CN112112083A - Pier shaft intelligence curing means - Google Patents

Pier shaft intelligence curing means Download PDF

Info

Publication number
CN112112083A
CN112112083A CN202011008397.0A CN202011008397A CN112112083A CN 112112083 A CN112112083 A CN 112112083A CN 202011008397 A CN202011008397 A CN 202011008397A CN 112112083 A CN112112083 A CN 112112083A
Authority
CN
China
Prior art keywords
fixed
subassembly
pier
telescopic sleeve
pier shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202011008397.0A
Other languages
Chinese (zh)
Other versions
CN112112083B (en
Inventor
秦浩
华刚
游宇斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Port Access Bridge Group Co ltd
Original Assignee
Jiangsu Port Access Bridge Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Port Access Bridge Group Co ltd filed Critical Jiangsu Port Access Bridge Group Co ltd
Priority to CN202011008397.0A priority Critical patent/CN112112083B/en
Publication of CN112112083A publication Critical patent/CN112112083A/en
Application granted granted Critical
Publication of CN112112083B publication Critical patent/CN112112083B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00Material constitution of bridges
    • E01D2101/20Concrete, stone or stone-like material
    • E01D2101/24Concrete
    • E01D2101/26Concrete reinforced

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The application relates to a pier shaft intelligence curing means, it is including arranging the fixed subassembly of pier shaft upper surface top in, fixed subassembly lower surface circumference fixedly connected with is used for carrying out the spray assembly of watering maintenance for the pier shaft, spray assembly lays along the length direction of pier shaft, be provided with the monitoring subassembly that is used for monitoring water content and temperature between pier shaft and the spray assembly between spray assembly and the pier shaft, this application has control maintenance water consumption and maintenance time, and then the effect of the stability of guaranteeing pier shaft and using.

Description

Pier shaft intelligence curing means
Technical Field
The application relates to the technical field of pier shaft maintenance, in particular to an intelligent pier shaft maintenance device.
Background
The pier shaft is the main part of the middle supporting structure of the multi-span bridge, and mainly comprises stone materials, reinforced concrete and steel, the pier shaft needs to be subjected to watering maintenance after forming, so that the wetting of the surface of concrete is guaranteed, children guarantee that cement hardening can be smoothly carried out, the maintenance is not timely, the cracking of the concrete can be caused, and the safety and the normal use of the structure are influenced.
When the existing pier body is maintained, generally, workers carry out watering maintenance on the pier body or manually carry out power-on and water-supply operation on a spraying pipeline to realize maintenance on the pier body.
Aiming at the related technologies, the inventor thinks that the defects of excessive or missing water consumption, irregular watering and incapability of ensuring the use stability of the pier body exist.
Disclosure of Invention
In order to solve the defect of the technical scheme, the application provides an intelligent pier body maintenance device.
The application provides a pier shaft intelligence curing means adopts following technical scheme: the utility model provides a pier shaft intelligence curing means, is including arranging the fixed subassembly of pier shaft upper surface top in, fixed subassembly lower surface circumference fixedly connected with is used for carrying out the spraying subassembly of watering maintenance for the pier shaft, and the spraying subassembly is laid along the length direction of pier shaft, is provided with the monitoring subassembly that is used for monitoring water content and temperature between pier shaft and the spraying subassembly between spraying subassembly and the pier shaft.
Through adopting above-mentioned technical scheme, when using intelligent curing means to maintain the pier shaft, with fixed subassembly fixed connection at the pier shaft upper surface, be connected spray assembly and fixed subassembly this moment, guarantee simultaneously that spray assembly is located the circumference outer wall of pier shaft, start spray assembly this moment, spray assembly sprays the maintenance to the pier shaft, water content and temperature between monitoring assembly monitoring pier shaft and the spray assembly simultaneously, monitoring assembly's monitoring result control spray assembly whether works, and then guaranteed the maintenance that sprays to the pier shaft, pier shaft intelligent curing means's setting can realize the effect of control maintenance water consumption and maintenance time, and then guaranteed the stability that the pier shaft used.
Optionally, the fixed subassembly includes fixed plate and solid fixed ring, and the fixed plate is provided with two, two fixed plate length direction center cross fixed connection, and two fixed plate lower surfaces all with the upper surface parallel of pier shaft, gu fixed ring fixed connection is at fixed plate lower surface both ends, and the fixed plate is perpendicular with solid fixed ring, gu the fixed ring cover is established at the circumference outer wall of pier shaft.
Through adopting above-mentioned technical scheme, the connection area of fixed subassembly and pier shaft has been guaranteed in the setting of fixed subassembly during the use, and fixed ring's setting has increased the stability of being connected between fixed subassembly and the subassembly that sprays, and fixed ring cover is established at the circumference outer wall of pier shaft simultaneously, has improved the stability that fixed subassembly and pier shaft are connected.
Optionally, the spray set includes the booster pump, the water hose, the distributive pipe, shower head and telescope tube, telescope tube one end and solid fixed ring fixed connection, the telescope tube is the extension state under its self action of gravity, telescope tube's length is not less than the length of pier shaft, the telescope tube cover is established at the circumference outer wall of pier shaft, and not with pier shaft butt, the distributive pipe is the annular tubular structure, the distributive pipe sets up a plurality ofly and is fixed in telescope tube's circumference inner wall, the distributive pipe distributes along telescope tube's length direction equidistance, the water hose communicates the distributive pipe, the arbitrary one end of water hose communicates with the booster pump, the one end that the increase pump was kept away from to the water hose is encapsulated situation, the shower head is provided with a plurality ofly, the shower head distributes along the circumference equidistance of distributive pipe and communicates with the distributive pipe, and the shower mouth.
Through adopting above-mentioned technical scheme, when reusing spray set to carry out the watering maintenance to the pier shaft, start the booster pump, in the booster pump pumped the water high-pressure pump in the water source hose, the hose sent moisture to the water diversion intraductally, through the shower head blowout, telescopic's setting can reduce to spray in the moisture evaporation dissipation of pier shaft circumference outer wall, has improved the maintenance effect after the single sprays, the setting up of a plurality of shower heads has realized the all-round spraying to the pier shaft, has improved the intensity that sprays.
Optionally, the spray header is an atomizing spray header.
Through adopting above-mentioned technical scheme, atomizer's setting is under the same condition of hose inflow, and atomizer's the area that sprays is bigger, and atomizer's setting up makes the same water yield spray time longer, reduces the use of water resource when guaranteeing the spray effect, and then has reduced the manufacturing cost of enterprise.
Optionally, the monitoring assembly comprises a temperature sensor, a humidity sensor and a control box, the temperature sensor and the humidity sensor are fixedly connected to one side, close to the pier body, of the water distribution pipe, the control box is fixedly connected to the upper surface of the fixing plate, and the control box is electrically connected with the temperature sensor, the humidity sensor and the booster pump.
Through adopting above-mentioned technical scheme, temperature sensor and humidity transducer are used for monitoring steam content and temperature between telescopic sleeve and the pier shaft, and then realize the operating time of control force (forcing) pump, cross when humidity crosses low or the high temperature, after the monitoring subassembly monitoring, the control box is with signal transmission to force (forcing) pump, force (forcing) pump begins work, and then has realized carrying out intelligent maintenance to the pier shaft in real time, can reduce the water consumption simultaneously, and then the effect of realization assurance pier shaft stability.
Optionally, be provided with between fixed subassembly and the telescope tube and be used for carrying out the rolling subassembly that contracts the telescope tube, the rolling subassembly includes rolling motor, wind-up roll and rolling hawser, and rolling motor fixed connection is on the fixed plate upper surface, wind-up roll one end and rolling motor's output shaft fixed connection, the one end and the wind-up roll fixed connection of rolling hawser, the one end fixed connection that fixed subassembly was kept away from to the remaining one end of rolling hawser and telescope tube.
Through adopting above-mentioned technical scheme, after pier shaft maintenance was accomplished, start the rolling motor, rolling motor's output shaft drives the wind-up roll and rotates to the realization carries out the effect of rolling with the rolling hawser, and telescopic sleeve follows the rolling hawser and is in the rolling state simultaneously, thereby makes things convenient for the staff to accomodate it.
Optionally, a limiting ring is arranged between the winding cable and the telescopic sleeve, and the limiting ring is distributed at equal intervals along the length direction of the telescopic sleeve.
Through adopting above-mentioned technical scheme, the stability of being connected between rolling hawser and the telescope tube has been injectd in setting up of spacing ring, and the equidistance along telescope tube length direction of spacing ring distributes simultaneously to injectd the volume after the telescope tube is folding, and then make things convenient for the staff to accomodate it.
Optionally, a connecting assembly is arranged between the fixing ring and the supporting plate, the connecting assembly comprises a connecting ring and a hook, the hook is fixedly connected to the circumferential outer wall of the fixing ring, and the connecting ring is fixedly connected to one end, close to the fixing plate, of the telescopic sleeve.
Through adopting above-mentioned technical scheme, coupling assembling's setting can make things convenient for the staff to connect or the split to telescope tube and solid fixed ring, only need hang the go-between hook on the couple when connecting simultaneously, and then realizes making things convenient for the effect that the staff used.
Optionally, the end of the hook close to the fixing ring is gradually inclined upwards to the end far away from the fixing ring.
Through adopting above-mentioned technical scheme, the couple slope sets up and can prevent that solid fixed ring from droing from the couple to improved the stability that coupling assembling used, and then guaranteed the maintenance effect that sprays.
Optionally, the telescopic sleeve is made of permeable geotextile.
Through adopting above-mentioned technical scheme, the telescope tube chooses dewatering geotechnological cloth for use as the raw materials, and the geotechnological cloth that permeates water has certain wearability and resistant drawing nature, and the geotechnological cloth material that permeates water simultaneously easily gets the low price, and then can also realize reducing enterprise manufacturing cost's effect.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the fixed assembly and the spraying assembly are matched for use, so that the effect of maintaining the pier body can be realized, and the time difference between single spraying maintenance is improved due to the arrangement of the telescopic sleeve;
2. the arrangement of the monitoring assembly realizes the monitoring of the humidity and the temperature of the pier body, and further realizes the control of whether the booster pump works or not, thereby ensuring the spraying maintenance effect of the pier body and the use stability of the pier body;
3. the setting of rolling subassembly can make things convenient for the staff to carry out the rolling to telescope tube, has reached the effect that makes things convenient for the staff to use.
Drawings
FIG. 1 is a schematic diagram of the overall structure of an embodiment of the present application;
FIG. 2 is an enlarged partial schematic view of portion A of FIG. 1;
FIG. 3 is a schematic view of a portion of the components of the take-up assembly;
FIG. 4 is a schematic view of a portion of the components of the monitoring assembly.
In the figure, 1, fixing the assembly; 11. a fixing plate; 12. a fixing ring; 2. a spray assembly; 21. a booster pump; 22. a flexible water pipe; 23. a water diversion pipe; 24. a shower head; 25. a telescopic sleeve; 3. a monitoring component; 31. a temperature sensor; 32. a humidity sensor; 33. a control box; 4. a winding component; 41. a winding motor; 42. a wind-up roll; 43. winding a mooring rope; 5. a limiting ring; 6. a connecting assembly; 61. a connecting ring; 62. hooking; 7. a pier body.
Detailed Description
The present application is described in further detail below with reference to figures 1-4.
The embodiment of the application discloses pier shaft intelligence curing means.
Referring to fig. 1 and 2, the intelligent pier body maintenance device comprises a fixing component 1 arranged above the upper surface of a pier body 7, a spraying component 2 used for spraying water for maintaining the pier body 7 is arranged on the lower surface of the fixing component 1, a monitoring component 3 used for monitoring the water content and the temperature between the pier body 7 and the spraying component 2 is arranged between the spraying component 2 and the pier body 7, the spraying component 2 is laid along the length direction of the pier body 7, when the intelligent maintenance device for the pier body 7 is used, the pier body 7 is connected with the spraying component 2 by using the fixing component 1, at the moment, the spraying component 2 sprays the pier body 7, thereby ensuring the temperature and the humidity of the pier body 7, achieving the effect of maintaining the pier body 7, simultaneously monitoring the pier body 7 by the monitoring component 3 in real time, and meanwhile, the spraying component 2 is controlled to spray water to the pier body 7 for maintenance, so that the watering time and the use stability of the pier body 7 are ensured.
Referring to fig. 1 and 2, fixed subassembly 1 includes fixed plate 11 and solid fixed ring 12, fixed plate 11 is provided with two, 11 length direction central points of two fixed plates put perpendicular fixed connection alternately, and two fixed plate 11 lower surfaces and pier shaft 7 upper surface are parallel, solid fixed ring 12 is annular platelike structure, solid fixed ring 12 fixed connection is at 11 length direction both ends of fixed plate, and fixed plate 11 lateral wall is perpendicular with fixed plate 11 lower surface, fixed subassembly 1's setting has improved the stability of being connected between spray assembly 2 and the pier shaft 7.
Referring to fig. 1 and 3, the spray assembly 2 includes a booster pump 21, a water hose 22, a water diversion pipe 23, a spray header 24 and a telescopic sleeve 25, one end of the telescopic sleeve 25 is fixedly connected with the fixed ring 12, the telescopic sleeve 25 is sleeved on the circumferential outer wall of the pier body 7, the circumferential inner wall of the telescopic sleeve 25 is not abutted to the circumferential outer wall of the pier body 7, the telescopic sleeve 25 is in an extended state under the action of its own gravity, the end of the telescopic sleeve 25 away from the fixed ring 12 is abutted to the ground, the length of the telescopic sleeve 25 is not less than the length of the pier body 7, the water diversion pipe 23 is in an annular tubular structure, the water diversion pipe 23 is sleeved on the circumferential outer wall of the pier body 7, the water diversion pipe 23 is provided with a plurality of water diversion pipes 23, the water diversion pipes 23 are equidistantly distributed along the length direction of the pier body 7, the spray header 24 is provided with a plurality of water diversion pipes, booster pump 21 and hose 22's bottom intercommunication, and hose 22's top is the encapsulated situation, and when using spray assembly 2, start booster pump 21, in booster pump 21 goes into the distributive pipe 23 with the water pump in the water source, spout 24 through the shower head again to the maintenance of spraying of pier shaft 7 is realized, and then has realized the effect of guaranteeing pier shaft 7 stability in use.
Referring to fig. 1, telescopic sleeve 25 chooses for use the geotechnological cloth that permeates water to make as the raw materials, and the geotechnological cloth that permeates water has certain wearability and resistance to scratching, and the geotechnological cloth material that permeates water simultaneously is easily obtained, and the low price, and then can also realize reducing enterprise manufacturing cost's effect.
Referring to fig. 4, monitoring subassembly 3 includes temperature sensor 31, humidity transducer 32 and control box 33, temperature sensor 31 and humidity transducer 32 are all fixed connection in the one side that shunt 23 is close to pier shaft 7, control box 33 fixed connection is on fixed plate 11 upper surface, temperature sensor 31, humidity transducer 32 and booster pump 21 all are connected with control box 33 electricity, after temperature sensor 31 and humidity transducer 32 monitored the temperature between spray subassembly 2 and the pier shaft 7, when temperature sensor 31 monitored pier shaft 7 high temperature or humidity transducer 32 monitored humidity when lower, control box 33 started booster pump 21 and sprays pier shaft 7.
Referring to fig. 1 and 3, the fixed component 1 and the telescopic sleeve 25 are provided with a winding component 4 for shrinking the telescopic sleeve 25, the winding component 4 includes a winding motor 41, a winding roller 42 and a winding cable 43, the winding motor 41 is fixedly connected to the upper surface of the fixed plate 11, the winding roller 42 is fixedly connected to an output shaft of the winding motor 41, a rotation axis of the winding roller 42 is collinear with a central line of the output shaft of the winding motor 41, one end of the winding cable 43 is fixedly connected to a circumferential outer wall of the winding roller 42, the remaining end of the winding cable 43 is fixedly connected to a bottom end of the telescopic sleeve 25, a limiting ring 5 is provided between the winding cable 43 and the telescopic sleeve 25, the winding cable 43 is inserted into the limiting ring 5, the limiting rings 5 are provided in plurality, the limiting rings 5 are fixedly connected at equal intervals along a length direction of the telescopic sleeve 25, and the limiting rings 5 are used, can realize carrying out the rolling with telescopic sleeve 25, telescopic sleeve 25 after the rolling can be realized to setting up of spacing ring 5 is folding even, has reached the effect that makes things convenient for the staff to collect its spray assembly 2.
Referring to fig. 1 and 2, be provided with coupling assembling 6 between telescope tube 25 and the solid fixed ring 12, coupling assembling 6 includes go-between 61 and couple 62, coupling pipe fixed connection is on telescope tube 25 circumference top, couple 62 fixed connection is at the circumference outer wall of fixed plate 11, couple 62 is hooked in go-between 61, coupling assembling 6's setting can make things convenient for the staff to carry out the dismouting to telescope tube 25, and then reach the effect that makes things convenient for the staff to accomodate pier shaft 7 intelligent curing means. The hooks 62 are gradually inclined upward from the end near the fixed ring 12 to the end away from the fixed ring 12. The couple 62 that the slope set up has increased the stability of being connected between telescopic sleeve 25 and the solid fixed ring 12, and then has guaranteed pier shaft 7 intelligent maintenance device to pier shaft 7's maintenance effect, has guaranteed pier shaft 7's stability in use.
The implementation principle of pier shaft intelligence curing means of this application embodiment is: use pier shaft 7 intelligence curing means to maintain pier shaft 7 when, use fixed subassembly 1 to be connected spray assembly 2 and pier shaft 7, spray assembly 2 is in the state of extending under self action of gravity this moment, when needs spray the maintenance to it, start the pressure boost originally, the water that sprays the maintenance passes through shower head 24 blowout, and then realize the maintenance that sprays pier shaft 7, monitoring subassembly 3 set up the monitoring of having realized pier shaft 7 temperature and humidity, realize the control to booster pump 21 simultaneously, and then guaranteed pier shaft 7 and received reasonable maintenance, and then reach the effect of guaranteeing pier shaft 7 stability in use.
The embodiments of the present invention are preferred embodiments of the present application, and the scope of protection of the present application is not limited by the embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a pier shaft intelligence curing means which characterized in that: including arranging fixed subassembly (1) above pier shaft (7) upper surface in, fixed subassembly (1) lower surface circumference fixedly connected with is used for spraying subassembly (2) of maintaining for pier shaft (7), and spray subassembly (2) are laid along the length direction of pier shaft (7), are provided with between spray subassembly (2) and pier shaft (7) and are used for monitoring pier shaft (7) and spray monitoring subassembly (3) of water content and temperature between subassembly (2).
2. The intelligent maintenance device for the pier body according to claim 1, wherein: fixed subassembly (1) includes fixed plate (11) and solid fixed ring (12), and fixed plate (11) are provided with two, two fixed plate (11) length direction center fixed connection that intersects, and two fixed plate (11) lower surfaces all with the upper surface parallel of pier shaft (7), gu fixed ring (12) fixed connection at fixed plate (11) lower surface both ends, and fixed plate (11) are perpendicular with solid fixed ring (12), gu fixed ring (12) cover is established at the circumference outer wall of pier shaft (7).
3. The intelligent maintenance device for the pier body according to claim 2, wherein: the spray assembly (2) comprises a booster pump (21), a water hose (22), a water diversion pipe (23), a spray header (24) and a telescopic sleeve (25), one end of the telescopic sleeve (25) is fixedly connected with a fixed ring (12), the telescopic sleeve (25) is in an extension state under the action of self gravity, the length of the telescopic sleeve (25) is not less than that of the pier body (7), the telescopic sleeve (25) is sleeved on the circumferential outer wall of the pier body (7) and is not abutted to the pier body (7), the water diversion pipe (23) is of an annular tubular structure, the water diversion pipe (23) is provided with a plurality of water diversion pipes and is fixed on the circumferential inner wall of the telescopic sleeve (25), the water diversion pipes (23) are distributed along the length direction of the telescopic sleeve (25) at equal intervals, the water hose (22) is communicated with the water diversion pipe (23), one end of any one end of the water hose (22) is communicated with the booster pump (21), one end of the water hose (22), the spray headers (24) are arranged in a plurality, the spray headers (24) are distributed at equal intervals along the circumferential direction of the water distribution pipe (23) and are communicated with the water distribution pipe (23), and the spray openings of the spray headers (24) face the pier body (7).
4. The intelligent maintenance device for the pier body according to claim 3, wherein: the spray head (24) is an atomizing spray head.
5. The intelligent maintenance device for the pier body according to claim 3, wherein: monitoring subassembly (3) include temperature sensor (31), humidity transducer (32) and control box (33), and temperature sensor (31) and humidity transducer (32) fixed connection are close to one side of pier shaft (7) in distributive pipe (23), and control box (33) fixed connection is in fixed plate (11) upper surface, and control box (33) are connected with temperature sensor (31), humidity transducer (32) and booster pump (21) electricity.
6. The intelligent maintenance device for the pier body according to claim 3, wherein: be provided with between fixed subassembly (1) and telescopic sleeve (25) and be used for carrying out the rolling subassembly (4) that shrink telescopic sleeve (25), rolling subassembly (4) are including rolling motor (41), wind-up roll (42) and rolling hawser (43), rolling motor (41) fixed connection is on fixed plate (11), the output shaft fixed connection of wind-up roll (42) one end and rolling motor (41), the one end and wind-up roll (42) fixed connection of rolling hawser (43), the one end fixed connection of fixed subassembly (1) is kept away from with telescopic sleeve (25) to rolling hawser (43) remaining one end.
7. The intelligent maintenance device for the pier body according to claim 6, wherein: a limiting ring (5) is arranged between the winding cable (43) and the telescopic sleeve (25), and the limiting ring (5) is distributed at equal intervals along the length direction of the telescopic sleeve (25).
8. The intelligent maintenance device for the pier body according to claim 3, wherein: be provided with coupling assembling (6) between solid fixed ring (12) and telescope tube (25), coupling assembling (6) are including go-between (61) and couple (62), and couple (62) fixed connection is at the circumference outer wall of solid fixed ring (12), and go-between (61) fixed connection is at the one end that telescope tube (25) is close to fixed plate (11).
9. The intelligent maintenance device for the pier body according to claim 8, wherein: the hook (62) is gradually inclined upwards from one end close to the fixing ring (12) to the end far away from the fixing ring (12).
10. The intelligent maintenance device for the pier body according to claim 3, wherein: the telescopic sleeve (25) is made of permeable geotextile.
CN202011008397.0A 2020-09-23 2020-09-23 Pier shaft intelligence curing means Active CN112112083B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011008397.0A CN112112083B (en) 2020-09-23 2020-09-23 Pier shaft intelligence curing means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011008397.0A CN112112083B (en) 2020-09-23 2020-09-23 Pier shaft intelligence curing means

Publications (2)

Publication Number Publication Date
CN112112083A true CN112112083A (en) 2020-12-22
CN112112083B CN112112083B (en) 2022-02-11

Family

ID=73800568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011008397.0A Active CN112112083B (en) 2020-09-23 2020-09-23 Pier shaft intelligence curing means

Country Status (1)

Country Link
CN (1) CN112112083B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113898196A (en) * 2021-10-08 2022-01-07 中交路桥华南工程有限公司 Concrete stand maintenance cover and concrete stand maintenance system
CN115341773A (en) * 2022-07-07 2022-11-15 中交二航局第二工程有限公司 High-pressure spray maintenance system applied to mass concrete pier body

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011207028A (en) * 2010-03-30 2011-10-20 Fujita Corp Wet-curing method of concrete structure
CN108316154A (en) * 2018-03-27 2018-07-24 中铁十局集团第二工程有限公司 A kind of pier shaft concrete sprinkling curing system and concrete spray maintenance process
CN208362926U (en) * 2018-05-08 2019-01-11 湖州华科建设工程质量检测有限公司 A kind of multifunctional concrete bridge pier health cloth and laying apparatus
CN208981168U (en) * 2018-10-29 2019-06-14 中铁一局集团第四工程有限公司 A kind of bridge pier abutment body intelligent spray curing system
CN209584819U (en) * 2018-11-27 2019-11-05 中铁六局集团有限公司 A kind of bridge pier curing means and bridge pier curing system
CN210758362U (en) * 2019-07-17 2020-06-16 中铁二十四局集团有限公司 Maintenance device of prefabricated stand

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011207028A (en) * 2010-03-30 2011-10-20 Fujita Corp Wet-curing method of concrete structure
CN108316154A (en) * 2018-03-27 2018-07-24 中铁十局集团第二工程有限公司 A kind of pier shaft concrete sprinkling curing system and concrete spray maintenance process
CN208362926U (en) * 2018-05-08 2019-01-11 湖州华科建设工程质量检测有限公司 A kind of multifunctional concrete bridge pier health cloth and laying apparatus
CN208981168U (en) * 2018-10-29 2019-06-14 中铁一局集团第四工程有限公司 A kind of bridge pier abutment body intelligent spray curing system
CN209584819U (en) * 2018-11-27 2019-11-05 中铁六局集团有限公司 A kind of bridge pier curing means and bridge pier curing system
CN210758362U (en) * 2019-07-17 2020-06-16 中铁二十四局集团有限公司 Maintenance device of prefabricated stand

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113898196A (en) * 2021-10-08 2022-01-07 中交路桥华南工程有限公司 Concrete stand maintenance cover and concrete stand maintenance system
CN113898196B (en) * 2021-10-08 2023-03-14 中交路桥华南工程有限公司 Concrete stand maintenance cover and concrete stand maintenance system
CN115341773A (en) * 2022-07-07 2022-11-15 中交二航局第二工程有限公司 High-pressure spray maintenance system applied to mass concrete pier body

Also Published As

Publication number Publication date
CN112112083B (en) 2022-02-11

Similar Documents

Publication Publication Date Title
CN112112083B (en) Pier shaft intelligence curing means
CN210808610U (en) Municipal garden irrigation equipment with adjustable
CN211171635U (en) Automatic maintenance device for bridge pier column
CN210263949U (en) Telescopic string tube device
CN106218826A (en) Floating on water waste cleaning device
CN211522914U (en) Bridge pier shaft sprays maintenance system
CN212344807U (en) Device for water lifting and irrigation of farmland hydraulic engineering
CN206046290U (en) A kind of spray head of Anti-blocking structure
CN201635177U (en) Concrete curing device for slip form construction of high building
CN216196780U (en) Concrete stand maintenance cover and concrete stand maintenance system
CN217460306U (en) Automatic maintenance spraying system for high pier creeping formwork
CN113898196B (en) Concrete stand maintenance cover and concrete stand maintenance system
CN113914643B (en) Adjustable concrete upright post maintenance cover and concrete upright post maintenance system
CN114961305A (en) Intelligent concrete curing means
CN216076418U (en) Concrete curing means for construction
CN210042881U (en) Degradable liquid mulching film spraying device
CN211297951U (en) Simple self-propelled combined irrigation system
CN209397512U (en) Bridge pier shaft concrete sprinkling curing system
CN219965246U (en) Bridge pier column cast-in-place concrete steam curing device
CN209836816U (en) Automatic maintenance appearance of pier
CN211322370U (en) Urban garden greening and maintaining device
CN217378572U (en) Pier shaft sprays equipment of maintenance
CN210791443U (en) Concrete pole movable automatic spray watering curing means
CN220394294U (en) Concrete curing means of heat preservation watering combination formula
CN210434712U (en) Organic solvent storage and spraying device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant