CN112055413A - 一种下行业务调度方法和装置 - Google Patents
一种下行业务调度方法和装置 Download PDFInfo
- Publication number
- CN112055413A CN112055413A CN201910484973.XA CN201910484973A CN112055413A CN 112055413 A CN112055413 A CN 112055413A CN 201910484973 A CN201910484973 A CN 201910484973A CN 112055413 A CN112055413 A CN 112055413A
- Authority
- CN
- China
- Prior art keywords
- scheduling
- downlink
- uplink
- user
- subframe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04W—WIRELESS COMMUNICATION NETWORKS
- H04W72/00—Local resource management
- H04W72/12—Wireless traffic scheduling
- H04W72/1263—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows
- H04W72/1273—Mapping of traffic onto schedule, e.g. scheduled allocation or multiplexing of flows of downlink data flows
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02D—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN INFORMATION AND COMMUNICATION TECHNOLOGIES [ICT], I.E. INFORMATION AND COMMUNICATION TECHNOLOGIES AIMING AT THE REDUCTION OF THEIR OWN ENERGY USE
- Y02D30/00—Reducing energy consumption in communication networks
- Y02D30/70—Reducing energy consumption in communication networks in wireless communication networks
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Signal Processing (AREA)
- Mobile Radio Communication Systems (AREA)
Abstract
本申请公开了一种下行业务调度方法和装置,其中方法包括:基站在当前子帧调度完每个上行用户后,计算每个所述上行用户当前剩余的上行待传数据量BS(u),并在下一个调度子帧进行调度之前,根据每个所述上行用户的所述BS(u),判断当前是否需要控制下行用户的调度;如果当前需要控制下行用户的调度,则所述基站在所述下一个调度子帧中禁止对下行CCE聚集级别为指定级别的用户的下行业务进行调度。采用本发明,可以提高上行视频容量、充分利用上行带宽资源。
Description
技术领域
本发明涉及移动通信技术,特别是涉及一种下行业务调度方法和装置。
背景技术
当前公安安全行业通过350M频段FDD 1.4M和5G的补充上行链路(SUL)8M联合起来支持集群语音和视频回传业务。
LTE 1.4M网络的带宽最大只有6个控制信元CCE,如下表所示:
目前LTE系统引入了5G的补充上行链路(SUL)技术后,SUL带宽一般为8M,虽然上行可以支持多路视频,但是会受限于下行控制信道容量。例如,在远点存在一路下行视频,此时占用的CCE个数为4,由于下行调度比上行调度优先进行,此种情况下,上行调度仅剩下2个CCE可用,从而造成上行视频容量下降,进而导致SUL 8M的上行带宽无法充分使用。
发明内容
有鉴于此,本发明的主要目的在于提供一种下行业务调度方法和装置,能够提高上行视频容量、充分利用上行带宽资源。
为了达到上述目的,本发明提出的技术方案为:
一种下行业务调度方法,包括:
基站在当前子帧调度完每个上行用户后,计算每个所述上行用户当前剩余的上行待传数据量BS(u),并在下一个调度子帧进行调度之前,根据每个所述上行用户的所述BS(u),判断当前是否需要控制下行用户的调度;
如果当前需要控制下行用户的调度,则所述基站在所述下一个调度子帧中禁止对下行CCE聚集级别为指定级别的用户的下行业务进行调度。
较佳地,所述根据每个所述上行用户的所述BS(u),判断当前是否需要控制下行用户的调度包括:
判断是否存在至少一个上行用户的所述BS(u)大于预设的待传上行数据量门限值,如果是,则判定当前需要控制下行用户的调度,否则,判定当前不需要控制下行用户的调度。
较佳地,所述指定级别为4。
较佳地,所述下行业务包括保证比特率GBR业务和非保证比特率non_GBR业务。
本申请还提供了一种下行业务调度装置,设置于基站中,包括:处理器,所述处理器用于:
在当前子帧调度完每个上行用户后,计算每个所述上行用户当前剩余的上行待传数据量BS(u),并在下一个调度子帧进行调度之前,根据每个所述上行用户的所述BS(u),判断当前是否需要控制下行用户的调度;
如果当前需要控制下行用户的调度,则在所述下一个调度子帧中禁止对下行CCE聚集级别为指定级别的用户的下行业务进行调度。
较佳地,所述处理器具体用于:
判断是否存在至少一个上行用户的所述BS(u)大于预设的待传上行数据量门限值,如果是,则判定当前需要控制下行用户的调度,否则,判定当前不需要控制下行用户的调度。
较佳地,所述指定级别为4。
较佳地,所述下行业务包括保证比特率GBR业务和非保证比特率non_GBR业务。
本申请还提供了一种非易失性计算机可读存储介质,所述非易失性计算机可读存储介质存储指令,其特征在于,所述指令在由处理器执行时使得所述处理器执行如上述的下行业务调度方法的步骤。
一种电子设备,包括如上所述的非易失性计算机可读存储介质、以及可访问所述非易失性计算机可读存储介质的所述处理器。
综上所述,本发明提出的下行业务调度方法和装置,基站在当前子帧调度完每个上行用户后,需要计算每个所述上行用户当前剩余的上行待传数据量BS(u),并在下一个调度子帧进行调度之前,根据每个所述上行用户的所述BS(u),判断当前是否需要控制下行用户的调度,进而根据判断结果对下行用户的调度进行控制。如此,通过计算每个上行用户的剩余上行待传数据量,可以及时获知当前的上行待传数据量的大小,从而可以在上行待传数据量较大时,通过控制下行用户的调度,减少下行CCE的开销,进而减少下行对上行业务的影响,有效提高了上行视频容量、充分利用上行带宽资源。
附图说明
图1为本发明实施例的方法流程示意图。
具体实施方式
为使本发明的目的、技术方案和优点更加清楚,下面将结合附图及具体实施例对本发明作进一步地详细描述。
图1为本发明实施例的方法流程示意图,如图1所示,该实施例实现的下行业务调度方法主要包括:
步骤101、基站在当前子帧调度完每个上行用户后,计算每个所述上行用户当前剩余的上行待传数据量BS(u),并在下一个调度子帧进行调度之前,根据每个所述上行用户的所述BS(u),判断当前是否需要控制下行用户的调度。
本步骤,通过在当前子帧调度完每个上行用户后,需要计算每个所述上行用户当前剩余的上行待传数据量BS(u),这样,可以在下一个调度子帧进行调度之前,根据每个上行用户的BS(u),判断出当前上行待传数据量是否较大,如果较大,则需要通过控制下行用户的调度,来减少下行调度的CCE开销,以使得上行可以获得更多CCE,从而可以满足当前大数据量的上行传输需求,如此,便可以减少下行对上行业务的影响,有效提高了上行视频容量,达到充分利用上行带宽资源的目的。
较佳地,可以采用下述方法根据每个所述上行用户的所述BS(u),判断当前是否需要控制下行用户的调度:
判断是否存在至少一个上行用户的所述BS(u)大于预设的待传上行数据量门限值,如果是,则判定当前需要控制下行用户的调度,否则,判定当前不需要控制下行用户的调度。
上述方法中,所述待传上行数据量门限值可由本领域技术人员根据实际需要进行设置,只要是反映出当前上行待传数据量较大,需要通过控制下行以提高上行容量即可。
步骤102、如果当前需要控制下行用户的调度,则所述基站在所述下一个调度子帧中禁止对下行CCE聚集级别为指定级别的用户的下行业务进行调度。
本步骤中,当步骤101中确定当前需要控制下行用户的调度时,需要限制禁止部分用户的下行调度,以节省CCE给上行用户调度来满足当前上行待传数据量较大的传输需求。
所述指定级别可由本领域技术人员根据实际需要设置,较佳地,所述指定级别可以设置最高的CCE聚集级别,即CCE聚集级别为4,从而可以最大程度的节省下行CCE开销。
较佳地,所述下行业务包括保证比特率(GBR)业务和非保证比特率(non_GBR)业务。
需要说明的是,在实际应用中为了减少对下行业务的影响,如果当前不需要控制下行用户的调度,则采用正常的下行调度方式即可,即在所有的下行调度用户范围内进行调度,而不禁止对指定下行用户的调度。
与上述方法实施例相对应,本申请还提供了一种下行业务调度装置,设置于基站中,包括:处理器,所述处理器用于:
在当前子帧调度完每个上行用户后,计算每个所述上行用户当前剩余的上行待传数据量BS(u),并在下一个调度子帧进行调度之前,根据每个所述上行用户的所述BS(u),判断当前是否需要控制下行用户的调度;
如果当前需要控制下行用户的调度,则在所述下一个调度子帧中禁止对下行CCE聚集级别为指定级别的用户的下行业务进行调度。
较佳地,所述处理器具体用于:
判断是否存在至少一个上行用户的所述BS(u)大于预设的待传上行数据量门限值,如果是,则判定当前需要控制下行用户的调度,否则,判定当前不需要控制下行用户的调度。
较佳地,所述指定级别为4。
较佳地,所述下行业务包括保证比特率GBR业务和非保证比特率non_GBR业务。
本申请还提供了一种非易失性计算机可读存储介质,所述非易失性计算机可读存储介质存储指令,其特征在于,所述指令在由处理器执行时使得所述处理器执行如上述的下行业务调度方法的步骤。
一种电子设备,包括如上所述的非易失性计算机可读存储介质、以及可访问所述非易失性计算机可读存储介质的所述处理器。
通过上述技术方案可以看出,上述实施例实现的下行业务调度方案中,基站在当前子帧调度完每个上行用户后,通过计算每个所述上行用户当前剩余的上行待传数据量BS(u),可以实时掌握各上行用户当前的上行待传数据量,这样,在下一个调度子帧进行调度之前,根据每个上行用户的BS(u),便可判断出当前上行待传数据量是否较大,如果较大,则需要通过控制下行用户的调度,来减少下行调度的CCE开销,以使得上行可以获得更多CCE以满足当前大数据量的上行传输需求,从而可以有效减少下行对上行业务的影响,有效提高了上行视频容量、充分利用上行带宽资源。
综上所述,以上仅为本发明的较佳实施例而已,并非用于限定本发明的保护范围。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (10)
1.一种下行业务调度方法,其特征在于,包括:
基站在当前子帧调度完每个上行用户后,计算每个所述上行用户当前剩余的上行待传数据量BS(u),并在下一个调度子帧进行调度之前,根据每个所述上行用户的所述BS(u),判断当前是否需要控制下行用户的调度;
如果当前需要控制下行用户的调度,则所述基站在所述下一个调度子帧中禁止对下行CCE聚集级别为指定级别的用户的下行业务进行调度。
2.根据权利要求1所述的方法,其特征在于,所述根据每个所述上行用户的所述BS(u),判断当前是否需要控制下行用户的调度包括:
判断是否存在至少一个上行用户的所述BS(u)大于预设的待传上行数据量门限值,如果是,则判定当前需要控制下行用户的调度,否则,判定当前不需要控制下行用户的调度。
3.根据权利要求1所述的方法,其特征在于,所述指定级别为4。
4.根据权利要求1所述的方法,其特征在于,所述下行业务包括保证比特率GBR业务和非保证比特率non_GBR业务。
5.一种下行业务调度装置,其特征在于,设置于基站中,包括:处理器,所述处理器用于:
在当前子帧调度完每个上行用户后,计算每个所述上行用户当前剩余的上行待传数据量BS(u),并在下一个调度子帧进行调度之前,根据每个所述上行用户的所述BS(u),判断当前是否需要控制下行用户的调度;
如果当前需要控制下行用户的调度,则在所述下一个调度子帧中禁止对下行CCE聚集级别为指定级别的用户的下行业务进行调度。
6.如权利要求5所述的装置,其特征在于,所述处理器具体用于:
判断是否存在至少一个上行用户的所述BS(u)大于预设的待传上行数据量门限值,如果是,则判定当前需要控制下行用户的调度,否则,判定当前不需要控制下行用户的调度。
7.如权利要求5所述的装置,其特征在于,所述指定级别为4。
8.如权利要求5所述的装置,其特征在于,所述下行业务包括保证比特率GBR业务和非保证比特率non_GBR业务。
9.一种非易失性计算机可读存储介质,所述非易失性计算机可读存储介质存储指令,其特征在于,所述指令在由处理器执行时使得所述处理器执行如权利要求1至4中任一项所述的下行业务调度方法的步骤。
10.一种电子设备,其特征在于,包括如权利要求9所述的非易失性计算机可读存储介质、以及可访问所述非易失性计算机可读存储介质的所述处理器。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910484973.XA CN112055413B (zh) | 2019-06-05 | 2019-06-05 | 一种下行业务调度方法和装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910484973.XA CN112055413B (zh) | 2019-06-05 | 2019-06-05 | 一种下行业务调度方法和装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112055413A true CN112055413A (zh) | 2020-12-08 |
CN112055413B CN112055413B (zh) | 2023-06-30 |
Family
ID=73608565
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910484973.XA Active CN112055413B (zh) | 2019-06-05 | 2019-06-05 | 一种下行业务调度方法和装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112055413B (zh) |
Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100157922A1 (en) * | 2008-12-19 | 2010-06-24 | Electronics And Telecommunications Research Institute | Physical downlink control channel resource-based scheduling method and apparatus used by base station |
WO2010133059A1 (zh) * | 2009-05-22 | 2010-11-25 | 中兴通讯股份有限公司 | 一种控制信道资源的分配方法及装置 |
CN102014510A (zh) * | 2009-11-03 | 2011-04-13 | 大唐移动通信设备有限公司 | 一种上行控制信道资源配置的方法、设备及系统 |
CN102647718A (zh) * | 2012-04-16 | 2012-08-22 | 北京大学 | 一种对VoIP业务进行混合资源分配的方法 |
US20140003356A1 (en) * | 2012-06-29 | 2014-01-02 | Yiping Wang | Method and system for cross-subframe scheduling during carrier aggregation |
CN103702420A (zh) * | 2012-09-27 | 2014-04-02 | 电信科学技术研究院 | 一种调度上行子帧的方法和系统 |
CN103929812A (zh) * | 2013-01-15 | 2014-07-16 | 电信科学技术研究院 | 一种信道资源的分配方法及装置 |
CN104602346A (zh) * | 2013-10-31 | 2015-05-06 | 普天信息技术研究院有限公司 | 物理上行控制信道资源的分配方法 |
CN104684086A (zh) * | 2013-11-28 | 2015-06-03 | 普天信息技术研究院有限公司 | 控制信道单元的分配方法 |
CN104981017A (zh) * | 2014-04-02 | 2015-10-14 | 成都鼎桥通信技术有限公司 | 上行资源分配方法和基站 |
CN105530705A (zh) * | 2014-09-28 | 2016-04-27 | 成都鼎桥通信技术有限公司 | 下行控制信道资源的分配方法和装置 |
WO2016188174A1 (zh) * | 2015-10-08 | 2016-12-01 | 中兴通讯股份有限公司 | 资源动态分配方法及装置 |
CN109041118A (zh) * | 2017-06-08 | 2018-12-18 | 大唐移动通信设备有限公司 | 一种资源分配方法及通信设备 |
CN109819518A (zh) * | 2017-11-20 | 2019-05-28 | 中国移动通信集团山东有限公司 | 一种上下行信道动态转换方法及基站 |
-
2019
- 2019-06-05 CN CN201910484973.XA patent/CN112055413B/zh active Active
Patent Citations (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20100157922A1 (en) * | 2008-12-19 | 2010-06-24 | Electronics And Telecommunications Research Institute | Physical downlink control channel resource-based scheduling method and apparatus used by base station |
WO2010133059A1 (zh) * | 2009-05-22 | 2010-11-25 | 中兴通讯股份有限公司 | 一种控制信道资源的分配方法及装置 |
CN102014510A (zh) * | 2009-11-03 | 2011-04-13 | 大唐移动通信设备有限公司 | 一种上行控制信道资源配置的方法、设备及系统 |
CN102647718A (zh) * | 2012-04-16 | 2012-08-22 | 北京大学 | 一种对VoIP业务进行混合资源分配的方法 |
US20140003356A1 (en) * | 2012-06-29 | 2014-01-02 | Yiping Wang | Method and system for cross-subframe scheduling during carrier aggregation |
CN103702420A (zh) * | 2012-09-27 | 2014-04-02 | 电信科学技术研究院 | 一种调度上行子帧的方法和系统 |
CN103929812A (zh) * | 2013-01-15 | 2014-07-16 | 电信科学技术研究院 | 一种信道资源的分配方法及装置 |
CN104602346A (zh) * | 2013-10-31 | 2015-05-06 | 普天信息技术研究院有限公司 | 物理上行控制信道资源的分配方法 |
CN104684086A (zh) * | 2013-11-28 | 2015-06-03 | 普天信息技术研究院有限公司 | 控制信道单元的分配方法 |
CN104981017A (zh) * | 2014-04-02 | 2015-10-14 | 成都鼎桥通信技术有限公司 | 上行资源分配方法和基站 |
CN105530705A (zh) * | 2014-09-28 | 2016-04-27 | 成都鼎桥通信技术有限公司 | 下行控制信道资源的分配方法和装置 |
WO2016188174A1 (zh) * | 2015-10-08 | 2016-12-01 | 中兴通讯股份有限公司 | 资源动态分配方法及装置 |
CN109041118A (zh) * | 2017-06-08 | 2018-12-18 | 大唐移动通信设备有限公司 | 一种资源分配方法及通信设备 |
CN109819518A (zh) * | 2017-11-20 | 2019-05-28 | 中国移动通信集团山东有限公司 | 一种上下行信道动态转换方法及基站 |
Non-Patent Citations (8)
Title |
---|
ERICSSON: "URLLC Downlink System Level Simulation Results", 《3GPP TSG_RAN\WG1_RL1 R1-1806012》 * |
MITSUBISHI ELECTRIC: "UE and CCE specific scrambling codes for low complexity blind detection of downlink control signaling", 《3GPP TSG_RAN\WG1_RL1 R1-073441 》 * |
PANASONIC: "R1-073614 \"Assignment of Downlink ACK/NACK channel\"" * |
SAMSUNG: "LTE downlink ACK channel mapping linked to CCE", 《3GPP TSG_RAN\WG1_RL1 R1-073106 》 * |
ZTE: "R1-160469 \"Scheduling of DL and UL Data Channels for NB-IoT\"" * |
林坤宁;: "VoLTE业务的资源调度方法研究" * |
陈兴龙等: "一种提升LTE大业务场景PDCCH资源调度效益的方法", 《广西通信技术》 * |
黎峰等: "VoLTE业务模型及容量性能评估", 《广西通信技术》 * |
Also Published As
Publication number | Publication date |
---|---|
CN112055413B (zh) | 2023-06-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110622618B (zh) | 关联于无线接入网络中的直接通信的方法和装置 | |
US8804646B2 (en) | Method and device for allocating control channel element | |
US10057887B2 (en) | Method and device for triggering buffer state reporting BSR | |
KR101685546B1 (ko) | 파워 제어 방법 및 단말 장치 | |
EP3171629B1 (en) | Access network congestion control method and base station device | |
EP3131349B1 (en) | Power configuration method, user equipment and base station | |
CN108347762B (zh) | 功率余量报告的上报方法和上报装置 | |
CN103313402B (zh) | 一种上行资源分配的方法、装置及系统 | |
CN108024285A (zh) | 数据传输方法、装置、系统、终端和接入网设备 | |
US9838972B2 (en) | Method for controlling power of uplink channel, user equipment and communication system | |
US9386543B2 (en) | Methods and devices for calculation of uplink transmission power | |
US10342025B2 (en) | Dynamic delay scheduling method and base station for voice data | |
WO2019214283A1 (zh) | 一种上行传输功率分配方法和移动通信设备 | |
CN109699063B (zh) | 一种抢占指示信令的处理和发送方法、终端和基站 | |
US9907111B2 (en) | Discontinuous transmission for a mobile phone network node | |
US7924770B2 (en) | Method of controlling communication between two nodes in a communication system | |
CN110366217B (zh) | 基于非对称上行载波聚合的载波切换方法和装置、介质 | |
CN111373827B (zh) | 多qos级上行链路授权和lcg控制过程 | |
CN106162914B (zh) | 一种lte系统中半静态与动态混合调度的方法 | |
US10075255B2 (en) | Physical downlink control channel (PDCCH) inter-cell-interference coordination | |
CN104427630B (zh) | 一种分组调度方法及装置 | |
WO2018077042A1 (zh) | 一种eMTC的下行功率控制方法及装置、基站 | |
CN112055413B (zh) | 一种下行业务调度方法和装置 | |
CN107820216B (zh) | 基于sc-mtch的调度方法及装置 | |
WO2016101148A1 (zh) | 物理无线资源块调度的方法、设备和系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |