CN112093003A - Installation method of marine scaffold wall connecting piece - Google Patents

Installation method of marine scaffold wall connecting piece Download PDF

Info

Publication number
CN112093003A
CN112093003A CN202010915251.8A CN202010915251A CN112093003A CN 112093003 A CN112093003 A CN 112093003A CN 202010915251 A CN202010915251 A CN 202010915251A CN 112093003 A CN112093003 A CN 112093003A
Authority
CN
China
Prior art keywords
wall connecting
scaffold
connecting piece
erected
ship
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010915251.8A
Other languages
Chinese (zh)
Inventor
张凯
葛杨飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Merchants Bureau Cruise Manufacturing Co ltd
China Merchants Jinling Shipyard Jiangsu Co Ltd
Original Assignee
China Merchants Bureau Cruise Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Merchants Bureau Cruise Manufacturing Co ltd filed Critical China Merchants Bureau Cruise Manufacturing Co ltd
Priority to CN202010915251.8A priority Critical patent/CN112093003A/en
Publication of CN112093003A publication Critical patent/CN112093003A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/60Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by the use of specific tools or equipment; characterised by automation, e.g. use of robots
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B73/00Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
    • B63B73/20Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Robotics (AREA)
  • Movable Scaffolding (AREA)

Abstract

The invention discloses a method for installing a scaffold wall connecting piece for a ship, which solves the problem of installing scaffold wall connecting pieces on site, reduces safety risks and improves work efficiency.

Description

Installation method of marine scaffold wall connecting piece
Technical Field
The invention relates to a method for installing scaffold wall connecting pieces for ships (including maritime workers), in particular to a method for installing scaffold wall connecting pieces for ships.
Background
Often need set up a large amount of scaffolds during boats and ships or marine structure are built, because boats and ships or marine structure self size is bigger, the scaffold height that needs to set up is also higher to the scaffold has the risk of toppling over, consequently needs to install between scaffold and hull structure and links the wall spare and stabilize the scaffold.
In the past, the scaffold and the wall connecting piece are installed synchronously with the scaffold, namely, the scaffold is erected at one side, when the wall connecting piece needs to be installed at a certain height, a person is sent to climb onto the scaffold which is not erected to weld the wall connecting piece, at the moment, the work of erecting the scaffold is paused, the wall connecting piece is welded, the scaffold and the wall connecting piece are connected well, the scaffold is continuously erected, and the operation is repeatedly circulated until the scaffold is completely erected.
According to the method for installing the wall connecting piece, the scaffold is built intermittently, and workers for installing the wall connecting piece construct on the scaffold which is not built completely, so that the construction progress is influenced and the safety risk is increased.
Disclosure of Invention
The invention aims to provide a method for installing a scaffold wall connecting piece for a ship.
The technical scheme adopted by the invention is as follows:
a method for installing a scaffold wall connecting piece for a ship is characterized by comprising the following steps: the method comprises the following steps:
step 1: in the early stage of starting up a ship project, integrally planning positions of scaffolds to be erected in sections according to ship building requirements;
step 2: after the position of a scaffold to be erected is determined, the form of the scaffold wall connecting piece is determined, and the required scaffold wall connecting piece is manufactured before operation;
and step 3: when the height of the single-sided scaffold exceeds 6m, arranging wall connecting pieces;
and 4, step 4: the wall connecting piece is used for pulling and fixing the scaffold to be erected so as to prevent the scaffold from toppling, and the wall connecting piece and the scaffold are connected through a connecting steel pipe;
and 5: the wall connecting pieces are welded and arranged on the corresponding hull structures at intervals of 6m in the length direction and the height direction of the scaffold building area;
step 6: the thickness of the wall connecting piece is generally 12-16mm, the welding leg is 6-8mm, and the welding quality is checked by using magnetic powder after welding;
and 7: the installation time of the wall connecting piece of the device is fully moved forward, the wall connecting piece is accurately installed at a corresponding position during the sectional manufacturing period, and the welded wall connecting piece is directly used when a scaffold is erected in the folding stage;
and 8: the wall connecting piece is removed when the use is finished.
The wall connecting piece is a lifting lug.
The invention has the advantages that: the problem of on-spot installation scaffold even wall spare is solved, the safety risk has been reduced, has improved the work efficiency.
Drawings
The present invention will be described in further detail with reference to the accompanying drawings and specific embodiments.
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the connection between the wall connecting member and the hull structure at a position a in fig. 1.
Wherein: 1. a scaffold; 2. a wall connecting piece; 3. connecting the steel pipes; 4; a hull structure.
Detailed Description
As shown in fig. 1-2, a method for installing a scaffold wall connecting member for a ship includes the following steps:
step 1: in the early stage of starting a ship project, integrally planning the positions of the scaffolds 1 required to be erected in sections according to the ship building requirements;
step 2: after the position of the scaffold 1 to be erected is determined, the form of the wall connecting piece 2 of the scaffold 1 is determined, and the required wall connecting piece 2 of the scaffold 1 is manufactured before operation;
and step 3: when the height of the single-sided scaffold 1 exceeds 6m, arranging the wall connecting piece 2;
and 4, step 4: the wall connecting piece 2 is used for pulling and fixing the scaffold 1 to be erected so as to prevent toppling, and the wall connecting piece 2 and the scaffold 1 are connected through the connecting steel pipe 3;
and 5: the wall connecting pieces 2 are welded and arranged on the corresponding hull structures 4 at intervals of 6m in the length and height directions in the building area of the scaffold 1;
step 6: the thickness of the wall connecting piece 2 is generally 12-16mm, the welding leg is 6-8mm, and the welding quality is checked by using magnetic powder after welding;
and 7: the installation time of the wall connecting piece 2 of the device is fully moved forward, the wall connecting piece is accurately installed at a corresponding position during the sectional manufacturing period, and the welded wall connecting piece 2 is directly used when the scaffold 1 is erected in the folding stage;
and 8: the wall connecting piece 2 is removed at the end of use.
The wall connecting piece 2 of the device is a lifting lug.
The invention solves the problem of installing the scaffold wall connecting piece on site, reduces the safety risk and improves the working efficiency.

Claims (2)

1. A method for installing a scaffold wall connecting piece for a ship is characterized by comprising the following steps: the method comprises the following steps:
step 1: in the early stage of starting up a ship project, integrally planning positions of scaffolds to be erected in sections according to ship building requirements;
step 2: after the position of a scaffold to be erected is determined, the form of the scaffold wall connecting piece is determined, and the required scaffold wall connecting piece is manufactured before operation;
and step 3: when the height of the single-sided scaffold exceeds 6m, arranging wall connecting pieces;
and 4, step 4: the wall connecting piece is used for pulling and fixing the scaffold to be erected so as to prevent the scaffold from toppling, and the wall connecting piece and the scaffold are connected through a connecting steel pipe;
and 5: the wall connecting pieces are welded and arranged on the corresponding hull structures at intervals of 6m in the length direction and the height direction of the scaffold building area;
step 6: the thickness of the wall connecting piece is generally 12-16mm, the welding leg is 6-8mm, and the welding quality is checked by using magnetic powder after welding;
and 7: the installation time of the wall connecting piece of the device is fully moved forward, the wall connecting piece is accurately installed at a corresponding position during the sectional manufacturing period, and the welded wall connecting piece is directly used when a scaffold is erected in the folding stage;
and 8: the wall connecting piece is removed when the use is finished.
2. The method for installing the scaffold wall connecting member for the ship according to claim 1, wherein: the wall connecting piece is a lifting lug.
CN202010915251.8A 2020-09-03 2020-09-03 Installation method of marine scaffold wall connecting piece Pending CN112093003A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010915251.8A CN112093003A (en) 2020-09-03 2020-09-03 Installation method of marine scaffold wall connecting piece

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010915251.8A CN112093003A (en) 2020-09-03 2020-09-03 Installation method of marine scaffold wall connecting piece

Publications (1)

Publication Number Publication Date
CN112093003A true CN112093003A (en) 2020-12-18

Family

ID=73757063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010915251.8A Pending CN112093003A (en) 2020-09-03 2020-09-03 Installation method of marine scaffold wall connecting piece

Country Status (1)

Country Link
CN (1) CN112093003A (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101844612A (en) * 2009-03-24 2010-09-29 上海外高桥造船有限公司 Fabricated scaffold and using method thereof
KR20140005427U (en) * 2013-04-11 2014-10-21 현대중공업 주식회사 Bolt fixing apparatus and installation structure for scaffold comprising the same
CN105000153A (en) * 2015-06-25 2015-10-28 上海外高桥造船有限公司 Scaffold horse and scaffold building method
CN205059960U (en) * 2015-09-17 2016-03-02 沪东中华造船(集团)有限公司 Exempt from to weld formula scaffold anchor
CN107444582A (en) * 2017-07-31 2017-12-08 广船国际有限公司 A kind of hyperboloid line style cabin scaffold device erection method
CN208453224U (en) * 2018-06-14 2019-02-01 招商局重工(江苏)有限公司 A kind of LNG ship cargo tank slope scaffold support
CN109319040A (en) * 2018-10-10 2019-02-12 上海江南长兴造船有限责任公司 A kind of scaffold building method for hull turn of the bilge region

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101844612A (en) * 2009-03-24 2010-09-29 上海外高桥造船有限公司 Fabricated scaffold and using method thereof
KR20140005427U (en) * 2013-04-11 2014-10-21 현대중공업 주식회사 Bolt fixing apparatus and installation structure for scaffold comprising the same
CN105000153A (en) * 2015-06-25 2015-10-28 上海外高桥造船有限公司 Scaffold horse and scaffold building method
CN205059960U (en) * 2015-09-17 2016-03-02 沪东中华造船(集团)有限公司 Exempt from to weld formula scaffold anchor
CN107444582A (en) * 2017-07-31 2017-12-08 广船国际有限公司 A kind of hyperboloid line style cabin scaffold device erection method
CN208453224U (en) * 2018-06-14 2019-02-01 招商局重工(江苏)有限公司 A kind of LNG ship cargo tank slope scaffold support
CN109319040A (en) * 2018-10-10 2019-02-12 上海江南长兴造船有限责任公司 A kind of scaffold building method for hull turn of the bilge region

Similar Documents

Publication Publication Date Title
CN102756019B (en) Device for roundness adjustment and supporting of penstock
CN202655402U (en) Device for adjusting roundness of penstock and supporting penstock
CN205954965U (en) Novel node of light -duty floor of steel skeleton
CN112093003A (en) Installation method of marine scaffold wall connecting piece
CN107268978B (en) The fixed device of towering structure constructor's row ladder sustaining wall and construction method
CN205476079U (en) Major diameter reinforcing bar net piece
CN218580601U (en) Marine wind power basis is with leaning on ship spare
CN110578405A (en) Protection method for standard floor outer wall edge opening
CN102022003A (en) Suspended ceiling keel sheet assembling and hoisting method
CN209891066U (en) Safety protection device in high tower crossbeam steel web construction
CN112031786B (en) Tunnel portal ring beam structure and method for connecting tunnel portal ring beam structure with steel sleeve
CN210134420U (en) Composite hoop for trestle steel pipe pile parallel connection
CN212153427U (en) Peripheral firm high accuracy zero interference weir mould body structure
CN211422500U (en) A ladder that continues for steel pipe pole is climbed
CN113833312A (en) Combined temporary construction stair used in assembly type stair
CN112227686A (en) Overhanging steel beam system scaffold moving positioning pile and construction method
CN213329974U (en) Steel pipe fixing device
CN216276849U (en) Detachable pull joint device for reinforcing outer frame
CN104652829A (en) Construction method for self-lifting folding positioning operation system
CN105438940B (en) Hoisting construction method for large indoor water tank of nuclear power station
CN111271068A (en) Movable reaction frame for shield launching
CN111379265A (en) Peripherally-stabilized high-precision zero-interference weir-mold integrated structure and construction method thereof
CN217030187U (en) Precast concrete pipe joint construction mould
JP5299982B1 (en) Wall linking band for cylindrical structure construction / repair work, and method for construction / repair of cylindrical structure by moving lifting type scaffolding using the wall linking band
CN213742226U (en) Climb supplementary bearing structure of frame and climb frame

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20230103

Address after: No.2261, Haimen street, Nantong City, Jiangsu Province

Applicant after: China Merchants Bureau Cruise Manufacturing Co.,Ltd.

Applicant after: China Merchants Jinling shipping (Jiangsu) Co.,Ltd.

Address before: No.2261, Haimen street, Nantong City, Jiangsu Province

Applicant before: China Merchants Bureau Cruise Manufacturing Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20201218

RJ01 Rejection of invention patent application after publication