CN112112288A CN202011087660.XA CN202011087660A CN112112288A CN 112112288 A CN112112288 A CN 112112288A CN 202011087660 A CN202011087660 A CN 202011087660A CN 112112288 A CN112112288 A CN 112112288A
Authority
CN
China
Prior art keywords
top surface
wall body
plate
welded
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011087660.XA
Other languages
Chinese (zh)
Inventor
迟玉华
吴艳阳
赵士勇
张学应
张羽
史佳兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Original Assignee
Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gold Mantis Fine Decoration Technology Suzhou Co Ltd filed Critical Gold Mantis Fine Decoration Technology Suzhou Co Ltd
Priority to CN202011087660.XA priority Critical patent/CN112112288A/en
Publication of CN112112288A publication Critical patent/CN112112288A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/61Connections for building structures in general of slab-shaped building elements with each other
    • E04B2001/6195Connections for building structures in general of slab-shaped building elements with each other the slabs being connected at an angle, e.g. forming a corner

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Connection Of Plates (AREA)

Abstract

The invention discloses a top surface connecting structure for mounting an assembled top surface, which comprises a top plate, wherein a wall body is arranged below the top plate, two third sliding rails are mounted inside the wall body, a third limiting block is welded on one side inside the third sliding rails, a third sliding block is connected inside the third sliding rails in a sliding manner, and a first fixing plate penetrates through the inside of the wall body; when the device is used, the first fixing plate is arranged to push the second fixing plate, so that the second clamping block is separated from the second clamping groove, the second spring pushes the first clamping block to be clamped into the first hole groove, and the first fixing plate is fixed in the first hole groove, so that the device can be used for quickly connecting a wall body and a top plate without additional auxiliary equipment for auxiliary installation; this device is when using, and through setting up the second slider and slide in the second slide rail, stability when reinforcing first fixture block motion prevents that first fixture block skew from leading to in unable card income first draw-in groove.

Description

Top surface connection structure is used in installation of assembled top surface
Technical Field
The invention relates to the technical field of assembly type top surface installation auxiliary equipment, in particular to a top surface connecting structure for assembly type top surface installation.
Background
The prefabricated building mainly comprises a prefabricated concrete structure, a steel structure, a modern wood structure building and the like, because the prefabricated building is designed in a standardized way, produced in a factory, constructed in an assembly way, managed in an informatization way and applied in an intelligentized way, the prefabricated building is represented by a modern industrial production way, along with the development of modern industrial technology, the prefabricated building components can be manufactured in a set in batch like the production of machines, and the prefabricated building components are only required to be transported to a construction site for assembly.
During the top surface installation of assembly type structure, need be connected wall body and top surface, when current assembly type top surface and wall connection, need with the help of auxiliary connection equipment with its rigidity, then pour it, work efficiency is low, is not convenient for carry out the high-speed joint to it, for this reason, provides a top surface connection structure for the installation of assembly type top surface.
Disclosure of Invention
The present invention is directed to a top connection structure for top surface installation, which solves the above problems of the prior art.
In order to achieve the purpose, the invention provides the following technical scheme: a top surface connecting structure for mounting an assembled top surface comprises a top plate, wherein a wall body is arranged below the top plate, two third slide rails are arranged inside the wall body, a third limiting block is welded on one side inside the third slide rails, a third slide block is connected inside the third slide rails in a sliding manner, a first fixing plate penetrates through the wall body, one side of the third slide block is welded with the first fixing plate, a third spring is welded on one side of the first fixing plate, one end of the third spring is fixedly connected with the wall body, a first hole groove is formed in one side inside the top plate, one side of the first fixing plate penetrates through the first hole groove, a first spring is welded on one side inside the first hole groove, a second fixing plate is welded on one end of the first spring, two second slide rails are mounted on two sides inside the first hole groove, and two second limiting blocks are welded on two sides inside the second slide rails, the utility model discloses a fixing device for fixing a sliding rail, including first slide rail, first fixed plate, first clamping groove and second clamping groove, the inside sliding connection of second slide rail has the second slider, the welding of one side of second slider has first fixture block, the welding of one side of first fixture block has the second spring, the one end and the roof welding of second spring, two first draw-in grooves have been seted up to the both sides of first fixed plate, first fixture block passes through first draw-in groove and first fixed plate joint, the second draw-in groove has been seted up to inside one side of first fixture block, the welding of one side of.
As further preferable in the present technical solution: two first slide rails are installed on two sides of the interior of the first hole groove, a first slide block is connected to the interior of the first slide rail in a sliding mode, and one side of the first slide block is welded with the second fixing plate.
As further preferable in the present technical solution: two first limiting blocks are welded on two sides of the interior of the first sliding rail.
As further preferable in the present technical solution: a third clamping groove is formed in one side of the wall body, and a first shell is clamped inside the third clamping groove.
As further preferable in the present technical solution: first screw hole has been seted up to one side of wall body, the inside one side threaded connection of first casing has first bolt, one side of first bolt is through first screw hole and wall body threaded connection, the one end of first bolt runs through third slider and first fixed plate, one side and third slider and first fixed plate threaded connection that first bolt runs through third slider and first fixed plate.
As further preferable in the present technical solution: the top welding of wall body has two inserted bars, two jacks have been seted up to one side of roof, the inserted bar passes through jack and roof joint.
As further preferable in the present technical solution: the wall body is characterized in that a corner plate is arranged on one side of the wall body, a second bolt and a third bolt are respectively in threaded connection with two sides of the interior of the corner plate, a second threaded hole is formed in one side of the top plate, a third threaded hole is formed in one side of the wall body, one end of the second bolt is in threaded connection with the top plate through the second threaded hole, and one end of the third bolt is in threaded connection with the wall body through the third threaded hole.
As further preferable in the present technical solution: a second rubber block is bonded to one side of the wall, and a supporting rod is welded to one side of the first shell.
As further preferable in the present technical solution: and two triangular plates are welded on one side of the corner plate.
As further preferable in the present technical solution: one end of the supporting rod is bonded with a first rubber block.
Compared with the prior art, the invention has the beneficial effects that:
when the device is used, the first fixing plate is arranged to push the second fixing plate, so that the second clamping block is separated from the second clamping groove, the second spring pushes the first clamping block to be clamped into the first hole groove, and the first fixing plate is fixed in the first hole groove, so that the device can be used for quickly connecting a wall body with a top plate without additional auxiliary equipment for auxiliary installation;
second, this device is when using, and through setting up the second slider and slide in the second slide rail, stability when reinforcing first fixture block motion prevents that first fixture block skew from leading to in unable card income first draw-in groove.
Drawings
FIG. 1 is a schematic side view of the wall of the present invention;
FIG. 2 is a schematic structural view of the present invention;
FIG. 3 is a side view of the corner panel of the present invention;
FIG. 4 is a side view of the top plate of the present invention;
FIG. 5 is a schematic side view of the wall of the present invention;
FIG. 6 is a side view of the corner panel of the present invention;
FIG. 7 is a side view of the first slot of the present invention.
In the figure: 1. a top plate; 2. a first housing; 3. a wall body; 4. a first bolt; 5. inserting a rod; 6. a first card slot; 7. a first fixing plate; 8. corner plates; 9. a set square; 10. a support bar; 11. a first rubber block; 12. a first slide rail; 13. a first stopper; 14. a first spring; 16. a second fixing plate; 17. a first slider; 18. a second fixture block; 19. a second spring; 20. a second slide rail; 21. a first hole groove; 22. a second slider; 23. a second limiting block; 24. a first clamping block; 25. a second card slot; 26. a second rubber block; 27. a third card slot; 28. a first threaded hole; 29. a third spring; 30. a third slide rail; 31. a third slider; 32. a third limiting block; 33. a second threaded hole; 34. a second bolt; 35. a third threaded hole; 36. a third bolt; 37. and (4) inserting the jack.
Detailed Description
The technical solutions in the embodiments of the present invention will be clearly and completely described below with reference to the drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all of the embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Examples
Referring to fig. 1-7, the present invention provides a technical solution: a top surface connecting structure for mounting an assembled top surface comprises a top plate 1, a wall body 3 is arranged below the top plate 1, two third slide rails 30 are mounted inside the wall body 3, a third limiting block 32 is welded on one side inside the third slide rails 30, a third slide block 31 is connected inside the third slide rails 30 in a sliding manner, a first fixing plate 7 penetrates through the inside of the wall body 3, one side of the third slide block 31 is welded with the first fixing plate 7, a third spring 29 is welded on one side of the first fixing plate 7, one end of the third spring 29 is fixedly connected with the wall body 3, a first hole groove 21 is formed in one side inside the top plate 1, one side of the first fixing plate 7 penetrates through the first hole groove 21, a first spring 14 is welded on one side inside the first hole groove 21, a second fixing plate 16 is welded on one end of the first spring 14, two second slide rails 20 are mounted on two sides inside the first hole groove 21, two second limiting blocks 23 are welded on two sides inside the second slide rails 20, the inside sliding connection of second slide rail 20 has second slider 22, first fixture block 24 has been welded to one side of second slider 22, second spring 19 has been welded to one side of first fixture block 24, the one end and the roof 1 welding of second spring 19, two first draw-in grooves 6 have been seted up to the both sides of first fixed plate 7, first fixture block 24 passes through first draw-in groove 6 and first fixed plate 7 joint, second draw-in groove 25 has been seted up to inside one side of first fixture block 24, two second fixture blocks 18 have been welded to one side of second fixed plate 16.
In this embodiment, specifically: two first slide rails 12 are installed to the inside both sides of first hole groove 21, and the inside sliding connection of first slide rail 12 has first slider 17, and one side and the welding of second fixed plate 16 of first slider 17 set up first slider 17 and slide in first slide rail 12, stability when reinforcing second fixed plate 16 motion.
In this embodiment, specifically: two first limiting blocks 13 are welded on two sides of the interior of the first slide rail 12, and the first limiting blocks 13 are arranged to prevent the first slide block 17 from being separated from the first slide rail 12.
In this embodiment, specifically: a third clamping groove 27 is formed in one side of the wall 3, a first shell 2 is clamped inside the third clamping groove 27, and the joint of the first bolt 4 and the wall 3 is protected by the first shell 2.
In this embodiment, specifically: first screw hole 28 has been seted up to one side of wall body 3, the inside one side threaded connection of first casing 2 has first bolt 4, first bolt 4's one side is through first screw hole 28 and wall body 3 threaded connection, third slider 31 and first fixed plate 7 are run through to the one end of first bolt 4, first bolt 4 runs through one side and third slider 31 and the threaded connection of first fixed plate 7 of third slider 31 and first fixed plate 7, sets up first bolt 4 and is used for fixed third slider 31 and first fixed plate 7.
In this embodiment, specifically: two inserted bars 5 have been welded at the top of wall body 3, and two jacks 37 have been seted up to one side of roof 1, and inserted bar 5 passes through jack 37 and roof 1 joint, sets up the mounted position skew that 5 cooperation jacks 37 of inserted bar prevent first fixed plate 7.
In this embodiment, specifically: one side of wall body 3 is equipped with corner board 8, there are second bolt 34 and third bolt 36 in the inside both sides of corner board 8 threaded connection respectively, second screw hole 33 has been seted up to one side of roof 1, third screw hole 35 has been seted up to one side of wall body 3, second bolt 34's one end is through second screw hole 33 and roof 1 threaded connection, third bolt 36's one end is through third screw hole 35 and wall body 3 threaded connection, set up corner board 8 cooperation set-square 9 reinforcing wall body 3 and roof 1's stability of being connected.
In this embodiment, specifically: a second rubber block 26 is bonded on one side of the wall body 3, a support rod 10 is welded on one side of the first shell 2, and the support rod 10 is arranged to further enhance the connection stability of the wall body 3 and the top plate 1.
In this embodiment, specifically: two triangular plates 9 are welded on one side of the corner plate 8.
In this embodiment, specifically: one end of the support bar 10 is bonded with a first rubber block 11.
In the working principle or the structural principle, when the connecting device is used, the first fixing plate 7 is pushed to extrude the third spring 29, the inserting rod 5 is inserted into the inserting hole 37, the third spring 29 pushes the first fixing plate 7 to enter the first hole groove 21, the first fixing plate 7 pushes the second fixing plate 16 to extrude the first spring 14, the second fixing plate 16 drives the second clamping block 18 to be separated from the second clamping groove 25, the second spring 19 pushes the first clamping block 24 to be clamped into the first clamping groove 6, the first fixing plate 7 is fixed inside the first hole groove 21, the first shell 2 is clamped into the third clamping groove 27, the first bolt 4 is rotated to penetrate through the third sliding block 31 and the first fixing plate 7, the positions of the third sliding block 31 and the first fixing plate 7 are fixed, and the connection between the wall body 3 and the top plate 1 can be completed quickly.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (10)

1. A top surface connection structure for mounting of an assembled top surface, comprising a top plate (1), characterized in that: a wall body (3) is arranged below the top plate (1), two third sliding rails (30) are arranged inside the wall body (3), a third limiting block (32) is welded on one side inside the third sliding rails (30), a third sliding block (31) is connected inside the third sliding rails (30) in a sliding manner, a first fixing plate (7) penetrates through the wall body (3), one side of the third sliding block (31) is welded with the first fixing plate (7), a third spring (29) is welded on one side of the first fixing plate (7), one end of the third spring (29) is fixedly connected with the wall body (3), a first hole groove (21) is formed in one side inside the top plate (1), the first hole groove (21) is penetrated through one side of the first fixing plate (7), a first spring (14) is welded on one side inside of the first hole groove (21), and a second fixing plate (16) is welded at one end of the first spring (14), two second slide rails (20) are installed to the inside both sides of first hole groove (21), the inside both sides welding of second slide rail (20) has two second stopper (23), the inside sliding connection of second slide rail (20) has second slider (22), one side welding of second slider (22) has first fixture block (24), one side welding of first fixture block (24) has second spring (19), the one end and the roof (1) welding of second spring (19), two first draw-in grooves (6) have been seted up to the both sides of first fixed plate (7), first fixture block (24) are through first draw-in groove (6) and first fixed plate (7) joint, second draw-in groove (25) have been seted up to inside one side of first fixture block (24), one side welding of second fixed plate (16) has two second fixture blocks (18).
2. The top surface connecting structure for mounting on a fabricated top surface of claim 1, wherein: two first slide rails (12) are installed to the inside both sides of first hole groove (21), the inside sliding connection of first slide rail (12) has first slider (17), one side and the welding of second fixed plate (16) of first slider (17).
3. The top surface connecting structure for top surface mounting of the fabricated type according to claim 2, wherein: two first limiting blocks (13) are welded on two sides of the interior of the first sliding rail (12).
4. The top surface connecting structure for mounting on a fabricated top surface of claim 1, wherein: a third clamping groove (27) is formed in one side of the wall body (3), and a first shell (2) is clamped inside the third clamping groove (27).
5. The top surface connecting structure for top surface mounting of the fabricated type according to claim 4, wherein: first screw hole (28) have been seted up to one side of wall body (3), the inside one side threaded connection of first casing (2) has first bolt (4), one side of first bolt (4) is through first screw hole (28) and wall body (3) threaded connection, the one end of first bolt (4) is run through third slider (31) and first fixed plate (7), one side and third slider (31) and first fixed plate (7) threaded connection that third slider (31) and first fixed plate (7) are run through in first bolt (4).
6. The top surface connecting structure for mounting on a fabricated top surface of claim 1, wherein: the top welding of wall body (3) has two inserted bars (5), two jack (37) have been seted up to one side of roof (1), inserted bar (5) are through jack (37) and roof (1) joint.
7. The top surface connecting structure for mounting on a fabricated top surface of claim 1, wherein: the wall body is characterized in that a corner plate (8) is arranged on one side of the wall body (3), a second bolt (34) and a third bolt (36) are respectively in threaded connection with two sides of the interior of the corner plate (8), a second threaded hole (33) is formed in one side of the top plate (1), a third threaded hole (35) is formed in one side of the wall body (3), one end of the second bolt (34) is in threaded connection with the top plate (1) through the second threaded hole (33), and one end of the third bolt (36) is in threaded connection with the wall body (3) through the third threaded hole (35).
8. The top surface connecting structure for top surface mounting of the fabricated type according to claim 4, wherein: a second rubber block (26) is bonded to one side of the wall body (3), and a support rod (10) is welded to one side of the first shell (2).
9. The top surface connecting structure for top surface mounting of the fabricated type according to claim 7, wherein: and two triangular plates (9) are welded on one side of the corner plate (8).
10. The top surface connecting structure for top surface mounting of the fabricated type according to claim 8, wherein: one end of the support rod (10) is bonded with a first rubber block (11).
CN202011087660.XA 2020-10-13 2020-10-13 Top surface connection structure is used in installation of assembled top surface Pending CN112112288A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011087660.XA CN112112288A (en) 2020-10-13 2020-10-13 Top surface connection structure is used in installation of assembled top surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011087660.XA CN112112288A (en) 2020-10-13 2020-10-13 Top surface connection structure is used in installation of assembled top surface

Publications (1)

Publication Number Publication Date
CN112112288A true CN112112288A (en) 2020-12-22

Family

ID=73797991

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011087660.XA Pending CN112112288A (en) 2020-10-13 2020-10-13 Top surface connection structure is used in installation of assembled top surface

Country Status (1)

Country Link
CN (1) CN112112288A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210140914U (en) * 2019-05-21 2020-03-13 山东大华广节能科技有限公司 Assembled house wallboard connection structure
CN211037263U (en) * 2019-07-30 2020-07-17 焦丹 Lap joint structure based on thin-wall square box hollow floor cover plate and wall body for air villa
CN211312935U (en) * 2019-11-16 2020-08-21 郑桂波 Assembled building element that can convenient hoist and mount
CN211369077U (en) * 2019-11-06 2020-08-28 亚泰集团沈阳现代建筑工业有限公司 Wall-connecting joint for mounting and supporting assembly type building wall
CN211523485U (en) * 2019-10-25 2020-09-18 湖州天跃建设工程有限公司 Connection structure for assembled shear force wall
CN213926780U (en) * 2020-10-13 2021-08-10 金螳螂精装科技(苏州)有限公司 Top surface connection structure is used in installation of assembled top surface

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN210140914U (en) * 2019-05-21 2020-03-13 山东大华广节能科技有限公司 Assembled house wallboard connection structure
CN211037263U (en) * 2019-07-30 2020-07-17 焦丹 Lap joint structure based on thin-wall square box hollow floor cover plate and wall body for air villa
CN211523485U (en) * 2019-10-25 2020-09-18 湖州天跃建设工程有限公司 Connection structure for assembled shear force wall
CN211369077U (en) * 2019-11-06 2020-08-28 亚泰集团沈阳现代建筑工业有限公司 Wall-connecting joint for mounting and supporting assembly type building wall
CN211312935U (en) * 2019-11-16 2020-08-21 郑桂波 Assembled building element that can convenient hoist and mount
CN213926780U (en) * 2020-10-13 2021-08-10 金螳螂精装科技(苏州)有限公司 Top surface connection structure is used in installation of assembled top surface

Similar Documents

Publication Publication Date Title
CN211172383U (en) Stable beam column connected node
CN213926780U (en) Top surface connection structure is used in installation of assembled top surface
CN217480405U (en) Assembled steel construction building
CN212405609U (en) Wallboard externally-hung connecting structure in assembled
CN112112288A (en) Top surface connection structure is used in installation of assembled top surface
CN211539569U (en) Angle steel puncher
CN210888068U (en) Combined building template
CN112095852A (en) Wallboard externally-hung connecting structure in assembled
CN213926895U (en) Shear wall corner steel column module for assembly type building
CN215168088U (en) Combined connecting and locking device for building template
CN212613026U (en) Crossbeam and stand connecting device for assembly type structure
CN214090371U (en) Shear-resistant reinforced node of assembled concrete wall body plate and concrete wall body column
CN213682777U (en) Supporting structure of assembled precast concrete furred ceiling
CN221193941U (en) Preassembled building beam structure
CN112252524A (en) Shear wall corner steel column module for assembly type building
CN212428090U (en) Building templates link for civil engineering
CN214090470U (en) Assembly type building component structure based on BIM
CN219484257U (en) Drilling device for manufacturing capacitor shell
CN220644746U (en) Prefabricated interior wallboard for building
CN216740092U (en) Auxiliary mechanism for horizontal connection and installation of steel structure
CN218323922U (en) Assembled horizontal splicing template
CN215978460U (en) Side form corner connecting piece capable of adjusting mounting height of beam body side form
CN214246064U (en) Novel reinforced structure is used in combination house construction
CN212562025U (en) Green assembled building lightweight steel wall connection structure
CN220035690U (en) Prefabricated post node connecting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination