China
Prior art keywords
shaped steel
steel column
laminated glass
toughened laminated
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010893162.8A
Other languages
Chinese (zh)
Other versions
CN112049366B (en
Inventor
宣善竹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202010893162.8A priority Critical patent/CN112049366B/en
Publication of CN112049366A publication Critical patent/CN112049366A/en
Application granted granted Critical
Publication of CN112049366B publication Critical patent/CN112049366B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F17/00Vertical ducts; Channels, e.g. for drainage
    • E04F17/005Lift shafts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F13/00Coverings or linings, e.g. for walls or ceilings
    • E04F13/07Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
    • E04F13/072Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements
    • E04F13/073Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements for particular building parts, e.g. corners or columns
    • E04F13/0736Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of specially adapted, structured or shaped covering or lining elements for particular building parts, e.g. corners or columns for columns

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The invention discloses an installation structure and a method for fixing nodes of an additionally-installed elevator derrick steel column and wall glass, and particularly relates to the technical field of fixing of the elevator derrick steel column and the wall glass. According to the invention, the H-shaped steel column of the elevator derrick is connected with the toughened laminated glass by adopting the Z-shaped steel and the L-shaped section, and then the Z-shaped steel and the L-shaped section are fixed with the toughened laminated glass by using the double-sided adhesive tape and the structural adhesive, and the edge of the toughened laminated glass is pressed by the metal edge, so that the connection part is safer and more stable, the field construction is convenient, and the construction process is simplified.

Description

Mounting structure and method for fixing joint by additionally mounting elevator derrick steel column and wall glass
Technical Field
The embodiment of the invention relates to the technical field of fixing of elevator derrick steel columns and wall glass, in particular to a structure and a method for installing elevator derrick steel columns and wall glass fixing nodes.
Background
Along with the development of people, the design of additionally installing an elevator in the existing building is changed, a traditional installation mode of additionally installing a fixed node of an elevator derrick steel column and a wall surface is to punch holes on toughened laminated glass, then fix the glass by using bolts or connecting claws, the manufacturing cost and the difficulty of a construction process are increased, the mode of fixing the toughened laminated glass by using structural glue and a metal plate is adopted at present, the fixation is difficult, the attractiveness of the whole elevator is greatly reduced, the difficulty of the construction process is increased in the construction process, and the safety performance cannot be guaranteed.
Disclosure of Invention
Therefore, the installation structure and the installation method for the fixing node of the additionally installed steel column of the elevator derrick and the wall glass are provided by the embodiment of the invention, the H-shaped steel column of the elevator derrick is connected with the toughened laminated glass by adopting the Z-shaped steel and the L-shaped section, then the Z-shaped steel and the L-shaped section are fixed with the toughened laminated glass by using double-sided adhesive and structural adhesive, and the edge of the toughened laminated glass is pressed by metal wrapping, so that the connection part is safer and more stable, the field construction is convenient, and the construction process is simplified.
In order to achieve the above object, the embodiments of the present invention provide the following technical solutions: the installing structure comprises four pieces of toughened laminated glass installed on a hoistway, an H-shaped steel column is arranged between every two adjacent pieces of toughened laminated glass, Z-shaped steel is arranged on a flange on one side of the top of the H-shaped steel column, one end of the Z-shaped steel is fixedly connected with the flange on one side of the top of the H-shaped steel column through a first bolt, the Z-shaped steel is arranged on the inner side of the toughened laminated glass and is fixedly bonded with the toughened laminated glass through a first double-faced adhesive tape, one side of the H-shaped steel column, which is parallel to the toughened laminated glass, is fixedly bonded with the toughened laminated glass through a first structural adhesive, the first structural adhesive is arranged between the first double-faced adhesive tapes, a metal plate is arranged between the two pieces of toughened laminated glass, the metal plate is arranged on the outer side of the H-shaped steel column, one end of the metal plate is fixedly connected with the other end of the H-shaped steel column through, the steel column structure is characterized in that an L-shaped section is arranged on the flange of the other side of the bottom of the H-shaped steel column, one end of the L-shaped section is fixedly connected with the flange of the other side of the bottom of the H-shaped steel column through a second bolt, the tempered laminated glass and the flange of the other side of the bottom of the H-shaped steel column and one side of the L-shaped section are fixedly bonded through second double-faced adhesive tapes, a second structural adhesive is arranged between the second double-faced adhesive tapes, the second structural adhesive is arranged between the tempered laminated glass and the flange of the other side of the bottom of the H-shaped steel column, and the other end of the metal plate is fixedly connected.
Furthermore, the flange on one side of the top of the H-shaped steel column is provided with a node A, and the flange on the other side of the bottom of the H-shaped steel column is provided with a node B.
Furthermore, a first weather-resistant sealant is filled at the joint of one end of the metal plate and the toughened laminated glass.
Furthermore, a second weather-resistant sealant is filled at the joint of the other end of the metal plate and the toughened laminated glass.
The invention also comprises an installation method of the installation structure for the fixed node of the steel column and the wall glass of the elevator derrick, which comprises the following specific steps:
the method comprises the following steps: for the node A of the H-shaped steel column: firstly, fixing one end of Z-shaped steel on a flange on one side of the top of an H-shaped steel column by using a first bolt, pasting first double-sided adhesive stickers on the outer sides of the other two sides, then coating first structural adhesive on one surface of the Z-shaped steel parallel to toughened laminated glass, namely the part between the first double-sided adhesive stickers, horizontally placing air-dried structural adhesive on the toughened laminated glass in an alignment position, finally fixing one end of a metal plate and the other end of the H-shaped steel column by using a first self-tapping screw, and then embedding and filling first weather-resistant sealant at the joint of the toughened laminated glass and the metal plate;
step two: for the B node of the H-shaped steel column: fixing one end of the L-shaped section on the flange of the other side of the bottom of the H-shaped steel column by using a second bolt, pasting second double-sided glue pastes on the other two sides, then coating second structural glue between the second double-sided glue pastes, horizontally placing air-dried structural glue at the aligned position of the toughened laminated glass, finally fixing the metal plate and one side of the L-shaped section vertical to the toughened laminated glass by using a second self-tapping screw, and embedding and filling second weather-resistant sealant at the joint of the toughened laminated glass and the metal plate.
The embodiment of the invention has the following advantages:
according to the invention, the H-shaped steel column of the elevator derrick is connected with the toughened laminated glass by adopting the Z-shaped steel and the L-shaped section, and then the Z-shaped steel and the L-shaped section are fixed with the toughened laminated glass by using the double-sided adhesive tape and the structural adhesive, and the edge of the toughened laminated glass is pressed by the metal edge, so that the connection part is safer and more stable, the field construction is convenient, and the construction process is simplified.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It should be apparent that the drawings in the following description are merely exemplary, and that other embodiments can be derived from the drawings provided by those of ordinary skill in the art without inventive effort.
The structures, ratios, sizes, and the like shown in the present specification are only used for matching with the contents disclosed in the specification, so as to be understood and read by those skilled in the art, and are not used to limit the conditions that the present invention can be implemented, so that the present invention has no technical significance, and any structural modifications, changes in the ratio relationship, or adjustments of the sizes, without affecting the effects and the achievable by the present invention, should still fall within the range that the technical contents disclosed in the present invention can cover.
FIG. 1 is a schematic view of the overall structure provided by the present invention;
FIG. 2 is an enlarged view of section C of FIG. 1 in accordance with the present invention;
FIG. 3 is an enlarged view of portion D of FIG. 1 in accordance with the present invention;
FIG. 4 is a schematic view of a Z-shaped steel structure provided by the present invention;
FIG. 5 is a schematic diagram of a metal plate structure according to the present invention;
fig. 6 is an L-shaped profile provided by the present invention (schematic structural view;
in the figure: 1 toughened laminated glass, 2H-shaped steel columns, 3Z-shaped steel, 4 first bolts, 5 first double-sided adhesive tapes, 6 first structural adhesive, 7 metal plates, 8 first self-tapping screws, 9 first weather-resistant sealant, 10L-shaped profiles, 11 second double-sided adhesive tapes, 12 second structural adhesive, 13 second self-tapping screws, 14 second weather-resistant sealant and 15 second bolts.
Detailed Description
The present invention is described in terms of particular embodiments, other advantages and features of the invention will become apparent to those skilled in the art from the following disclosure, and it is to be understood that the described embodiments are merely exemplary of the invention and that it is not intended to limit the invention to the particular embodiments disclosed. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1:
referring to the attached drawings 1, 2, 4 and 5 in the specification, the installation structure of the fixed node of the steel column of the elevator derrick and the wall glass comprises four pieces of toughened laminated glass 1 installed on a hoistway, an H-shaped steel column 2 is arranged between every two adjacent pieces of toughened laminated glass 1, a flange on one side of the top of the H-shaped steel column 2 is provided with a Z-shaped steel 3, one end of the Z-shaped steel 3 is fixedly connected with a flange on one side of the top of the H-shaped steel column 2 through a first bolt 4, the Z-shaped steel 3 is arranged on the inner side of the toughened laminated glass 1 and is fixedly bonded through a first double-sided adhesive 5, one parallel surface of the H-shaped steel column 2 and the toughened laminated glass 1 is fixedly bonded through a first structural adhesive 6, the first structural adhesive 6 is arranged between the first double-sided adhesive 5, a metal plate 7 is arranged between the two pieces of toughened laminated glass 1, and the metal plate 7 is arranged on the outer side of the H-shaped steel column 2, one end of the metal plate 7 is fixedly connected with the other end of the H-shaped steel column 2 through a first self-tapping screw 8.
Further, the flange on one side of the top of the H-shaped steel column 2 is an A node.
Furthermore, a first weather-resistant sealant 9 is filled at the joint of one end of the metal plate 7 and the toughened laminated glass 1.
The embodiment also comprises an installation method of the installation structure for the fixed node of the steel column and the wall glass of the elevator derrick, which comprises the following specific steps:
for the 2A node of the H-shaped steel column: the H-shaped steel column 2 and the toughened laminated glass 1 are not easy to be directly fixed, so that Z-shaped steel 3 is adopted for connection; firstly, fixing one end of Z-shaped steel 3 on a flange on one side of the top of an H-shaped steel column 2 by using a first bolt 4, pasting first double-sided adhesive stickers 5 on the outer sides of the other two sides, then coating first structural adhesive 6 on one surface of the Z-shaped steel 3 parallel to toughened laminated glass 1, namely the position between the first double-sided adhesive stickers 5, horizontally placing air-dried structural adhesive on the toughened laminated glass 1 in an aligned position, finally fixing one end of a metal plate 7 and the other end of the H-shaped steel column 2 by using a first self-tapping screw 8, and then embedding and filling first weather-resistant sealant 9 at the joint of the toughened laminated glass 1 and the metal plate 7.
Example 2:
referring to the attached drawings 1, 3, 5 and 6 in the specification, in the fixing node installation structure for the steel column of the elevator derrick and the wall glass, an L-shaped section 10 is arranged on a flange on the other side of the bottom of the H-shaped steel column 2, one end of the L-shaped section 10 is fixedly connected with a flange on the other side of the bottom of the H-shaped steel column 2 through a second bolt 15, the tempered laminated glass 1, the flange on the other side of the bottom of the H-shaped steel column 2 and one side of the L-shaped section 10 are fixedly bonded through a second double-faced adhesive tape 11, a second structural adhesive 12 is arranged between the second double-faced adhesive tapes 11, the second structural adhesive 12 is arranged between the tempered laminated glass 1 and the flange on the other side of the bottom of the H-shaped steel column 2, and the other end of the metal plate 7 is fixedly connected with the other end.
Further, a B node is arranged on the flange on the other side of the bottom of the H-shaped steel column 2.
Further, a second weather-resistant sealant 14 is filled at the joint of the other end of the metal plate 7 and the tempered laminated glass 1.
The embodiment also comprises an installation method of the installation structure for the fixed node of the steel column and the wall glass of the elevator derrick, which comprises the following specific steps:
for the B node of the H-shaped steel column: firstly, fixing one end of an L-shaped section bar 10 on the flange on the other side of the bottom of an H-shaped steel column 2 by using a second bolt 15, pasting second double-sided glue pastes 11 on the other two sides, then smearing second structural glue 12 between the second double-sided glue pastes 11, horizontally placing air-dried structural glue at the aligned position of toughened laminated glass 1, finally fixing a metal plate 7 and one side of the L-shaped section bar 10 vertical to the toughened laminated glass 1 by using a second self-tapping screw 13, and embedding and filling second weather-resistant sealant 14 at the joint of the toughened laminated glass 1 and the metal plate 7.
According to the invention, the H-shaped steel column 2 of the elevator derrick is jointed with the toughened laminated glass 1 by adopting the Z-shaped steel 3 and the L-shaped section 10, and then the Z-shaped steel 3 and the L-shaped section 10 are fixed with the toughened laminated glass 1 by using the double-sided adhesive tape and the structural adhesive, and the edge of the toughened laminated glass 1 is pressed by metal wrapping, so that the joint is safer and more stable, the field construction is convenient, and the construction process is simplified.
Although the invention has been described in detail above with reference to a general description and specific examples, it will be apparent to one skilled in the art that modifications or improvements may be made thereto based on the invention. Accordingly, such modifications and improvements are intended to be within the scope of the invention as claimed.

Claims (5)

1. Install elevator derrick steel column and wall glass fixed node mounting structure additional, including installing four tempering doubling glass (1) on the well, adjacent two be equipped with H shaped steel post (2), its characterized in that between tempering doubling glass (1): the steel structure is characterized in that a Z-shaped steel (3) is arranged on a flange on one side of the top of the H-shaped steel column (2), one end of the Z-shaped steel (3) is fixedly connected with the flange on one side of the top of the H-shaped steel column (2) through a first bolt (4), the Z-shaped steel (3) is arranged on the inner side of toughened laminated glass (1) and is fixedly bonded with the toughened laminated glass (1) through a first double-faced adhesive tape (5), one side, parallel to the toughened laminated glass (1), of the H-shaped steel column (2) is fixedly bonded with the toughened laminated glass (1) through a first structural adhesive (6), the first structural adhesive (6) is arranged between the first double-faced adhesive tapes (5), a metal plate (7) is arranged between the two toughened laminated glass (1), the metal plate (7) is arranged on the outer side of the H-shaped steel column (2), one end of the metal plate (7) is fixedly connected with the other end of the H-shaped steel column (2) through a first self, the steel column structure is characterized in that an L-shaped section (10) is arranged on a flange on the other side of the bottom of the H-shaped steel column (2), one end of the L-shaped section (10) is fixedly connected with a flange on the other side of the bottom of the H-shaped steel column (2) through a second bolt (15), the toughened laminated glass (1) is fixedly bonded with the flange on the other side of the bottom of the H-shaped steel column (2) and one side of the L-shaped section (10) through a second double-faced adhesive tape (11), a second structural adhesive (12) is arranged between the second double-faced adhesive tapes (11), the second structural adhesive (12) is arranged between the toughened laminated glass (1) and the flange on the other side of the bottom of the H-shaped steel column (2), and the other end of the metal plate (7) is fixedly connected with the other end of the L-.
2. The structure of claim 1, wherein the mounting structure comprises: a node A is arranged on the flange on one side of the top of the H-shaped steel column (2), and a node B is arranged on the flange on the other side of the bottom of the H-shaped steel column (2).
3. The structure of claim 1, wherein the mounting structure comprises: and a first weather-resistant sealant (9) is filled at the joint of one end of the metal plate (7) and the toughened laminated glass (1).
4. The structure of claim 1, wherein the mounting structure comprises: and a second weather-resistant sealant (14) is filled at the joint of the other end of the metal plate (7) and the toughened laminated glass (1).
5. The installing structure for the fixed nodes of the steel columns and the wall glass of the elevator derrick according to any one of claims 1 to 4, wherein: the method for installing the elevator derrick steel column and wall glass fixed node installation structure comprises the following steps:
the method comprises the following steps: for the H-shaped steel column and the H-shaped steel column (2), the A node: firstly, fixing one end of Z-shaped steel (3) on a flange on one side of the top of an H-shaped steel column (2) by using a first bolt (4), pasting first double-sided adhesive stickers (5) on the outer sides of other two sides, then coating first structural adhesive (6) on one side of the Z-shaped steel (3) parallel to toughened laminated glass (1), namely the position between the first double-sided adhesive stickers (5), horizontally placing air-dried structural adhesive on the toughened laminated glass (1) in an aligned position, finally fixing one end of a metal plate (7) and the other end of the H-shaped steel column (2) by using a first self-tapping screw (8), and then embedding a first weather-resistant sealant (9) at the joint of the toughened laminated glass (1) and the metal plate (7);
step two: for the B node of the H-shaped steel column: firstly, fixing one end of an L-shaped section bar (10) on the flange of the other side of the bottom of an H-shaped steel column (2) by using a second bolt (15), pasting second double-sided adhesive stickers (11) on the other two sides, then smearing second structural adhesive (12) between the second double-sided adhesive stickers (11), horizontally placing air-dried structural adhesive on the toughened laminated glass (1) in an aligned position, finally fixing a metal plate (7) and one side of the L-shaped section bar (10) vertical to the toughened laminated glass (1) by using a second self-tapping screw (13), and embedding and filling second weather-resistant sealant (14) at the joint of the toughened laminated glass (1) and the metal plate (7).
CN202010893162.8A 2020-08-31 2020-08-31 Mounting structure and method for fixing joint by additionally mounting elevator derrick steel column and wall glass Active CN112049366B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010893162.8A CN112049366B (en) 2020-08-31 2020-08-31 Mounting structure and method for fixing joint by additionally mounting elevator derrick steel column and wall glass

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010893162.8A CN112049366B (en) 2020-08-31 2020-08-31 Mounting structure and method for fixing joint by additionally mounting elevator derrick steel column and wall glass

Publications (2)

Publication Number Publication Date
CN112049366A true CN112049366A (en) 2020-12-08
CN112049366B CN112049366B (en) 2021-11-19

Family

ID=73607246

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010893162.8A Active CN112049366B (en) 2020-08-31 2020-08-31 Mounting structure and method for fixing joint by additionally mounting elevator derrick steel column and wall glass

Country Status (1)

Country Link
CN (1) CN112049366B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605586A (en) * 2021-09-03 2021-11-05 广东广菱电梯有限公司 Curtain wall capable of being installed quickly and well
CN115095106A (en) * 2022-05-31 2022-09-23 上海宝冶集团有限公司 Elevator shaft structure and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4223017A1 (en) * 1992-07-13 1994-01-20 Oliver Dipl Ing Franz Elevator shaft for multi-storey prefabricated houses
CN102704645A (en) * 2012-07-05 2012-10-03 中国建筑装饰集团有限公司 Detachable frameless big glass keel dry-hanging method construction system and construction method
CN207582751U (en) * 2017-12-07 2018-07-06 广东梯井电梯配套工程有限公司 The glass curtain wall of sightseeing elevator hoistway
CN207672944U (en) * 2017-12-04 2018-07-31 三洋电梯(珠海)有限公司 A kind of exterior wall installs the glass mounting assembly of elevator shaft additional
CN208898324U (en) * 2018-09-21 2019-05-24 山东泉顺达装配式建筑有限公司 A kind of hoistway section connection structure of assembling type steel structure elevator
CN209127823U (en) * 2018-09-21 2019-07-19 山东泉顺达装配式建筑有限公司 A kind of assembling type steel structure elevator
CN210713418U (en) * 2019-09-06 2020-06-09 山东齐泰实业集团股份有限公司 Curved surface glass curtain wall mounting structure
CN210857629U (en) * 2019-07-03 2020-06-26 浙江亚厦幕墙有限公司 Connecting structure for glass curtain wall corner

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4223017A1 (en) * 1992-07-13 1994-01-20 Oliver Dipl Ing Franz Elevator shaft for multi-storey prefabricated houses
CN102704645A (en) * 2012-07-05 2012-10-03 中国建筑装饰集团有限公司 Detachable frameless big glass keel dry-hanging method construction system and construction method
CN207672944U (en) * 2017-12-04 2018-07-31 三洋电梯(珠海)有限公司 A kind of exterior wall installs the glass mounting assembly of elevator shaft additional
CN207582751U (en) * 2017-12-07 2018-07-06 广东梯井电梯配套工程有限公司 The glass curtain wall of sightseeing elevator hoistway
CN208898324U (en) * 2018-09-21 2019-05-24 山东泉顺达装配式建筑有限公司 A kind of hoistway section connection structure of assembling type steel structure elevator
CN209127823U (en) * 2018-09-21 2019-07-19 山东泉顺达装配式建筑有限公司 A kind of assembling type steel structure elevator
CN210857629U (en) * 2019-07-03 2020-06-26 浙江亚厦幕墙有限公司 Connecting structure for glass curtain wall corner
CN210713418U (en) * 2019-09-06 2020-06-09 山东齐泰实业集团股份有限公司 Curved surface glass curtain wall mounting structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605586A (en) * 2021-09-03 2021-11-05 广东广菱电梯有限公司 Curtain wall capable of being installed quickly and well
CN115095106A (en) * 2022-05-31 2022-09-23 上海宝冶集团有限公司 Elevator shaft structure and construction method thereof
CN115095106B (en) * 2022-05-31 2024-01-30 上海宝冶集团有限公司 Elevator shaft structure and construction method thereof

Also Published As

Publication number Publication date
CN112049366B (en) 2021-11-19

Similar Documents

Publication Publication Date Title
CN112049366B (en) Mounting structure and method for fixing joint by additionally mounting elevator derrick steel column and wall glass
CN103154397A (en) A structural infill wall panel module
CN103243813A (en) Fastening system
WO2009129293A2 (en) Transparent sustainable wall system
CN216004855U (en) Building block type curtain wall without gluing and building frame and steel structure hoistway
CN205591409U (en) Glass curtain wall connecting structure
CN103015588A (en) Integrated closed-end exposed frame upright post component
CN207110134U (en) A kind of photovoltaic curtain wall photovoltaic board member and its mounting structure
KR20090112293A (en) Apparatus for reinforcing frame of curtain wall and window system
CN202969654U (en) Novel closed exposed frame pillar component
CN211943301U (en) Lightweight door and wallboard cover structure
CN212054397U (en) Split type fireproof section bar and corresponding embedded aluminum-clad steel fireproof window
CN217557297U (en) Self-insulation simple assembly type external wall panel structure
CN206615892U (en) A kind of hollow cage guide mounting assembly
JP2019078153A (en) Drill screw for folded-plate roof and folded-plate roof method
CN211776808U (en) Double-deck fire window mounting structure of assembled
CN213359040U (en) A fixed knot constructs for curtain installation
CN220133374U (en) Modular composite dry-hanging large plate ceramic tile
CN219971539U (en) Outdoor additional installation type elevator
CN216766338U (en) Assembled building structure heated board
CN220014126U (en) Glass curtain wall periphery decoration aluminum plate installation connection node
CN217172858U (en) Support column for building elevator derrick
CN216664640U (en) Non-rib full glass curtain wall upright post combined structure
CN219887357U (en) Integrated smoke discharging skylight
CN215442563U (en) Glass curtain wall unit used as railing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant