CN112134633B - Resource allocation method, device, related equipment and storage medium - Google Patents
Resource allocation method, device, related equipment and storage medium Download PDFInfo
- Publication number
- CN112134633B CN112134633B CN201910556299.1A CN201910556299A CN112134633B CN 112134633 B CN112134633 B CN 112134633B CN 201910556299 A CN201910556299 A CN 201910556299A CN 112134633 B CN112134633 B CN 112134633B
- Authority
- CN
- China
- Prior art keywords
- terminal
- power
- allocated
- network device
- modulation mode
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 51
- 238000013468 resource allocation Methods 0.000 title claims abstract description 26
- 230000005540 biological transmission Effects 0.000 claims description 54
- 230000015654 memory Effects 0.000 claims description 32
- 229920006343 melt-processible rubber Polymers 0.000 claims description 30
- 238000004590 computer program Methods 0.000 claims description 18
- 230000008054 signal transmission Effects 0.000 description 17
- 238000004891 communication Methods 0.000 description 14
- 238000010586 diagram Methods 0.000 description 7
- 230000001360 synchronised effect Effects 0.000 description 6
- 230000008878 coupling Effects 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 230000003993 interaction Effects 0.000 description 2
- 238000010295 mobile communication Methods 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 238000003491 array Methods 0.000 description 1
- 235000019800 disodium phosphate Nutrition 0.000 description 1
- 230000006870 function Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 230000010363 phase shift Effects 0.000 description 1
- 238000001228 spectrum Methods 0.000 description 1
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04B—TRANSMISSION
- H04B17/00—Monitoring; Testing
- H04B17/30—Monitoring; Testing of propagation channels
- H04B17/382—Monitoring; Testing of propagation channels for resource allocation, admission control or handover
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/50—Allocation or scheduling criteria for wireless resources
- H04W72/56—Allocation or scheduling criteria for wireless resources based on priority criteria
- H04W72/563—Allocation or scheduling criteria for wireless resources based on priority criteria of the wireless resources
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
The invention discloses a resource allocation method, a resource allocation device, related equipment and a storage medium. The method comprises the following steps: allocating Resource Blocks (RBs) for a control channel of a terminal; the allocated RB is an inner RB within the corresponding channel bandwidth.
Description
Technical Field
The present invention relates to the field of wireless communications, and in particular, to a resource allocation method, apparatus, related device, and storage medium.
Background
Currently, in the fourth Generation mobile communication (4 g, fourth Generation) system, when data transmission is performed, uplink or downlink time-frequency domain physical resources are grouped into Resource Blocks (RBs), and the RBs are used as physical Resource units for scheduling and allocation. For example, when the network device needs to perform uplink scheduling on the terminal, the terminal may be allocated with a corresponding RB, so that the terminal can perform uplink signal transmission using the allocated RB.
In the above manner, in order to satisfy radio frequency indexes such as Error Vector Magnitude (EVM), the power required to be backed off when the terminal performs uplink signal transmission is large, so that the transmission power of the terminal is reduced, and the uplink coverage performance is reduced.
Disclosure of Invention
In view of this, embodiments of the present invention are intended to provide a resource allocation method, device, related apparatus, and storage medium.
In order to achieve the above purpose, the technical solution of the embodiment of the present invention is realized as follows:
the embodiment of the invention provides a resource allocation method, which is applied to first network equipment and comprises the following steps:
allocating RBs for control channels of the terminals; the allocated RB is an inner RB within the corresponding channel bandwidth.
In the above solution, when allocating an inner RB to a control channel of a terminal, the method further includes:
configuring the number of inner RBs.
The embodiment of the invention provides a resource allocation method, which is applied to second network equipment and comprises the following steps:
based on the transmission power, power level and modulation mode of the terminal, an RB allocated to a Physical Uplink Shared Channel (PUSCH) is selected as an inner RB or an outer RB.
In the above scheme, the method further comprises:
and estimating the transmitting power of the terminal.
In the foregoing scheme, the selecting the RB allocated for the PUSCH to be an inner RB or an outer RB based on the transmission power, the power class, and the modulation mode of the terminal includes:
judging whether the transmitting power of the terminal is equal to the maximum transmitting power configured for the terminal by the second network equipment;
and when the transmission power of the terminal is determined to be equal to the maximum transmission power configured for the terminal by the second network equipment, selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the obtained power level and modulation mode of the terminal.
In the foregoing scheme, the selecting the RB to be allocated for the PUSCH as an inner RB or an outer RB based on the obtained power level and modulation mode of the terminal includes:
judging whether the numerical values of Maximum Power Reduction (MPR) corresponding to the inner RB and the non-inner RB are the same or not based on the obtained Power grade and the modulation mode of the terminal;
when the value of the MPR corresponding to the inner RB and the non-inner RB is determined to be different, the RB selected and distributed for the PUSCH is the inner RB; and when the value of the MPR corresponding to the inner RB and the non-inner RB is determined to be the same, selecting the RB to be allocated for the PUSCH as the outer RB.
In the foregoing solution, the determining whether the values of the MPRs corresponding to the inner RB and the non-inner RB are the same based on the obtained power level and the obtained modulation mode of the terminal includes:
based on the obtained power grade and modulation mode of the terminal, searching a first resource difference value corresponding to the power grade and modulation mode from a resource difference table; the resource difference table stores the corresponding relation between the power grade of the terminal, the modulation mode and the resource difference value;
judging whether the first resource difference value is equal to a preset threshold value or not;
when the first resource difference value is determined to be equal to a preset threshold value, determining that the numerical values of the MPRs corresponding to the inner RB and the non-inner RB are different; otherwise, determining that the value of the MPR corresponding to the inner RB and the non-inner RB is the same.
The embodiment of the invention provides a resource allocation device, which is applied to first network equipment, and comprises:
a first allocation unit, configured to allocate RBs for a control channel of a terminal; the allocated RB is an inner RB within the corresponding channel bandwidth.
In the above scheme, when allocating inner RBs for a control channel of a terminal, the first allocating unit is further configured to allocate the number of inner RBs.
The embodiment of the invention provides a resource allocation device, which is applied to second network equipment, and comprises the following components:
and the second allocating unit is used for selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the transmitting power, the power level and the modulation mode of the terminal.
In the above scheme, the apparatus further comprises:
and the estimation unit is used for estimating the transmitting power of the terminal.
In the foregoing solution, the second allocating unit is specifically configured to determine whether the transmit power of the terminal is equal to a maximum transmit power configured for the terminal by the second network device; and when the transmission power of the terminal is determined to be equal to the maximum transmission power configured for the terminal by the second network equipment, selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the obtained power level and the modulation mode of the terminal.
In the foregoing solution, the second allocating unit is specifically configured to determine whether the values of the maximum power back-off MPRs corresponding to the inner RB and the non-inner RB are the same based on the obtained power level and the modulation mode of the terminal; when the numerical value of the MPR corresponding to the inner RB and the non-inner RB is determined to be different, the RB selected to be distributed for the PUSCH is the inner RB; and when the value of the MPR corresponding to the inner RB and the non-inner RB is determined to be the same, selecting the RB to be allocated for the PUSCH as the outer RB.
In the foregoing solution, the second allocating unit is specifically configured to search, based on the obtained power level and modulation mode of the terminal, a first resource difference value corresponding to the power level and the modulation mode from a resource difference table; the resource difference table stores the corresponding relation of the power grade, the modulation mode and the resource difference value of the terminal; judging whether the first resource difference value is equal to a preset threshold value or not; when the first resource difference value is determined to be equal to a preset threshold value, determining that the numerical values of the MPRs corresponding to the inner RB and the non-inner RB are different; otherwise, determining that the value of MPR corresponding to the inner RB and the non-inner RB is the same.
An embodiment of the present invention provides a first network device, where the first network device includes:
a first processor for allocating an RB for a control channel of a terminal; the allocated RB is an inner RB within the corresponding channel bandwidth.
In the above scheme, when inner RBs are allocated for a control channel of a terminal, the first processor is further configured to configure the number of inner RBs.
An embodiment of the present invention provides a second network device, where the second network device includes:
and the second processor is used for selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the transmission power, the power level and the modulation mode of the terminal.
In the above solution, the second processor is further configured to estimate the transmit power of the terminal.
In the foregoing solution, the second processor is specifically configured to determine whether the transmission power of the terminal is equal to a maximum transmission power configured for the terminal by the second network device; and when the transmission power of the terminal is determined to be equal to the maximum transmission power configured for the terminal by the second network equipment, selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the obtained power level and modulation mode of the terminal.
In the foregoing solution, the second processor is specifically configured to determine whether the values of the maximum power back-off MPRs corresponding to the inner RB and the non-inner RB are the same based on the obtained power level and the modulation mode of the terminal; when the numerical value of the MPR corresponding to the inner RB and the non-inner RB is determined to be different, the RB selected to be distributed for the PUSCH is the inner RB; and when the value of the MPR corresponding to the inner RB and the non-inner RB is determined to be the same, selecting the RB to be allocated for the PUSCH as the outer RB.
In the foregoing solution, the second processor is specifically configured to search, based on the obtained power level and modulation mode of the terminal, a first resource difference value corresponding to the power level and the modulation mode from a resource difference table; the resource difference table stores the corresponding relation between the power grade of the terminal, the modulation mode and the resource difference value; judging whether the first resource difference value is equal to a preset threshold value or not; when the first resource difference value is determined to be equal to a preset threshold value, determining that the numerical values of MPRs corresponding to an inner RB and a non-inner RB are different; otherwise, determining that the value of MPR corresponding to the inner RB and the non-inner RB is the same.
An embodiment of the present invention provides a first network device, including: a first processor and a first memory for storing a computer program capable of running on the processor,
wherein the first processor is configured to execute the steps of the resource allocation method at any side of the first network device when running the computer program.
An embodiment of the present invention provides a second network device, including: a second processor and a second memory for storing a computer program capable of running on the processor,
wherein the second processor is configured to execute the steps of the resource allocation method on any side of the second network device when the computer program is executed.
An embodiment of the present invention provides a storage medium, on which a computer program is stored, where the computer program, when executed by a processor, implements the steps of any one of the above first network device side resource allocation methods; or, implementing any of the above steps of the second network device side resource allocation method.
In the embodiment of the invention, the RB is distributed for the control channel of the terminal; the allocated RB is an inner RB within the corresponding channel bandwidth. By adopting the technical scheme of the embodiment of the invention, the difference of the numerical values of the MPR corresponding to the inner RB and the non-inner RB is considered, namely the MPR value corresponding to the inner RB is the minimum, so that the first network equipment allocates the inner RB to the control channel of the terminal, the terminal can realize power backoff through the minimum MPR value, and the uplink coverage performance can be further improved.
In addition, in the embodiment of the present invention, the allocated RB may also be selected as an inner RB or an outer RB for the PUSCH based on the transmission power, the power class, and the modulation mode of the terminal. By adopting the technical scheme of the embodiment of the invention, the difference of the numerical values of the MPR corresponding to the inner RB and the MPR corresponding to the non-inner RB is considered, namely the MPR value corresponding to the inner RB is minimum, and the MPR value corresponding to the edge RB is maximum, so that the second network equipment selects the RB to be allocated as the inner RB or the outer RB for the PUSCH of the terminal, and the edge RB is prohibited to be allocated, so that the terminal can realize power backoff through a smaller MPR value, and further the uplink coverage performance can be improved.
Drawings
Fig. 1 is a schematic view illustrating a first implementation flow of a resource allocation method according to an embodiment of the present invention;
FIG. 2 is a schematic diagram of inner RB, outer RB and edge RB according to an embodiment of the present invention;
FIG. 3 is a schematic diagram of a second implementation flow of the resource allocation method according to the embodiment of the present invention;
FIG. 4 is a first schematic diagram illustrating a first exemplary configuration of a resource allocation apparatus according to the present invention;
FIG. 5 is a schematic diagram illustrating a second exemplary embodiment of a resource allocation apparatus;
fig. 6 is a first schematic structural diagram of a first network device according to an embodiment of the present invention;
fig. 7 is a schematic structural diagram of a second network device according to an embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the drawings and examples.
Currently, in a 4G system, when data transmission is performed, uplink or downlink time-frequency domain physical resources may be grouped into RBs, and the RBs are used as a physical resource unit for scheduling and allocation. For example, when the network device needs to perform uplink scheduling on the terminal, the terminal may be allocated with a corresponding RB, so that the terminal can perform uplink signal transmission using the allocated RB.
In the foregoing manner, in order to satisfy radio frequency indexes such as EVM, adjacent channel leakage ratio (ALCR), spectrum template (SEM), and Spurious Emission (SM), the power required to be backed off when the terminal performs uplink signal transmission is large, so that the transmission power of the terminal is reduced, and the uplink coverage performance is further reduced.
Based on this, in the embodiment of the present invention, an RB is allocated to a control channel of a terminal; the allocated RB is an inner RB within the corresponding channel bandwidth. And selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the transmitting power, the power level and the modulation mode of the terminal.
An embodiment of the present invention provides a resource allocation method, which is applied to a first network device, and as shown in fig. 1, the method includes:
step 101: allocating RBs for control channels of the terminals; the allocated RB is an inner RB within the corresponding channel bandwidth.
Here, the first network device may refer to a base station, a Control Unit (CU), and a Distributed Unit (DU). In a fifth Generation mobile communication (5g, first Generation) system, the base station may be a next Generation node B (gNB).
Here, the Control Channel may refer to a Physical Uplink Control Channel (PUCCH) or a Physical Random Access Channel (PRACH).
Here, the RB may refer to a resource block consisting of all OFDM symbols within one slot and 12 subcarriers in the frequency domain.
Here, in the 5G system, RBs can be classified into three categories, inner, edge, and outer. Wherein, the edge RB may refer to an RB which is located at the edge of the channel and has a continuous RB length of not more than 2 RBs; wherein the maximum number of RBs can be represented by NRB given a channel bandwidth and a subcarrier spacing. The contiguous RB length of the Inner RB is represented by LCRB, which is related to NRB by: LCRB ≦ ceil (NRB/2), and the starting RB position of Inner RB is denoted by (RBStart, low), where RBStart, low = max (1,floor (LCRB/2)), and the ending RB position of Inner RB is denoted by (RBStart, high), where RBStart, high = NRB-RBStart, low-LCRB. The RBs except edge RB and inner RB are Outer RB. FIG. 2 is a schematic diagram of inner RB, outer RB and edge RB.
Tables 1 and 2 show the MPR indices of inner RB, outer RB and edge RB. Table 1 shows MPR indexes of an inner RB, an outer RB, and an edge RB obtained by testing power required to be backed-off when a terminal of power class 3 performs uplink signal transmission using different types of RBs. Table 2 shows MPR indexes of inner RB, outer RB, and edge RB obtained by testing power required to be backed off when a terminal of power class 2 performs uplink signal transmission using different types of RBs. As can be seen from tables 1 and 2, the terminal needs the minimum power for backoff in uplink signal transmission using the inner RB. For example, the power required to be backed off when the terminal with the power level 2 performs uplink signal transmission by using the edge RB and adopting the DFT-S-OFDM PI/2 modulation mode is 3.5dB, the power required to be backed off when the terminal performs uplink signal transmission by using the outer RB and adopting the DFT-S-OFDM PI/2 modulation mode is 0.5dB, and the power required to be backed off when the terminal performs uplink signal transmission by using the inner RB and adopting the DFT-S-OFDM PI/2 modulation mode is 0dB.
TABLE 1
TABLE 2
In practical application, considering that the difference between the values of the MPRs corresponding to the inner RB and the non-inner RB exists, that is, the MPR value corresponding to the inner RB is the minimum, in this way, the first network device may allocate the inner RB to the control channel of the terminal, so that the terminal can implement power backoff through the minimum MPR value, and further, uplink coverage performance can be improved.
Specifically, the first network device may allocate inner RB to PUCCH and PRACH of the terminal in a semi-static allocation manner, so that allocation of edge RB and outer RB to PUCCH and PRACH of the terminal may be avoided, and reduction of transmission power of the terminal by reducing power required to be backed off is avoided, thereby improving uplink coverage performance. The semi-static allocation method may be that only one inner RB needs to be allocated to the PUCCH and the PRACH of the terminal, and then the terminal may be reused.
In practical application, when channel bandwidths corresponding to control channels of terminals are different, the number of inner RBs required by the terminals for uplink signal transmission is also different, and thus, the network device may further configure the number of inner RBs.
Based on this, in an embodiment, when allocating an inner RB for a control channel of a terminal, the method further includes: configuring the number of inner RBs.
Here, the number of inner RBs may be configured according to a channel bandwidth corresponding to a control channel of a terminal. Table 3 is a correspondence of channel bandwidth to the number of inner RBs.
For example, assuming that the PUCCH of the terminal corresponds to a channel bandwidth of 1.4MHz, looking up table 3, the number of inner RBs is 1, and thus, the network device may configure the number of inner RBs as 1. Assuming that the channel bandwidth corresponding to the PRACH of the terminal is 5MHz, looking up table 3, the number of inner RBs obtained is 8, and thus, the network device may configure the number of inner RBs to be 8.
Channel bandwidth | inner RB number |
1.4 |
1 |
|
4 |
|
8 |
TABLE 3
Step 102: transmitting an inner RB allocated for a control channel of a terminal to the terminal.
Here, the inner RB allocated to the control channel of the terminal is sent to the terminal, so that the terminal can perform uplink signal transmission by using the allocated inner RB, for example, the terminal may send the cell level parameters to the first network device by using the inner RB allocated to the PRACH.
By adopting the technical scheme provided by the embodiment of the invention, the first network equipment allocates the inner RB for the control channel of the terminal, so that the power required for backing back when the terminal carries out uplink signal transmission is smaller, the transmission power of the terminal cannot be reduced too much, and the uplink coverage performance can be improved.
An embodiment of the present invention provides a resource allocation method, which is applied to a second network device, and as shown in fig. 3, the method includes:
step 301: and selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the transmission power, the power level and the modulation mode of the terminal.
The Modulation scheme may include Quadrature Phase Shift Keying (QPSK), quadrature Amplitude Modulation (QAM), and the like. The power level may be determined according to a communication system of the terminal, for example, the power level 4 corresponding to GSM/GPRS 850/900; GSM/GPRS1800/1900 corresponds to power class 1, and so on.
In practical application, in order to select the allocated RB as an inner RB or an outer RB for the PUSCH based on the transmission power, the power level, and the modulation mode of the terminal, the second network device needs to estimate the transmission power of the terminal.
Based on this, in an embodiment, the method may further include: and estimating the transmitting power of the terminal.
Here, the second network device may estimate the transmit Power of the terminal based on a Power Headroom Report (PHR) reported by the terminal; or, the second network device may estimate the transmit power of the terminal based on a Modulation and Coding Scheme (MCS) and a Physical Resource Block (PRB) used by the terminal for performing the transmission using the PUSCH.
In practical application, since the maximum transmission power of the terminal is affected by the size of the MPR value, when the transmission power of the terminal reaches full power transmission, the uplink coverage performance is affected by the difference between the MPR values corresponding to the inner RB and the MPR values corresponding to the non-inner RB.
Based on this, in an embodiment, the selecting the RB to be allocated for the PUSCH as an inner RB or an outer RB based on the transmission power, the power level, and the modulation scheme of the terminal includes: judging whether the transmitting power of the terminal is equal to the maximum transmitting power configured for the terminal by the second network equipment; and when the transmission power of the terminal is determined to be equal to the maximum transmission power configured for the terminal by the second network equipment, selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the obtained power level and modulation mode of the terminal.
In practical application, whether the MPR values of the inner RB and the non-inner RB have a difference is related to the power level and the modulation scheme of the terminal, so that the second network device may obtain the power level and the modulation scheme of the terminal, and determine whether the MPR values of the inner RB and the non-inner RB have a difference based on the obtained power level and the modulation scheme of the terminal.
Based on this, in an embodiment, the selecting the allocated RB for the PUSCH to be an inner RB or an outer RB based on the obtained power level and modulation scheme of the terminal includes: judging whether the values of the MPRs corresponding to the inner RB and the non-inner RB are the same or not based on the obtained power level and the modulation mode of the terminal; when the numerical value of the MPR corresponding to the inner RB and the non-inner RB is determined to be different, the RB selected to be distributed for the PUSCH is the inner RB; and when the value of the MPR corresponding to the inner RB and the non-inner RB is determined to be the same, selecting the RB to be allocated for the PUSCH as the outer RB.
Here, the second network device may dynamically select an RB allocated for a PUSCH of a terminal as an inner RB or an outer RB.
For example, when it is determined that the transmission power of the terminal is equal to the maximum transmission power configured for the terminal by the second network device, if there is a gap between the MPR values of inner RB and non-inner RB, inner RB is allocated for PUSCH; otherwise, allocating outer RB for PUSCH.
In practical application, in order to determine whether there is a difference between the MPR values of the inner RB and the non-inner RB based on the power level and the modulation mode of the terminal, the second network device may establish a resource difference table, where a corresponding relationship between the power level, the modulation mode, and the resource difference value of the terminal is stored in the resource difference table.
Based on this, in an embodiment, the determining whether the value of the MPR corresponding to the inner RB is the same as the value of the MPR corresponding to the non-inner RB based on the obtained power level and the obtained modulation scheme of the terminal includes: based on the obtained power grade and the modulation mode of the terminal, searching a first resource difference value corresponding to the power grade and the modulation mode from a resource difference table; the resource difference table stores the corresponding relation between the power grade of the terminal, the modulation mode and the resource difference value; judging whether the first resource difference value is equal to a preset threshold value or not; when the first resource difference value is determined to be equal to a preset threshold value, determining that the numerical values of MPRs corresponding to an inner RB and a non-inner RB are different; otherwise, determining that the value of the MPR corresponding to the inner RB and the non-inner RB is the same.
Table 4 is an established resource difference table, and as shown in table 4, the resource difference table stores the correspondence between the power level of the terminal, the modulation method, and the resource difference value. For example, assuming that the modulation scheme is DFT-s-OFDM QPSK, the power level of the terminal is power level 2, and querying the resource difference table may query that the first resource difference value is Y, where "Y" represents that there is a difference between MPR values of inner RB and non-inner RB. Assuming that the modulation mode is DFT-s-OFDM 256QAM, the power level of the terminal is power level 2, and querying the resource difference table may query that the first resource difference value is N, where "N" represents that there is no difference between the MPR values of inner RB and non-inner RB.
TABLE 3
For example, suppose that the second network device needs to perform uplink scheduling on terminal a and terminal B at a certain time. Assuming that the terminal a is located in a cell close to the second network device, so that the PHR reported by the terminal a to the second network device is large, assuming that the modulation mode adopted by the terminal a is CP-OFDM 64QAM or CP-OFDM 256QAM, after the second network device obtains the power level and the modulation mode of the terminal a, querying the resource difference table, and querying that the first resource difference value is N, where "N" represents that there is no difference between MPR values of an inner RB and a non-inner RB, so that when the second network device allocates RBs for PUSCH, it is not necessary to consider the difference between the inner RB and the non-inner RB. Assuming that the terminal B is located in a cell far away from the second network device, and the PHR reported by the terminal B to the second network device is small, and assuming that the modulation mode adopted by the terminal B is CP-OFDM or DFT-S-OFDM, after the network device obtains the power class and the modulation mode of the terminal B, the resource difference table is queried, and it can be queried that the first resource difference value is Y, where "Y" represents that a difference exists between MPR values of inner RB and non-inner RB. In this way, the second network device preferentially allocates the inner RB to the PUSCH, avoiding using the edge RB.
Step 302: and sending an inner RB or outer RB allocated for the PUSCH of the terminal to the terminal.
Here, the inner RB or outer RB allocated for the PUSCH of the terminal is transmitted to the terminal, so that the terminal can perform uplink signal transmission using the allocated inner RB or outer RB, for example, the terminal may transmit the cell level parameters to the second network device using the inner RB or outer RB allocated for the PRACH.
By adopting the technical scheme provided by the embodiment of the invention, the second network equipment selects the RB allocated for the PUSCH of the terminal as the inner RB or the outer RB, in other words, the second network equipment preferentially allocates the inner RB and forbids allocation of the edge RB for the PUSCH of the terminal. Therefore, when the terminal transmits the uplink signal, the power back-off of the edge user can be reduced, the uplink power of the terminal can be fully exerted, and the uplink coverage performance of the system can be improved.
To implement the method according to the embodiment of the present invention, an embodiment of the present invention further provides a resource allocation apparatus, which is disposed on a first network device, and as shown in fig. 4, the apparatus includes:
a first allocation unit 41 configured to allocate RBs for control channels of terminals; the allocated RB is an inner RB within the corresponding channel bandwidth.
A first transmitting unit 42, configured to transmit an inner RB allocated for a control channel of a terminal to the terminal.
Here, the first network device may refer to a base station, CU, DU. In a 5G system, the base station may be a next generation node B (gNB).
Here, the control channel may refer to a Physical Uplink Control Channel (PUCCH), a Physical Random Access Channel (PRACH).
Here, the RB may refer to a resource block consisting of all OFDM symbols within one slot and 12 subcarriers in the frequency domain.
Here, in the 5G system, RBs can be classified into three categories, inner, edge, and outer.
In practical application, considering that the difference exists between the values of the MPRs corresponding to the inner RB and the MPRs corresponding to the non-inner RB, that is, the MPR value corresponding to the inner RB is the minimum, the base station can allocate the inner RB to the control channel of the terminal, so that the terminal can implement power backoff through the minimum MPR value, and the uplink coverage performance can be improved.
Specifically, the first network device may allocate inner RB to PUCCH and PRACH of the terminal in a semi-static allocation manner, so that allocation of edge RB and outer RB to PUCCH and PRACH of the terminal may be avoided, and reduction of transmission power of the terminal by reducing power required to be backed off is avoided, thereby improving uplink coverage performance. The semi-static allocation method may be that only one inner RB needs to be allocated to the PUCCH and the PRACH of the terminal, and then the terminal may be reused.
In practical application, when channel bandwidths corresponding to control channels of terminals are different, the number of inner RBs required by the terminals for uplink signal transmission is also different, and thus, the network device may further configure the number of inner RBs.
Based on this, when allocating inner RBs for the control channel of the terminal, the first allocating unit 41 is further configured to allocate the number of inner RBs.
Here, the number of inner RBs may be configured according to a channel bandwidth corresponding to a control channel of a terminal.
Here, the inner RB allocated to the control channel of the terminal is sent to the terminal, so that the terminal can perform uplink signal transmission by using the allocated inner RB, for example, the terminal may send the cell-level parameters to the first network device by using the inner RB allocated to the PRACH.
In practical applications, the first allocating unit 41 may be implemented by a processor in a resource allocating device, and the first sending unit 42 may be implemented by a communication interface in the resource allocating device.
In order to implement the method according to the embodiment of the present invention, an embodiment of the present invention further provides a resource allocation apparatus, which is disposed on a second network device, and as shown in fig. 5, the apparatus includes:
the second allocating unit 51 is configured to select an RB allocated to the PUSCH as an inner RB or an outer RB based on the transmission power, the power level, and the modulation scheme of the terminal.
A second transmitting unit 52, configured to transmit an inner RB or an outer RB allocated for a PUSCH of a terminal to the terminal.
In practical application, in order to select the allocated RB as an inner RB or an outer RB for the PUSCH based on the transmission power, the power level, and the modulation mode of the terminal, the second network device needs to estimate the transmission power of the terminal.
Based on this, in an embodiment, the apparatus further comprises: and the estimation unit is used for estimating the transmitting power of the terminal.
Here, the second network device may predict the transmit power of the terminal based on the PHR reported by the terminal; or, the second network device may estimate the transmit power of the terminal based on the MCS and the PRB used by the terminal for the current transmission using the PUSCH.
In practical application, since the maximum transmission power of the terminal is affected by the size of the MPR value, when the transmission power of the terminal reaches full power transmission, the uplink coverage performance is affected by the difference between the MPRs corresponding to the inner RB and the MPR corresponding to the non-inner RB.
Based on this, in an embodiment, the second allocating unit 51 is specifically configured to determine whether the transmission power of the terminal is equal to the maximum transmission power configured for the terminal by the second network device; and when the transmission power of the terminal is determined to be equal to the maximum transmission power configured for the terminal by the second network equipment, selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the obtained power level and modulation mode of the terminal.
In practical application, whether the MPR values of the inner RB and the non-inner RB have a difference is related to the power level and the modulation scheme of the terminal, so that the second network device may obtain the power level and the modulation scheme of the terminal, and determine whether the MPR values of the inner RB and the non-inner RB have a difference based on the obtained power level and the modulation scheme of the terminal.
Based on this, in an embodiment, the second allocating unit 51 is specifically configured to determine whether the values of the maximum power back-off MPRs corresponding to the inner RB and the non-inner RB are the same based on the obtained power level and the modulation mode of the terminal; when the value of the MPR corresponding to the inner RB and the non-inner RB is determined to be different, the RB selected and distributed for the PUSCH is the inner RB; and when the value of the MPR corresponding to the inner RB and the non-inner RB is determined to be the same, selecting the RB to be allocated for the PUSCH as the outer RB.
Here, the second network device may dynamically select an RB allocated for a PUSCH of a terminal as an inner RB or an outer RB.
In practical application, in order to determine whether there is a difference between the MPR values of the inner RB and the non-inner RB based on the power level and the modulation mode of the terminal, the second network device may establish a resource difference table, where a corresponding relationship between the power level, the modulation mode, and the resource difference value of the terminal is stored in the resource difference table.
Based on this, in an embodiment, the second allocating unit 51 is specifically configured to search, based on the obtained power level and modulation scheme of the terminal, a first resource difference value corresponding to the power level and the modulation scheme from a resource difference table; the resource difference table stores the corresponding relation of the power grade, the modulation mode and the resource difference value of the terminal; judging whether the first resource difference value is equal to a preset threshold value or not; when the first resource difference value is determined to be equal to a preset threshold value, determining that the numerical values of MPRs corresponding to an inner RB and a non-inner RB are different; otherwise, determining that the value of the MPR corresponding to the inner RB and the non-inner RB is the same.
Here, the inner RB or outer RB allocated for the PUSCH of the terminal is sent to the terminal, so that the terminal can perform uplink signal transmission by using the allocated inner RB or outer RB, for example, the terminal may send the cell level parameter to the second network device by using the inner RB or outer RB allocated for the PRACH.
In practice, the second allocating unit 51 and the pre-estimating unit may be implemented by a processor in the resource allocating device, and the second sending unit 52 may be implemented by a communication interface in the resource allocating device.
An embodiment of the present invention further provides a first network device, as shown in fig. 6, where the first network device 60 includes: a first communication interface 61, a first processor 62, a first memory 63; wherein,
a first communication interface 61 capable of information interaction with other devices;
the first processor 62 is connected to the first communication interface 61, and configured to execute a method provided by one or more technical solutions of the first network device side when running the computer program. And the computer program is stored on the first memory 63.
Of course, in practice, the various components of the first network device 60 are coupled together by a bus system 64. It will be appreciated that the bus system 64 is used to enable communications among the components. The bus system 64 includes a power bus, a control bus, and a status signal bus in addition to the data bus. For clarity of illustration, however, the various buses are labeled as bus system 64 in fig. 6.
The first memory 63 in the embodiment of the present application is used to store various types of data to support the operation of the first network device 60. Examples of such data include: any computer program for operating on the first network device 60.
The method disclosed in the embodiment of the present application can be applied to the first processor 62, or implemented by the first processor 62. The first processor 62 may be an integrated circuit chip having signal processing capabilities. In implementation, the steps of the above method may be performed by integrated logic circuits of hardware or instructions in the form of software in the first processor 62. The first Processor 62 may be a general purpose Processor, a Digital Signal Processor (DSP), or other programmable logic device, discrete gate or transistor logic device, discrete hardware components, etc. The first processor 62 may implement or perform the methods, steps and logic blocks disclosed in the embodiments of the present application. A general purpose processor may be a microprocessor or any conventional processor or the like. The steps of the method disclosed in the embodiments of the present application may be directly implemented by a hardware decoding processor, or implemented by a combination of hardware and software modules in the decoding processor. The software module may be located in a storage medium located in the first memory 63, and the first processor 62 reads the information in the first memory 63 and, in conjunction with its hardware, performs the steps of the foregoing method.
An embodiment of the present invention further provides a second network device, as shown in fig. 7, where the second network device 70 includes: a second communication interface 71, a second processor 72, a second memory 73; wherein,
a second communication interface 71, which can perform information interaction with other devices;
and a second processor 72, connected to the second communication interface 71, and configured to execute the method provided by one or more technical solutions of the second network device side when running a computer program. And the computer program is stored on the second memory 73.
Of course, in practice, the various components of the second network device 70 are coupled together by a bus system 74. It will be appreciated that the bus system 74 is used to enable connected communication between these components. The bus system 74 includes a power bus, a control bus, and a status signal bus in addition to a data bus. For clarity of illustration, however, the various buses are identified in fig. 7 as the bus system 74.
The second memory 73 in the embodiment of the present application is used to store various types of data to support the operation of the second network device 70. Examples of such data include: any computer program for operating on the second network device 70.
The method disclosed in the embodiment of the present application may be applied to the second processor 72, or implemented by the second processor 72. The second processor 72 may be an integrated circuit chip having signal processing capabilities. In implementation, the steps of the above method may be implemented by integrated logic circuits of hardware or instructions in the form of software in the second processor 72. The second Processor 72 may be a general purpose Processor, a Digital Signal Processor (DSP), or other programmable logic device, discrete gate or transistor logic device, discrete hardware component, etc. The second processor 72 may implement or perform the methods, steps and logic blocks disclosed in the embodiments of the present application. The general purpose processor may be a microprocessor or any conventional processor or the like. The steps of the method disclosed in the embodiments of the present application may be directly implemented by a hardware decoding processor, or implemented by a combination of hardware and software modules in the decoding processor. The software module may be located in a storage medium located in the second memory 73, and the second processor 72 reads the information in the second memory 73 and, in conjunction with its hardware, performs the steps of the foregoing method.
In an exemplary embodiment, the first network Device 60 and the second network Device 70 may be implemented by one or more Application Specific Integrated Circuits (ASICs), DSPs, programmable Logic Devices (PLDs), complex Programmable Logic Devices (CPLDs), field Programmable Gate Arrays (FPGAs), general purpose processors (gpus), controllers, micro Controllers (MCUs), microprocessors (microprocessors), or other electronic components for performing the foregoing methods.
It is understood that the first memory 63 and the second memory 73 of the embodiment of the present application may be a volatile memory or a nonvolatile memory, and may include both volatile and nonvolatile memories. Among them, the nonvolatile Memory may be a Read Only Memory (ROM), a Programmable Read Only Memory (PROM), an Erasable Programmable Read-Only Memory (EPROM), an Electrically Erasable Programmable Read-Only Memory (EEPROM), a magnetic random access Memory (FRAM), a magnetic random access Memory (Flash Memory), a magnetic surface Memory, an optical Disc, or a Compact Disc Read-Only Memory (CD-ROM); the magnetic surface storage may be disk storage or tape storage. Volatile Memory can be Random Access Memory (RAM), which acts as external cache Memory. By way of illustration and not limitation, many forms of RAM are available, such as Static Random Access Memory (SRAM), synchronous Static Random Access Memory (SSRAM), dynamic Random Access Memory (DRAM), synchronous Dynamic Random Access Memory (SDRAM), double Data Rate Synchronous Dynamic Random Access Memory (DDRSDRAM), enhanced Synchronous Dynamic Random Access Memory (ESDRAM), enhanced Synchronous Dynamic Random Access Memory (Enhanced DRAM), synchronous Dynamic Random Access Memory (SLDRAM), direct Memory (DRmb Access), and Random Access Memory (DRAM). The memories described in the embodiments of the present application are intended to comprise, without being limited to, these and any other suitable types of memory.
It should be noted that: "first," "second," and the like are used for distinguishing between similar elements and not necessarily for describing a particular sequential or chronological order.
In the several embodiments provided in the present application, it should be understood that the disclosed apparatus and method may be implemented in other ways. The above-described device embodiments are merely illustrative, for example, the division of the unit is only one logical function division, and there may be other division ways in actual implementation, such as: multiple units or components may be combined, or may be integrated into another system, or some features may be omitted, or not implemented. In addition, the coupling, direct coupling or communication between the components shown or discussed may be through some interfaces, indirect coupling or communication between devices or units, and may be electrical, mechanical or other forms
It should be noted that: the technical schemes described in the embodiments of the present invention can be combined arbitrarily without conflict.
The above description is only a preferred embodiment of the present invention, and is not intended to limit the scope of the present invention.
Claims (15)
1. A resource allocation method, applied to a first network device, includes:
allocating a Resource Block (RB) for a control channel of a terminal; the allocated RB is an inner RB within the corresponding channel bandwidth;
wherein the start RB position of inner RB is denoted by RBStart, low, RBStart, low = max (1,floor (LCRB/2)), and the end RB position of inner RB is denoted by RBStart, high, RBStart, high = NRB-RBStart, low-LCRB; wherein NRB represents the maximum number of RBs; LCRB represents the contiguous RB length of the inner RB, and the relationship of LCRB to NRB is: LCRB is less than or equal to ceil (NRB/2).
2. The method of claim 1, wherein when allocating an inner RB for a control channel of a terminal, the method further comprises:
configuring the number of inner RBs.
3. A resource allocation method, applied to a second network device, the method includes:
selecting an RB (radio bearer) to be allocated as an inner RB or an outer RB for a Physical Uplink Shared Channel (PUSCH) based on the transmitting power, the power level and the modulation mode of a terminal;
wherein, the selecting the allocated RB for the PUSCH to be an inner RB or an outer RB based on the transmission power, the power class, and the modulation scheme of the terminal includes:
judging whether the transmitting power of the terminal is equal to the maximum transmitting power configured for the terminal by the second network equipment;
when the transmission power of the terminal is determined to be equal to the maximum transmission power configured for the terminal by the second network equipment, selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the obtained power level and the modulation mode of the terminal;
the selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the obtained power level and modulation scheme of the terminal includes:
judging whether the numerical values of the MPR corresponding to the inner RB and the non-inner RB are the same or not based on the obtained power grade and the modulation mode of the terminal;
when the value of the MPR corresponding to the inner RB and the non-inner RB is determined to be different, the RB selected and distributed for the PUSCH is the inner RB; when the inner RB is determined to be the same as the MPR value corresponding to the non-inner RB, the RB selected to be allocated for the PUSCH is the outer RB;
the determining whether the values of the MPRs corresponding to the inner RB and the non-inner RB are the same based on the obtained power level and the obtained modulation mode of the terminal includes:
based on the obtained power grade and the modulation mode of the terminal, searching a first resource difference value corresponding to the power grade and the modulation mode from a resource difference table; the resource difference table stores the corresponding relation between the power grade of the terminal, the modulation mode and the resource difference value;
judging whether the first resource difference value is equal to a preset threshold value or not;
when the first resource difference value is determined to be equal to a preset threshold value, determining that the numerical values of the MPRs corresponding to the inner RB and the non-inner RB are different; otherwise, determining that the value of the MPR corresponding to the inner RB and the non-inner RB is the same.
4. The method of claim 3, further comprising:
and estimating the transmitting power of the terminal.
5. An apparatus for resource allocation, applied to a first network device, the apparatus comprising:
a first allocation unit for allocating RBs to a control channel of a terminal; the allocated RB is an inner RB within the corresponding channel bandwidth;
wherein the starting RB position of inner RB is denoted by RBStart, low, RBStart, low = max (1,floor (LCRB/2)), the ending RB position of inner RB is denoted by RBStart, high, RBStart, high = NRB-RBStart, low-LCRB; wherein NRB represents the maximum number of RBs; LCRB represents the contiguous RB length of the inner RB, and the relationship of LCRB to NRB is: LCRB is less than or equal to ceil (NRB/2).
6. The apparatus of claim 5, wherein the first allocating unit is further configured to configure the number of inner RBs when inner RBs are allocated for the control channels of the terminals.
7. A resource allocation apparatus, applied to a second network device, the apparatus comprising:
the second allocating unit is used for selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the transmitting power, the power level and the modulation mode of the terminal;
the second allocating unit is specifically configured to determine whether the transmission power of the terminal is equal to a maximum transmission power configured for the terminal by the second network device; when the transmission power of the terminal is determined to be equal to the maximum transmission power configured for the terminal by the second network equipment, selecting the distributed RB as an inner RB or an outer RB for the PUSCH based on the obtained power level and modulation mode of the terminal;
the second allocating unit is specifically configured to determine whether the values of the maximum power back-off MPRs corresponding to the inner RB and the non-inner RB are the same based on the obtained power level and the obtained modulation mode of the terminal; when the numerical value of the MPR corresponding to the inner RB and the non-inner RB is determined to be different, the RB selected to be distributed for the PUSCH is the inner RB; when the inner RB is determined to be the same as the MPR value corresponding to the non-inner RB, the RB selected to be allocated for the PUSCH is the outer RB;
the second allocating unit is specifically configured to search, based on the obtained power level and modulation mode of the terminal, a first resource difference value corresponding to the power level and the modulation mode from a resource difference table; the resource difference table stores the corresponding relation between the power grade of the terminal, the modulation mode and the resource difference value; judging whether the first resource difference value is equal to a preset threshold value or not; when the first resource difference value is determined to be equal to a preset threshold value, determining that the numerical values of the MPRs corresponding to the inner RB and the non-inner RB are different; otherwise, determining that the value of the MPR corresponding to the inner RB and the non-inner RB is the same.
8. The apparatus of claim 7, further comprising:
and the estimation unit is used for estimating the transmitting power of the terminal.
9. A first network device, wherein the first network device comprises:
a first processor for allocating an RB for a control channel of a terminal; the allocated RB is an inner RB within the corresponding channel bandwidth;
wherein the start RB position of inner RB is denoted by RBStart, low, RBStart, low = max (1,floor (LCRB/2)), and the end RB position of inner RB is denoted by RBStart, high, RBStart, high = NRB-RBStart, low-LCRB; wherein NRB represents the maximum number of RBs; LCRB represents the contiguous RB length of the inner RB, and the relationship of LCRB to NRB is: LCRB is less than or equal to ceil (NRB/2).
10. The first network device of claim 9, wherein the first processor is further configured to configure the number of inner RBs when allocating inner RBs for the control channel of the terminal.
11. A second network device, the second network device comprising:
a second processor, configured to select an RB allocated to the PUSCH as an inner RB or an outer RB based on the transmission power, the power class, and the modulation scheme of the terminal;
the second processor is specifically configured to determine whether the transmission power of the terminal is equal to a maximum transmission power configured for the terminal by the second network device; when the transmission power of the terminal is determined to be equal to the maximum transmission power configured for the terminal by the second network equipment, selecting the allocated RB as an inner RB or an outer RB for the PUSCH based on the obtained power level and the modulation mode of the terminal;
the second processor is specifically configured to determine, based on the obtained power level and the obtained modulation mode of the terminal, whether the values of the maximum power reduction MPRs corresponding to the inner RB and the non-inner RB are the same; when the numerical value of the MPR corresponding to the inner RB and the non-inner RB is determined to be different, the RB selected to be distributed for the PUSCH is the inner RB; when the inner RB is determined to be the same as the MPR value corresponding to the non-inner RB, the RB selected to be allocated for the PUSCH is the outer RB;
the second processor is specifically configured to search a first resource difference value corresponding to the power level and the modulation mode from a resource difference table based on the obtained power level and the modulation mode of the terminal; the resource difference table stores the corresponding relation between the power grade of the terminal, the modulation mode and the resource difference value; judging whether the first resource difference value is equal to a preset threshold value or not; when the first resource difference value is determined to be equal to a preset threshold value, determining that the numerical values of the MPRs corresponding to the inner RB and the non-inner RB are different; otherwise, determining that the value of MPR corresponding to the inner RB and the non-inner RB is the same.
12. The second network device of claim 11, wherein the second processor is further configured to estimate a transmit power of the terminal.
13. A first network device, comprising: a first processor and a first memory for storing a computer program capable of running on the processor,
wherein the first processor is adapted to perform the steps of the method of claim 1 or 2 when running the computer program.
14. A second network device, comprising: a second processor and a second memory for storing a computer program capable of running on the processor,
wherein the second processor is adapted to perform the steps of the method of claim 3 or 4 when running the computer program.
15. A storage medium having a computer program stored thereon, the computer program, when being executed by a processor, performing the steps of the method as claimed in claim 1 or 2; alternatively, the steps of the method of claim 3 or 4 are carried out.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910556299.1A CN112134633B (en) | 2019-06-25 | 2019-06-25 | Resource allocation method, device, related equipment and storage medium |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910556299.1A CN112134633B (en) | 2019-06-25 | 2019-06-25 | Resource allocation method, device, related equipment and storage medium |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112134633A CN112134633A (en) | 2020-12-25 |
CN112134633B true CN112134633B (en) | 2022-10-21 |
Family
ID=73849798
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910556299.1A Active CN112134633B (en) | 2019-06-25 | 2019-06-25 | Resource allocation method, device, related equipment and storage medium |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112134633B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2022027385A1 (en) * | 2020-08-05 | 2022-02-10 | 华为技术有限公司 | Uplink scheduling method and communication apparatus |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101651890A (en) * | 2008-08-11 | 2010-02-17 | 夏普株式会社 | Method for feeding back uplink control signaling, base station, user equipment and communication system |
CN103118431A (en) * | 2012-10-11 | 2013-05-22 | 中兴通讯股份有限公司 | Resource allocation method and device |
US9451554B1 (en) * | 2015-01-29 | 2016-09-20 | Sprint Spectrum L.P. | Selective control of uplink transmission power based on roaming status |
CN108811060A (en) * | 2017-05-05 | 2018-11-13 | 华为技术有限公司 | A kind of Poewr control method and device |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9137801B2 (en) * | 2012-01-17 | 2015-09-15 | Nokia Technologies Oy | Method and apparatus for determination of additional maximum power reduction table based on control channel location indices |
US9426785B2 (en) * | 2013-05-20 | 2016-08-23 | Nokia Technologies Oy | Contiguous intra-band carrier aggregation (CA), PUCCH, and quasi-contiguous uplink resource allocation |
US9924515B2 (en) * | 2014-03-18 | 2018-03-20 | Apple Inc. | Dynamic selection of power reduction values |
KR101874083B1 (en) * | 2016-04-27 | 2018-07-04 | 한국전자통신연구원 | Method and apparatus for transmitting uplink control channel for high speed terminal |
US10439789B2 (en) * | 2017-05-08 | 2019-10-08 | Skyworks Solutions, Inc. | Radio frequency communication systems with dynamic waveform control and power boost |
-
2019
- 2019-06-25 CN CN201910556299.1A patent/CN112134633B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101651890A (en) * | 2008-08-11 | 2010-02-17 | 夏普株式会社 | Method for feeding back uplink control signaling, base station, user equipment and communication system |
CN103118431A (en) * | 2012-10-11 | 2013-05-22 | 中兴通讯股份有限公司 | Resource allocation method and device |
US9451554B1 (en) * | 2015-01-29 | 2016-09-20 | Sprint Spectrum L.P. | Selective control of uplink transmission power based on roaming status |
CN108811060A (en) * | 2017-05-05 | 2018-11-13 | 华为技术有限公司 | A kind of Poewr control method and device |
Also Published As
Publication number | Publication date |
---|---|
CN112134633A (en) | 2020-12-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110474737B (en) | Parameter determination method, monitoring method and communication device | |
CN106851744B (en) | Method and apparatus for wireless communication | |
US20210007107A1 (en) | Downlink control information transmission method, device and network equipment | |
US11039448B2 (en) | Resource scheduling method and apparatus | |
CN102265677B (en) | Providing a downlink control structure in a first carrier to indicate control information in a second, different carrier | |
US11722276B2 (en) | Search space monitoring | |
EP2996380A1 (en) | Information transmission method and device | |
CN110785973B (en) | Method for channel transmission, terminal equipment and network equipment | |
US10992434B2 (en) | Transmission in a guard band of a rat | |
CN110475292B (en) | Communication method and device | |
WO2022048199A1 (en) | Nr pdcch resource allocation method and apparatus under spectrum sharing | |
CN112134633B (en) | Resource allocation method, device, related equipment and storage medium | |
CN111294958A (en) | Resource indication method, user equipment, network equipment and computer storage medium | |
EP3648527B1 (en) | Method, device, and system for transmitting downlink control information | |
IL268117A (en) | Method for informing available resource for pdsch, method for determining available resource for pdsch, base station and ue | |
EP3606227A1 (en) | Method, and apparatus for determining data transmission resource, terminal, base station and device | |
CN110391888B (en) | Terminal capability processing method and device, related equipment and storage medium | |
CN111684852A (en) | Resource allocation method, device and computer readable storage medium | |
US9414393B2 (en) | Resource allocation method for allocating resource blocks to several user equipment | |
CN110662300B (en) | Uplink communication control method and device and network side equipment | |
CN113676284B (en) | PT-RS configuration method, transmission device, communication node and storage medium | |
CN113826342B (en) | Communication method and related equipment | |
CN112543086B (en) | Design method for control resource set, network equipment and terminal equipment | |
CN114615748A (en) | Data transmission method, device, related equipment and storage medium | |
CN111466139B (en) | User equipment and wireless communication method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |