CN112135453A - Engineering project progress management structure in construction - Google Patents
Engineering project progress management structure in construction Download PDFInfo
- Publication number
- CN112135453A CN112135453A CN202011020374.1A CN202011020374A CN112135453A CN 112135453 A CN112135453 A CN 112135453A CN 202011020374 A CN202011020374 A CN 202011020374A CN 112135453 A CN112135453 A CN 112135453A
- Authority
- CN
- China
- Prior art keywords
- module
- plate
- base
- project progress
- side plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K5/00—Casings, cabinets or drawers for electric apparatus
- H05K5/02—Details
- H05K5/0217—Mechanical details of casings
- H05K5/0234—Feet; Stands; Pedestals, e.g. wheels for moving casing on floor
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K5/00—Casings, cabinets or drawers for electric apparatus
- H05K5/02—Details
- H05K5/0217—Mechanical details of casings
- H05K5/0226—Hinges
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K5/00—Casings, cabinets or drawers for electric apparatus
- H05K5/02—Details
- H05K5/03—Covers
-
- H—ELECTRICITY
- H05—ELECTRIC TECHNIQUES NOT OTHERWISE PROVIDED FOR
- H05K—PRINTED CIRCUITS; CASINGS OR CONSTRUCTIONAL DETAILS OF ELECTRIC APPARATUS; MANUFACTURE OF ASSEMBLAGES OF ELECTRICAL COMPONENTS
- H05K7/00—Constructional details common to different types of electric apparatus
- H05K7/20—Modifications to facilitate cooling, ventilating, or heating
- H05K7/20009—Modifications to facilitate cooling, ventilating, or heating using a gaseous coolant in electronic enclosures
- H05K7/20136—Forced ventilation, e.g. by fans
Landscapes
- Engineering & Computer Science (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses an engineering project progress management structure in building construction, which comprises a base, wherein a side plate is arranged above the base, an L-shaped plate is welded on the side wall of the side plate, the L-shaped plate is fixed on the side wall of the base through a plurality of locking screws, an upper cover plate is arranged at the upper end of the L-shaped plate, the upper cover plate is fixedly connected to the upper end face of the side plate through screws, a negative pressure fan is arranged on the outer side wall of the side plate, a ventilation pipe is fixedly connected to the inner wall of the side plate and is arranged in the vertical direction, the ventilation pipe is communicated with the input end of the negative pressure fan, and a plurality of air inlet nozzles communicated with the ventilation. The invention has reasonable structural design, is convenient for the assembly of a management mechanism, can effectively prevent dust, and ensures that personnel calling the information in the management equipment need to be audited by adding the face identification module, the fingerprint identification module and the identity card reading module, thereby having good confidentiality effect.
Description
Technical Field
The invention relates to the technical field of management mechanisms, in particular to a project progress management structure in building construction.
Background
Along with the development of national economic construction, various infrastructures are developed in various places, the construction industry is increasingly popular, the current construction progress is managed in a planned mode, the working efficiency can be effectively improved, the construction period is reasonably planned, the construction quality is improved, the construction progress is accelerated, workers are guided, the construction risk is reduced, the safety construction consciousness is improved, reasonable and orderly construction is achieved, however, the current constructor usually adopts a computer to print the construction progress management and attaches the computer to the site for publicity, the method does not have corresponding protection on the progress, the progress cannot be stored for a long time, the practicability is not high, the technology of the management device is improved, the construction progress supervision is better, and the better development of construction enterprises is promoted.
And the administrative mechanism among the prior art is mostly the steel sheet welding, and high in manufacturing cost, and difficult installation, generally adopts ordinary airstrainer to the filtration of outside air among the prior art, and its filter effect is poor, can not effectively solve a large amount of accumulations's of the inside dust of administrative mechanism and suspended particles problem, and has certain information security problem, easily leads to information leakage.
Disclosure of Invention
The invention aims to solve the defects in the prior art, and provides an engineering project progress management structure in building construction, which is characterized in that a side plate is vertically placed on a base, a limiting strip is inserted into a 'U' -shaped groove, an L-shaped plate is fixed with the base through a locking screw, an upper cover plate is fixed at the upper end of the side plate through a screw after the side plate is fixed, and a cabinet door is arranged on the side wall of the side plate through a hinge, so that the electric cabinet is convenient to install and use; the ventilation pipe is fixed on the inner wall of the side plate, the negative pressure fan is arranged on the outer side wall of the side plate, the output end of the negative pressure fan is connected with the ventilation pipe, and effective dust prevention is achieved through the double pipes; through adding facial recognition module, fingerprint identification module and ID card reading module, make the personnel of the interior information of transfer management equipment need be examined and verified, play good secret effect.
In order to achieve the purpose, the invention adopts the following technical scheme:
the utility model provides an engineering project progress management structure in construction, includes the base, the top of base is provided with the curb plate, the lateral wall welding of curb plate has the L shaped plate, the L shaped plate is fixed on the lateral wall of base through a plurality of locking screws, the upper end of L shaped plate is equipped with the upper cover plate, the upper cover plate passes through screw fixed connection at the up end of curb plate, negative-pressure air fan is installed to the lateral wall of curb plate, the inner wall fixedly connected with of curb plate is along the ventilation pipe that vertical direction set up, the ventilation pipe with negative-pressure air fan's input intercommunication, install a plurality of air inlet spouts rather than the intercommunication on the ventilation pipe.
Preferably, the upper end surface of the base is provided with a ' shaped groove ', the lower end of the side plate is welded with a limiting strip corresponding to the ' shaped groove, and the limiting strip is arranged in the ' shaped groove '.
Preferably, the corners of the L-shaped plate are chamfered.
Preferably, a stainless steel handle is installed on the cabinet door, an insulating rubber sleeve is glued on the stainless steel handle, and anti-skid grains are arranged on the surface of the insulating rubber sleeve.
Preferably, the lower sheet of the base is fixedly connected with a supporting leg, and the supporting leg is fixedly connected with the ground through an expansion screw.
Preferably, a cabinet door is rotatably connected to the side plate through a hinge, and the cabinet door and the side plate are both coated with antirust paint.
Preferably, the host system electricity is connected with wiFi module, power module, audio output module, encryption module, operation module and voice system, the wiFi module is used for being connected with remote terminal for remote control reads data, power module is used for supplying power to management equipment, audio output module is used for broadcasting data information, encryption module is used for encrypting the information in the management equipment, operation module is used for manual operation to control management equipment, voice system is used for handling input or output management equipment's pronunciation and saves.
Preferably, the encryption module is electrically connected with an identity information registration module and an execution module, the identity information registration module is used for acquiring identity information of an operator and processing data of the operator, and is used for storing the operator information, acquiring corresponding identity information and service information, and sending a corresponding instruction to a relevant execution mechanism, and the execution module is used for executing the instruction of the operation module.
Preferably, the identity information registration module includes a face recognition module, a fingerprint recognition module and an identity card reading module, the face recognition module includes a static and dynamic image acquisition device and a data processing unit, and is used for capturing a static or dynamic face image and comparing the image information with the image information stored in the memory card or the server to acquire corresponding identity information, the fingerprint recognition module is used for recording the fingerprint of the operator, and the identity card reading module is used for recording the identity card information of the operator.
Preferably, the operation module comprises a display screen and keys.
The invention has the following beneficial effects:
1. the side plates are vertically placed on the base, the limiting strips are inserted into the 'U' -shaped grooves, the L-shaped plates are fixed with the base through locking screws, after the side plates are fixed, the upper cover plate is fixed at the upper ends of the side plates through the screws, and the cabinet doors are installed on the side walls of the side plates through hinges, so that the electric cabinet is convenient to install and use;
2. the ventilation pipe is fixed on the inner wall of the side plate, the negative pressure fan is arranged on the outer side wall of the side plate, the output end of the negative pressure fan is connected with the ventilation pipe, and effective dust prevention is achieved through the double pipes;
3. through adding facial recognition module, fingerprint identification module and ID card reading module, make the personnel of the interior information of transfer management equipment need be examined and verified, play good secret effect.
Drawings
FIG. 1 is a schematic structural diagram of a construction project progress management structure in building construction according to the present invention;
FIG. 2 is an enlarged view of the structure at A in FIG. 1;
FIG. 3 is a schematic top view of a base of an engineering project progress management structure in building construction according to the present invention;
FIG. 4 is a system diagram of a project progress management structure in building construction according to the present invention;
FIG. 5 is a system diagram of an encryption module of an engineering project progress management structure in building construction according to the present invention;
fig. 6 is a system block diagram of an operation module of a project progress management structure in building construction according to the present invention.
In the figure: the air conditioner comprises a side plate 1, a negative pressure fan 2, an air inlet nozzle 3, a vent pipe 4, a cabinet door 5, an upper cover plate 6, supporting legs 7, an L-shaped plate 8, a groove 9', a limiting strip 10, a locking screw 11, a base 12 and a main control module 13.
Detailed Description
In order to make the aforementioned objects, features and advantages of the present invention comprehensible, embodiments accompanied with figures are described in detail below. In the following description, numerous specific details are set forth in order to provide a thorough understanding of the present invention. This invention may, however, be embodied in many different forms and should not be construed as limited to the embodiments set forth herein, but rather should be construed as broadly as the present invention is capable of modification in various respects, all without departing from the spirit and scope of the present invention.
It will be understood that when an element is referred to as being "secured to" another element, it can be directly on the other element or intervening elements may also be present. When an element is referred to as being "connected" to another element, it can be directly connected to the other element or intervening elements may also be present. The terms "vertical," "horizontal," "left," "right," and the like as used herein are for illustrative purposes only and do not represent the only embodiments.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terminology used in the description of the invention herein is for the purpose of describing particular embodiments only and is not intended to be limiting of the invention. As used herein
The term "and/or" includes any and all combinations of one or more of the associated listed items.
Referring to fig. 1-6, an engineering project progress management structure in building construction comprises a base 12, a side plate 1 is arranged above the base 12, a't-shaped groove 9' is formed in the upper end face of the base 12, a limiting strip 10 corresponding to the't-shaped groove 9' in position is welded to the lower end of the side plate 1, the limiting strip 10 is arranged in the't-shaped groove 9', the side plate 1 is vertically placed on the base 12, the limiting strip 10 is inserted into the't-shaped groove 9', and then an L-shaped plate 8 and the base 12 are fixed through a locking screw 11.
The side wall of the side plate 1 is welded with an L-shaped plate 8, and the corners of the L-shaped plate 8 are chamfered.
The cabinet door 5 is rotatably connected to the side plate 1 through a hinge, the cabinet door 5 and the side plate 1 are coated with antirust paint, a stainless steel handle is mounted on the cabinet door 5, an insulating rubber sleeve is glued to the stainless steel handle, and anti-skid lines are arranged on the surface of the insulating rubber sleeve.
The lower sheet of the base 12 is fixedly connected with a supporting leg 7, and the supporting leg is fixedly connected with the ground through an expansion screw.
L shaped plate 8 is fixed on the lateral wall of base 12 through a plurality of locking screw 11, the upper end of L shaped plate 8 is equipped with upper cover plate 6, upper cover plate 6 passes through screw fixed connection at the up end of curb plate 1, negative-pressure air fan 2 is installed to the lateral wall of curb plate 1, the ventilation pipe 4 that the inner wall fixedly connected with of curb plate 1 set up along vertical direction, ventilation pipe 4 and negative-pressure air fan 2's input intercommunication, install a plurality of air inlet nozzle 3 rather than the intercommunication on ventilation pipe 4, wherein air inlet nozzle 3 department installs the filter bed, and the filter bed material is dustproof sponge, the lower extreme of upper cover plate 6 is located fixedly connected with main control module 13 between two curb plates 1, ventilation pipe 4 is fixed on the inner wall of curb plate 1, and install negative-pressure air fan 2 on the lateral wall of curb plate 1, be connected negative-pressure air fan 2's output and ventilation pipe.
The main control module 13 is electrically connected with a WiFi module, a power supply module, an audio output module, an encryption module, an operation module and a voice system, the WiFi module is used for being connected with a remote terminal and used for remotely controlling and reading data, the power supply module is used for supplying power to the management equipment, the audio output module is used for broadcasting data information, the encryption module is used for encrypting information in the management equipment, the operation module is used for manually operating and controlling the management equipment, and the voice system is used for processing and storing voice input or output of the management equipment.
The encryption module is electrically connected with an identity information registration module and an execution module, the identity information registration module is used for acquiring the identity information of the operator and processing data, the identity information registration module is used for storing the information of the operator, acquiring corresponding identity information and service information and sending a corresponding instruction to a relevant execution mechanism, and the execution module is used for executing the instruction of the operation module.
Identity information registration module includes facial recognition module, fingerprint identification module and ID card read module, facial recognition module includes static state, dynamic image collection system and data processing unit, be used for catching static state or dynamic people's facial image and compare with the image information of storage in memory card or the server, acquire corresponding identity information, fingerprint identification module is used for acceping operating personnel's fingerprint, identity read module is used for acceping operating personnel's ID card information, through increasing facial recognition module, fingerprint identification module and ID card read module, make the personnel of the interior information of transfer management equipment need be examined and examined, play good secret effect.
The operation module comprises a display screen and keys.
When the management mechanism is installed, an operator firstly fixedly connects the supporting legs 7 at the lower end of the base 12 with the ground through expansion screws, then vertically places the side plate 1 on the base 12, inserts the limiting strips 10 into the 'U' -shaped grooves 9, then fixes the L-shaped plate 8 with the base 12 through the locking screws 11, fixes the side plate 1, fixes the upper cover plate 6 at the upper end of the side plate 1 through screws, installs the cabinet door 5 on the side wall of the side plate 1 through hinges, namely, completes the installation of the management mechanism, fixes the ventilation pipe 4 on the inner wall of the side plate 1, installs the negative pressure fan 2 on the outer side wall of the side plate 1, connects the output end of the negative pressure fan 2 with the ventilation pipe 4, achieves effective dust prevention through double pipes, and enables personnel who call information in the management device to be audited through adding the face identification module, the fingerprint identification module and the identity card reading module, has good secrecy effect.
The above description is only for the preferred embodiment of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the technical scope of the present invention, and the technical solutions and the inventive concepts thereof according to the present invention should be equivalent or changed within the scope of the present invention.
Claims (10)
1. The utility model provides an engineering project progress management structure in construction, includes base (12), its characterized in that, the top of base (12) is provided with curb plate (1), the lateral wall welding of curb plate (1) has L shaped plate (8), L shaped plate (8) are fixed on the lateral wall of base (12) through a plurality of locking screw (11), the upper end of L shaped plate (8) is equipped with upper cover plate (6), upper cover plate (6) are through screw fixed connection at the up end of curb plate (1), negative-pressure air fan (2) are installed to the lateral wall of curb plate (1), the inner wall fixedly connected with of curb plate (1) is along ventilation pipe (4) that vertical direction set up, ventilation pipe (4) with the input intercommunication of negative-pressure air fan (2), install a plurality of air inlet nozzles (3) rather than the intercommunication on ventilation pipe (4), the lower extreme of upper cover plate (6) is located fixedly connected with main control module (13) between two curb plates (1) .
2. The construction project progress management structure in building construction according to claim 1, wherein the upper end surface of the base (12) is provided with a "" shaped groove (9), the lower end of the side plate (1) is welded with a limiting strip (10) corresponding to the "" shaped groove (9), and the limiting strip (10) is arranged in the "" shaped groove (9).
3. The structure for managing the progress of a project in building construction according to claim 1, wherein the corners of the L-shaped plate (8) are chamfered.
4. The construction project progress management structure in building construction according to claim 2, characterized in that a cabinet door (5) is rotatably connected to the side plate (1) through a hinge, and the cabinet door (5) and the side plate (1) are both coated with antirust paint.
5. The project progress management structure in building construction according to claim 1, characterized in that the lower sheet of the base (12) is fixedly connected with a support leg (7), and the support leg is fixedly connected with the ground through an expansion screw.
6. The project progress management structure in building construction according to claim 1, characterized in that a stainless steel handle is installed on the cabinet door (5), an insulating rubber sleeve is glued on the stainless steel handle, and the surface of the insulating rubber sleeve is provided with anti-skid lines.
7. The construction project progress management structure in the building construction according to claim 1, characterized in that the main control module (13) is electrically connected with a WiFi module, a power supply module, an audio output module, an encryption module, an operation module and a voice system, the WiFi module is used for being connected with a remote terminal and being used for remotely controlling and reading data, the power supply module is used for supplying power to the management device, the audio output module is used for broadcasting data information, the encryption module is used for encrypting information in the management device, the operation module is used for manually operating to control the management device, and the voice system is used for processing and storing voice input or output to the management device.
8. The construction project progress management structure according to claim 7, wherein the encryption module is electrically connected to an identity information registration module and an execution module, the identity information registration module is used for acquiring identity information of an operator and processing data of the operator, storing the operator information, acquiring corresponding identity information and service information, and sending a corresponding instruction to a relevant execution mechanism, and the execution module is used for executing the instruction of the operation module.
9. The construction project progress management structure according to claim 8, wherein the identity information registration module includes a face recognition module, a fingerprint recognition module and an identity card reading module, the face recognition module includes a static and dynamic image acquisition device and a data processing unit, the face recognition module is used for capturing a static or dynamic human face image and comparing the static or dynamic human face image with image information stored in a memory card or a server to obtain corresponding identity information, the fingerprint recognition module is used for recording fingerprints of operators, and the identity reading module is used for recording identity card information of the operators.
10. The structure of managing the progress of an engineering project in building construction according to claim 7, wherein the operation module includes a display screen and a button.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011020374.1A CN112135453A (en) | 2020-09-25 | 2020-09-25 | Engineering project progress management structure in construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011020374.1A CN112135453A (en) | 2020-09-25 | 2020-09-25 | Engineering project progress management structure in construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112135453A true CN112135453A (en) | 2020-12-25 |
Family
ID=73840068
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011020374.1A Pending CN112135453A (en) | 2020-09-25 | 2020-09-25 | Engineering project progress management structure in construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112135453A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102745091A (en) * | 2012-07-11 | 2012-10-24 | 潍柴动力股份有限公司 | Power battery box device used for new energy automobile and control method thereof |
JP5135488B1 (en) * | 2012-06-29 | 2013-02-06 | 辰也 西野 | Loom control panel cooling device and loom equipped with the same |
CN207625722U (en) * | 2017-12-26 | 2018-07-17 | 湛江市晋盛牧业科技有限公司 | A kind of network equipment router rack |
CN109672945A (en) * | 2019-01-21 | 2019-04-23 | 刘垒 | A kind of portable intercommunication interconnection communication system |
CN110495722A (en) * | 2019-07-19 | 2019-11-26 | 新乡医学院三全学院 | One kind being based on the classifiable archive management device of artificial intelligence |
CN110785033A (en) * | 2019-09-28 | 2020-02-11 | 云梭(宁波)科技有限公司 | Network equipment fender bracket |
-
2020
- 2020-09-25 CN CN202011020374.1A patent/CN112135453A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5135488B1 (en) * | 2012-06-29 | 2013-02-06 | 辰也 西野 | Loom control panel cooling device and loom equipped with the same |
CN102745091A (en) * | 2012-07-11 | 2012-10-24 | 潍柴动力股份有限公司 | Power battery box device used for new energy automobile and control method thereof |
CN207625722U (en) * | 2017-12-26 | 2018-07-17 | 湛江市晋盛牧业科技有限公司 | A kind of network equipment router rack |
CN109672945A (en) * | 2019-01-21 | 2019-04-23 | 刘垒 | A kind of portable intercommunication interconnection communication system |
CN110495722A (en) * | 2019-07-19 | 2019-11-26 | 新乡医学院三全学院 | One kind being based on the classifiable archive management device of artificial intelligence |
CN110785033A (en) * | 2019-09-28 | 2020-02-11 | 云梭(宁波)科技有限公司 | Network equipment fender bracket |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105788040A (en) | Dynamic authorization system for office building visitors and management method | |
CN209928503U (en) | Access control system with face recognition function | |
CN106982528A (en) | Rack between a kind of light current with warning device | |
CN111583439A (en) | Intelligent management method for box-type ring main unit | |
CN112135453A (en) | Engineering project progress management structure in construction | |
CN109218039B (en) | Teleconferencing control system | |
CN207601601U (en) | Laboratory monitoring device and laboratory monitoring system | |
CN209803853U (en) | Enterprise management system | |
CN206400656U (en) | A kind of high education management personnel identification device | |
CN205719108U (en) | A kind of information communications equipment room equipment monitoring apparatus | |
CN211429430U (en) | Be applied to portable wired dolly of making a video recording in little place | |
CN210515417U (en) | Security entrance guard access control device | |
CN207457790U (en) | Guest room management and control device | |
CN209625290U (en) | A kind of entrance guard device using biological identification technology for intelligence community | |
CN209281504U (en) | A kind of integral type operation and maintenance supervising terminating machine | |
CN206773492U (en) | A kind of intelligentized meeting room | |
CN206961132U (en) | A kind of server monitoring all-in-one | |
CN217985258U (en) | Video entrance guard intercom equipment with button protection architecture | |
CN219124256U (en) | Visual intercom device for building | |
CN220357627U (en) | Multifunctional intelligent access control system for coal preparation plant | |
CN216561922U (en) | Wisdom entrance guard's device of community | |
CN211297412U (en) | Intelligent network cabinet with automatic alarm function | |
CN215450099U (en) | Natural resources engineering survey monitoring data recorder | |
CN212852956U (en) | Property management cabinet based on thing networking | |
CN216527825U (en) | Vehicle information display equipment for property management |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20201225 |
|
RJ01 | Rejection of invention patent application after publication |