CN112112433A - House construction unloading platform and construction method thereof - Google Patents

House construction unloading platform and construction method thereof Download PDF

Info

Publication number
CN112112433A
CN112112433A CN202010997783.0A CN202010997783A CN112112433A CN 112112433 A CN112112433 A CN 112112433A CN 202010997783 A CN202010997783 A CN 202010997783A CN 112112433 A CN112112433 A CN 112112433A
Authority
CN
China
Prior art keywords
sliding
plate
bottom plate
building
sliding bottom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010997783.0A
Other languages
Chinese (zh)
Other versions
CN112112433B (en
Inventor
吴冰珍
彭本庚
林建辉
赵彬
林栋�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Chuangyun Construction Co ltd
Original Assignee
Fujian Chuangyun Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Chuangyun Construction Co ltd filed Critical Fujian Chuangyun Construction Co ltd
Priority to CN202010997783.0A priority Critical patent/CN112112433B/en
Publication of CN112112433A publication Critical patent/CN112112433A/en
Application granted granted Critical
Publication of CN112112433B publication Critical patent/CN112112433B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/166Landings, receiving platforms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The application discloses a house construction unloading platform and a construction method thereof, relating to the technical field of house construction, which comprises a main beam frame, a platform plate, a lateral baffle plate and a rear baffle plate, wherein the platform plate comprises a placing plate and two extending plates, the extension plate comprises a sliding bottom plate and a side plate parallel to the side baffle, the bottom of the placing plate is provided with a sliding chute for the sliding bottom plate to slide, two sides of one end of the sliding bottom plate far away from the side plate are provided with sliding columns sliding in the sliding chute, two ends of the placing plate are also connected with rotating blocks, the rotating block is provided with a rotating groove which is communicated with the sliding groove and is used for sliding the sliding column, the sliding column on the sliding bottom plate can rotate along the sliding column after sliding into the rotating groove from the sliding groove, and when the bottom plate that slides rotated to parallel with the side direction baffle, the side board on two extension boards docks each other and shields the top of landing slab, be provided with the retaining member that advances line location to the extension board position on the extension board. This application can protect the staff to get on the platform of unloading.

Description

House construction unloading platform and construction method thereof
Technical Field
The application relates to the technical field of house construction, in particular to a house construction unloading platform and a construction method thereof.
Background
In the house building, the building materials need to be transported into the building for construction, and the tower crane cannot directly convey the building materials into the building, so that the method adopted by most construction enterprises is as follows: a platform is built outside a construction floor, the building materials are hoisted to the platform through a tower crane, and then the building materials are carried to the construction floor through manual work.
The invention discloses a discharging platform for building construction, which comprises a discharging platform plate, wherein a supporting mechanism is integrally machined at the rear side of the discharging platform plate, stabilizing mechanisms are bolted at two sides of the discharging platform plate, a fixing mechanism is bolted at the rear side of the bottom of the discharging platform plate, clamping fixing frames are bolted at two sides of the top of the discharging platform plate, the number of the clamping fixing frames is eight, each clamping fixing frame consists of two clamping rods, a stabilizing cover is bolted between the tops of the clamping fixing frames, lifting mechanisms are bolted at two sides of the bottom of the clamping fixing frames, and a protective baffle is slidably connected inside the clamping fixing frames
In the building work progress, each is treated the construction floor and all can be provided with the platform of unloading, when the staff removes to the platform of unloading on the transport building material, can take the shakiness sometimes and lead to building material to drop, and has the staff on the platform of unloading of below to get the material this moment, can lead to injuring the staff on the platform of unloading by a crashing object.
Disclosure of Invention
In order to protect the working personnel to take materials on the discharging platform, the application provides a building construction discharging platform and a construction method thereof.
In a first aspect, the application provides a platform of unloading is built in room, adopts following technical scheme:
a building construction unloading platform comprises a main beam frame fixedly arranged on a building, the end part of the main beam frame extending to the outside of the building, a platform plate arranged on the main beam frame, side baffle plates vertically arranged at two side edges of the platform plate, and a rear baffle plate arranged at one side of the platform plate far away from the building, wherein the platform plate comprises a placing plate for placing building materials and two extending plates which are respectively arranged at the bottom of the placing plate in a sliding way towards the baffle direction towards two sides, the extending plates comprise a sliding bottom plate and side edge plates parallel to the side baffle plates, the bottom of the placing plate is provided with a sliding groove for the sliding bottom plate to slide, sliding columns sliding in the sliding grooves are arranged at two sides of one end of the sliding bottom plate far away from the side edge plates, the two ends of the placing plate are also connected with rotating blocks, rotating grooves communicated with the sliding grooves and used for the sliding columns to slide in are arranged on the rotating blocks, the sliding columns on the sliding bottom plate can rotate along the, and when the bottom plate that slides rotated to parallel with the side direction baffle, the side board on two extension boards docks each other and shields the top of landing slab, be provided with the retaining member that advances line location to the extension board position on the extension board.
Through adopting above-mentioned technical scheme, when the building material that needs were placed is more, can be through the roll-off in the groove that slides of placing the board bottom with the extension board, the retaining member will extend the board location, make many building material can place on the extension board, when the people need remove to the landing slab top simultaneously, two extension boards can rotate and lock behind the roll-off, the side board can seal the top of landing slab, and then avoid building construction in-process sky falling object to smash the staff who gets the material on the landing slab.
Preferably, the two ends of the placing plate extend downwards to be provided with positioning feet, the placing plate is fixed on the main beam frame through the positioning feet, a storage section for placing the sliding bottom plate is formed between the two positioning feet, and the sliding grooves are formed in the opposite side faces of the two positioning feet.
Through adopting above-mentioned technical scheme, place the board and fix a position through the location foot, form between two location feet and deposit the interval, can conveniently slide the installation of bottom plate.
Preferably, the two side baffles are provided with communication doors which can be opened and closed.
Through adopting above-mentioned technical scheme, through the setting of intercommunication door, the staff can open the intercommunication door and carry the building material of placing on the bottom plate that slides.
Preferably, the main beam frame comprises at least three frame rods extending into the house body, and the two frame rods positioned on two sides respectively extend towards the direction far away from the platform frame to form a supporting part for the sliding bottom plate to slide out and then the lower end face of the sliding bottom plate to abut against.
Through adopting above-mentioned technical scheme, can play the supporting role better to the bottom plate that slides after the bottom plate roll-off that slides through setting up of butt portion.
Preferably, after the sliding column moves into the rotating groove and turns over, the sliding bottom plate abuts against the lateral baffle.
Through adopting above-mentioned technical scheme, the retaining member will extend the board fixed back, and the bottom plate that slides keeps the state that offsets with the side direction baffle, can promote holistic stability.
Preferably, the locking piece is a locking bolt, a threaded hole for the locking bolt to be in threaded connection is formed in the sliding bottom plate, a through hole for the locking bolt to pass through is formed in the lateral baffle, and a through hole for the locking bolt to pass through is further formed in the supporting part;
when the sliding bottom plate completely slides out of the storage region, the locking bolt is in threaded connection with the threaded hole and then penetrates into the through hole to position the position of the sliding bottom plate;
when the sliding bottom plate is turned to be parallel to the lateral baffle, the locking bolt penetrates through the through hole and then is in threaded connection with the threaded hole to achieve locking.
Through adopting above-mentioned technical scheme, the position of retaining member bottom plate that will slide is fixed a position, can keep the stability in the use.
Preferably, the side plate comprises a fixed plate integrally arranged with the sliding bottom plate and a sliding plate arranged on the fixed plate in a sliding manner along a direction perpendicular to the sliding bottom plate.
By adopting the technical scheme, through the arrangement of the sliding plates, when the sliding bottom plate is fixedly connected with the lateral baffle, the sliding plates can slide on the fixed plate, and the upper space of the unloading platform can be opened by separating the two sliding plates, so that the building material can be conveniently hung on the unloading platform by the tower crane; the two sliding plates are close to each other, so that the upper space of the discharging platform can be closed, and a worker who falls objects from a high place and takes materials on the discharging platform can be prevented from being smashed.
Preferably, one end of the main beam frame extending into the building is connected with a compression plate, the compression plate is connected to the floor through expansion bolts, one end of the main beam frame extending into the building is further connected with a vertically arranged ejector rod, and the top of the ejector rod is abutted to a ceiling in the building.
By adopting the technical scheme, after the building material is placed on the platform frame, one end of the main beam frame extending into the building has a tilting trend, and the stability in the using process can be improved by fixing the main beam frame on the floor through the expansion bolts; meanwhile, the top rod is abutted against the ceiling, so that the main beam frame can be further limited to turn.
Preferably, the ejector rod comprises a fixed rod fixedly connected to the main beam frame and an adjusting rod in threaded connection with the fixed rod, and the top of the adjusting rod is further provided with an abutting plate abutting against a ceiling.
Through adopting above-mentioned technical scheme, through being the dead lever with the ejector pin split with adjusting the pole, can conveniently after the ejector pin installation finishes, make butt joint board and ceiling offset through adjusting the regulation pole, stability when further promoting the use.
In a second aspect, the application provides a construction method of a house building construction unloading platform, which adopts the following technical scheme:
a construction method of a house building construction unloading platform is used for constructing the unloading platform and comprises the following specific steps:
s1, fixing the placing plate, the lateral baffle and the rear baffle on the main beam frame;
s2, aligning the sliding column on the sliding bottom plate with the sliding groove on the placing plate, and then installing the sliding column into the installation area;
s3, aligning a rotating groove on the rotating seat with a sliding groove on the positioning foot, and fixedly installing the rotating seat on the positioning foot;
s4, hoisting the main beam frame which is installed in the S3 through a tower crane, and enabling one end of the main beam frame, which is not provided with the placing plate, to extend into a room body;
s5, compressing one end of the main beam frame extending into the house body through a compression plate, and fixedly connecting the compression plate to the floor slab through expansion bolts;
and S6, fixing the ejector rod on the main beam frame, and then adjusting the adjusting rod in the ejector rod to enable the abutting plate at the top of the adjusting rod to abut against the ceiling in the house body.
Through adopting above-mentioned technical scheme, when the building material that needs were placed is more or length is longer, can be through with extending the board from placing the groove roll-off that slides of board bottom, make many building material can place on extending the board, when the people need remove to the landing slab top simultaneously, two extension boards can rotate and lock behind the roll-off, the side board can seal the top of landing slab, and then avoid building construction process mid-air falling object to smash the staff who gets the material on the landing slab.
In summary, the present application includes at least one of the following benefits:
1. when more building materials need to be placed, the extension plates can slide out of the sliding grooves in the bottoms of the placing plates, the locking parts can position the extension plates, so that more building materials can be placed on the extension plates, meanwhile, when a person needs to move to the position above the platform plates, the two extension plates can rotate and lock after sliding out, the side plates can seal the tops of the platform plates, and further, workers taking materials on the platform plates are prevented from being injured by falling objects in the building construction process;
2. when the material is required to be added to the unloading platform, the two sliding plates can be opened, and the tower crane can directly hang the building material on the unloading platform; and then the sliding plate is closed to safely take the materials.
Drawings
FIG. 1 is a schematic structural view of the discharging platform after the extension plate is pulled out;
FIG. 2 is a transverse cross-sectional view of the discharge platform extension panel of this embodiment after being pulled out;
FIG. 3 is a schematic view of the construction of the closed upper space after the extension board of the discharging platform is turned over in this embodiment;
fig. 4 is an enlarged view at a in fig. 3.
Description of reference numerals: 1. a main beam frame; 11. a frame bar; 111. a support portion; 12. a cross bar; 13. a compression plate; 2. a platform plate; 21. placing the plate; 211. a positioning leg; 212. storing the interval; 213. a chute; 22. an extension plate; 221. a sliding bottom plate; 2211. a traveler; 222. a side plate; 2221. a fixing plate; 2222. a sliding plate; 223. a protection plate; 23. rotating the block; 231. a rotating groove; 3. a lateral baffle; 31. a communication door; 4. a tailgate; 5. a top rod; 51. fixing the rod; 52. adjusting a rod; 521. a butt joint plate; 6. and a locking member.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses construction platform of unloading is built in room. Referring to fig. 1 and 2, the platform of unloading is including setting firmly on the building and the tip extends to the main beam frame 1 outside the building, the landing slab 2 of setting on main beam frame 1, vertical setting is at the side direction baffle 3 on 2 both sides limits of landing slab, and set up the backplate 4 of keeping away from building one side at landing slab 2. The two side panels 3, the back panel 4 and the platform panel 2 enclose a storage space 212 for the building material. The tower crane conveys the building materials into the storage area 212 and conveys the building materials to the interior of the construction floor through workers.
Specifically, main beam frame 1 is including stretching into three hack levers 11 of the internal portion in room, and the one end that the room body was kept away from to three hack levers 11 is in the same place through a horizontal pole 12 fixed connection, and three hack levers 11 stretch into the internal one end in room simultaneously and are connected with pressure strip 13, fix on the internal floor in room through expansion bolts on pressure strip 13.
In order to further improve the stability of the discharging platform during use, one end of the two frame rods 11 positioned on two sides extending into the house body is also connected with a vertically arranged ejector rod 5. The top of ejector rod 5 offsets with the internal ceiling in room, and ejector rod 5 specifically includes fixed connection and adjusts pole 52 on fixed pole 51 on main beam frame 1 and threaded connection, and the top of adjusting pole 52 still is provided with butt joint board 521, adjusts pole 52 through rotating and can adjust the vertical position of adjusting pole 52, accomplishes the installation after butt joint board 521 on adjusting pole 52 offsets with the internal ceiling in room.
The platform board 2 includes that the board 21 and two extension boards 22 that set up in the board 21 bottom of placing slide to 3 directions of baffle to both sides respectively that supply building material to place, places board 21 and is provided with downwardly extending's location foot 211 along the ascending both ends bottom of main beam frame 1 length direction, forms between two location feet 211 and supplies the storage interval 212 that extension board 22 placed, and two location feet 211 have seted up spout 213 on the relative side simultaneously.
Referring to fig. 2 and 3, the extension plate 22 is made of a light plate, and includes a sliding bottom plate 221 sliding in the storage section 212, an upper side plate 222 vertically connected to the sliding bottom plate 221, and a protection plate 223 disposed on a side of the side plate 222 away from the house body, one end of the sliding bottom plate 221 away from the side plate 222 is provided with a sliding column 2211 inserted into the sliding groove 213 and sliding in the sliding groove 213, and when the sliding bottom plate 221 is located in the storage section 212, the side plate 222 is parallel to the side barrier 3, and the protection plate 223 is located outside the rear barrier 4; when the side plate 222 and the side baffle 3 are attached together, the two sliding bottom plates 221 in the storage section 212 are in an abutting state.
Referring to fig. 2 and 4, the sliding groove 213 penetrates through both ends of the positioning leg 211 along the length direction thereof, and the placing plate 21 is further fixed with a rotating block 23 at both ends of the positioning leg 211, and the rotating block 23 is provided with a rotating groove 231 communicated with the sliding groove 213. The sliding column 2211 on the sliding bottom plate 221 is cylindrical, when the sliding bottom plate 221 slides out of the storage region 212, and the sliding column 2211 enters the rotating groove 231, the sliding bottom plate 221 can turn over with the rotating groove 231 as a center, and when the sliding bottom plate 221 rotates to be parallel to the lateral baffle 3, the sliding bottom plate 221 abuts against the lateral baffle 3, and at this time, the two side plates 222 are butted with each other to seal the region above the discharging platform.
Referring to fig. 2 and 3, in order to facilitate the charging of the construction material on the discharging platform, the side plate 222 includes a fixed plate 2221 integrally provided with the sliding bottom plate 221 and a sliding plate 2222 slidably provided on the fixed plate 2221 in a direction perpendicular to the sliding bottom plate 221. One side of the sliding plate 2222, which is close to the house body, is also provided with a toggle block 2223 which is convenient for controlling the sliding plate 2222, and the upper space of the unloading platform can be opened just by separating the two sliding plates 2222, so that the building material can be conveniently hung on the unloading platform by a tower crane; the two sliding plates 2222 can be closed by closing the upper space of the discharging platform to prevent falling objects from falling from the high place and hitting the discharging platform to take the materials.
The frame bodies on both sides extend towards the direction away from the platform frame and form a support part 111 for the lower end surface of the sliding bottom plate 221 to abut against, and when the sliding bottom plate 221 slides out from the storage section 212, the support part 111 abuts against the lower end surface of the sliding bottom plate 221 to support the sliding bottom plate 221.
Referring to fig. 1 and 2, a locking member 6 for positioning the position of the sliding bottom plate 221 is further disposed on the sliding bottom plate 221, the locking member 6 is configured as a locking bolt, a threaded hole for the locking bolt to be in threaded connection is formed in the sliding bottom plate 221, a through hole for the locking bolt to pass through is formed in the lateral baffle 3, and a through hole for the locking bolt to pass through is further disposed on the supporting portion 111; when the sliding bottom plate 221 completely slides out of the storage section 212, the locking bolt is in threaded connection with the threaded hole and then penetrates into the through hole to position the sliding bottom plate 221; when the sliding bottom plate 221 is turned to be parallel to the lateral baffle 3, the locking bolt penetrates through the through hole and then is in threaded connection with the threaded hole to realize locking.
The implementation principle of the construction platform of unloading is built in room in this application embodiment is:
when the building materials are few, the building materials are hung on the discharging platform by opening the sliding plate 2222, and then the sliding plate 2222 is closed by a worker, so that the worker can safely move to the discharging platform to take materials;
when the building materials are more, the extension plate 22 can be turned downwards and then positioned through the locking bolt, and more building materials can be placed on the sliding bottom plate 221. The side shutter 3 is provided with an openable and closable communication door 31 so that the material can be taken from the slide bottom plate 221.
The embodiment of the application also discloses a construction method of the house building construction unloading platform, which is used for constructing the unloading platform. The construction method comprises the following specific steps:
s1, fixing the placing plate 21, the side baffle 3 and the rear baffle 4 on the main beam frame 1;
s2, aligning the sliding column 2211 on the sliding bottom board 221 with the sliding groove 213 on the placing board 21, and then installing the sliding column 2211 into the installation area;
s3, aligning the rotating groove 231 on the rotating seat with the sliding groove 213 on the positioning leg 211, and fixedly installing the rotating seat on the positioning leg 211;
s4, hoisting the main beam frame 1 which is installed in the step S3 by a tower crane, and enabling one end of the main beam frame 1, which is not provided with the placing plate 21, to extend into a house body;
s5, compressing one end of the main beam frame 1 extending into the house body through a compression plate 13, and fixedly connecting the compression plate 13 to a floor slab through an expansion bolt;
s6, the jack 5 is fixed to the main beam frame 1, and then the adjustment lever 52 of the jack 5 is adjusted so that the abutting plate 521 at the top of the adjustment lever 52 abuts against the ceiling in the room.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a platform of unloading is built in room, includes sets firmly on the building and the tip extends to the outer girder structure (1) of building, sets up landing slab (2) on landing slab structure (1), vertical setting at side direction baffle (3) on landing slab (2) both sides limit and set up backplate (4) of keeping away from building one side at landing slab (2), its characterized in that: the platform board (2) including supply building material to place board (21) and to two extension boards (22) of setting in placing board (21) bottom that slide to baffle (3) direction to both sides respectively, extension board (22) are including sliding bottom plate (221) and being on a parallel with side board (222) of side baffle (3), place board (21) bottom has spout (213) that supply sliding bottom plate (221) to slide, the both sides of the one end that side board (222) were kept away from to sliding bottom plate (221) are provided with traveller (2211) that slides in spout (213), the both ends of placing board (21) still are connected with turning block (23), set up on turning block (23) and communicate with spout (213) and supply traveller (2211) to slide rotation groove (231) into, traveller (2211) on the sliding bottom plate (221) can rotate along traveller (2211) after sliding into rotation groove (231) from spout (213), and when bottom plate (221) that slides rotated to be parallel with side direction baffle (3), side board (222) on two extension boards (22) dock each other and shield the top of landing slab (2), be provided with retaining member (6) that go on fixing a position extension board (22) on extension board (22).
2. The building construction unloading platform according to claim 1, characterized in that: two ends of the placing plate (21) extend downwards to be provided with positioning feet (211), a storage section (212) for placing the sliding bottom plate (221) is formed between the positioning feet (211), and the sliding groove (213) is formed in the opposite side faces of the two positioning feet (211).
3. The building construction unloading platform according to claim 1, characterized in that: and the two lateral baffles (3) are provided with communication doors (31) which can be opened and closed.
4. The building construction unloading platform according to claim 1, characterized in that: the main beam frame (1) comprises at least three frame rods (11) extending into the house body, and two frame rods (11) positioned on two sides respectively extend towards the direction far away from the platform frame to form a supporting part (111) for the sliding bottom plate (221) to slide out and then the lower end face of the sliding bottom plate is abutted against.
5. The building construction unloading platform according to claim 1, characterized in that: and after the sliding column (2211) moves into the rotating groove (231) and is turned over, the sliding bottom plate (221) is abutted against the lateral baffle (3).
6. The building construction unloading platform according to claim 4, characterized in that:
the locking piece (6) is a locking bolt, a threaded hole for the locking bolt to be in threaded connection is formed in the sliding bottom plate (221), a through hole for the locking bolt to pass through is formed in the lateral baffle plates (3) and (3), and a through hole for the locking bolt to pass through is further formed in the supporting part (111);
when the sliding bottom plate (221) completely slides out of the storage section (212), the locking bolt is in threaded connection with the threaded hole and then penetrates into the through hole to position the position of the sliding bottom plate (221);
when the sliding bottom plate (221) is turned to be parallel to the lateral baffle plates (3) and (3), the locking bolt penetrates through the through hole and then is in threaded connection with the threaded hole to achieve locking.
7. The building construction unloading platform according to claim 1, characterized in that: the side plate (222) comprises a fixed plate (2221) integrally arranged with the sliding bottom plate (221) and a sliding plate (2222) arranged on the fixed plate (2221) in a sliding mode along the direction perpendicular to the sliding bottom plate (221).
8. The building construction unloading platform according to claim 1, characterized in that: the main beam frame (1) is connected with a pressing plate (13) at one end extending into the building, the pressing plate (13) is connected to a floor through expansion bolts, a vertically arranged ejector rod (5) is further connected at one end extending into the building of the main beam frame (1), and the top of the ejector rod (5) is abutted to a ceiling in the building.
9. The building construction unloading platform according to claim 8, characterized in that: the ejector rod (5) comprises a fixed rod (51) fixedly connected to the main beam frame (1) and an adjusting rod (52) in threaded connection with the fixed rod (51), and the top of the adjusting rod (52) is further provided with an abutting plate (521) abutting against a ceiling.
10. A construction method of a discharging platform for building construction, which is used for the discharging platform of claim 9, and is characterized in that: the method comprises the following specific steps:
s1, fixing the placing plate (21), the lateral baffle (3) and the rear baffle (4) on the main beam frame (1);
s2, aligning a sliding column (2211) on the sliding bottom plate (221) with a sliding groove (213) on the placing plate (21) and further installing the sliding column into an installation interval;
s3, aligning the rotating groove (231) on the rotating seat with the sliding groove (213) on the positioning foot (211), and fixedly installing the rotating seat on the positioning foot (211);
s4, hoisting the main beam frame (1) which is installed in the S3 through a tower crane, and enabling one end of the main beam frame (1) which is not provided with the placing plate (21) to extend into a house body;
s5, compressing one end of the main beam frame (1) extending into the house body through a compression plate (13), and fixedly connecting the compression plate (13) to the floor slab through an expansion bolt;
s6, the ejector rod (5) is fixed on the main beam frame (1), and then the adjusting rod (52) in the ejector rod (5) is adjusted, so that the abutting plate (521) at the top of the adjusting rod (52) abuts against the ceiling in the house body.
CN202010997783.0A 2020-09-21 2020-09-21 House construction unloading platform and construction method thereof Active CN112112433B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010997783.0A CN112112433B (en) 2020-09-21 2020-09-21 House construction unloading platform and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010997783.0A CN112112433B (en) 2020-09-21 2020-09-21 House construction unloading platform and construction method thereof

Publications (2)

Publication Number Publication Date
CN112112433A true CN112112433A (en) 2020-12-22
CN112112433B CN112112433B (en) 2022-01-28

Family

ID=73800191

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010997783.0A Active CN112112433B (en) 2020-09-21 2020-09-21 House construction unloading platform and construction method thereof

Country Status (1)

Country Link
CN (1) CN112112433B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006504A (en) * 2021-03-05 2021-06-22 福建力森建设有限公司 House construction project platform of unloading
CN113605666A (en) * 2021-09-03 2021-11-05 耀华建设管理有限公司 Face supplementary construction platform of limit structure post

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205908032U (en) * 2016-08-16 2017-01-25 南通四建集团有限公司 Construction overhanging type removes blanking platform
CN206873949U (en) * 2017-05-02 2018-01-12 中天建设集团有限公司 Construction regularization floor steel platform for material unloading
CN207092571U (en) * 2017-08-25 2018-03-13 浙江宏超建设集团有限公司 A kind of discharging platform
US20180305940A1 (en) * 2015-11-12 2018-10-25 True Power Pty Ltd Furling crane loading platform
CN111021750A (en) * 2020-01-20 2020-04-17 中冶建工集团有限公司 Integral platform protective structure of unloading

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20180305940A1 (en) * 2015-11-12 2018-10-25 True Power Pty Ltd Furling crane loading platform
CN205908032U (en) * 2016-08-16 2017-01-25 南通四建集团有限公司 Construction overhanging type removes blanking platform
CN206873949U (en) * 2017-05-02 2018-01-12 中天建设集团有限公司 Construction regularization floor steel platform for material unloading
CN207092571U (en) * 2017-08-25 2018-03-13 浙江宏超建设集团有限公司 A kind of discharging platform
CN111021750A (en) * 2020-01-20 2020-04-17 中冶建工集团有限公司 Integral platform protective structure of unloading

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113006504A (en) * 2021-03-05 2021-06-22 福建力森建设有限公司 House construction project platform of unloading
CN113006504B (en) * 2021-03-05 2022-04-22 福建力森建设有限公司 House construction project platform of unloading
CN113605666A (en) * 2021-09-03 2021-11-05 耀华建设管理有限公司 Face supplementary construction platform of limit structure post

Also Published As

Publication number Publication date
CN112112433B (en) 2022-01-28

Similar Documents

Publication Publication Date Title
CN112112433B (en) House construction unloading platform and construction method thereof
CA2883418C (en) A panel support bracket
US4829726A (en) Extensible construction
CN111287353B (en) Unit curtain wall hoisting process
US4974700A (en) Movable support mechanism for construction of elevator shafts and the like
CN113006504B (en) House construction project platform of unloading
CN214302811U (en) Self-adaptive all-steel attached lifting scaffold in micro-tilt building
WO2009109514A1 (en) Collapsible container
CN208072912U (en) A kind of Easy opened scaffold that construction site auxiliary is built
CN214819520U (en) Maintenance of prefabricated case roof beam is with health preserving device
CN214696789U (en) External wall insulation decorates intergral template construction erection equipment
CN209620551U (en) A kind of multi-functional mounting platform of high voltage power cable
CN109555301A (en) A kind of multi-functional mounting platform of high voltage power cable
CN212176483U (en) Falling-proof scaffold for green construction
CN110847637B (en) Multi-layer spliced box-type house and assembling method thereof
CN113152705A (en) Outer hanging protective structure of shelter
CN106968454A (en) A kind of repair method of removing stage makeup and costume of curtain wall panel
CN208428915U (en) Multi-joint shelter lateral connection channel
CN216429116U (en) Interim protection network installation device of elevator mouth for building engineering
CN110306784A (en) A kind of aluminum tunnel modular system and its operating method
CN214656894U (en) Floor type drilling platform
CN212176497U (en) Portable scaffold for constructional engineering
CN219823593U (en) Construction lifting platform with protection structure
CN218292959U (en) Concealed whistle for ground pit worker
CN214462304U (en) Reinforced structure is prevent wind to scaffold frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant