CN112144545A - Cantilever combined type foundation pit supporting mechanism and combined construction method - Google Patents

Cantilever combined type foundation pit supporting mechanism and combined construction method Download PDF

Info

Publication number
CN112144545A
CN112144545A CN202011165102.0A CN202011165102A CN112144545A CN 112144545 A CN112144545 A CN 112144545A CN 202011165102 A CN202011165102 A CN 202011165102A CN 112144545 A CN112144545 A CN 112144545A
Authority
CN
China
Prior art keywords
pile
supporting
piles
supporting piles
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011165102.0A
Other languages
Chinese (zh)
Inventor
胡家平
胡家旭
刘代林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Baolitong Foundation Engineering Co ltd
Original Assignee
Shanghai Baolitong Foundation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Baolitong Foundation Engineering Co ltd filed Critical Shanghai Baolitong Foundation Engineering Co ltd
Priority to CN202011165102.0A priority Critical patent/CN112144545A/en
Publication of CN112144545A publication Critical patent/CN112144545A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/02Foundation pits
    • E02D17/04Bordering surfacing or stiffening the sides of foundation pits
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a cantilever combined type foundation pit supporting mechanism and a combined construction method, wherein the mechanism comprises a plurality of groups of vertical supporting piles and inclined supporting piles which are matched for use, wherein one pile side wall slot is formed in two opposite side walls of each vertical supporting pile in a staggered mode, the two staggered pile side walls are communicated, and the inclined supporting piles are matched to penetrate through the two pile side wall slots in an inclined mode; two beam crowns are arranged on the top ends of the multiple groups of vertical supporting piles and the oblique supporting piles in parallel, and a plurality of connecting beams are arranged between the two beam crowns in parallel to fix the vertical supporting piles and the oblique supporting piles. Through the combination of the vertical supporting piles and the oblique supporting piles, an integral stress system is formed, and no additional support is required to be arranged; the slant fender pile is all buried inside the soil body, so the earthwork excavation is comparatively convenient, and the vertical fender pile can adopt cantilever excavation.

Description

Cantilever combined type foundation pit supporting mechanism and combined construction method
Technical Field
The invention belongs to the field of building construction, and particularly relates to a cantilever combined type foundation pit supporting mechanism and a combined construction method.
Background
In the construction of the pile by the conventional SMW (soil Mixing wall) method, no additional connection exists between the H-shaped steel and the crown beam, and when the crown beam is subjected to a large vertical jacking force, the H-shaped steel can be separated from the crown beam.
When carrying out foundation ditch support system construction, conventional fender pile need set up horizontal brace or diagonal bracing, can cause the rise of cost like this on the one hand, and on the other hand, the existence of support can lead to the fact the hindrance to the earthwork excavation and the underground structure construction in later stage, slows down the construction progress.
Disclosure of Invention
In order to overcome the defects of the prior art, the invention aims to provide a cantilever combined type foundation pit supporting mechanism and a combined construction method, namely, a combined type structure is provided, and the cantilever of the foundation pit is excavated by combining and assembling support piles to form a whole, so that the problems are solved.
The purpose of the invention is realized by adopting the following technical scheme:
a cantilever combined type foundation pit supporting mechanism comprises a plurality of groups of vertical supporting piles and inclined supporting piles which are matched for use, wherein a pile side wall slot is formed in two opposite side walls of each vertical supporting pile in a staggered mode, the two staggered pile side walls are communicated with each other, and the inclined supporting piles are matched and obliquely inserted into the two pile side wall slots; the top ends of the vertical supporting piles and the inclined supporting piles are parallelly provided with two beam crowns, and a plurality of connecting beams are parallelly arranged between the two beam crowns to fix the vertical supporting piles and the inclined supporting piles.
Preferably, a bottom sealing steel plate for plugging is arranged at the bottom of the vertical support pile.
Preferably, a breakable baffle is arranged on the opening groove of the side wall of the pile.
Preferably, the vertical support piles are hollow square steel.
Preferably, the oblique supporting piles are made of square steel or round steel.
The combined construction method of the supporting mechanism comprises the following steps: s1, driving vertical support piles, and driving a proper number of vertical support piles according to the position of the foundation pit; s2, driving the oblique supporting pile at a matched angle and distance according to the driven vertical supporting pile, and ensuring that the oblique supporting pile obliquely penetrates through the vertical supporting pile after being slotted through the side wall of the pile; s3, fixing the supporting piles, and filling micro-expansion concrete from the top of the vertical supporting pile to the inside so as to fix the vertical supporting pile and the inclined supporting pile into a whole; and S4, after the construction of a row of supporting piles is finished, pouring crown beams of reinforced concrete on the tops of the vertical supporting piles and the inclined supporting piles, and connecting the two crown beams together through connecting beams to finish the construction of the supporting mechanism.
Compared with the prior art, the invention has the beneficial effects that: can conveniently strut system construction and earthwork excavation through this scheme: 1, forming an integral stress system by combining vertical support piles and oblique support piles without arranging additional supports; 2, because the slant fender pile is whole to be buried inside the soil body, therefore the earthwork excavation is comparatively convenient, and vertical fender pile can adopt the cantilever excavation.
Drawings
Fig. 1 and 2 are schematic views of a vertical support pile;
FIG. 3 is a schematic view of a combination of vertical support piles and diagonal support piles;
FIG. 4 is a schematic view of the overall assembly of the support mechanism;
fig. 5 is a schematic application scenario section of the supporting mechanism.
In the figure: 1. vertically supporting piles; 2. grooving the side wall of the pile; 3. a baffle plate; 4. a bottom sealing steel plate; 5. obliquely supporting piles; 6. a crown beam; 7. and (5) connecting the beams.
Detailed Description
In order to make the objects, technical solutions and advantages of the embodiments of the present invention clearer, the technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are some, but not all, embodiments of the present invention. All other embodiments, which can be obtained by a person skilled in the art without any inventive step based on the embodiments of the present invention, are within the scope of the present invention.
A cantilever combined type foundation pit supporting mechanism is disclosed, and referring to fig. 1-5, the mechanism comprises a plurality of groups of vertical supporting piles 1 and inclined supporting piles 5 which are matched for use, wherein one pile side wall slot 2 is formed in two opposite side walls of each vertical supporting pile 1 in a staggered mode, the two staggered pile side wall slots 2 are communicated, and the inclined supporting piles 5 are inserted into the two pile side wall slots 2 in a matched and inclined mode; the top ends of the vertical supporting piles 1 and the oblique supporting piles 5 are parallelly provided with two beam crowns 6, and a plurality of connecting beams 7 are parallelly arranged between the two beam crowns 6 to fix the vertical supporting piles 1 and the oblique supporting piles 5.
And a bottom sealing steel plate 4 for plugging is arranged at the bottom of the vertical support pile 1.
And a breakable baffle 3 is arranged on the pile side wall slot 2.
The vertical supporting piles 1 are made of hollow square steel.
The oblique supporting piles 5 are made of square steel or round steel.
Specifically, the side walls at two ends of the vertical supporting pile 1 are grooved to form pile side wall grooves 2 which are relatively staggered and run through, and the vertical supporting pile can be used for inserting the oblique supporting pile 5. Vertical fender pile 1 is squeezed into earlier during the construction, in order to avoid this in-process soil body to get into, sets up baffle 3 at the lateral wall both ends and seals, and the material of baffle 3 can adopt hard board or plastic slab, pastes on the lateral wall of vertical fender pile 1 to adopt back cover steel sheet 4 to carry out the back cover in the bottom. After the vertical supporting piles 1 are driven into the soil, the inclined supporting piles 5 are driven into the soil from one side at a certain angle, the inclined supporting piles 5 penetrate through the baffle 3 and then penetrate through the vertical supporting piles 1, and then the vertical supporting piles 1 are filled with micro-expansion concrete, so that the vertical supporting piles 1 and the inclined supporting piles 5 form a whole. After the construction of a row of supporting piles is finished, reinforced concrete crown beams 6 are poured on the tops of the supporting piles, and then the front crown beams and the rear crown beams 6 are connected together through connecting beams 7. Thus, the combined supporting structure is constructed, and cantilever excavation can be carried out on foundation pit engineering.
Finally, it should be noted that: the above examples are only intended to illustrate the technical solution of the present invention, but not to limit it; although the present invention has been described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: the technical solutions described in the foregoing embodiments may still be modified, or some technical features may be equivalently replaced; and such modifications or substitutions do not depart from the spirit and scope of the corresponding technical solutions of the embodiments of the present invention.

Claims (6)

1. The utility model provides a cantilever combination formula excavation supporting mechanism which characterized in that: the mechanism comprises a plurality of groups of vertical supporting piles (1) and inclined supporting piles (5) which are matched for use, wherein one pile side wall slot (2) is formed in two opposite side walls of each vertical supporting pile (1) in a staggered mode, the two staggered pile side wall slots (2) are communicated, and the inclined supporting piles (5) are inserted into the two pile side wall slots (2) in a matched, penetrating and inclined mode; the top parallel of the top of vertical supporting piles (1) and the top parallel of slant supporting piles (5) are provided with two beam crowns (6), and two parallel between the beam crowns (6) are provided with a plurality of connecting beams (7) to fix the vertical supporting piles (1) and the slant supporting piles (5).
2. The cantilever combined type foundation pit supporting mechanism according to claim 1, wherein: and a bottom sealing steel plate (4) for plugging is arranged at the bottom of the vertical support pile (1).
3. The cantilever combined type foundation pit supporting mechanism according to claim 1, wherein: and a breakable baffle (3) is arranged on the pile side wall slot (2).
4. The cantilever combined type foundation pit supporting mechanism according to claim 1, wherein: the vertical supporting piles (1) are made of hollow square steel.
5. The cantilever combined type foundation pit supporting mechanism according to claim 1, wherein: the oblique supporting piles (5) are made of square steel or round steel.
6. A method of assembling a retaining and protecting structure according to any one of claims 1 to 5, the method including:
s1, driving vertical supporting piles (1), and driving a proper number of vertical supporting piles (1) according to the position of the foundation pit;
s2, driving the oblique supporting pile (5) obliquely according to the driven vertical supporting pile (1) at a matched angle and distance, and ensuring that the oblique supporting pile (5) obliquely penetrates through the vertical supporting pile (1) after passing through the pile side wall slot (2);
s3, fixing the supporting piles, and filling micro-expansion concrete from the top of the vertical supporting pile (1) to the inside so as to fix the vertical supporting pile (1) and the oblique supporting pile (5) into a whole;
and S4, after the construction of a row of supporting piles is finished, pouring reinforced concrete crown beams (6) on the tops of the vertical supporting piles (1) and the inclined supporting piles (5), and then connecting the two crown beams (6) together through connecting beams (7) to finish the construction of the supporting mechanism.
CN202011165102.0A 2020-10-27 2020-10-27 Cantilever combined type foundation pit supporting mechanism and combined construction method Pending CN112144545A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011165102.0A CN112144545A (en) 2020-10-27 2020-10-27 Cantilever combined type foundation pit supporting mechanism and combined construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011165102.0A CN112144545A (en) 2020-10-27 2020-10-27 Cantilever combined type foundation pit supporting mechanism and combined construction method

Publications (1)

Publication Number Publication Date
CN112144545A true CN112144545A (en) 2020-12-29

Family

ID=73953656

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011165102.0A Pending CN112144545A (en) 2020-10-27 2020-10-27 Cantilever combined type foundation pit supporting mechanism and combined construction method

Country Status (1)

Country Link
CN (1) CN112144545A (en)

Similar Documents

Publication Publication Date Title
CN108278116B (en) Shallow-buried large-span pipe curtain supporting system and construction method thereof
CN211257007U (en) A supporting construction for building foundation ditch construction
CN112832257A (en) Foundation pit enclosure type LHW construction method
CN213448494U (en) Deep foundation pit supporting structure with single-row piles, double-row piles and inner supports coordinated with each other
CN110777802A (en) Deep foundation pit high-low span supporting structure and construction method thereof
CN110777806B (en) Multi-connecting-rod plane frame permanent supporting structure and construction process thereof
CN113550322A (en) Enclosure system next to deep and shallow foundation pit and construction method
CN110468873B (en) Underpinning structure for abutment pile foundation in small space and using method
CN109083128B (en) Profile steel upright assembled underground continuous wall with high bearing capacity
CN112144545A (en) Cantilever combined type foundation pit supporting mechanism and combined construction method
CN213805411U (en) Cantilever combination formula excavation supporting mechanism
CN105804085A (en) Divisional construction method of multi-unit shaft-type underground stereo garage
KR20190002845U (en) Braced wall
CN211080247U (en) Oblique cement soil mixing pile foundation pit supporting system
CN210887256U (en) Straight combined sheet pile-ground wall-connecting type frame of water retaining cofferdam
CN210216457U (en) Soft soil foundation deep foundation pit supporting structure
JP2014125728A (en) Structure of wall body
KR102194381B1 (en) Pile for Earth self-retaining wall using double I beam
JPH0559728A (en) Sheathing work above underground structure
CN212427117U (en) Foundation ditch stagnant water supporting construction
CN212316942U (en) Inclined support foundation pit supporting system
CN210177517U (en) Offshore deep foundation pit pile-wall integrated enclosure structure
CN214401801U (en) Strut and block integrated enclosure system for firstly supporting and then digging water stopping groove piles and inclined tubular piles
CN218148236U (en) Cofferdam and drilling platform integrated system
CN212026277U (en) Foundation pit supporting pile

Legal Events