CN112127574A - Stone dry hanging structure of assembled wall - Google Patents
Stone dry hanging structure of assembled wall Download PDFInfo
- Publication number
- CN112127574A CN112127574A CN202011088502.6A CN202011088502A CN112127574A CN 112127574 A CN112127574 A CN 112127574A CN 202011088502 A CN202011088502 A CN 202011088502A CN 112127574 A CN112127574 A CN 112127574A
- Authority
- CN
- China
- Prior art keywords
- hanging
- plate
- wall
- groove
- stone dry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0803—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements
- E04F13/081—Separate fastening elements with load-supporting elongated furring elements between wall and covering elements with additional fastening elements between furring elements and covering elements
- E04F13/083—Hooking means on the back side of the covering elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/14—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements stone or stone-like materials, e.g. ceramics concrete; of glass or with an outer layer of stone or stone-like materials or glass
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The invention provides a stone dry hanging structure of an assembled wall, which comprises a transverse keel, a hanging piece and a wall plate, wherein the transverse keel is fixedly installed on the wall surface through a fastening piece, a first hanging groove is formed in the transverse keel, the hanging piece is adhered to the wall plate, a first hanging plate is arranged on the hanging piece and is hung in the first hanging groove, a lock catch plate is arranged on the first hanging plate and is elastically connected in an installation groove in the first hanging plate, the end part of the lock catch plate is inserted in a sliding groove in the side wall of the first hanging groove, the sliding groove is arranged along the length direction of the transverse keel, and the end surface of the lock catch plate is an inclined surface. According to the stone dry hanging structure of the assembled wall, the stone wallboard hanging structure is stable, and the wall formed by splicing the stone wallboards is high in integrity.
Description
Technical Field
The invention relates to an assembled wall, in particular to a stone dry hanging structure of the assembled wall.
Background
In interior decoration projects, wall decoration is an important content. The wall decoration not only has the function of beautiful decoration, but also can play a role of protecting the wall surface. The wall surface is usually decorated by using the wall boards, the wall surface adopts an assembly type structure, and the wall boards are spliced to form the wall surface.
When the wallboard was stone material or ceramic tile, because the wallboard dead weight is great, lead to articulating the structural deformation easily, articulate the effect not good to the wall wholeness that the wallboard concatenation formed is not high.
Disclosure of Invention
In view of the above, the invention provides a stone dry hanging structure of an assembly wall, which solves the problems that the existing stone wallboard is poor in hanging effect and the integrity of a spliced wall surface is not high.
The invention provides a stone dry hanging structure of an assembly wall, which comprises a transverse keel, a hanging piece and a wall plate, wherein the transverse keel is fixedly installed on the wall surface through a fastening piece, a first hanging groove is formed in the transverse keel, the hanging piece is adhered to the wall plate, a first hanging plate is arranged on the hanging piece, the first hanging plate is hung in the first hanging groove, a lock catch plate is arranged on the first hanging plate, the lock catch plate is elastically connected in an installation groove in the first hanging plate, the end part of the lock catch plate is inserted in a sliding groove in the side wall of the first hanging groove, the sliding groove is arranged along the length direction of the transverse keel, and the end surface of the lock catch plate is an inclined surface.
Further, the hanging piece comprises a connecting plate and a top plate, the wallboard is bonded on the connecting plate, the top plate is hung on the cross keel, and the first hanging plate is fixedly installed below the top plate.
Furthermore, a second hanging plate is further arranged on the connecting plate and hung in a second hanging groove corresponding to the transverse keel.
Further, the bottom plate of the second hanging groove extends outwards to form a baffle, and the bottom of the connecting plate abuts against the baffle.
Further, the back of the connecting plate is provided with a plurality of grooves which are arranged in parallel.
Further, the groove is V-shaped.
Further, be provided with a plurality of counter bores on the cross keel, a plurality of counter bores are arranged along the length direction of cross keel.
According to the stone dry hanging structure of the assembled wall, provided by the invention, after the hanging and connecting piece is bonded on the wallboard, the wallboard is hung on the cross keel through the hanging and connecting piece, the wallboard can slide on the cross keel to adjust the position, and the end part of the locking plate is inserted into the sliding groove on the side wall of the first hanging groove, so that the wallboard cannot move upwards to be separated from the cross keel, and the integrity of the wall surface is ensured when the wallboard is spliced. During the specific installation: the cross keel is fixedly installed on the wall surface through a fastener (such as a bolt), and in order to fix the cross keel better and not influence the hanging connection of the hanging part, a plurality of countersunk holes are formed in the cross keel and used for realizing the countersunk installation of the fastener. When the hanging piece is hung, the first hanging plate is downwards inserted into the first hanging groove, the lock catch plate is compressed by the side wall of the first hanging groove and is contained in the first hanging plate through the inclined plane of the end part, and after the first hanging plate is hung in place, the lock catch plate is reset and inserted into the sliding groove in the side wall of the first hanging groove. The roof of the hanging piece is hung on the cross keel and supports against the wall surface, on one hand, the stability of the hanging structure is further guaranteed, and on the other hand, when the wallboard is prevented from being hung, the first hanging plate is deformed due to collision with the wall surface.
According to the stone dry hanging structure of the assembled wall, the stone wallboard hanging structure is stable, and the wall formed by splicing the stone wallboards is high in integrity.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
fig. 1 is a schematic structural elevation view of a stone dry-hanging structure of an assembled wall according to an embodiment of the present invention;
fig. 2 is a first schematic view illustrating a hanging process of a stone dry hanging structure of an assembly wall according to an embodiment of the present invention;
fig. 3 is a schematic view illustrating a second hanging process of a stone dry-hanging structure of an assembly wall according to an embodiment of the present invention;
fig. 4 is a schematic structural view of a cross keel in a stone dry-hanging structure of an assembled wall according to an embodiment of the invention;
fig. 5 is a perspective view of a cross keel in a stone dry-hanging structure of an assembled wall according to an embodiment of the invention;
fig. 6 is a schematic structural diagram of a hanging member in a stone dry-hanging structure of an assembly wall according to an embodiment of the present invention;
fig. 7 is a schematic side view angle structure diagram of a hanging piece in a stone dry-hanging structure of an assembly wall according to an embodiment of the present invention;
fig. 8 is a schematic structural view of a striker plate in the stone dry-hanging structure of the assembled wall according to the embodiment of the present invention.
Wherein, 1-the transverse keel; 11-a first hooking groove; 111-a chute; 12-a second hooking groove; 121-a baffle; 13-countersunk; 2-hanging a connecting piece; 21-a first hitch plate; 22-a connecting plate; 221-grooves; 23-a top plate; 24-a second hitch plate; 3-wallboard; 4-a fastener; 5-locking the board; 51-end face.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art.
The first embodiment is as follows:
referring to fig. 1 to 8, a stone dry hanging structure of an assembly wall according to an embodiment of the present invention is shown in the drawings, and includes a cross keel 1, a hanging member 2 and a wall plate 3, the cross keel 1 is fixedly mounted on a wall surface through a fastener 4, the cross keel 1 is provided with a first hanging groove 11, the hanging member 2 is bonded on the wall plate 3, the hanging member 2 is provided with a first hanging plate 21, the first hanging plate 21 is hung in the first hanging groove 11, the first hanging plate 21 is provided with a locking plate 5, the locking plate 5 is elastically connected in a mounting groove of the first hanging plate 21, an end of the locking plate 5 is inserted in a sliding groove 111 on a side wall of the first hanging groove 11, the sliding groove 111 is arranged along a length direction of the cross keel 1, and an end surface 51 of the locking plate 5 is an inclined surface.
Specifically, referring to fig. 1 to 8, the hanging member 2 includes a connecting plate 22 and a top plate 23, the wall plate 3 is bonded to the connecting plate 22, the top plate 23 is hung on the cross member 1, and the first hanging plate 21 is fixedly mounted below the top plate 23.
Specifically, referring to fig. 1 to 8, a plurality of countersunk holes 13 are formed in the cross keel 1, and the plurality of countersunk holes 13 are arranged along the length direction of the cross keel 1.
According to the stone dry hanging structure of the assembled wall, provided by the invention, after the hanging and connecting piece is bonded on the wallboard, the wallboard is hung on the cross keel through the hanging and connecting piece, the wallboard can slide on the cross keel to adjust the position, and the end part of the locking plate is inserted into the sliding groove on the side wall of the first hanging groove, so that the wallboard cannot move upwards to be separated from the cross keel, and the integrity of the wall surface is ensured when the wallboard is spliced. During the specific installation: the cross keel is fixedly installed on the wall surface through a fastener (such as a bolt), and in order to fix the cross keel better and not influence the hanging connection of the hanging part, a plurality of countersunk holes are formed in the cross keel and used for realizing the countersunk installation of the fastener. When the hanging piece is hung, the first hanging plate is downwards inserted into the first hanging groove, the lock catch plate is compressed by the side wall of the first hanging groove and is contained in the first hanging plate through the inclined plane of the end part, and after the first hanging plate is hung in place, the lock catch plate is reset and inserted into the sliding groove in the side wall of the first hanging groove. The roof of the hanging piece is hung on the cross keel and supports against the wall surface, on one hand, the stability of the hanging structure is further guaranteed, and on the other hand, when the wallboard is prevented from being hung, the first hanging plate is deformed due to collision with the wall surface.
According to the stone dry hanging structure of the assembled wall, the stone wallboard hanging structure is stable, and the wall formed by splicing the stone wallboards is high in integrity.
Example two:
referring to fig. 1 to 8, a stone dry hanging structure of an assembly wall according to a second embodiment of the present invention is shown in the drawings, and the present embodiment further adopts the following technical solutions as improvements on the basis of the above embodiments: the connecting plate 22 is also provided with a second hanging plate 24, and the second hanging plate 24 is hung in a second hanging groove 12 corresponding to the position of the cross keel 1; the bottom plate of the second hanging groove 12 extends outwards to form a baffle 121, and the bottom of the connecting plate 22 abuts against the baffle 121.
In order to further ensure that the hanging structure of the wall plate is stable, a second hanging plate is further arranged on the hanging and connecting piece and hung and connected on the cross keel, and the hanging and connecting piece is firmly hung and connected with the cross keel. In addition, the transverse keel is also supported by the baffle plate to hang the connecting piece, so that the hanging structure is further guaranteed to be stable.
Example three:
referring to fig. 1 to 8, a stone dry hanging structure of an assembly wall according to a third embodiment of the present invention is shown in the drawings, and the present embodiment further adopts the following technical solutions as improvements on the basis of the above embodiments: the back of the connecting plate 22 is provided with a plurality of grooves 221 which are arranged in parallel; the groove 221 is V-shaped.
The groove is internally provided with bonding glue, so that the bonding effect of the wallboard and the hanging and connecting piece is ensured. The V-shaped groove can further enhance the bonding effect, improve the friction force and prevent the wallboard from being separated from the connecting piece under the action of gravity.
It will be apparent to those skilled in the art that various changes and modifications may be made in the present invention without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims of the present invention and their equivalents, the present invention is also intended to include such modifications and variations.
Claims (7)
1. The stone dry hanging structure of the assembled wall is characterized by comprising a transverse keel (1), hanging pieces (2) and a wall plate (3), wherein the transverse keel (1) is fixedly installed on the wall surface through a fastening piece (4), a first hanging groove (11) is formed in the transverse keel (1), the hanging pieces (2) are bonded on the wall plate (3), a first hanging plate (21) is arranged on the hanging pieces (2), the first hanging plate (21) is hung in the first hanging groove (11), a lock catch plate (5) is arranged on the first hanging plate (21), the lock catch plate (5) is elastically connected in an installation groove in the first hanging plate (21), the end part of the lock catch plate (5) is plugged in a sliding groove (111) in the side wall of the first hanging groove (11), and the sliding groove (111) is arranged along the length direction of the transverse keel (1), the end surface (51) of the locking plate (5) is an inclined surface.
2. An assembled wall stone dry hanging structure as claimed in claim 1, characterized in that said hanging element (2) comprises a connecting plate (22) and a top plate (23), said wall plate (3) is glued on said connecting plate (22), said top plate (23) is hung on said cross keel (1), said first hanging plate (21) is fixedly mounted under said top plate (23).
3. A stone dry-hang structure for assembled wall as claimed in claim 2, characterized in that the connecting plate (22) is further provided with a second hang-up plate (24), and the second hang-up plate (24) is hung up in a second hang-up groove (12) corresponding to the position of the cross keel (1).
4. A stone dry-hang structure for assembled walls as claimed in claim 3, wherein the bottom plate of the second hang-up groove (12) extends outwards to form a baffle (121), and the bottom of the connecting plate (22) abuts against the baffle (121).
5. A stone dry-hang structure for assembled wall as claimed in claim 2, wherein the back of the connection plate (22) is provided with a plurality of grooves (221) arranged in parallel.
6. A stone dry-hang structure for assembled walls as claimed in claim 5, wherein the groove (221) is V-shaped.
7. An assembled wall stone dry-hanging structure as claimed in claim 1, characterized in that a plurality of countersunk holes (13) are provided on the cross keel (1), and a plurality of the countersunk holes (13) are arranged along the length direction of the cross keel (1).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011088502.6A CN112127574A (en) | 2020-10-13 | 2020-10-13 | Stone dry hanging structure of assembled wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011088502.6A CN112127574A (en) | 2020-10-13 | 2020-10-13 | Stone dry hanging structure of assembled wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN112127574A true CN112127574A (en) | 2020-12-25 |
Family
ID=73853625
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011088502.6A Pending CN112127574A (en) | 2020-10-13 | 2020-10-13 | Stone dry hanging structure of assembled wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112127574A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113622624A (en) * | 2021-07-12 | 2021-11-09 | 浙江亚厦装饰股份有限公司 | Stone dry-hanging assembly and mounting method thereof |
CN114687528A (en) * | 2022-04-15 | 2022-07-01 | 深圳市大地幕墙科技有限公司 | Stone material articulates subassembly, system and stone material curtain |
-
2020
- 2020-10-13 CN CN202011088502.6A patent/CN112127574A/en active Pending
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113622624A (en) * | 2021-07-12 | 2021-11-09 | 浙江亚厦装饰股份有限公司 | Stone dry-hanging assembly and mounting method thereof |
CN114687528A (en) * | 2022-04-15 | 2022-07-01 | 深圳市大地幕墙科技有限公司 | Stone material articulates subassembly, system and stone material curtain |
CN114687528B (en) * | 2022-04-15 | 2023-01-03 | 深圳市大地幕墙科技有限公司 | Stone material articulates subassembly, system and stone material curtain |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112127574A (en) | Stone dry hanging structure of assembled wall | |
US4638618A (en) | Decorative panels comprising replaceable decorative sheets | |
CN110424665A (en) | A kind of wall decorating veneer component and wall body decoration method of plate installation | |
CN213682996U (en) | Stone dry hanging structure of assembled wall | |
CN110725842A (en) | Wall nail assembly and hook, decorative board, wall hanging and mirror using same | |
EP0169061A2 (en) | Decorative panel comprising replaceable decorative sheets | |
CN110295715A (en) | A kind of fibre cement board mounting structure | |
CN210597832U (en) | Ceiling decorative panel installation assembly | |
CN100429370C (en) | Structure component for mounting veneer on wall and using method | |
CN208105743U (en) | Without keel type ceramic tile dry-hanging piece for stone | |
KR101150047B1 (en) | Interior decoration materials for wall | |
CN212897343U (en) | Parquet wood veneer background molding mounting structure | |
CN211817164U (en) | External corner structure of wood veneer decorative wall | |
CN205259533U (en) | Wood veneer link plate decorative structure | |
CN207998947U (en) | A kind of curtain wall structure | |
CN209145113U (en) | A kind of type unitized curtain wall dried hanging hang structure | |
CN208884901U (en) | A kind of concealed keel for wall corner connection decorative panel | |
CN111321862A (en) | Assembled veneer wall structure | |
JP2016037758A (en) | Interior panel | |
CN207228524U (en) | A kind of fireproof heat insulating stone material aluminium honeycomb composite plate | |
CN218714524U (en) | Anti-falling ceramic tile assembly, ceramic tile and hook | |
CN208777607U (en) | A kind of keel of connecting wall corner decorative panel | |
CN216142323U (en) | A safe fixing device for locking stone material composite sheet honeycomb panel | |
CN216616509U (en) | Assembled design structure of public space wood wool board top surface | |
CN218176485U (en) | Silence dado coupling assembling and silence dado |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |