CN112096417A - Underground excavation arch cover method interface structure and construction method thereof - Google Patents

Underground excavation arch cover method interface structure and construction method thereof Download PDF

Info

Publication number
CN112096417A
CN112096417A CN202011060649.4A CN202011060649A CN112096417A CN 112096417 A CN112096417 A CN 112096417A CN 202011060649 A CN202011060649 A CN 202011060649A CN 112096417 A CN112096417 A CN 112096417A
Authority
CN
China
Prior art keywords
interface
arch
air duct
arch cover
main
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202011060649.4A
Other languages
Chinese (zh)
Inventor
赵文强
姜久纯
龚旭东
李海龙
康后金
姜畔
张碧文
王天明
王海祥
王俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN202011060649.4A priority Critical patent/CN112096417A/en
Publication of CN112096417A publication Critical patent/CN112096417A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/14Lining predominantly with metal
    • E21D11/28Longitudinal struts, i.e. longitudinal connections between adjoining arches
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents

Abstract

The invention relates to an underground excavation arch cover method interface structure and a construction method thereof. The invention changes the air duct close to the main body part into the construction of the arch cover method, can facilitate the on-site construction organization, can finish the second lining construction of the main body earlier, effectively solves the risks and difficulties existing in the structural construction of the traditional interface part, improves the safety and the reliability of the engineering, and has higher economic benefit and social benefit.

Description

Underground excavation arch cover method interface structure and construction method thereof
Technical Field
The invention belongs to the technical field of tunnel engineering construction, and particularly relates to an underground excavation arch cover method interface structure and a construction method thereof.
Background
For a shallow-buried underground excavation method station with a soft upper stratum and a hard lower stratum, an arch cover method is a relatively perfect construction method and construction process, but meanwhile, the construction of the arch cover method requires that excavation is finished on the upper half section (arch part) of the station, the lower step of the station is excavated after secondary lining construction, and the construction cannot be carried out due to the fact that an air duct interface is free of arch foot beams and the two linings are single-sided in suspension.
Disclosure of Invention
The invention aims to provide an underground excavation and arch cover method interface structure and a construction method thereof. The technical problem existing in the traditional scheme is solved, and the interface form of the arch cover method is optimized.
The technical scheme adopted by the invention is as follows:
undercut arch cover method interface structure, its characterized in that:
the interface structure is positioned at the interface of the main structure of the station and the air channel structure and comprises an arch cover at the top, and the main structure expansion section is constructed by constructing the arch cover and transversely connecting the arch cover into the air channel structure.
And an arched cover joist is arranged at the joint of the air duct structure.
The interface of the air duct structure is contracted inwards, and the arched cover joist is positioned at the outer side of the contracted part.
The main structure expansion section is a part of the main structure standard section in the station main structure, which transversely expands outwards and is positioned at the interface of the station main structure and the air duct structure.
And arch cover joists are arranged below arch feet at two ends of the air duct structure, the joists are of a steel frame concrete structure and are fixed by 2 locking anchor rods with the length of 6 m.
The construction method of the underground excavation arch cover method interface structure is characterized in that:
the method comprises the following steps:
the method comprises the following steps: finishing the second lining construction of the standard section of the main body structure, and constructing a second lining at the interface of the air duct and the main body after the design strength is reached; simultaneously manufacturing the main structure expansion section and the vault two linings of the air duct, and removing the mold after the two linings reach the design strength;
step two: excavating a lower soil body under the protection of the arch cover; constructing an expansion section of the main structure and an inverted arch and a side wall of the air duct in sequence, and constructing two end walls of the main structure finally;
step three: and constructing an internal structure of the air duct.
The invention has the following advantages:
the section of the expanded section of the main structure of the station is large in size and complex in stress, in order to accelerate the construction progress, the air duct close to the main part is constructed by the arch cover method, the on-site construction organization can be facilitated, the second lining construction of the main body can be completed earlier, the risks and difficulties existing in the construction of the traditional interface part structure are effectively solved, the safety and reliability of the engineering are improved, and the high economic benefit and the high social benefit are achieved.
Drawings
FIG. 1 is a plan view of the interface structure of the main body and the air duct.
FIG. 2 is a longitudinal cross-sectional view of the interface structure between the main body and the air duct.
FIG. 3 is a cross-sectional view of the interface structure of the main body and the air duct.
In the figure, 1-a main structure standard section, 2-a main structure expanding section, 3-an air duct structure, 4-an arch cover joist, 5-an arch cover and 6-a station end wall.
Detailed Description
The present invention will be described in detail with reference to specific embodiments.
The invention relates to an underground excavation arch cover method interface structure, which is positioned at the interface of a station main body structure and an air channel structure 3 and comprises an arch cover 5 at the top, wherein a main body structure expansion section 2 is arranged below the arch cover 5 and transversely connected into the air channel structure 3.
An arch cover joist 4 is arranged at the interface of the air duct structure 3. The interface of the air duct structure 3 is contracted inwards, and the arched cover joist 4 is positioned at the outer side of the contracted part.
The main structure expanding section 2 is a part of the main structure standard section 1 in the station main structure, which transversely expands outwards and is positioned at the interface of the station main structure and the air duct structure 3.
And arch cover joists 4 are arranged below arch feet at two ends of the air duct structure 3, and the joists 4 are of a steel frame concrete structure and are fixed by 2 locking anchor rods with the length of 6 m.
The construction method of the underground excavation arch cover method interface structure comprises the following construction steps of arch excavation → vault lining → excavation of lower earthwork → inverted arch lining → side wall lining → headwall lining:
the method comprises the following steps: finishing the second lining construction of the main body structure standard section 1, and constructing a second lining at the interface of the air duct and the main body after the design strength is reached; simultaneously manufacturing the main structure expanding section 2 and the second vault lining 3 of the air duct, and removing the mold after the second vault lining reaches the design strength;
step two: excavating a lower soil body under the protection of the arch cover 5; constructing the main structure expansion section 2 and the inverted arch and the side wall of the air duct in sequence, and constructing two end walls 6 of the main structure finally;
step three: and constructing an internal structure of the air duct.
The invention is not limited to the examples, and any equivalent changes to the technical solution of the invention by a person skilled in the art after reading the description of the invention are covered by the claims of the invention.

Claims (6)

1. Undercut arch cover method interface structure, its characterized in that:
the interface structure is positioned at the interface of the station main body structure and the air channel structure (3) and comprises an arch cover (5) at the top, and the main body structure expansion section (2) is constructed by applying the arch cover (5) and transversely connected into the air channel structure (3).
2. The undermining arch-style interface structure of claim 1, wherein:
an arch cover joist (4) is arranged at the interface of the air duct structure (3).
3. The undermining arch-style interface structure of claim 2, wherein:
the interface of the air duct structure (3) is contracted inwards, and the arched cover joist (4) is positioned at the outer side of the contracted part.
4. The undermining cove interface structure of claim 3, wherein:
the main structure expanding section (2) is a part of the main structure standard section (1) in the main structure of the station, which transversely expands outwards and is positioned at the interface of the main structure of the station and the air duct structure (3).
5. The undercut arch-type interface structure of claim 4, wherein:
and arch cover joists (4) are arranged below arch feet at two ends of the air duct structure (3), the joists (4) are of a steel frame concrete structure and are fixed by 2 locking anchor rods with the length of 6 m.
6. The construction method of the underground excavation arch cover method interface structure is characterized in that:
the method comprises the following steps:
the method comprises the following steps: finishing the second lining construction of the main body structure standard section (1), and constructing a second lining at the interface of the air duct and the main body after the design strength is reached; simultaneously manufacturing the main structure expanding section (2) and the second vault lining (3) of the air duct, and removing the mold after the second vault lining reaches the design strength;
step two: excavating a lower soil body under the protection of the arch cover (5); sequentially constructing an expansion section (2) of the main structure, an inverted arch and a side wall of the air duct, and finally constructing two end walls (6) of the main structure;
step three: and constructing an internal structure of the air duct.
CN202011060649.4A 2020-09-30 2020-09-30 Underground excavation arch cover method interface structure and construction method thereof Pending CN112096417A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202011060649.4A CN112096417A (en) 2020-09-30 2020-09-30 Underground excavation arch cover method interface structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202011060649.4A CN112096417A (en) 2020-09-30 2020-09-30 Underground excavation arch cover method interface structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN112096417A true CN112096417A (en) 2020-12-18

Family

ID=73782929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202011060649.4A Pending CN112096417A (en) 2020-09-30 2020-09-30 Underground excavation arch cover method interface structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN112096417A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112610225A (en) * 2021-01-14 2021-04-06 中铁工程设计咨询集团有限公司 Semi-amplitude jacking main body device for large-span air duct of underground excavation station and construction method thereof
CN113236296A (en) * 2021-04-25 2021-08-10 中铁二局第二工程有限公司 Arch pier body preservation method for subway station arch cover construction

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298501A (en) * 2015-11-11 2016-02-03 上海市城市建设设计研究总院 Construction method for auxiliary air duct structure of underground excavation station
CN110486036A (en) * 2019-08-26 2019-11-22 中建隧道建设有限公司 A kind of first branch ledge method construction method of expansion arch springing

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105298501A (en) * 2015-11-11 2016-02-03 上海市城市建设设计研究总院 Construction method for auxiliary air duct structure of underground excavation station
CN110486036A (en) * 2019-08-26 2019-11-22 中建隧道建设有限公司 A kind of first branch ledge method construction method of expansion arch springing

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
李赵九: "拱盖法暗挖地铁车站主体与附属结构支护体系转换施工技术研究", 《现代隧道技术》 *
王渭明等: "基于结构先行的浅埋碎裂岩体暗挖地铁隧道交叉点施工方案研究与应用", 《现代隧道技术》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112610225A (en) * 2021-01-14 2021-04-06 中铁工程设计咨询集团有限公司 Semi-amplitude jacking main body device for large-span air duct of underground excavation station and construction method thereof
CN113236296A (en) * 2021-04-25 2021-08-10 中铁二局第二工程有限公司 Arch pier body preservation method for subway station arch cover construction
CN113236296B (en) * 2021-04-25 2023-08-18 中铁二局第二工程有限公司 Arch leg rock mass preservation method for subway station arch cover method construction

Similar Documents

Publication Publication Date Title
CN106337686B (en) Three layers of subway station canopy structure of rocky stratum tunneling and construction method
CN105114105B (en) Steel-concrete combined type tunnel-liner support structure and making thereof and construction method
WO2016095630A1 (en) Method for constructing extra-large variable cross section tunnel
CN109404005B (en) Pre-reinforcing system for small hole and large hole of underground tunnel and construction method
CN204729099U (en) Rock quality layer tunneling three layers of subway station canopy structure
CN102758642A (en) Long-span tunnel overlapping carrying arch structure for upper-soft and lower-hard stratum and construction method thereof
CN112096417A (en) Underground excavation arch cover method interface structure and construction method thereof
CN109958445B (en) Scaffold construction method for ultra-shallow large underground space
CN111520145B (en) Underground excavation tunnel primary support slope adjusting and arch changing construction method
CN104612696A (en) Construction method for underground excavated large-section subway station to pass through viaduct in fine sand layer based on pioneer heading-column method
CN210217774U (en) Loess tunnel supporting system
CN111810200A (en) Shield tunnel expanding and excavating system and method based on middle upright posts and inverted arches
CN112855225B (en) Soft rock tunnel supporting construction method with high safety
CN105386779B (en) The counterfort method of large underground structure is built in shallow embedding rock stratum
CN112922646B (en) Building method of underground excavation station excavated by large-section single-span support through superposed arch-wall integrated type
CN112065467B (en) Underground engineering supporting structure and construction method thereof
CN105626098A (en) Combination type tunnel lining, culvert or underground comprehensive pipe gallery
CN110159323A (en) The construction method fixed with steel arch-shelf is excavated suitable for extra-large cross-section underground chamber
CN212154778U (en) Accessory interface structure of underground excavation subway station by arch cover method
CN112962672A (en) Structure system of subway station passing through short piles at zero distance and construction method
CN109026031B (en) Reconstruction construction method for collapsed section of gas tunnel after strong earthquake
CN112145183A (en) Construction method for upward excavation of shallow-buried weak surrounding rock steep slope tunnel
CN112065479B (en) Construction method of asymmetric multi-curve double-arch tunnel
CN110331980A (en) A kind of shallow embedding fine sand layer tunnel Varied section transition and conversion construction method
CN215053220U (en) Structure system for zero-distance crossing stub subway station

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20201218

WD01 Invention patent application deemed withdrawn after publication