CN112064978A - Composite floor structure and using method - Google Patents

Composite floor structure and using method Download PDF

Info

Publication number
CN112064978A
CN112064978A CN202010985440.2A CN202010985440A CN112064978A CN 112064978 A CN112064978 A CN 112064978A CN 202010985440 A CN202010985440 A CN 202010985440A CN 112064978 A CN112064978 A CN 112064978A
Authority
CN
China
Prior art keywords
stone
plastic substrate
hole
group
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010985440.2A
Other languages
Chinese (zh)
Inventor
丁欣欣
丁泽成
张建平
王文广
周东珊
武鹏
余文钊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN202010985440.2A priority Critical patent/CN112064978A/en
Publication of CN112064978A publication Critical patent/CN112064978A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/10Flooring or floor layers composed of a number of similar elements of other materials, e.g. fibrous or chipped materials, organic plastics, magnesite tiles, hardboard, or with a top layer of other materials
    • E04F15/107Flooring or floor layers composed of a number of similar elements of other materials, e.g. fibrous or chipped materials, organic plastics, magnesite tiles, hardboard, or with a top layer of other materials composed of several layers, e.g. sandwich panels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • E04F15/02038Flooring or floor layers composed of a number of similar elements characterised by tongue and groove connections between neighbouring flooring elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The invention provides a composite floor structure and a using method thereof, belonging to the technical field of composite floor installation. The composite floor structure and the using method thereof comprise a plurality of stone-plastic substrates, ceramic tiles, fixing pieces and inserting connecting pieces. According to the invention, the ceramic tile is supported by the fixing piece, and two ends of the plug-in connection piece are respectively connected to two adjacent stone-plastic substrates, so that the installation of a plurality of stone-plastic substrates is completed, and the ceramic tile is installed on the stone-plastic substrates.

Description

Composite floor structure and using method
Technical Field
The invention belongs to the technical field of composite floor installation, and relates to a composite floor structure and a using method thereof.
Background
At present, cement fiber boards or plastics are mostly used as ceramic tile and stone composite board substrates in the decoration industry, and when the cement fiber boards are used as the substrates, installation structures are formed around the cement fiber boards through injection molding; when the plastic is used as a substrate, a thin-wall shell structure is formed by injection molding, and four sides of the thin-wall shell structure are provided with buckle mounting structures. When the cement fiberboard is used as a substrate, the cement fiberboard is greatly deformed in a humid environment, when plastic is used as the substrate, the composite board is high in cost, and the thin-wall shell structure can make a hollow sound, so that the process is complex and the cost is high.
Disclosure of Invention
The invention provides a composite floor structure and a using method aiming at the problems in the prior art, and the technical problems to be solved by the invention are as follows: how to provide a composite floor structure and a using method.
The purpose of the invention can be realized by the following technical scheme:
the utility model provides a composite floor structure, includes that a plurality of stones mould the base plate, set up ceramic tile on the base plate is moulded to the stone, be used for supporting mounting, the plug connector that the base plate was moulded to the stone, mounting one end is connected in the base plate is moulded to the stone, the plug connector both ends are connected respectively in two adjacent stones and are moulded the base plate.
Preferably, the first end of stone-plastic substrate is equipped with first picture peg, the second end is equipped with first slot, one the first picture peg of stone-plastic substrate is pegged graft in the first slot of another stone-plastic substrate.
Preferably, the stone-plastic substrate is provided with a plurality of mounting through holes at the third end and the fourth end, one end of the fixing part is inserted into the mounting through hole, one end of the inserting connection part is inserted into the mounting through hole of one stone-plastic substrate, and the other end of the inserting connection part is inserted into the mounting through hole of the other stone-plastic substrate.
Preferably, the plug connector includes the first post of pegging graft that is used for pegging graft in the mounting hole of a stone plastic substrate, the second post of pegging graft that is used for pegging graft in the mounting hole of another stone plastic substrate, is used for carrying out spacing first limiting plate for the ceramic tile when moulding the base plate with the ceramic tile with the stone, first post and the symmetry setting of second post of pegging graft, first limiting plate both ends are connected respectively in first post, the post of pegging graft of second, first post, the post of pegging graft of second and the equal interference fit of mounting hole.
Preferably, the mounting includes the third post of pegging graft in the mounting hole, connects in the second limiting plate of third post of pegging graft, connects in the loading board of a second limiting plate tip, sets up fixing hole, the rifle nail that one end run through in fixing hole on the loading board, the third post of pegging graft and mounting hole interference fit, be equipped with the recess on the stone moulds the base plate, the loading board is arranged in the recess of another stone moulds the base plate when the third post of pegging graft is pegged graft in the mounting hole of a stone moulds the base plate.
A method of using a composite floor structure, comprising the steps of:
s1: fixing the first stone-plastic substrate through a first group of fixing pieces;
s2: one end of the first group of plug-in connectors is plugged in the first stone-plastic substrate, the other end of the first group of plug-in connectors is plugged in one end of the second stone-plastic substrate, and the other end of the second stone-plastic substrate is fixed through the second group of fixing pieces;
s3: inserting one end of a third stone-plastic substrate into one end of the second stone-plastic substrate, and fixing the third stone-plastic substrate through a third group of fixing pieces;
s4: and one end of the second group of the plug-in connectors is plugged into the third stone-plastic substrate, the first end of the fourth stone-plastic substrate is plugged into the second stone-plastic substrate, the second end of the fourth stone-plastic substrate is plugged into the other end of the second group of the plug-in connectors, and the third end of the fourth stone-plastic substrate is fixed through the fourth group of the fixing pieces.
Preferably, step S1 specifically includes: the third inserting column of the first group of fixing pieces is inserted into one mounting through hole in the first stone-plastic substrate, one end of the gun nail penetrates through the fixing through holes in the first group of fixing pieces to enable the first stone-plastic substrate to support the first fixing pieces, the first group of fixing pieces are even, and the first group of fixing pieces are symmetrically arranged at two ends of the first stone-plastic substrate.
Preferably, step S2 specifically includes: the mounting method comprises the steps of inserting a first inserting column of a first group of inserting connectors into another mounting through hole in a first stone-plastic substrate, inserting a second inserting column of the first group of inserting connectors into a mounting through hole in one end of a second stone-plastic substrate, accommodating a bearing plate of a first group of fixing pieces in a groove of the second stone-plastic substrate, inserting a third inserting column of a second group of fixing pieces into a mounting through hole in the other end of the second stone-plastic substrate, and penetrating one end of a gun nail through a fixing through hole in the second group of fixing pieces to support the second stone-plastic substrate.
Preferably, step S3 specifically includes: the third stone-plastic substrate is inserted into the first stone-plastic substrate in a mode of inserting the first inserting plate of the third stone-plastic substrate into the first inserting groove of the first stone-plastic substrate or inserting the first inserting groove of the third stone-plastic substrate into the first inserting plate of the first stone-plastic substrate, the third inserting column of the third group of fixing pieces is inserted into one mounting through hole of the third stone-plastic substrate, and one end of the gun nail penetrates through the fixing through hole in the third group of fixing pieces to support the third stone-plastic substrate.
Preferably, step S4 specifically includes: the first inserting column of the second group of inserting connecting pieces is inserted into the other installing through hole of the third stone plastic substrate, the first end of the fourth stone plastic substrate is inserted into the second stone plastic substrate in a mode of inserting the first inserting plate of the fourth stone plastic substrate into the first inserting groove of the second stone plastic substrate or inserting the first inserting groove of the fourth stone plastic substrate into the first inserting plate of the second stone plastic substrate, the installing through hole of the second end of the fourth stone plastic substrate is inserted into the second inserting column of the second group of inserting connecting pieces, the bearing plate of the third group of fixing pieces is contained in the groove of the fourth stone plastic substrate, the third inserting column of the fourth group of fixing pieces is inserted into the installing through hole of the third end of the fourth stone plastic substrate, and one end of the gun nail penetrates through the fixing through hole of the third group of fixing pieces to support the third stone plastic substrate.
The invention has the following beneficial effects: 1. the ceramic tile is mounted on the stone-plastic substrate, so that the mounting is simple and convenient, the processing technology is simple and convenient, the cost is low, and the stability is high;
2. the first inserting plate of one stone-plastic substrate is inserted into the first inserting groove of the other stone-plastic substrate, so that the two stone-plastic substrates are conveniently installed together, and the installation is simple and convenient;
3. the first inserting column is inserted into the mounting through hole of one stone-plastic substrate, the second inserting column is inserted into the mounting through hole of the other stone-plastic substrate, the first inserting column and the second inserting column are in interference fit with the mounting through hole, mounting strength is improved, therefore, two ends of the inserting connecting piece are respectively connected to two adjacent stone-plastic substrates, the first limiting plate can limit a ceramic tile when the ceramic tile is mounted on the stone-plastic substrates, a distance is reserved between the two adjacent stone-plastic substrates, and mounting efficiency is improved;
4. the third inserting column is inserted into the mounting through hole of one stone-plastic substrate, one end of the gun nail penetrates through the fixing through hole and is fixed on the wall surface or the ground, the bearing plate is accommodated in the groove of the other stone-plastic substrate, so that one end of one stone-plastic substrate can be supported, one end of the other stone-plastic substrate can be supported, the two stone-plastic substrates can be supported, and the third inserting column is in interference fit with the mounting through hole, so that the mounting strength is improved, and the structure is simple;
5. mounting through holes are symmetrically formed in two ends of the first stone-plastic substrate, third inserting columns of the first group of fixing pieces are respectively inserted into the mounting through holes in the two ends, the number of the first group of fixing pieces is even, one ends of gun nails penetrate through the fixing through holes in the first group of fixing pieces to support the first stone-plastic substrate, so that the two ends of the first stone-plastic substrate are respectively supported, the mounting is simple and convenient, and the stability is high;
6. inserting a first inserting column of a first group of inserting connectors into another mounting through hole on a first stone-plastic substrate, aligning a bearing plate of a first group of fixing pieces with a groove of a second stone-plastic substrate, aligning a second inserting column of the first group of inserting connectors with a mounting through hole at one end of the second stone-plastic substrate, knocking one end of the second stone-plastic substrate by a rubber hammer to enable the second stone-plastic substrate to move towards the position close to the second inserting column, inserting the second inserting column of the first group of inserting connectors into the mounting through hole at one end of the second stone-plastic substrate, accommodating the bearing plate of the first group of fixing pieces into the groove of the second stone-plastic substrate, inserting a third inserting column of the second group of fixing pieces into the mounting through hole at the other end of the second stone-plastic substrate, and penetrating one end of a gun nail into the fixing through hole on the second group of fixing pieces to support the second stone-plastic substrate, the installation of the two stone plastic substrates is realized, and the installation is simple and convenient;
7. if the first slot of the first stone-plastic substrate and the first slot of the second stone-plastic substrate are located on the same side, the third stone-plastic substrate is inserted into the first slot of the first stone-plastic substrate by inserting the first inserting plate of the third stone-plastic substrate into the first slot of the first stone-plastic substrate, the third fixing member is inserted into one mounting through hole of the third stone-plastic substrate, one end of a gun nail penetrates through the fixing through hole of the third fixing member to support the third stone-plastic substrate, so that the third stone-plastic substrate supports the third stone-plastic substrate to complete the mounting of the third stone-plastic substrate, the first inserting column of the second inserting connecting member is inserted into the other mounting through hole of the third stone-plastic substrate, the first inserting plate of the first end of the fourth stone-plastic substrate is inserted into the first slot of the second stone-plastic substrate, the bearing plates of the third group are aligned with the grooves of the fourth stone-plastic substrate, and the second inserting column of the second inserting connecting member and the fourth stone-plastic substrate are aligned with each other groove The mounting through holes at the second ends of the substrates are aligned, the second end of the fourth stone plastic substrate is knocked by the rubber hammer to enable the fourth stone plastic substrate to move towards the position close to the second inserting column, so that the second inserting column of the second group of inserting connecting pieces is inserted into the mounting through hole at the first end of the fourth stone plastic substrate, the bearing plate of the third group of fixing pieces is accommodated in the groove of the second stone plastic substrate, the third inserting column of the fourth group of fixing pieces is inserted into the mounting through hole at the third end of the fourth stone plastic substrate, and one end of the gun nail penetrates through the fixing through hole in the fourth group of fixing pieces to support the fourth stone plastic substrate; if the first slot of the first stone-plastic substrate and the first slot of the second stone-plastic substrate are positioned on opposite sides, the third stone-plastic substrate is inserted into the first stone-plastic substrate by using one mode of inserting the first slot of the third stone-plastic substrate into the first inserting plate of the first stone-plastic substrate, then the third stone-plastic substrate of the third group of fixing pieces is inserted into one mounting through hole of the third stone-plastic substrate, one end of a gun nail penetrates through the fixing through hole on the third group of fixing pieces to support the third stone-plastic substrate, so that the third stone-plastic substrate is supported, the mounting of the third stone-plastic substrate is completed, the first inserting column of the second group of inserting connecting pieces is inserted into the other mounting through hole of the third stone-plastic substrate, the first inserting plate of the first end of the fourth stone-plastic substrate is inserted into the first slot of the second stone-plastic substrate, the bearing plate of the third group of mounting pieces is aligned with the groove of the fourth stone-plastic substrate, and the second inserting column and the fourth inserting column of the second group of connecting pieces are aligned with the fourth inserting column of the fourth stone-plastic The mounting through holes at the second ends of the stone plastic substrates are aligned, the second ends of the fourth stone plastic substrates are knocked by the rubber hammers to enable the fourth stone plastic substrates to move towards the second inserting columns, so that the second inserting columns of the second group of inserting connectors are inserted into the mounting through holes at the first ends of the fourth stone plastic substrates, the bearing plates of the third group of fixing pieces are accommodated in the grooves of the second stone plastic substrates, the third inserting columns of the fourth group of fixing pieces are inserted into the mounting through holes at the third ends of the fourth stone plastic substrates, and one ends of the gun nails penetrate through the fixing through holes in the fourth group of fixing pieces to support the fourth stone plastic substrates; therefore, the four stone plastic substrates are mounted, and the mounting is simple and convenient.
Drawings
FIG. 1 is a schematic diagram of the structure of the present invention;
FIG. 2 is a schematic view of the structure at A in the present invention;
FIG. 3 is a schematic view of the structure at B in the present invention;
FIG. 4 is a schematic view of the construction of the plug connector of the present invention;
FIG. 5 is a schematic view of the construction of the fixing member of the present invention;
FIG. 6 is a front view of two stone-plastic substrates according to the present invention when they are joined;
FIG. 7 is a schematic view of a stone-plastic substrate according to the present invention;
FIG. 8 is a top view of two stone-plastic substrates of the present invention when joined;
FIG. 9 is a schematic structural view of three stone-plastic substrates according to the present invention;
FIG. 10 is a schematic view of the structure of the four stone-plastic substrates of the present invention when they are connected;
FIG. 11 is a schematic flow chart of the present invention.
In the figure: 1-ceramic tile, 2-stone plastic substrate, 21-first slot, 22-first inserting plate, 23-installation through hole, 24-groove, 3-inserting connecting piece, 31-first inserting column, 311-first chamfer, 32-second inserting column, 321-second chamfer, 33-first limiting plate, 4-fixing piece, 41-third inserting column, 411-third chamfer, 42-bearing plate, 43-second limiting plate, 44-fixing through hole and 45-gun nail.
Detailed Description
The following are specific embodiments of the present invention and are further described with reference to the drawings, but the present invention is not limited to these embodiments.
Referring to fig. 1-11, the composite floor structure in the embodiment includes a plurality of stone-plastic substrates 2, tiles 1 disposed on the stone-plastic substrates 2, fixing members 4 for supporting the stone-plastic substrates 2, and plug connectors 3, wherein one end of each fixing member 4 is connected to one stone-plastic substrate 2, and two ends of each plug connector 3 are respectively connected to two adjacent stone-plastic substrates 2.
Here, support through mounting 4, 3 both ends of plug connector connect respectively in two adjacent stone mould base plates 2, accomplish the installation of a plurality of stone mould base plates 2, and ceramic tile 1 installs on stone mould base plate 2, and the simple installation, processing technology is simple and convenient, low cost, stability is higher.
The first end of the stone-plastic substrate 2 is provided with a first inserting plate 22, the second end is provided with a first inserting groove 21, and the first inserting plate 22 of one stone-plastic substrate 2 is inserted into the first inserting groove 21 of the other stone-plastic substrate 2. The first inserting plate 22 of one stone plastic substrate 2 is inserted into the first inserting groove 21 of the other stone plastic substrate 2, so that the two stone plastic substrates 2 are conveniently installed together, the two stone plastic substrates 2 form a whole, and the installation is simple and convenient.
The central line of the first slot 21, the central line of the first slot 21 and the horizontal central line of the stone-plastic substrate 2 are superposed.
The stone-plastic substrate 2 is located the third end and the fourth end and can be provided with a plurality of mounting through holes 23, one end of the fixing part 4 is inserted into the mounting through hole 23, and one end of the inserting connection part 3 is inserted into the mounting through hole 23 of one stone-plastic substrate 2 and the other end is inserted into the mounting through hole 23 of the other stone-plastic substrate 2.
The mounting through hole 23 can run through the setting of the stone plastic substrate 2 from the third end of the stone plastic substrate 2 to the fourth end of the real-time substrate, thereby forming a hollow mounting through hole 23 on the stone plastic substrate 2, facilitating mass production of the stone plastic substrate 2, reducing the weight of the composite board and reducing the material utilization.
Plug connector 3 is including being used for pegging graft in the first post 31 of pegging graft of the installation through-hole 23 of base plate 2 is moulded to a stone, be used for pegging graft in the second post 32 of pegging graft of the installation through-hole 23 of base plate 2 is moulded to another stone, be used for carrying out spacing first limiting plate 33 for ceramic tile 1 when installing ceramic tile 1 on base plate 2 is moulded to stone, first post 31 and the symmetry setting of second post 32 are pegged graft, first limiting plate 33 both ends are connected respectively in first post 31 of pegging graft, second post 32 of pegging graft, first post 31 of pegging graft, second post 32 of pegging graft and the equal interference fit of installation through-hole 23. First peg graft post 31 is pegged graft in the installation through-hole 23 that base plate 2 was moulded to a stone, the second peg graft post 32 is pegged graft in the installation through-hole 23 that base plate 2 was moulded to another stone, first peg graft post 31 and second peg graft post 32 all with 23 interference fit of installation through-hole, improve the installation strength, thereby realize that the both ends of plug connector 3 connect respectively in two adjacent stones and mould base plate 2, first limiting plate 33 can be spacing for ceramic tile 1 when installing ceramic tile 1 on base plate 2 is moulded to stone, realize moulding base plate 2 with two adjacent stones and reserve one section distance, the installation effectiveness is improved.
The first insertion column 31 has a first chamfer 311311 at its end for facilitating insertion into the mounting through hole 23, and the second insertion column 32 has a second chamfer 321 at its end for facilitating insertion into the mounting through hole 23. Therefore, the first inserting column 31 and the second inserting column 32 can be conveniently inserted into the installation through hole 23, the situation that the installation through hole 23 is extruded to damage the safety through hole in the installation process is avoided, and meanwhile materials can be saved.
The first limiting plate 33 is an annular plate, and the first inserting column 31, the second inserting column 32 and the first limiting plate 33 are of a symmetrical structure. The installation through hole 23 can be a square through hole, the first inserting column 31 and the second inserting column 32 can be square inserting columns, the first inserting column 31 is the same as the second inserting column 32 in shape, the second chamfer 321 is the same as the second chamfer 321 in shape, and the inserting connection piece 3 is installed and manufactured in large-scale production.
The fixing member 4 may include a third inserting column 41 inserted into the mounting through hole 23, a second limiting plate 43 connected to the third inserting column 41, a bearing plate 42 connected to an end of the second limiting plate 43, a fixing through hole 44 disposed on the bearing plate 42, and a gun nail 45 having one end penetrating through the fixing through hole 44, wherein the third inserting column 41 is in interference fit with the mounting through hole 23. The third inserting column 41 is inserted into the mounting through hole 23 of one stone-plastic substrate 2, one end of the gun nail 45 penetrates through the fixing through hole 44 and is fixed on the wall surface or the ground, the bearing plate 42 is accommodated in the groove 24 of the other stone-plastic substrate 2, so that one end of one stone-plastic substrate 2 can be supported, one end of the other stone-plastic substrate 2 can also be supported, two stone-plastic substrates 2 can be supported, the third inserting column 41 and the mounting through hole 23 are in interference fit, the mounting strength is improved, and the structure is simple.
The width of the portion of the second limiting plate 43 protruding from the third plugging column 41 may be equal to the width of the portion of the first limiting plate 33 protruding from the first plugging column 31. The width of the second limiting plate 43 can be 1.3-1.7 mm, and is consistent with the width of a reserved gap of the paving and sealing seam of the ceramic tile 1.
The end of the third inserting column 41 may be provided with a third chamfer 411 for facilitating insertion into the mounting through hole 23, so that the third inserting column 41 is conveniently inserted into the mounting through hole 23, and the mounting through hole 23 is prevented from being damaged by the third inserting column 41 being inserted into the mounting through hole 23 when the mounting through hole 23 is pressed. The shape of the third inserting column 41 is the same as that of the second inserting column 32, the sizes of the third inserting column 41, the second inserting column 32 and the first inserting column 31 are the same, the sizes of the mounting through holes 23 of the stone-plastic substrate 2 are the same, certain randomness is achieved in mounting, and the mounting efficiency is improved.
The stone-plastic substrate 2 is provided with a groove 24, and the bearing plate 42 is arranged in the groove 24 of the other stone-plastic substrate 2 when the third inserting-connecting column 41 is inserted into the mounting through hole 23 of one stone-plastic substrate 2. The recess 24 may be a square recess 24 and the carrier plate 42 may be a square carrier plate 42.
Referring to fig. 1-11, a method for using a composite floor structure includes the following steps:
s1: fixing the first stone-plastic substrate 2 through a first set of fixing pieces 4;
s2: one end of a first group of plug-in connectors 3 is plugged in the first stone-plastic substrate 2, the other end is plugged in one end of a second stone-plastic substrate 2, and the other end of the second stone-plastic substrate 2 is fixed through a second group of fixing pieces 4;
s3: inserting one end of a third stone plastic substrate 2 into one end of the second stone plastic substrate 2, and fixing the third stone plastic substrate 2 through a third group of fixing pieces 4;
s4: one end of the second group of the plug-in connectors 3 is plugged into the third stone-plastic substrate 2, the first end of the fourth stone-plastic substrate 2 is plugged into the second stone-plastic substrate 2, the second end of the fourth stone-plastic substrate 2 is plugged into the other end of the second group of the plug-in connectors 3, and the third end of the fourth stone-plastic substrate 2 is fixed through the fourth group of the fixing pieces 4.
Step S1 specifically includes: the third inserting column 41 of the first group of fixing pieces 4 is inserted into one installing through hole 23 on the first stone plastic substrate 2, one end of a gun nail 45 penetrates through a fixing through hole 44 on the first group of fixing pieces 4 so as to support the first stone plastic substrate 2, the number of the first group of fixing pieces 4 is even, and the first group of fixing pieces are symmetrically arranged at two ends of the first stone plastic substrate 2. The first stone plastic substrate 2 both ends symmetry is equipped with mounting through hole 23, pegs graft the third of first group mounting 4 and pegs graft in the mounting through hole 23 at both ends respectively, and first group mounting 4 is the even number, runs through fixing hole 44 on first group mounting 4 with rifle nail 45 one end in order to mould the first stone plastic substrate 2 support column to mould the both ends support column respectively of first stone plastic substrate 2, and the simple installation, stability is higher.
Step S2 specifically includes: the first inserting column 31 of the first group of inserting connectors 3 is inserted into the other installing through hole 23 on the first stone-plastic substrate 2, the second inserting column 32 of the first group of inserting connectors 3 is inserted into the installing through hole 23 at one end of the second stone-plastic substrate 2, the bearing plate 42 of the first group of fixing pieces 4 is accommodated in the groove 24 of the second stone-plastic substrate 2, the third inserting column 41 of the second group of fixing pieces 4 is inserted into the installing through hole 23 at the other end of the second stone-plastic substrate 2, and one end of the gun nail 45 penetrates through the fixing through hole 44 on the second group of fixing pieces 4 to support the second stone-plastic substrate 2. Inserting the first inserting column 31 of the first group of inserting connectors 3 into the other installing through hole 23 on the first stone-plastic substrate 2, aligning the bearing plate 42 of the first group of fixing members 4 with the groove 24 of the second stone-plastic substrate 2 and aligning the second inserting column 32 of the first group of inserting connectors 3 with the installing through hole 23 at one end of the second stone-plastic substrate 2, knocking one end of the second stone-plastic substrate 2 by a rubber hammer to enable the second stone-plastic substrate 2 to move towards the second inserting column 32, so that the second inserting column 32 of the first group of inserting connectors 3 is inserted into the installing through hole 23 at one end of the second stone-plastic substrate 2, and simultaneously accommodating the bearing plate 42 of the first group of fixing members 4 into the groove 24 of the second stone-plastic substrate 2, and inserted into the installing through hole 23 at the other end of the second stone-plastic substrate 2 by the third inserting column 41 of the second group of fixing members 4, one end of a gun 45 penetrates through the fixing through hole 44 on the second group of fixing members 4 to support the second stone-plastic substrate 2, the two stone-plastic substrates 2 are mounted, and the mounting is simple and convenient.
Step S3 specifically includes: the third stone-plastic substrate 2 is inserted into the first stone-plastic substrate 2 by using one of the way of inserting the first inserting plate 22 of the third stone-plastic substrate 2 into the first inserting groove 21 of the first stone-plastic substrate 2 or inserting the first inserting groove 21 of the third stone-plastic substrate 2 into the first inserting plate 22 of the first stone-plastic substrate 2, the third inserting column 41 of the third set of fixing members 4 is inserted into one mounting through hole 23 of the third stone-plastic substrate 2, and one end of the gun nail 45 penetrates through the fixing through hole 44 on the third set of fixing members 4 to support the third stone-plastic substrate 2.
Step S4 specifically includes: the first inserting column 31 of the second group of inserting connecting pieces 3 is inserted into the other mounting through hole 23 of the third stone plastic substrate 2, the first end of the fourth stone plastic substrate 2 is inserted into the second stone plastic substrate 2 by using one mode of inserting the first inserting plate 22 of the fourth stone plastic substrate 2 into the first inserting groove 21 of the second stone plastic substrate 2 or inserting the first inserting groove 21 of the fourth stone plastic substrate 2 into the first inserting plate 22 of the second stone plastic substrate 2, the mounting through hole 23 of the second end of the fourth stone plastic substrate 2 is inserted into the second inserting column 32 of the second group of inserting connecting piece 3, the bearing plate 42 of the third group of fixing pieces 4 is accommodated in the groove 24 of the fourth stone plastic substrate 2, and a third inserting-connecting column 41 of the fourth fixing member 4 is inserted into the mounting through hole 23 at the third end of the fourth stone-plastic substrate 2, and one end of a gun nail 45 penetrates through a fixing through hole 44 on the fourth fixing member 4 to support the fourth stone-plastic substrate 2. If the first slot 21 of the first stone-plastic substrate 2 and the first slot 21 of the second stone-plastic substrate 2 are located on the same side, the third stone-plastic substrate 2 is inserted into the first slot 21 of the first stone-plastic substrate 2 by inserting the first inserting plate 22 of the third stone-plastic substrate 2 into the first slot 21 of the first stone-plastic substrate 2, the third fixing member 4 is inserted into one mounting hole 23 of the third stone-plastic substrate 2, one end of the gun nail 45 penetrates through the fixing hole 44 of the third fixing member 4 to support the third stone-plastic substrate 2, so that the third stone-plastic substrate 2 is supported to complete the mounting of the third stone-plastic substrate 2, the first inserting column 31 of the second inserting connecting member 3 is inserted into the other mounting hole 23 of the third stone-plastic substrate 2, the first inserting plate 22 of the first end of the fourth stone-plastic substrate 2 is inserted into the first slot 21 of the second stone-plastic substrate 2, aligning the bearing plate 42 of the third group of fixing pieces 4 with the groove 24 of the fourth stone-plastic substrate 2 and aligning the second plug-in column 32 of the second group of plug-in connectors 3 with the mounting through hole 23 of the second end of the fourth stone-plastic substrate 2, knocking the second end of the fourth stone-plastic substrate 2 by a rubber hammer to enable the fourth stone-plastic substrate 2 to move towards the position close to the second plug-in column 32, so that the second plug-in column 32 of the second group of plug-in connectors 3 is plugged in the mounting through hole 23 of the first end of the fourth stone-plastic substrate 2, meanwhile, the bearing plate 42 of the third group of fixing pieces 4 is accommodated in the groove 24 of the second stone-plastic substrate 2, the third plug-in column 41 of the fourth group of fixing pieces 4 is plugged in the mounting through hole 23 of the third end of the fourth stone-plastic substrate 2, and one end of a gun nail 45 penetrates through the fixing through hole 44 on the fourth group of fixing pieces 4 to support; if the first slot 21 of the first stone-plastic substrate 2 and the first slot 21 of the second stone-plastic substrate 2 are located on opposite sides, the third stone-plastic substrate 2 is inserted into the first stone-plastic substrate 2 by using one of the first slot 21 of the third stone-plastic substrate 2 and the first insertion plate 22 of the first stone-plastic substrate 2, the third fixing member 4 is inserted into one of the mounting through holes 23 of the third stone-plastic substrate 2, one end of the gun 45 is inserted into the fixing through hole 44 of the third fixing member 4 to support the third stone-plastic substrate 2, so as to support the third stone-plastic substrate 2, thereby completing the mounting of the three stone-plastic substrates 2, the first insertion column 31 of the second insertion connecting member 3 is inserted into the other mounting through hole 23 of the third stone-plastic substrate 2, the first insertion plate 22 of the first end of the fourth stone-plastic substrate 2 is inserted into the first slot 21 of the second stone-plastic substrate 2, aligning the bearing plate 42 of the third group of fixing pieces 4 with the groove 24 of the fourth stone-plastic substrate 2 and aligning the second plug-in column 32 of the second group of plug-in connectors 3 with the mounting through hole 23 of the second end of the fourth stone-plastic substrate 2, knocking the second end of the fourth stone-plastic substrate 2 by a rubber hammer to enable the fourth stone-plastic substrate 2 to move towards the position close to the second plug-in column 32, so that the second plug-in column 32 of the second group of plug-in connectors 3 is plugged in the mounting through hole 23 of the first end of the fourth stone-plastic substrate 2, meanwhile, the bearing plate 42 of the third group of fixing pieces 4 is accommodated in the groove 24 of the second stone-plastic substrate 2, the third plug-in column 41 of the fourth group of fixing pieces 4 is plugged in the mounting through hole 23 of the third end of the fourth stone-plastic substrate 2, and one end of a gun nail 45 penetrates through the fixing through hole 44 on the fourth group of fixing pieces 4 to support; therefore, the four stone plastic substrates 2 are installed, and the installation is simple and convenient.
The stone-plastic substrate 2 is processed in an extrusion mode, and compared with a die sinking injection molding processing technology, the processing technology is simple and convenient, and the cost is low; the mounting through hole 23 in the stone-plastic substrate 2 is of a hollow structure, so that the weight of the composite board is reduced, and the material utilization is reduced; the plug-in connector 3 is connected with the mounting through hole 23 in an interference fit manner, and two adjacent stone-plastic substrates 2 are integrated, so that the height difference caused by the flatness error of the ground or the wall surface is reduced; the plug connector 3 is provided with a first limiting plate 33, so that the lengths of two ends of the plug connector inserted into adjacent substrates are equal, and the strength of two sides is ensured to be the same when the plug connector is stressed; the size of the insertion end of the fixing piece 4 and the size of the insertion end of the plug-in connection piece 3 are the same, the size of the installation through hole 23 of the stone-plastic substrate 2 is the same, certain randomness is achieved in installation, and installation efficiency is improved.
The specific embodiments described herein are merely illustrative of the spirit of the invention. Various modifications or additions may be made to the described embodiments or alternatives may be employed by those skilled in the art without departing from the spirit or ambit of the invention as defined in the appended claims.

Claims (10)

1. A composite floor structure characterized by: mould base plate (2), set up ceramic tile (1) on base plate (2) are moulded to stone including a plurality of stones, be used for supporting mounting (4), the grafting connecting piece (3) that base plate (2) are moulded to stone, mounting (4) one end is connected in base plate (2) are moulded to stone, grafting connecting piece (3) both ends are connected respectively in two adjacent stones and are moulded base plate (2).
2. A composite floor structure according to claim 1, wherein: the first end of stone plastic substrate (2) is equipped with first picture peg (22), the second end is equipped with first slot (21), one first picture peg (22) of stone plastic substrate (2) are pegged graft in first slot (21) of another stone plastic substrate (2).
3. A composite floor structure as claimed in claim 1 or 2, wherein: the stone plastic substrate (2) is located the third end and the fourth end and all is equipped with a plurality of mounting through hole (23), mounting (4) one end is pegged graft in mounting through hole (23), grafting connecting piece (3) one end is pegged graft in mounting through hole (23) of stone plastic substrate (2), the other end is pegged graft in mounting through hole (23) of another stone plastic substrate (2).
4. A composite floor structure according to claim 3, wherein: the inserting connection piece (3) comprises a first inserting column (31) used for being inserted into a mounting through hole (23) of a stone plastic substrate (2), a second inserting column (32) used for being inserted into another stone plastic substrate (2) and used for limiting a first limiting plate (33) of the ceramic tile (1) when the ceramic tile (1) is mounted on the stone plastic substrate (2), the first inserting column (31) and the second inserting column (32) are symmetrically arranged, two ends of the first limiting plate (33) are connected to the first inserting column (31) and the second inserting column (32) respectively, and the first inserting column (31), the second inserting column (32) and the mounting through hole (23) are in interference fit.
5. A composite floor structure according to claim 3, wherein: fixing piece (4) including be used for pegging graft in third plug column (41) of mounting hole (23), connect in second limiting plate (43) of third plug column (41), connect in loading board (42) of second limiting plate (43) one end portion, set up fixing hole (44), one end on loading board (42) and run through rifle nail (45) in fixing hole (44), third plug column (41) and mounting hole (23) interference fit, be equipped with recess (24) on stone plastic substrate (2), recess (24) of another stone plastic substrate (2) are arranged in to loading board (42) when third plug column (41) are pegged graft in mounting hole (23) of one stone plastic substrate (2).
6. A method of using a composite floor structure, comprising the steps of:
s1: fixing the first stone-plastic substrate (2) through a first group of fixing pieces (4);
s2: one end of a first group of plug-in connectors (3) is plugged in the first stone-plastic substrate (2), the other end of the first group of plug-in connectors is plugged in one end of the second stone-plastic substrate (2), and the other end of the second stone-plastic substrate (2) is fixed through a second group of fixing pieces (4);
s3: one end of a third stone plastic substrate (2) is inserted into one end of the second stone plastic substrate (2), and the third stone plastic substrate (2) is fixed through a third group of fixing pieces (4);
s4: one end of the second group of the plug-in connectors (3) is plugged into the third stone plastic substrate (2), the first end of the fourth stone plastic substrate (2) is plugged into the second stone plastic substrate (2), the second end is plugged into the other end of the second group of the plug-in connectors (3), and the third end of the fourth stone plastic substrate (2) is fixed through the fourth group of the fixing pieces (4).
7. The method of using a composite floor structure according to claim 6, wherein the step S1 specifically includes: the third inserting column (41) of the first group of fixing pieces (4) is inserted into one installing through hole (23) on the first stone plastic substrate (2), one end of a gun nail (45) penetrates through the fixing through hole (44) on the first group of fixing pieces (4) so as to support the first stone plastic substrate (2), the first group of fixing pieces (4) are even, and the first group of fixing pieces are symmetrically arranged at two ends of the first stone plastic substrate (2).
8. The method of using a composite floor structure according to claim 7, wherein the step S2 specifically includes: the method comprises the steps of inserting a first inserting column (31) of a first group of inserting connectors (3) into another installing through hole (23) on a first stone-plastic substrate (2), inserting a second inserting column (32) of the first group of inserting connectors (3) into an installing through hole (23) at one end of a second stone-plastic substrate (2), accommodating a bearing plate (42) of a first group of fixing pieces (4) into a groove (24) of the second stone-plastic substrate (2), inserting a third inserting column (41) of the second group of fixing pieces (4) into an installing through hole (23) at the other end of the second stone-plastic substrate (2), and penetrating one end of a gun nail (45) into a fixing through hole (44) on the second group of fixing pieces (4) to support the second stone-plastic substrate (2).
9. The method of using a composite floor structure according to claim 8, wherein the step S3 specifically includes: the third stone-plastic substrate (2) is inserted into the first stone-plastic substrate (2) in a mode of inserting the first inserting plate (22) of the third stone-plastic substrate (2) into the first inserting groove (21) of the first stone-plastic substrate (2) or inserting the first inserting groove (21) of the third stone-plastic substrate (2) into the first inserting plate (22) of the first stone-plastic substrate (2), the third inserting column (41) of the third group of fixing pieces (4) is inserted into one mounting through hole (23) of the third stone-plastic substrate (2), and one end of the gun nail (45) penetrates through the fixing through hole (44) on the third group of fixing pieces (4) to support the third stone-plastic substrate (2).
10. The method of using a composite floor structure according to claim 9, wherein the step S4 specifically includes: inserting a first inserting column (31) of a second group of inserting connecting pieces (3) into another installing through hole (23) of a third stone plastic substrate (2), inserting a first inserting plate (22) of a fourth stone plastic substrate (2) into a first inserting groove (21) of the second stone plastic substrate (2) or inserting the first inserting groove (21) of the fourth stone plastic substrate (2) into a first inserting plate (22) of the second stone plastic substrate (2) so as to insert a first end of the fourth stone plastic substrate (2) into the second stone plastic substrate (2), inserting an installing through hole (23) of a second end of the fourth stone plastic substrate (2) into a second inserting column (32) of the second group of inserting connecting pieces (3), accommodating a bearing plate (42) of a third group of fixing pieces (4) into a groove (24) of the fourth stone plastic substrate (2), and inserting a third inserting column (41) of the fourth group of fixing pieces (4) into a third installing through hole (23) of the fourth stone plastic substrate (2) And the hole (23) is used for enabling one end of a gun nail (45) to penetrate through a fixing through hole (44) in the fourth group of fixing pieces (4) so as to support the fourth stone-plastic substrate (2).
CN202010985440.2A 2020-09-18 2020-09-18 Composite floor structure and using method Pending CN112064978A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010985440.2A CN112064978A (en) 2020-09-18 2020-09-18 Composite floor structure and using method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010985440.2A CN112064978A (en) 2020-09-18 2020-09-18 Composite floor structure and using method

Publications (1)

Publication Number Publication Date
CN112064978A true CN112064978A (en) 2020-12-11

Family

ID=73682124

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010985440.2A Pending CN112064978A (en) 2020-09-18 2020-09-18 Composite floor structure and using method

Country Status (1)

Country Link
CN (1) CN112064978A (en)

Similar Documents

Publication Publication Date Title
US20130305646A1 (en) Panel veneer system with cage-type embedded rail
CN113006340A (en) Modular assembly type partition wall
CN213143740U (en) Composite floor structure
CN112064978A (en) Composite floor structure and using method
CN203008119U (en) Prefabricated housing building
CN215830184U (en) Warning fence for construction site of constructional engineering
CN112064966A (en) Novel ceramic tile composite board structure and mounting method
CN212427932U (en) Novel ceramic tile composite board structure
CN211172801U (en) Art wall mounting structure
CN202787650U (en) Combination type wood-plastic plate
CN211341570U (en) Floor assembly
CN207892189U (en) Composite stone material and plug-in composite floor board
CN217580964U (en) Ceramic decorative board connection structure and connecting piece
CN210633820U (en) Stair prefab mould
CN217517948U (en) Double-row staggered hole structure wallboard
CN220377636U (en) Concrete perforated brick with pre-fixing assembly structure
CN219431239U (en) Wood-plastic wallboard fixed connection mounting structure
CN113775133A (en) Wall structure of mating formation for hotel design
CN220266994U (en) Antifreezing building block
CN220644590U (en) Assembled beam column coupling mechanism
CN211396434U (en) Fastener and floor assembly
CN210177786U (en) Assembled T type module
CN211616010U (en) A mould for production of concrete prefabricated part
CN108130999A (en) Composite stone material and plug-in composite floor board
CN211312883U (en) Environment-friendly assembly type building

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination