | |
CN204691662U (zh) | 一种复合式工程钻机 | |
Reid | The development of automated drilling rigs | |
CN110984924B (zh) | 一种易钻磨裸眼完井管柱施工方法 | |
CN103132978A (zh) | 石油钻机钻柱的升降控制系统 | |
Kennett et al. | The Design of an Automated Drilling Rig: RA-D | |
CN206144459U (zh) | 一种顶驱式岩心钻机 | |
CN218000958U (zh) | 一种可查找钻杆立柱内异物的装置 | |
CN212774109U (zh) | 一种模拟石油钻机电动转盘驱动及负载的实验装置 | |
CN110217733B (zh) | 一种煤层气、油气井下管柱提升设备 | |
Bromell | Automation in drilling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201229 |
|
RJ01 | Rejection of invention patent application after publication |