CN112107946A CN202010957679.9A CN202010957679A CN112107946A CN 112107946 A CN112107946 A CN 112107946A CN 202010957679 A CN202010957679 A CN 202010957679A CN 112107946 A CN112107946 A CN 112107946A
Authority
CN
China
Prior art keywords
water
top end
shell
support arm
working face
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010957679.9A
Other languages
Chinese (zh)
Inventor
张明平
王健勇
李淑杰
刘红玉
刘亚宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingjian Group Co Ltd
Qingdao Bohai Construction Group Co Ltd
Original Assignee
Qingjian Group Co Ltd
Qingdao Bohai Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingjian Group Co Ltd, Qingdao Bohai Construction Group Co Ltd filed Critical Qingjian Group Co Ltd
Priority to CN202010957679.9A priority Critical patent/CN112107946A/en
Publication of CN112107946A publication Critical patent/CN112107946A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B01PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
    • B01DSEPARATION
    • B01D47/00Separating dispersed particles from gases, air or vapours by liquid as separating agent
    • B01D47/06Spray cleaning

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Fire-Extinguishing By Fire Departments, And Fire-Extinguishing Equipment And Control Thereof (AREA)

Abstract

The invention discloses a spraying dust-settling and cooling device for a construction working face for constructional engineering, which comprises a shell, wherein a water tank is arranged in the shell, a first water pump and a second water pump are arranged at the top end of the shell, a support upright post is arranged in the middle position of the top end of the shell, a first sliding block is arranged on one side of the support upright post, the first sliding block is connected with the support upright post through a first lifting adjusting mechanism, a first support arm is arranged on one side of the first sliding block, a plurality of first spraying heads are arranged at the top end of the first support arm, a second sliding block is arranged on the other side of the support upright post, the second sliding block is connected with the support upright post through a second lifting adjusting mechanism, a second support arm is. Has the advantages that: can spray dust fall cooling operation to building construction working face, avoid the dust to fly upward, improve the travelling comfort of during operation, the device can intelligent movement, can adjust the height of support arm, is applicable to different building places, the dust fall work that sprays of co-altitude.

Description

Building construction working face sprays dust fall heat sink for building engineering
Technical Field
The invention relates to a spraying dust-settling and cooling device for a construction working face for constructional engineering.
Background
When the main structure of the building engineering is constructed, the working face is exposed under burning sun mostly, in hot summer, the temperature of the construction working face is very high and sometimes even exceeds 40 ℃, so that workers have to stagger high-temperature time periods when constructing on a building scaffold, even if the high-temperature time periods are too long, the phenomenon of heatstroke and falling of the workers due to high temperature still happens occasionally during construction operation, therefore, the temperature of the construction working face is reduced, the high-temperature environment of the construction working face is improved to become people-oriented, green construction and key factors for improving the construction efficiency of the building engineering are achieved, in addition, a lot of dust is generated in the construction process of the main structure of the building engineering, the workers can cause adverse effects on the health of the workers when being in the environment for a long time, the dust fall cooling device which is owned at present can not better meet the requirements of dust fall cooling.
An effective solution to the problems in the related art has not been proposed yet.
Disclosure of Invention
The invention provides a spraying dust-reducing and cooling device for a construction working face for constructional engineering, aiming at solving the technical problems in the prior art.
Therefore, the invention adopts the following specific technical scheme:
a spraying dust-settling and cooling device for a construction working face for constructional engineering comprises a shell, wherein two ends of the bottom of the shell are respectively provided with a driving steering mechanism, the bottom end of the driving steering mechanism is provided with a plurality of driving wheels, the top end of one side of the front face of the shell is provided with a control panel, the control panel is provided with a plurality of control buttons, a water tank is arranged in the shell, the top end of the water tank is provided with an intelligent controller and a battery pack, one side of the top end of the water tank is provided with a water inlet joint which is inserted in the shell, one side of the top end of the shell is provided with a first water pump, the other side of the top end of the shell is provided with a second water pump, the first water pump, the second water pump and the water tank are respectively connected through water pumping pipes, the middle position of the, the two sides of the supporting upright post are respectively provided with a sliding groove, one side of the supporting upright post is provided with a first sliding block which is matched and connected with the sliding groove, the first sliding block is matched and connected with the supporting upright post through a first lifting adjusting mechanism, one side of the first sliding block is provided with a first supporting arm, the top end of the first supporting arm is provided with a plurality of first atomizing heads, the first atomizing heads are matched and connected with the first water pump through a first water hose, the other side of the supporting upright post is provided with a second sliding block which is matched and connected with the sliding groove, the second sliding block is matched and connected with the supporting upright post through a second lifting adjusting mechanism, one side of the second sliding block is provided with a second supporting arm, the top end of the second supporting arm is provided with a plurality of second atomizing heads and a heat dissipation fan, and the second atomizing heads, the second spray head is connected with the second water pump in a matched mode through a soft water pipe.
Further, both ends of casing all are provided with a plurality of distance sensor respectively, the intermediate position at casing both ends all is provided with the camera that cruises respectively, the positive one side of control panel is provided with a plurality of water yield warning indicator.
Furthermore, the top of one side inside the water tank is provided with a water level sensor I, the bottom of one side inside the water tank is provided with a water level sensor II, and a heat insulation filling layer is arranged between the water tank and the shell.
Further, the both sides of the inside bottom of water tank all be provided with respectively with drinking-water pipe bottom assorted water catch bowl, the top of water catch bowl is provided with the cover and locates the filter mantle of drinking-water pipe.
Furthermore, both sides of the supporting upright post are respectively and fixedly connected with the shell through a first fixing zipper, and the supporting arm I is fixedly connected with the first sliding block and the supporting arm II is fixedly connected with the second sliding block through a second fixing zipper.
Furthermore, one side on the top end of the shell is provided with a water pipe placing disc matched with the first water hose, and the other side on the top end of the shell is provided with a water pipe placing disc II matched with the second water hose.
Furthermore, coupling mechanism comprises slide rail and sliding sleeve, the slide rail with the sliding sleeve is detachable construction, the slide rail with the top fixed connection of support arm two, the sliding sleeve with atomising head two with radiator fan fixed connection, one side of sliding sleeve be provided with slide rail assorted sliding clamping groove.
Furthermore, support arm one with support arm two is the slope structure respectively, support arm one with support arm two with the slope contained angle of supporting the stand is 35, atomising head one with contained angle between the support arm one and atomising head two with contained angle between the support arm two is 45 respectively.
Furthermore, lift adjustment mechanism one with lift adjustment mechanism two constitutes by twist grip, wire winding roller, guide roll and haulage rope respectively, the wire winding roller is located the inside bottom of support post and with support post swing joint, twist grip is located the bottom of support post one side and with the wire winding roller cooperatees and connects, the guide roll is located the top of support post and through the support frame with the support post cooperatees and connects, the haulage rope connect in the wire winding roller the guide roll slider one with slider two.
The invention has the beneficial effects that: through setting up by the casing, drive steering mechanism, control panel, the water tank, intelligent control ware, the group battery, water pump one, water pump two, the support post, slider one, lift adjustment mechanism one, support arm one, first atomizer, slider two, lift adjustment mechanism two, support arm two, second atomizer, radiator fan, the building construction working face sprays dust fall heat sink for the building engineering that coupling mechanism constitutes, thereby can spray dust fall heat sink work to the building construction working face, avoid the dust to fly upward, improve the travelling comfort of during operation, the device can realize intelligent cruise and remove, can avoid the barrier automatically, can the height of manual regulation support arm, be applicable to different building places, the dust fall work that sprays of co-altitude.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings needed in the embodiments will be briefly described below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art to obtain other drawings without creative efforts.
Fig. 1 is one of schematic structural diagrams of a spraying dust-reducing and temperature-reducing device for a construction working face of construction engineering according to an embodiment of the invention;
fig. 2 is a second schematic structural diagram of a spraying dust-reducing and temperature-reducing device for a construction working surface in building engineering according to an embodiment of the invention;
FIG. 3 is a schematic structural view of a supporting column of a spraying dust-reducing and cooling device for a construction working surface in building engineering according to an embodiment of the present invention;
FIG. 4 is an enlarged view of a portion of FIG. 2 at A;
fig. 5 is a partially enlarged view at B in fig. 2.
In the figure:
1. a housing; 2. driving a steering mechanism; 3. a drive wheel; 4. a control panel; 5. a control button; 6. a water tank; 7. an intelligent controller; 8. a battery pack; 9. a water inlet joint; 10. a first water pump; 11. a second water pump; 12. a water pumping pipe; 13. mounting grooves; 14. supporting the upright post; 15. a chute; 16. a first sliding block; 17. a first lifting adjusting mechanism; 18. a first supporting arm; 19. a first spray head; 20. a first water hose; 21. a second sliding block; 22. a second lifting adjusting mechanism; 23. a second supporting arm; 24. a second spray head; 25. a heat radiation fan; 26. a connecting mechanism; 27. a second water hose; 28. a distance sensor; 29. a cruise camera; 30. a water quantity alarm indicator lamp; 31. a first water level sensor; 32. a water level sensor II; 33. a thermally insulating fill layer; 34. a water collection tank; 35. a filter housing; 36. fixing the zipper I; 37. fixing a zipper II; 38. a water pipe placing plate; 39. a second water pipe placing plate; 40. a slide rail; 41. a sliding sleeve; 42. a sliding clamping groove; 43. rotating the handle; 44. a winding roller; 45. a guide roller; 46. a hauling rope; 47. a support frame.
Detailed Description
For further explanation of the various embodiments, the drawings which form a part of the disclosure and which are incorporated in and constitute a part of this specification, illustrate embodiments and, together with the description, serve to explain the principles of operation of the embodiments, and to enable others of ordinary skill in the art to understand the various embodiments and advantages of the invention, and, by reference to these figures, reference is made to the accompanying drawings, which are not to scale and wherein like reference numerals generally refer to like elements.
According to the embodiment of the invention, the invention provides a spraying dust-reducing and cooling device for a construction working face for constructional engineering.
The first embodiment is as follows:
as shown in fig. 1-5, the spraying dust-settling and cooling device for the construction working face of the building engineering according to the embodiment of the present invention includes a housing 1, wherein two ends of the bottom of the housing 1 are respectively provided with a driving steering mechanism 2, the bottom end of the driving steering mechanism 2 is provided with a plurality of driving wheels 3, the top end of one side of the front face of the housing 1 is provided with a control panel 4, the control panel 4 is provided with a plurality of control buttons 5, the interior of the housing 1 is provided with a water tank 6, the top end of the water tank 6 is provided with an intelligent controller 7 and a battery pack 8, one side of the top end of the water tank 6 is provided with a water inlet joint 9 inserted into the housing 1, one side of the top end of the housing 1 is provided with a first water pump 10, the other side of the top end of the housing 1 is provided with a second water pump 11, and the first, the middle position of the top end of the shell 1 is provided with a mounting groove 13, the top end of the mounting groove 13 is fixedly provided with a support upright post 14, two sides of the support upright post 14 are respectively provided with a sliding groove 15, one side of the support upright post 14 is provided with a first sliding block 16 matched and connected with the sliding groove 15, the first sliding block 16 is matched and connected with the support upright post 14 through a first lifting adjusting mechanism 17, one side of the first sliding block 16 is provided with a first support arm 18, the top end of the first support arm 18 is provided with a plurality of first spray heads 19, the first spray heads 19 are matched and connected with the first water pump 10 through a first hose 20, the other side of the support upright post 14 is provided with a second sliding block 21 matched and connected with the sliding groove 15, the second sliding block 21 is matched and connected with the support upright post 14 through a second lifting adjusting mechanism 22, and one side of the, the top of the second support arm 23 is provided with a plurality of second spray heads 24 and a heat radiation fan 25, the second spray heads 24 and the heat radiation fan 25 are connected with the second support arm 23 in a matched manner through a connecting mechanism 26, and the second spray heads 24 are connected with the second water pump 11 in a matched manner through a second water hose 27.
By means of the technical scheme, the spraying dust-reducing and temperature-reducing device for the construction working face of the building engineering, which is composed of a shell 1, a driving steering mechanism 2, the driving steering mechanism 2, a control panel 4, a water tank 6, an intelligent controller 7, a battery pack 8, a first water pump 10, a second water pump 11, a support upright post 14, a first slide block 16, a first lifting adjusting mechanism 17, a first support arm 18, a first spray head 19, a second slide block 21, a second lifting adjusting mechanism 22, a second support arm 23, a second spray head 24, a cooling fan 25 and a connecting mechanism 26, is arranged, thereby can spray dust fall cooling operation to building construction operation face, avoid the dust to fly upward, improve the travelling comfort of during operation, the device can realize that intelligence is cruising and is removed, can avoid the barrier automatically, and the height that can the manual regulation support arm is applicable to different building place, the not dust fall work that sprays of co-altitude.
In one embodiment, the two ends of the housing 1 are respectively provided with a plurality of distance sensors 28, the middle position of the two ends of the housing 1 is respectively provided with a cruise camera 29, and one side of the front surface of the control panel 4 is provided with a plurality of water quantity alarm indicator lamps 30.
In one embodiment, a first water level sensor 31 is disposed at the top end of one side of the inside of the water tank 6, a second water level sensor 32 is disposed at the bottom end of one side of the inside of the water tank 6, and an insulating filling layer 33 is disposed between the water tank 6 and the housing 1.
In one embodiment, the two sides of the bottom end inside the water tank 6 are respectively provided with a water collecting tank 34 matched with the bottom end of the water pumping pipe 12, and the top end of the water collecting tank 34 is provided with a filter cover 35 sleeved on the water pumping pipe 12.
In one embodiment, both sides of the supporting column 14 are fixedly connected to the housing 1 through a first fixing fastener 36, and the supporting arm 18 and the sliding block 16 are fixedly connected to each other, and the supporting arm 23 and the sliding block 21 are fixedly connected to each other through a second fixing fastener 37.
In one embodiment, a water pipe placing tray 38 matched with the first flexible water pipe 20 is provided at one side of the top end of the housing 1, and a water pipe placing tray 39 matched with the second flexible water pipe 27 is provided at the other side of the top end of the housing 1.
In one embodiment, the connecting mechanism 26 is composed of a sliding rail 40 and a sliding sleeve 41, the sliding rail 40 and the sliding sleeve 41 are detachable structures, the sliding rail 40 is fixedly connected with the top end of the second supporting arm 23, the sliding sleeve 41 is fixedly connected with the second atomizing head 24 and the heat dissipation fan 25, and a sliding clamping groove 42 matched with the sliding rail 40 is arranged on one side of the sliding sleeve 41.
In one embodiment, the first support arm 18 and the second support arm 23 are both inclined structures, the inclined angles between the first support arm 18 and the support arm 23 and the support upright 14 are 35 °, and the included angle between the first spray head 19 and the first support arm 18 and the included angle between the second spray head 24 and the second support arm 23 are both 45 °.
In one embodiment, each of the first lifting adjusting mechanism 17 and the second lifting adjusting mechanism 22 is composed of a rotating handle 43, a winding roller 44, a guiding roller 45 and a pulling rope 46, the winding roller 44 is located at the bottom end inside the supporting upright 14 and is movably connected with the supporting upright 14, the rotating handle 43 is located at the bottom end of one side of the supporting upright 14 and is in fit connection with the winding roller 44, the guiding roller 45 is located at the top end of the supporting upright 14 and is in fit connection with the supporting upright 14 through a supporting frame 47, and the pulling rope 46 is connected to the winding roller 44, the guiding roller 45, the first slider 16 and the second slider 21.
The working principle is as follows: during the use, through the external water pipe of water supply connector 9, fill water to 6 insides of water tank, can monitor the water level through level sensor one 31 and level sensor two 32, be full of the electricity to group battery 8 simultaneously, when needs spray the cooling to a certain working face, remove the device to the appointed place, start water pump one 10 with two 11 of water pump spray the dust fall operation, according to the height of working face, manual regulation lift adjustment mechanism one 17 and two 22 of lift adjustment mechanism to the height control of control support arm one 18 and support arm two 23, realize the not high dust removal that sprays, when needs remove dust to whole building site, adjusting device is automatic cruise mode, the device of being automatic movement on the building site road, thereby can spray the dust fall to whole building site road.
In summary, with the above technical solution of the present invention, by providing the construction work surface spraying cooling device for construction engineering, which is composed of the housing 1, the driving steering mechanism 2, the control panel 4, the water tank 6, the intelligent controller 7, the battery pack 8, the first water pump 10, the second water pump 11, the supporting column 14, the first slider 16, the first lifting adjusting mechanism 17, the first supporting arm 18, the first spray head 19, the second slider 21, the second lifting adjusting mechanism 22, the second supporting arm 23, the second spray head 24, the cooling fan 25, and the connecting mechanism 26, thereby can spray dust fall cooling operation to building construction operation face, avoid the dust to fly upward, improve the travelling comfort of during operation, the device can realize that intelligence is cruising and is removed, can avoid the barrier automatically, and the height that can the manual regulation support arm is applicable to different building place, the not dust fall work that sprays of co-altitude.
In the present invention, unless otherwise expressly specified or limited, the terms "mounted," "disposed," "connected," "secured," "screwed" and the like are to be construed broadly, e.g., as meaning fixedly connected, detachably connected, or integrally formed; can be mechanically or electrically connected; the terms may be directly connected or indirectly connected through an intermediate, and may be communication between two elements or interaction relationship between two elements, unless otherwise specifically limited, and the specific meaning of the terms in the present invention will be understood by those skilled in the art according to specific situations.
The above description is only for the purpose of illustrating the preferred embodiments of the present invention and is not to be construed as limiting the invention, and any modifications, equivalents, improvements and the like that fall within the spirit and principle of the present invention are intended to be included therein.

Claims (9)

1. The spraying dust-settling and cooling device for the construction working face for the building engineering is characterized by comprising a shell (1), wherein two ends of the bottom of the shell (1) are respectively provided with a driving steering mechanism (2), the bottom of the driving steering mechanism (2) is provided with a plurality of driving wheels (3), the top end of one side of the front face of the shell (1) is provided with a control panel (4), the control panel (4) is provided with a plurality of control buttons (5), a water tank (6) is arranged inside the shell (1), the top end of the water tank (6) is provided with an intelligent controller (7) and a battery pack (8), one side of the top end of the water tank (6) is provided with a water inlet connector (9) which is inserted into the shell (1), one side of the top end of the shell (1) is provided with a first water pump (10), and the other side of the top end of the shell (1, the water pump I (10) and the water pump II (11) are connected with the water tank (6) through a water pumping pipe (12), a mounting groove (13) is formed in the middle position of the top end of the shell (1), a supporting upright post (14) is fixedly arranged at the top end of the mounting groove (13), sliding grooves (15) are formed in two sides of the supporting upright post (14) respectively, a first sliding block (16) matched and connected with the sliding grooves (15) is arranged on one side of the supporting upright post (14), the first sliding block (16) is matched and connected with the supporting upright post (14) through a first lifting adjusting mechanism (17), a first supporting arm (18) is arranged on one side of the first sliding block (16), a plurality of first spray heads (19) are arranged at the top end of the first supporting arm (18), the first spray heads (19) are matched and connected with the first water pump (10) through a first water hose (20), the opposite side of support post (14) be provided with spout (15) cooperate the slider two (21) of connecting, slider two (21) with cooperate through two (22) of lift adjustment mechanism between support post (14) to connect, one side of slider two (21) is provided with support arm two (23), the top of support arm two (23) is provided with a plurality of atomising head two (24) and radiator fan (25), atomising head two (24) with radiator fan (25) through coupling mechanism (26) with support arm two (23) cooperate to be connected, atomising head two (24) with cooperate to be connected through hose two (27) between water pump two (11).
2. The spraying dust-reducing and temperature-reducing device for the construction working face of the building engineering according to claim 1, wherein a plurality of distance sensors (28) are respectively arranged at two ends of the casing (1), a cruise camera (29) is respectively arranged at the middle position of each of the two ends of the casing (1), and a plurality of water quantity alarm indicator lamps (30) are arranged at one side of the front face of the control panel (4).
3. The spraying dust-reducing and temperature-reducing device for the construction working face of the building engineering according to claim 1, wherein a first water level sensor (31) is arranged at the top end of one side inside the water tank (6), a second water level sensor (32) is arranged at the bottom end of one side inside the water tank (6), and a heat-insulating filling layer (33) is arranged between the water tank (6) and the shell (1).
4. The spraying dust-reducing and temperature-reducing device for the construction working face of the building engineering as claimed in claim 1, wherein water collecting troughs (34) matched with the bottom ends of the water pumping pipes (12) are respectively arranged on two sides of the bottom ends inside the water tank (6), and filter covers (35) sleeved on the water pumping pipes (12) are arranged on the top ends of the water collecting troughs (34).
5. The spraying dust-reducing and temperature-reducing device for the construction working face of the building engineering according to claim 1, wherein two sides of the supporting upright post (14) are respectively and fixedly connected with the shell (1) through a first fixing zipper (36), and the supporting arm (18) and the sliding block (16) as well as the supporting arm (23) and the sliding block (21) are respectively and fixedly connected through a second fixing zipper (37).
6. The spraying dust-reducing and temperature-reducing device for the construction working face of the building engineering according to claim 1, wherein a water pipe placing disc (38) matched with the first water hose (20) is arranged on one side of the top end of the shell (1), and a water pipe placing disc II (39) matched with the second water hose (27) is arranged on the other side of the top end of the shell (1).
7. The spraying dust-reducing and temperature-reducing device for the construction working face of the building engineering according to claim 1, wherein the connecting mechanism (26) is composed of a sliding rail (40) and a sliding sleeve (41), the sliding rail (40) and the sliding sleeve (41) are detachable structures, the sliding rail (40) is fixedly connected with the top end of the second support arm (23), the sliding sleeve (41) is fixedly connected with the second spray head (24) and the heat-dissipating fan (25), and a sliding clamping groove (42) matched with the sliding rail (40) is arranged on one side of the sliding sleeve (41).
8. The spraying dust-reducing and temperature-reducing device for the construction working face of the building engineering as claimed in claim 1, wherein the first support arm (18) and the second support arm (23) are both inclined structures, the inclined included angles between the first support arm (18) and the second support arm (23) and the support column (14) are 35 °, and the included angles between the first spray head (19) and the first support arm (18) and the included angles between the second spray head (24) and the second support arm (23) are both 45 °.
9. The spraying dust-reducing and temperature-reducing device for the construction working face of the building engineering as claimed in claim 1, wherein the first lifting adjusting mechanism (17) and the second lifting adjusting mechanism (22) are respectively composed of a rotating handle (43), a winding roller (44), a guide roller (45) and a traction rope (46), the winding roller (44) is located at the bottom end inside the supporting column (14) and is movably connected with the supporting column (14), the rotating handle (43) is located at the bottom end of one side of the supporting column (14) and is in matched connection with the winding roller (44), the guide roller (45) is located at the top end of the supporting column (14) and is in matched connection with the supporting column (14) through a supporting frame (47), and the traction rope (46) is connected with the winding roller (44) and the guide roller (45), The first sliding block (16) and the second sliding block (21).
CN202010957679.9A 2020-09-14 2020-09-14 Building construction working face sprays dust fall heat sink for building engineering Pending CN112107946A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010957679.9A CN112107946A (en) 2020-09-14 2020-09-14 Building construction working face sprays dust fall heat sink for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010957679.9A CN112107946A (en) 2020-09-14 2020-09-14 Building construction working face sprays dust fall heat sink for building engineering

Publications (1)

Publication Number Publication Date
CN112107946A true CN112107946A (en) 2020-12-22

Family

ID=73803001

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010957679.9A Pending CN112107946A (en) 2020-09-14 2020-09-14 Building construction working face sprays dust fall heat sink for building engineering

Country Status (1)

Country Link
CN (1) CN112107946A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030178501A1 (en) * 1995-06-08 2003-09-25 Doherty John A. Vehicle mounted travel surface and weather condition monitoring system
CN207451473U (en) * 2017-10-30 2018-06-05 袁雪理 A kind of construction site tower crane with spraying and dedusting
CN108926936A (en) * 2018-08-15 2018-12-04 安徽理工大学 A kind of method and apparatus that can source mist cooling depositing dust automatically
CN109235352A (en) * 2018-09-14 2019-01-18 中建八局第建设有限公司 A kind of construction site dynamic cruising and fugitive dust observing and controlling robot

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030178501A1 (en) * 1995-06-08 2003-09-25 Doherty John A. Vehicle mounted travel surface and weather condition monitoring system
CN207451473U (en) * 2017-10-30 2018-06-05 袁雪理 A kind of construction site tower crane with spraying and dedusting
CN108926936A (en) * 2018-08-15 2018-12-04 安徽理工大学 A kind of method and apparatus that can source mist cooling depositing dust automatically
CN109235352A (en) * 2018-09-14 2019-01-18 中建八局第建设有限公司 A kind of construction site dynamic cruising and fugitive dust observing and controlling robot

Similar Documents

Publication Publication Date Title
WO2018053986A1 (en) Solar panel cleaning robot
CN217414033U (en) Tunnel inspection robot
CN112186629B (en) Intelligent inspection equipment and method for high-voltage transmission line
CN112107946A (en) Building construction working face sprays dust fall heat sink for building engineering
CN213508467U (en) Piping lane lateral wall concrete structure curing means
CN202083279U (en) Indirect air cooling tower internal cleaning device
CN212284954U (en) Energy-saving urban building brightening system
CN108042058A (en) A kind of floor cleaning climbing robot of temperature difference infrared perception
CN213643540U (en) Constructional engineering construction working face sprays dust fall heat sink
CN209196884U (en) Heat supply factory's boiler inner wall deashing device
CN112878540A (en) Wall assembly for new rural construction building
CN106995016A (en) A kind of spliced antifreeze skin climbing rail system with deceleration
CN214701069U (en) Civil engineering is with high-efficient intelligent drainage equipment
CN214158975U (en) Clean production of building prefabricated component, clean construction system
CN209623403U (en) A kind of cooling tower being convenient to clean internal impurity
CN216367181U (en) Full-automatic spraying dust and fog falling pile
CN217795226U (en) Dust fall auxiliary device is used in installation of building intelligent engineering
CN217904941U (en) Automatic matching control device for speed ratio of mining head and walking
CN216079805U (en) Automatic control device for tail gas temperature of cremation machine
CN219009735U (en) Crane guide rail detection device
CN221251768U (en) Unmanned aerial vehicle is patrolled and examined to heating network
CN211302461U (en) Heatstroke prevention dust removal spray set for construction
CN216259769U (en) Building site intelligence dust collector
CN113172648B (en) Intelligent self-running obstacle removing robot
CN214423247U (en) Job site management device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201222