CN112101875A - Material transportation processing method, device and system - Google Patents

Material transportation processing method, device and system Download PDF

Info

Publication number
CN112101875A
CN112101875A CN202011029382.2A CN202011029382A CN112101875A CN 112101875 A CN112101875 A CN 112101875A CN 202011029382 A CN202011029382 A CN 202011029382A CN 112101875 A CN112101875 A CN 112101875A
Authority
CN
China
Prior art keywords
transportation
loss
track
collision
thread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN202011029382.2A
Other languages
Chinese (zh)
Inventor
张惠元
张宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Yuxi New Material Technology Co Ltd
Original Assignee
Suzhou Yuxi New Material Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Yuxi New Material Technology Co Ltd filed Critical Suzhou Yuxi New Material Technology Co Ltd
Priority to CN202011029382.2A priority Critical patent/CN112101875A/en
Publication of CN112101875A publication Critical patent/CN112101875A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/08Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
    • G06Q10/083Shipping
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/08Construction

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • General Health & Medical Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

According to the material transportation processing method, device and system, first transportation loss of material data corresponding to a target building material in a first transportation simulation thread is obtained, second transportation loss of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread is obtained, the second transportation loss is matched with the first transportation loss, and finally the second transportation simulation thread is corrected according to the first transportation loss and the second transportation loss. Therefore, the transportation strategy can be changed in time according to the corrected second transportation simulation thread, so that the emergency in the material transportation process can be dealt with, the building material is prevented from being subjected to destructive collision during operation, and the quality of the building material in the transportation process in different places is ensured.

Description

Material transportation processing method, device and system
Technical Field
The invention relates to the technical field of material transportation, in particular to a material transportation processing method, device and system.
Background
The transport of construction materials off-site is a common practice in the construction industry today. In order to ensure that the construction material is not damaged as much as possible during transportation, off-site transportation of the construction material needs to be managed.
However, most of the existing technologies for ensuring that the building materials are not damaged as much as possible during transportation are based on manual supervision, so that it is difficult to change the transportation strategy in time when some emergency situations occur.
Disclosure of Invention
In order to improve the problems, the invention provides a material transportation and treatment method, a device and a system.
A material transport treatment method comprising:
obtaining a first transportation loss of material data corresponding to a target building material in a first transportation simulation thread;
obtaining a second transportation loss of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread, wherein the second transportation loss is matched with the first transportation loss;
and correcting the second transportation simulation thread according to the first transportation loss and the second transportation loss.
Alternatively,
the obtaining of the first transportation loss of the material data corresponding to the target building material in the first transportation simulation thread includes: obtaining a first transportation collision loss track of material data corresponding to a target building material in a first transportation simulation thread;
the obtaining of the second transportation loss of the material data corresponding to the target building material in the thread running interval corresponding to the second transportation simulation thread includes: obtaining a second transportation collision loss track of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread;
the correcting the second transportation simulation thread according to the first transportation loss and the second transportation loss comprises: and correcting the second transportation simulation thread according to the first transportation collision loss track and the second transportation collision loss track.
Optionally, the modifying the second transportation simulation thread according to the first transportation collision loss trajectory and the second transportation collision loss trajectory includes:
acquiring first collision interval information of at least two first track nodes on the first transportation collision loss track;
acquiring second collision interval information of at least two second track nodes on the second transportation collision loss track;
and correcting the second transportation simulation thread according to the first collision interval information of the at least two first track nodes, the second collision interval information of the at least two second track nodes and the material transportation demand information corresponding to the second transportation collision loss track.
Optionally, the modifying the second transportation simulation thread according to the first collision interval information of the at least two first trajectory nodes, the second collision interval information of the at least two second trajectory nodes, and the material transportation demand information corresponding to the second transportation collision loss trajectory includes:
representing second collision interval information of a target second track node matched with the at least two first track nodes on the second transportation collision loss track by adopting the first collision interval information of the at least two first track nodes and the thread characteristic distribution of the second transportation simulation thread;
adopting second collision interval information of the at least two second track nodes to represent track change characteristics of the second transportation collision loss track;
acquiring material transportation demand information corresponding to the second transportation collision loss track according to second collision interval information of the target second track node and track change characteristics of the second transportation collision loss track;
and performing correlation data extraction on the thread characteristic distribution according to the material transportation demand information corresponding to the second transportation collision loss track to obtain transportation correction parameters of the second transportation simulation thread.
A material transport treatment apparatus comprising:
the first obtaining module is used for obtaining a first transportation loss of material data corresponding to the target building material in a first transportation simulation thread;
a second obtaining module, configured to obtain a second transportation loss of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread, where the second transportation loss is matched with the first transportation loss;
and the thread correction module is used for correcting the second transportation simulation thread according to the first transportation loss and the second transportation loss.
Alternatively,
a first obtaining module to: obtaining a first transportation collision loss track of material data corresponding to a target building material in a first transportation simulation thread;
a second obtaining module to: obtaining a second transportation collision loss track of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread;
a thread modification module to: and correcting the second transportation simulation thread according to the first transportation collision loss track and the second transportation collision loss track.
Optionally, the thread modification module is configured to:
acquiring first collision interval information of at least two first track nodes on the first transportation collision loss track;
acquiring second collision interval information of at least two second track nodes on the second transportation collision loss track;
and correcting the second transportation simulation thread according to the first collision interval information of the at least two first track nodes, the second collision interval information of the at least two second track nodes and the material transportation demand information corresponding to the second transportation collision loss track.
Optionally, the thread modification module is configured to:
representing second collision interval information of a target second track node matched with the at least two first track nodes on the second transportation collision loss track by adopting the first collision interval information of the at least two first track nodes and the thread characteristic distribution of the second transportation simulation thread;
adopting second collision interval information of the at least two second track nodes to represent track change characteristics of the second transportation collision loss track;
acquiring material transportation demand information corresponding to the second transportation collision loss track according to second collision interval information of the target second track node and track change characteristics of the second transportation collision loss track;
and performing correlation data extraction on the thread characteristic distribution according to the material transportation demand information corresponding to the second transportation collision loss track to obtain transportation correction parameters of the second transportation simulation thread.
A material transport processing system comprising a server and a simulation device in communication with each other, the simulation device for conducting a transport simulation of a construction material, the server for:
obtaining a first transportation loss of material data corresponding to a target building material in a first transportation simulation thread;
obtaining a second transportation loss of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread, wherein the second transportation loss is matched with the first transportation loss;
and correcting the second transportation simulation thread according to the first transportation loss and the second transportation loss.
By applying the method, the device and the system, the first transportation loss of the material data corresponding to the target building material in a first transportation simulation thread is obtained firstly, the second transportation loss of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread is obtained secondly, the second transportation loss is matched with the first transportation loss, and finally the second transportation simulation thread is corrected according to the first transportation loss and the second transportation loss. Therefore, the transportation strategy can be changed in time according to the corrected second transportation simulation thread, so that the emergency in the material transportation process can be dealt with, the building material is prevented from being subjected to destructive collision during operation, and the quality of the building material in the transportation process in different places is ensured.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings needed to be used in the embodiments will be briefly described below, it should be understood that the following drawings only illustrate some embodiments of the present invention and therefore should not be considered as limiting the scope, and for those skilled in the art, other related drawings can be obtained according to the drawings without inventive efforts.
Fig. 1 is a flowchart of a material transportation processing method according to an embodiment of the present invention.
Fig. 2 is a functional block diagram of a material transportation and processing apparatus according to an embodiment of the present invention.
Fig. 3 is a schematic diagram of a material transportation and processing system according to an embodiment of the present invention.
Fig. 4 is a schematic diagram of a hardware structure of a server according to an embodiment of the present invention.
Detailed Description
In order to better understand the technical solutions of the present invention, the following detailed descriptions of the technical solutions of the present invention are provided with the accompanying drawings and the specific embodiments, and it should be understood that the specific features in the embodiments and the examples of the present invention are the detailed descriptions of the technical solutions of the present invention, and are not limitations of the technical solutions of the present invention, and the technical features in the embodiments and the examples of the present invention may be combined with each other without conflict.
Referring to fig. 1, a material transportation processing method is shown, which includes the following steps S11-S13.
Step S11, a first transportation loss of the material data corresponding to the target building material in the first transportation simulation thread is obtained.
Step S12, obtaining a second transportation loss of the material data corresponding to the target building material in the thread running interval corresponding to the second transportation simulation thread, where the second transportation loss is matched with the first transportation loss.
And correcting the second transportation simulation thread according to the first transportation loss and the second transportation loss.
By applying the method steps, first transportation loss of material data corresponding to a target building material in a first transportation simulation thread is obtained, second transportation loss of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread is obtained, the second transportation loss is matched with the first transportation loss, and finally the second transportation simulation thread is corrected according to the first transportation loss and the second transportation loss. Therefore, the transportation strategy can be changed in time according to the corrected second transportation simulation thread, so that the emergency in the material transportation process can be dealt with, the building material is prevented from being subjected to destructive collision during operation, and the quality of the building material in the transportation process in different places is ensured.
Optionally, in step S21, the obtaining a first transportation loss of the material data corresponding to the target building material in the first transportation simulation thread includes: obtaining a first transportation collision loss track of material data corresponding to a target building material in a first transportation simulation thread;
optionally, in step S22, the obtaining of the second transportation loss of the material data corresponding to the target building material in the thread running interval corresponding to the second transportation simulation thread includes: obtaining a second transportation collision loss track of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread;
optionally, in step S23, the modifying the second transportation simulation thread according to the first transportation loss and the second transportation loss includes: and correcting the second transportation simulation thread according to the first transportation collision loss track and the second transportation collision loss track.
Optionally, in step S23, the modifying the second transportation simulation thread according to the first transportation collision loss trajectory and the second transportation collision loss trajectory includes:
acquiring first collision interval information of at least two first track nodes on the first transportation collision loss track;
acquiring second collision interval information of at least two second track nodes on the second transportation collision loss track;
and correcting the second transportation simulation thread according to the first collision interval information of the at least two first track nodes, the second collision interval information of the at least two second track nodes and the material transportation demand information corresponding to the second transportation collision loss track.
Optionally, in step S23, the modifying the second transportation simulation thread according to the first collision interval information of the at least two first trajectory nodes, the second collision interval information of the at least two second trajectory nodes, and the material transportation demand information corresponding to the second transportation collision loss trajectory includes:
representing second collision interval information of a target second track node matched with the at least two first track nodes on the second transportation collision loss track by adopting the first collision interval information of the at least two first track nodes and the thread characteristic distribution of the second transportation simulation thread;
adopting second collision interval information of the at least two second track nodes to represent track change characteristics of the second transportation collision loss track;
acquiring material transportation demand information corresponding to the second transportation collision loss track according to second collision interval information of the target second track node and track change characteristics of the second transportation collision loss track;
and performing correlation data extraction on the thread characteristic distribution according to the material transportation demand information corresponding to the second transportation collision loss track to obtain transportation correction parameters of the second transportation simulation thread.
Referring to fig. 2, a material transport and handling apparatus 200 is shown, comprising:
a first obtaining module 210, configured to obtain a first transportation loss of material data corresponding to a target building material in a first transportation simulation thread;
a second obtaining module 220, configured to obtain a second transportation loss of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread, where the second transportation loss is matched with the first transportation loss;
a thread modification module 230, configured to modify the second transportation simulation thread according to the first transportation loss and the second transportation loss.
Optionally, the first obtaining module 210 is configured to: obtaining a first transportation collision loss track of material data corresponding to a target building material in a first transportation simulation thread;
a second obtaining module 220, configured to: obtaining a second transportation collision loss track of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread;
a thread modification module 230 configured to: and correcting the second transportation simulation thread according to the first transportation collision loss track and the second transportation collision loss track.
Optionally, the thread modification module 230 is configured to:
acquiring first collision interval information of at least two first track nodes on the first transportation collision loss track;
acquiring second collision interval information of at least two second track nodes on the second transportation collision loss track;
and correcting the second transportation simulation thread according to the first collision interval information of the at least two first track nodes, the second collision interval information of the at least two second track nodes and the material transportation demand information corresponding to the second transportation collision loss track.
Optionally, the thread modification module 230 is configured to:
representing second collision interval information of a target second track node matched with the at least two first track nodes on the second transportation collision loss track by adopting the first collision interval information of the at least two first track nodes and the thread characteristic distribution of the second transportation simulation thread;
adopting second collision interval information of the at least two second track nodes to represent track change characteristics of the second transportation collision loss track;
acquiring material transportation demand information corresponding to the second transportation collision loss track according to second collision interval information of the target second track node and track change characteristics of the second transportation collision loss track;
and performing correlation data extraction on the thread characteristic distribution according to the material transportation demand information corresponding to the second transportation collision loss track to obtain transportation correction parameters of the second transportation simulation thread.
Referring to fig. 3, a material transportation processing system 100 is provided, including a server 110 and a simulation device 120 in communication with each other, the simulation device 110 being configured to perform a transportation simulation of a construction material, the server 110 being configured to:
obtaining a first transportation loss of material data corresponding to a target building material in a first transportation simulation thread;
obtaining a second transportation loss of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread, wherein the second transportation loss is matched with the first transportation loss;
and correcting the second transportation simulation thread according to the first transportation loss and the second transportation loss.
Referring to fig. 4, a hardware block diagram of the server 110 is provided.
Fig. 4 is a block diagram illustrating a server 110 according to an embodiment of the present invention. The server 110 in the embodiment of the present invention may be a server with data storage, transmission, and processing functions, as shown in fig. 4, the server 110 includes: memory 111, processor 112, network module 113, and material transport processing device 200.
The memory 111, the processor 112, and the network module 113 are electrically connected directly or indirectly to enable transmission or interaction of data. For example, the components may be electrically connected to each other via one or more communication buses or signal lines. The memory 111 stores the material transportation processing device 200, the material transportation processing device 200 includes at least one software function module which can be stored in the memory 111 in the form of software or firmware (firmware), and the processor 112 executes various function applications and data processing by running the software programs and modules stored in the memory 111, such as the material transportation processing device 200 in the embodiment of the present invention, so as to implement the material transportation processing method in the embodiment of the present invention.
The Memory 111 may be, but is not limited to, a Random Access Memory (RAM), a Read Only Memory (ROM), a Programmable Read-Only Memory (PROM), an Erasable Read-Only Memory (EPROM), an electrically Erasable Read-Only Memory (EEPROM), and the like. The memory 111 is used for storing a program, and the processor 112 executes the program after receiving the execution instruction.
The processor 112 may be an integrated circuit chip having data processing capabilities. The Processor 112 may be a general-purpose Processor including a Central Processing Unit (CPU), a Network Processor (NP), and the like. The various methods, steps and logic blocks disclosed in embodiments of the present invention may be implemented or performed. A general purpose processor may be a microprocessor or the processor may be any conventional processor or the like.
The network module 113 is used for establishing communication connection between the server 110 and other communication terminal devices through a network, and implementing transceiving operation of network signals and data. The network signal may include a wireless signal or a wired signal.
It will be appreciated that the configuration shown in fig. 4 is merely illustrative and that server 110 may include more or fewer components than shown in fig. 4 or have a different configuration than shown in fig. 4. The components shown in fig. 4 may be implemented in hardware, software, or a combination thereof.
An embodiment of the present invention also provides a computer-readable storage medium, which includes a computer program. The computer program is operative to control the readable storage medium to execute the following material transportation processing method at the server 110.
In summary, by applying the method, the apparatus, and the system, a first transportation loss of material data corresponding to a target building material in a first transportation simulation thread is obtained, a second transportation loss of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread is obtained, the second transportation loss is matched with the first transportation loss, and the second transportation simulation thread is corrected according to the first transportation loss and the second transportation loss. Therefore, the transportation strategy can be changed in time according to the corrected second transportation simulation thread, so that the emergency in the material transportation process can be dealt with, the building material is prevented from being subjected to destructive collision during operation, and the quality of the building material in the transportation process in different places is ensured.
In the embodiments provided in the present invention, it should be understood that the disclosed apparatus and method can be implemented in other ways. The apparatus and method embodiments described above are illustrative only, as the flowcharts and block diagrams in the figures illustrate the architecture, functionality, and operation of possible implementations of apparatus, methods and computer program products according to various embodiments of the present invention. In this regard, each block in the flowchart or block diagrams may represent a module, segment, or portion of code, which comprises one or more executable instructions for implementing the specified logical function(s). It should also be noted that, in some alternative implementations, the functions noted in the block may occur out of the order noted in the figures. For example, two blocks shown in succession may, in fact, be executed substantially concurrently, or the blocks may sometimes be executed in the reverse order, depending upon the functionality involved. It will also be noted that each block of the block diagrams and/or flowchart illustration, and combinations of blocks in the block diagrams and/or flowchart illustration, can be implemented by special purpose hardware-based systems which perform the specified functions or acts, or combinations of special purpose hardware and computer instructions.
In addition, the functional modules in the embodiments of the present invention may be integrated together to form an independent part, or each module may exist separately, or two or more modules may be integrated to form an independent part.
The functions, if implemented in the form of software functional modules and sold or used as a stand-alone product, may be stored in a computer readable storage medium. Based on such understanding, the technical solution of the present invention or a part thereof, which essentially contributes to the prior art, can be embodied in the form of a software product stored in a storage medium and including instructions for causing a computer device (which may be a personal computer, an electronic device 10, or a network device) to execute all or part of the steps of the method according to the embodiments of the present invention. And the aforementioned storage medium includes: a U-disk, a removable hard disk, a Read-Only Memory (ROM), a Random Access Memory (RAM), a magnetic disk or an optical disk, and other various media capable of storing program codes. It should be noted that, in this document, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
The above are merely examples of the present application and are not intended to limit the present application. Various modifications and changes may occur to those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present application should be included in the scope of the claims of the present application.

Claims (9)

1. A method of material transport processing, comprising:
obtaining a first transportation loss of material data corresponding to a target building material in a first transportation simulation thread;
obtaining a second transportation loss of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread, wherein the second transportation loss is matched with the first transportation loss;
and correcting the second transportation simulation thread according to the first transportation loss and the second transportation loss.
2. The method of claim 1,
the obtaining of the first transportation loss of the material data corresponding to the target building material in the first transportation simulation thread includes: obtaining a first transportation collision loss track of material data corresponding to a target building material in a first transportation simulation thread;
the obtaining of the second transportation loss of the material data corresponding to the target building material in the thread running interval corresponding to the second transportation simulation thread includes: obtaining a second transportation collision loss track of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread;
the correcting the second transportation simulation thread according to the first transportation loss and the second transportation loss comprises: and correcting the second transportation simulation thread according to the first transportation collision loss track and the second transportation collision loss track.
3. The method of claim 2, wherein modifying the second transportation simulation thread based on the first transportation collision loss trajectory and the second transportation collision loss trajectory comprises:
acquiring first collision interval information of at least two first track nodes on the first transportation collision loss track;
acquiring second collision interval information of at least two second track nodes on the second transportation collision loss track;
and correcting the second transportation simulation thread according to the first collision interval information of the at least two first track nodes, the second collision interval information of the at least two second track nodes and the material transportation demand information corresponding to the second transportation collision loss track.
4. The method of claim 3, wherein the modifying the second transportation simulation thread according to the first collision interval information of the at least two first trajectory nodes, the second collision interval information of the at least two second trajectory nodes, and the material transportation demand information corresponding to the second transportation collision loss trajectory comprises:
representing second collision interval information of a target second track node matched with the at least two first track nodes on the second transportation collision loss track by adopting the first collision interval information of the at least two first track nodes and the thread characteristic distribution of the second transportation simulation thread;
adopting second collision interval information of the at least two second track nodes to represent track change characteristics of the second transportation collision loss track;
acquiring material transportation demand information corresponding to the second transportation collision loss track according to second collision interval information of the target second track node and track change characteristics of the second transportation collision loss track;
and performing correlation data extraction on the thread characteristic distribution according to the material transportation demand information corresponding to the second transportation collision loss track to obtain transportation correction parameters of the second transportation simulation thread.
5. A material transport treatment apparatus, comprising:
the first obtaining module is used for obtaining a first transportation loss of material data corresponding to the target building material in a first transportation simulation thread;
a second obtaining module, configured to obtain a second transportation loss of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread, where the second transportation loss is matched with the first transportation loss;
and the thread correction module is used for correcting the second transportation simulation thread according to the first transportation loss and the second transportation loss.
6. The apparatus of claim 5,
a first obtaining module to: obtaining a first transportation collision loss track of material data corresponding to a target building material in a first transportation simulation thread;
a second obtaining module to: obtaining a second transportation collision loss track of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread;
a thread modification module to: and correcting the second transportation simulation thread according to the first transportation collision loss track and the second transportation collision loss track.
7. The apparatus of claim 6, wherein the thread modification module is configured to:
acquiring first collision interval information of at least two first track nodes on the first transportation collision loss track;
acquiring second collision interval information of at least two second track nodes on the second transportation collision loss track;
and correcting the second transportation simulation thread according to the first collision interval information of the at least two first track nodes, the second collision interval information of the at least two second track nodes and the material transportation demand information corresponding to the second transportation collision loss track.
8. The apparatus of claim 7, wherein the thread modification module is configured to:
representing second collision interval information of a target second track node matched with the at least two first track nodes on the second transportation collision loss track by adopting the first collision interval information of the at least two first track nodes and the thread characteristic distribution of the second transportation simulation thread;
adopting second collision interval information of the at least two second track nodes to represent track change characteristics of the second transportation collision loss track;
acquiring material transportation demand information corresponding to the second transportation collision loss track according to second collision interval information of the target second track node and track change characteristics of the second transportation collision loss track;
and performing correlation data extraction on the thread characteristic distribution according to the material transportation demand information corresponding to the second transportation collision loss track to obtain transportation correction parameters of the second transportation simulation thread.
9. A material transport processing system comprising a server and a simulation device in communication with each other, the simulation device for performing a transport simulation of a construction material, the server for:
obtaining a first transportation loss of material data corresponding to a target building material in a first transportation simulation thread;
obtaining a second transportation loss of the material data corresponding to the target building material in a thread running interval corresponding to a second transportation simulation thread, wherein the second transportation loss is matched with the first transportation loss;
and correcting the second transportation simulation thread according to the first transportation loss and the second transportation loss.
CN202011029382.2A 2020-09-27 2020-09-27 Material transportation processing method, device and system Withdrawn CN112101875A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011029382.2A CN112101875A (en) 2020-09-27 2020-09-27 Material transportation processing method, device and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011029382.2A CN112101875A (en) 2020-09-27 2020-09-27 Material transportation processing method, device and system

Publications (1)

Publication Number Publication Date
CN112101875A true CN112101875A (en) 2020-12-18

Family

ID=73756293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011029382.2A Withdrawn CN112101875A (en) 2020-09-27 2020-09-27 Material transportation processing method, device and system

Country Status (1)

Country Link
CN (1) CN112101875A (en)

Similar Documents

Publication Publication Date Title
CN106250192B (en) Software upgrading method and system of upper computer
CN110958024B (en) Method and device for encoding serial data, embedded equipment and communication system
CN111880916A (en) Multi-drawing task processing method, device, terminal, medium and host in GPU
CN111433739A (en) Program upgrading method and embedded device
CN111897826A (en) Parameter information updating method and device, electronic equipment and readable storage medium
CN110879714B (en) Apparatus and computer-readable storage medium for providing update of vehicle
CN112101875A (en) Material transportation processing method, device and system
US12026500B2 (en) Software update device, server, software update system, and software update method
CN113849859A (en) Linux kernel modification method, terminal device and storage medium
CN112181033A (en) Adjusting method and device for cast iron environment control equipment
CN113283456A (en) Information processing method, device and system applied to unmanned aerial vehicle
CN113285772A (en) Data transmission processing method, device and system based on cloud computing
CN113285967A (en) Smart city-based monitoring equipment processing method, device and system
CN108388819B (en) Anti-collision method, device and system based on ultrahigh frequency rfid transponder
CN113746660A (en) Online office equipment network parameter processing method and device
CN110825406A (en) Software upgrading method and related equipment
CN113904916A (en) Online office network repairing method and device and server
CN113282964A (en) Block chain intelligent terminal processing method and device applied to block chain
CN113835949A (en) Self-help borrowing and returning machine control method and device based on Internet of things
CN116107603B (en) Firmware upgrading method and device, storage medium and electronic equipment
CN111682956B (en) Network upgrading method, device, server and readable storage medium
CN113282650A (en) Service data processing method and device based on big data
CN113284571A (en) Medical platform management method and device based on big data and cloud computing and server
CN113285968A (en) Service processing method and device based on big data and artificial intelligence and server
CN107291503B (en) Application program upgrading device, device and method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20201218

WW01 Invention patent application withdrawn after publication